Professional Documents
Culture Documents
F08463S-D0610-TERMINAL WIRING DRAWING OF 220KV SECTION BREAKER BAY LCP
F08463S-D0610-TERMINAL WIRING DRAWING OF 220KV SECTION BREAKER BAY LCP
The drawing / document has been checked to ensure compliance with the
Contract. The approval status shall be interpreted as laid down in the
Contract and shall not relieve the Contractor form his contractual
obligations.
Cat. 1 [ ]APPROVED
Cat. 2 [ ]APPROVED EXCEPT AS NOTED
Cat. 3 [ ]NOT APPROVED
Cat. 4 [ ]FOR INFORMATION ONLY
COMMENT SHEET NUMBER:_____________________________________
DATE:__________________________
SIGNATURES:__________________________________________________
K-Electric Limited
BUS B SECTION
1 CBC CBC
GCB CB1X
2 GCB:1
3 SG:15 BUS B SECTION BUS B SECTION
BUS B SECTION BUS B SECTION
4 S430 :21 1 Q021:4 53 Q022:4
63GA 63GA:1 1 30:2 CBX5A:3 1 Q52A 1:2
CB1:216 5 Q30D :11 S430 :17 2 S430 :7 54 K52T2 :1
2 63GB 63GB:1 2 Q52B 1:2
6 3 GCB:4 55 CB1:99
3 63GC 63GC:1 3 Q52C 1:2
7 GCB:11 4 56
CBC:3 4 63GA GL1:3 4
8 GCB:12 5 57 Q022:2
5 63GB GL1:3 CBX5A:1 5 JD:25
9 GCB:13 6 K632 :72 58 K52T2:A2
6 63GC GL1:3 6 CBX5B:1
10 SG:21 7 59 K52T2:A1
CB1:102 7 63GA GL2:5 7 CBX5C:1
11 SG:22 8 CB1:35 60
8 63GB GL2:5 8
12 SG:23 9 K471 :3 61 YB2(A):2
9 63GC GL2:5 Q52A 2:3 9 CBX5A:4
13 SG:24 10 62
10 10 Q52B 2:3
14 SG:25 11 63
30:7 11 63GA 63GA:2 11 Q52C 2:3
15 SG:26 12 K52CL:A1 64 YB2(B):2
30:8 12 63GB 63GB:2 12
16 S430 :22 13 65
30:9 13 63GC 63GC:2 13 CBX5A:2
17 S43 :28 14 66
63GA GL1:4 14 K631:A1 14
18 SIL :2 15 CB1:142 67 YB2(C):2
15 63GB GL1:4 15 JD:30
19 Q30D :12 16 CB1:151 68
16 63GC GL1:4
20 Q31D :12 17 Q021:2 69
63GA GL2:6 17 K632:A1
21 Q02 :12 18 K52A:A2 70
18 63GB GL2:6
22 Q811 :12 19 S430 :28 71 CB1:172
19 63GC GL2:6 Comments sent vide KE/TEG & NESPAK & RE2
23 Q812 :12 20 K52CL:A2 72 CB1:174
24 Q91 :12 Letter No. :_______________Date:_________________
21 73 CB1:176
25 22 74 CB1:182 900 MW BQPS-III Combined Cycle Plant & Associated Transmission
26 K631 :14 23 75 CB1:184 Projects PAKISTAN
27 K49A:54 24 S430 :1 76 CB1:186
28 K631 :62 25 K52A :71 The drawing / document has been checked to ensure compliance with the
29 S430 :20 26 Contract. The approval status shall be interpreted as laid down in the
30 S43 :26 27 Contract and shall not relieve the Contractor form his contractual
31 Q021 :12 28 S430 :3
obligations.
32 Q022 :12 29 K52B :71
33 S152 :13
Cat. 1 [ ]APPROVED
30 CBC:32
Cat. 2 [ ]APPROVED EXCEPT AS NOTED
34 S152 :14 31 Cat. 3 [ ]NOT APPROVED
35 S152 :17 CBC:30 32 S430 :5 Cat. 4 [ ]FOR INFORMATION ONLY
36 S152 :18 33 K52C :71 COMMENT SHEET NUMBER:_____________________________________
SG 34 S430 :9
35 DATE:__________________________
BUS B SECTION 36
37 S430 :11 SIGNATURES:__________________________________________________
K30:OC 1 K631 :43 38
2 G1 :3 39
3 G2 :3 40 S430 :13
4 G3 :3 41
5 G4 :3 42
6 G5 :3 43 S430 :10
7 G6 :3 44
G1 :4 8 K30:3 45
K30:4 9 G2 :4 46 S430 :12
G3 :4
K30:6
10
11
K30:5
G4 :4
47 K-Electric Limited
48
K30:7 12 G5 :4 49 S430 :14
G6 :4 13 K30:8 50
14 51
G1 :1 15 30:3 52
Tractebel Engineering GmbH
16 G2 :1
17 G3 :1
18 G4 :1
19 G5 :1
20 G6 :1
Renewable Resources(Pvt.) LTD
30:10 21 G1 :2
G2 :2 22 30:11 Harbin Electric International Co., Ltd
30:12 23 G3 :2
30:13 24 G4 :2
G5 :2 25 30:14 NORTHEAST ELECTRIC POWER DESIGN INSTITUTE CO.,LTD.
