Professional Documents
Culture Documents
SURAT Estimate
SURAT Estimate
Grit Chamber
Fine Screen
Vortex type
Chamber
Sr.No. ITEM
Stilling
SBR
1 Excavation 0-1.5m 294 135 243 18773
2 Excavation 1.50-3.0m 144 63 113 18421
3 Excavation 3.0-4.5m 18072
4 Excavation 4.5-6.0m
5 Excavation 6-7.5m
6 PCCM15 13 2 16 1760
7 RCC M25
8 R.CC M30 111 62 131 10187
9 Shuttering 500 278 589 25976
10 Reinforcement 11 6 13 1019
11 Internal Plaster 12mm 172 107 394 24575
12 Bituminous paint 172 107 394 24575
13 External Plaster 20mm 262 89 370 2659
14 External Painting 262 89 370 2659
15 jacketing
16 Railing 82 36 63 1856
17 Dewatering 35000
18 Hydraulic Testing 100000 175000
19 Soil Stabilisation for Improving Bearing Capacity 11969
20 Refilling 408 184 400
21 LDPE Sheet for Soil Stabilization 400 micron 12257
22 Building Up to 4.5 m Height
23 Building Up to 6.0 m Height
24 Soil Stabilisation 3% lime &12 % flyash 450 mm th. 11969
25 Brick Masonry
26 Shifting of excavated / dismantled Material 30 14 55266
27 Internal Road
28 Bypass Pipe (1800 mm dia.)
29 Disposal Pipe (RCC NP3 1600 MM)
30 Storm water Drain (RCC NP3 600 MM)
31 Dismantling of Concrete / and Brick
32 Dismantling of Existing Pipeline
33 River Sand for Electrical Work
34 Chamber for Disposal Pipe
35 Chamber for Flow meter (2x3x2.5 m)
36 Valve Chamber (2.5x2.5x2.5 m)
21 11 27 2023
Blower/ MCC/
Sludge Sump
PLC Control
FIBER DISC
UV Channel
Feed Pump
Electrolyte
and Scada
Centrifuge
Anaerobic
Biological
Metering
Building
Building
and UV
SBR air
HOUSE
FILTER
HT Sub
Dosing
Station
Admin
House
Room
room
Tank
Poly
New
1082 221 347 122 144
1002 140 324 0
926
853
78 20 28 8 43
250 20 52 42 400
20000 5000
100000
2401 227
192 26 25 9 199 65 35 6 48 19
Centrifuge
House
256
69
Digester
sludge
recirculation
pump house
242
100
71
Civil Work for
ABSTRACT OF QUANTATIES
Electrical
400
120
250
1800
27
Dismantling
of Concrete /
and Brick
450
2150
19
Dismantling
pipeline work
30721
29258
12957
109
1893
1556
3039
4664
7043
Sludge
Thickener
Platform
230
62
Security
Cabin
3
12
Bypass Pipe
350
2975
980
1995
77
Disposal Pipe
(RCC NP3
1600 MM)
169
900
7200
2340
4860
Chamber for
Disposal Pipe
20
8
Chamber for
Flow meter
10
5
Old SBR tank
Internal Road
Storm Water
Old Digester
(100 MLD)
Chamber
Total Qty
(55 MLD)
Pathway
Valve
Drain
Rate
Unit
42972 cum 100
30569 cum 110
23662 cum 125
3892 cum 135
1556 cum 700
2218 cum 4139
72 172 cum 5206
12531 cum 5922
35310 Sqm 500
1253 M.T 52949
33015 Sqm 450
33015 Sqm 280
2306 6440 13549 Sqm 400
4407 Sqm 280
2306 2306 Sqm 700
600 3401 RMT 2100
89258 BHP 50
375000 LS 1
11969 Sqm 550
32335 cum 50
13489 Sqm 50
1329 Sqm 27000
280 Sqm 29000
11969 cum 1250
120 cum 4460
70263 cum 250
3823 3823 Sqm 2000
350 RMT 19000
900 RMT 16000
1345 1345 RMT 1650
450 Sqm 3000
1893 RMT 2000
400 cum 2450
8 Nos. 250000
5 Nos. 200000
20 20 Nos. 150000
30 22 25 26 16 76 353851596
Other Expenses
Design and Drawing Rs.
Site Office and Fencing Rs.
Construction Power and Water Rs.
Latest Laptop Rs.
Statutory approval Rs.
Tanker Loading Facility Rs.
Plant LED model Rs.
Amount in
Lack
Rs.
4297152 43
3362603 34
2957773 30
525357 5
1088878 11
9179503 92
895356 9
74210600 742
17654968 177
66366777 664
14856820 149
9244244 92
5419729 54
1233979 12
1614060 16
7141924 71
4462900 45
375000 4
6583022 66
1616757 16
674450 7
35876250 359
8120000 81
14961412 150
535200 5
17565633 176
7646000 76
6650000 67
14400000 144
2219250 22
1350000 14
3786000 38
980000 10
2000000 20
1000000 10
3000000 30
353851596
3539 lakhs
5000000
1200000
2000000
100000
1500000
1000000
500000
2000000
2000000
153
3692 lakhs
S.N. NAME OF UNIT/SUBWORK COST RS.(LACK).
1 Stilling Chamber 21
2 Fine Screen 11
3 Vortex type Grit Chamber 27
4 SBR 2023
5 FIBER DISC FILTER HOUSE 192
6 UV Channel and UV Building 26
7 Biological Sludge Sump 25
8 Poly Electrolyte Dosing 9
9 Anaerobic Tank modification for IFAS 199
10 HT Sub Station 65
11 PLC Control and Scada Room 35
12 Metering room 6
13 SBR air Blower/ MCC/ Admin Building 48
14 Centrifuge Feed Pump House 19
15 Centrifuge House 69
16 Digester sludge recirculation pump house 71
17 Civil Work for Electrical 27
18 Dis-metaling of Concrete / and Brick 19
19 pipeline work 109
20 Sludge Thickener Platform 62
21 Security Cabin 3
22 Bypass Pipe 77
23 Disposal Pipe (RCC NP3 1600 MM) X 900 mtr 169
24 Chamber for Disposal Pipe 20
25 Chamber for Flow meter 10
26 Valve Chamber 30
27 Storm Water Drain 22
28 Old SBR tank repair (55 MLD) 25
29 Old Digester Repair (100 MLD) 26
30 Pathway 16
31 Internal Road 76
32 Other Expences 153
Total Civil Cost 3692