30:15 26 G6 :2 CHINA POWER ENGINEERING CONSULTING GROUP
57 CBX1B:17 124 CBX3A:13 CBX4B:7 189 CBX4A:8
CB1 K88A :13 58 CBX1C:17 125 CBX3A:14 CBX4C:7 190 CBX4B:8
JS1:1 59 CBX1A:18 126 CBX3B:13 CBX4C:28 191 J:29
BUS B SECTION
CBX1B:18 60 JS2:1 127 CBX3B:14 192 CBX4A:9
CBX1A:11 1 K52A :14 JS3:1 61 CBX1C:18 128 CBX3C:13 CBX4B:9 193 CBX4A:10
S152 :1 2 K52A :61 62 129 CBX3C:14 CBX4B:10 194 CBX4C:9
K52CL :2 3 63 130 CBX3A:15 J:32 195 CBX4C:10
CBX1B:11 4 K52B :14 64 131 CBX3A:16 DS1:54 196 CBX4A:11
K52B :61 5 S152 :6 65 CBX3A:23 132 CBX3B:15 CBX4B:11 197 CBX4A:12
CBX1B:21 6 66 CBX3B:23 133 CBX3B:16 CBX4C:11 198 CBX4B:12
CBX1C:11 7 K52C :14 67 134 CBX3C:15 J:31 199 CBX4C:12
K52C :61 8 S152 :10 68 135 CBX3C:16 200 CBX4A:13
K52CL :6 9 69 CBX2B:9 136 CBX3A:17 CBX4A:14 201 CBX4B:13
K52A :31 10 CBX1A:1 70 137 CBX3A:18 CBX4C:13 202 CBX4B:14
K52B :31 11 CBX1B:1 71 138 CBX3B:17 203 J:34
CBX1C:1 12 K52C :31 72 CBX3B:9 139 CBX3B:18 204 CBX4A:15
K52A :72 13 CBX1A:19 73 140 CBX3C:17 CBX4A:16 205 CBX4B:15
K52B :72 14 CBX1B:19 74 141 CBX3C:18 CBX4B:16 206 CBX4C:15
CBX1C:19 15 K52C :72 75 CBC:15 142 CBC:15 207 CBX4C:16
16 CBX1A:2 76 CBX3C:7 143 CBX3A:20 208 CBX4A:17
17 CBX1B:2 77 CBX3A:24 144 CBX3B:19 CBX4B:17 209 CBX4A:18
CBX1C:2 18 CBX1A:9 78 CBX3B:24 145 CBX3B:20 CBX4B:18 210 CBX4C:17
K52A :21 19 CBX1A:12 79 CBX3C:24 146 CBX3C:19 211 CBX4C:18
CBX1B:12 20 K52B :21 80 CBX2A:10 CBX3C:20 147 K52T1:A1 212 CBX4A:19
K52C :21 21 CBX1C:12 81 CBX2B:10 148 CBX3A:21 CBX4B:19 213 CBX4A:20
CBX1B:10 22 CBX1A:10 82 CBX2C:10 CBX3B:21 149 CBX3A:22 CBX4B:20 214 CBX4C:19
23 CBX1B:9 83 CBX3A:10 CBX3B:22 150 CBX3C:21 215 CBX4C:20 Comments sent vide KE/TEG & NESPAK & RE2
CBX1C:10 24 K631 :21 84 CBX3B:10 CBC:16 151 CBX3C:22 30:5 216 CBX4A:21 Letter No. :_______________Date:_________________
25 85 CBX3C:10 CBX3A:5 152 J:2 CBX4B:21 217 CBX4A:22
900 MW BQPS-III Combined Cycle Plant & Associated Transmission
K52T1 :2 26 CBX1A:3 86 CBX3A:8 CBX3B:5 153 CBX3A:6 CBX4B:22 218 CBX4C:21 Projects PAKISTAN
CB1:173 27 CBX1A:5 87 CBX3B:8 CBX3C:5 154 CBX3B:6 219 DS1:42
K52T1 :4 28 CBX1B:3 88 CBX3C:8 J:3 155 CBX3C:6 220 CBX4A:23 The drawing / document has been checked to ensure compliance with the
CBX1B:5 29 CB1:175 89 156 CBX3A:3 CBX4A:24 221 CBX4B:23 Contract. The approval status shall be interpreted as laid down in the
K52T1 :6 30 CBX1C:3 90 K52T2 :2 CBX3B:3 157 CBX3A:4 CBX4C:23 222 CBX4B:24 Contract and shall not relieve the Contractor form his contractual
CBX1C:5 31 CB1:177 91 CB1:183 CBX3B:4 158 CBX3C:3 223 CBX4C:24 obligations.
K631 :31 32 CBX1A:4 K52T2 :4 92 CBX2B:3 159 CBX3C:4
33 CBX1B:4 93 CB1:185 CBX3A:1 160 J:9
Cat. 1 [ ]APPROVED
Cat. 2 [ ]APPROVED EXCEPT AS NOTED
34 CBX1C:4 K52T2 :6 94 CBX2C:3 CBX3B:1 161 CBX3A:2
Cat. 3 [ ]NOT APPROVED
CBC:8 35 CBX1A:14 95 CB1:187 CBX3C:1 162 CBX3B:2
Cat. 4 [ ]FOR INFORMATION ONLY
36 CBX1B:14 K632 :71 96 CBX2A:4 CBX3C:2 163 J:11 COMMENT SHEET NUMBER:_____________________________________
37 97 CBX2B:4 164 CBX2A:11
38 CBX2A:23 98 CBX2C:4 CBX2B:11 165 CBX2A:12 DATE:__________________________
39 CBX2B:23 99 CBC:55 CBX2C:11 166 CBX2B:12
40 100 167 CBX2C:12 SIGNATURES:__________________________________________________
41 Q52A :97 101 168 CBX3A:11
42 Q52B :97 GCB:7 102 K472 :3 CBX3A:12 169 CBX3B:11
CB1:53 43 Q52C :97 K472X :11 103 CBX2A:17 170 CBX3B:12
K471X :1 44 CBX1A:13 104 CBX2B:17 171 CBX3C:12
45 CBX1B:13 105 CBX2C:17 CBC:71 172 CBX4A:1
46 CBX1C:13 K472:2 106 CBX2A:20 CB1:27 173 CBX4A:2
CBX1A:16 47 K471:2 107 CBX2B:20 CBC:72 174 CBX4B:1
48 CBX1B:16 108 CBX4B:2 175 CB1:29
49 CBX1C:16 109 CBC:73 176 CBX4C:1
K88A:A1
K88B:A1
50
51
CBX2A:24
CBX2B:24
110
111
H152:X1
H152:X2
CBX4C:2 177
178
CB1:31
CBX4A:3
K-Electric Limited
CBX2C:24 52 K88C:A1 CBX2B:15 112 CBX2A:16 CBX4B:3 179 CBX4A:4
53 CB1:43 CBX2A:14 113 CBX2B:13 CBX4C:3 180 CBX4B:4
54 114 CBX2B:16 181 CBX4C:4
55 CBX2B:14 115 CBX2C:13 CBX4A:5 182 CBC:74 Tractebel Engineering GmbH
56 CBX1A:17 116 CBX2C:16 CB1:91 183 CBX4A:6
CBX2C:14 117 TBM:9 CBX4B:5 184 CBC:75
118 CBX2A:1 CB1:93 185 CBX4B:6
119 CBX2A:2 CBX4C:5 186 CBC:76
120 CBX2B:1 CB1:95 187 CBX4C:6
Renewable Resources(Pvt.) LTD
121 CBX2B:2 CBX4A:7 188 DS1:50
122 CBX2C:1 Harbin Electric International Co., Ltd
123 CBX2C:2
1 T1:1 48
2 T2:1 49 T4:1
3 T3:1 50 T5:1
4 51 T6:1
5 T1:2 52
6 T2:2 53 T4:2
7 T3:2 54 T5:2
8 T1:3 55 T6:2
9 T2:3 56 T4:3
10 T3:3 57 T5:3
11 :PE 58 T6:3
12 59 :PE
13 T1:4 60
14 T2:4 61 T4:4
15 T3:4 62 T5:4
16 63 T6:4
17 T1:5 64
18 T2:5 65 T4:5
19 T3:5 66 T5:5
20 T1:6 67 T6:5 Comments sent vide KE/TEG & NESPAK & RE2
21 T2:6 68 T4:6 Letter No. :_______________Date:_________________
22 T3:6 69 T5:6
23 :PE 70 T6:6 900 MW BQPS-III Combined Cycle Plant & Associated Transmission
24 71 :PE Projects PAKISTAN
25 T1:7 72
The drawing / document has been checked to ensure compliance with the
26 T2:7 73 T4:7
Contract. The approval status shall be interpreted as laid down in the
27 T3:7 74 T5:7
Contract and shall not relieve the Contractor form his contractual
28 75 T6:7 obligations.
29 T1:8 76
30 T2:8 77 T4:8 Cat. 1 [ ]APPROVED
31 T3:8 78 T5:8 Cat. 2 [ ]APPROVED EXCEPT AS NOTED
32 T1:9 79 T6:8 Cat. 3 [ ]NOT APPROVED
33 T2:9 80 T4:9 Cat. 4 [ ]FOR INFORMATION ONLY
34 T3:9 81 T5:9 COMMENT SHEET NUMBER:_____________________________________
35 :PE 82 T6:9
DATE:__________________________
36 83 :PE
37 T1:10 84 SIGNATURES:__________________________________________________
38 T2:10 85 T4:10
39 T3:10 86 T5:10
40 87 T6:10
41 T1:11 88
42 T2:11 89 T4:11
43 T3:11 90 T5:11
44 T1:12 91 T6:11
45 T2:12 92 T4:12
46 T3:12 93 T5:12
47 :PE 94 T6:12
95 :PE K-Electric Limited
96
BUS B SECTION
BUS B SECTION
1 S289 2:4
58 X2:7
2 S289 1:2
59 X2:8
3 S43 :8
60 X2:9
H289:X2 4 X1:1
61 X2:10
X1:2 5 H289:X1
62 X2:11
TBM:8 6 X1:3
63 X2:12
S43 :5 8 Q822 :14
64 X2:13
9 K82 :43
65 X2:14
X1:21 10 K82 :6
66 X2:15
K82:A2 11 X1:22
67 X2:16
K92:A2 12 X1:23
68 X2:17
K92 :22 13 X1:26
69 X2:18
Q822:4 14 X1:38
70 X2:19
JD:22 15 X1:43
71 X2:20
K82 :2 16 X1:37
72 X2:21
X1:41 17 K92 :1
73 X2:22
X1:42 18 DS2:25
74 X2:23
KV12:A1 19 X1:24
75 X2:24
20
76 X2:25
21
J:9 22 X1:27
77 X2:26 Comments sent vide KE/TEG & NESPAK & RE2
78 X2:27 Letter No. :_______________Date:_________________
X1:39 23 K92 :4
79 X2:28
K82 :3 24 X1:36 900 MW BQPS-III Combined Cycle Plant & Associated Transmission
80 X2:29
DS2:18 25 Q822:2 Projects PAKISTAN
81 X2:30
JD:27 26 X1:44
82 X2:31 The drawing / document has been checked to ensure compliance with the
27 Q821:2
83 X2:32 Contract. The approval status shall be interpreted as laid down in the
KV12:A2 28 J:17
84 X2:33 Contract and shall not relieve the Contractor form his contractual
29
30 X1:5
85 X2:34 obligations.
86 X2:35
31 X1:6
87 X2:36 Cat. 1 [ ]APPROVED
32 X1:7
88 X2:37 Cat. 2 [ ]APPROVED EXCEPT AS NOTED
33 X1:8 Cat. 3 [ ]NOT APPROVED
89 X2:38
34 X1:9 Cat. 4 [ ]FOR INFORMATION ONLY
90 X2:39
35 X1:10 COMMENT SHEET NUMBER:_____________________________________
91 X2:40
36 X1:11
92 X2:41 DATE:__________________________
37 X1:12
93 X2:42
38 X1:15
94 X2:43 SIGNATURES:__________________________________________________
39 X1:16
95 X2:44
X1:17 40 DS1:41
96 X2:45
X1:18 41 S430 :27
97 X2:46
X1:19 42 DS1:43
X1:20 43 ES1:40
X1:30 44 J:16
J:20 45 X1:31
J:23 46 X1:32
X1:33 47 J:24
J:27 48 X1:34
J:28 49 X1:35 K-Electric Limited
X1:45 50 DS1:51
KEX3 :74 51 X1:46
X2:1 52 DS1:52
X2:2 53 J:33
X2:3 54 DS1:55
Tractebel Engineering GmbH
X2:4 55 KEX6 :74
X2:5 56 DS1:56
X2:6 57 J:35
A:1a 1 DS3:59
DS3:63 2 B:1a
C:1a 3 DS3:67
4 A:1n
5 B:1n
6 C:1n
7
8
8
8
8
8
V1:2 9 F1:1
A:2a 10 DS3:71
B:2a 11 DS3:75
DS3:79 12 C:2a
13 A:2n
14 B:2n
15 C:2n
16
17
17
17
17
17 Comments sent vide KE/TEG & NESPAK & RE2
18 F2:1 Letter No. :_______________Date:_________________
A:3a 19 DS3:83
900 MW BQPS-III Combined Cycle Plant & Associated Transmission
B:3a 20 DS3:87
Projects PAKISTAN
C:3a 21 DS3:91
22 A:3n The drawing / document has been checked to ensure compliance with the
23 B:3n Contract. The approval status shall be interpreted as laid down in the
24 C:3n Contract and shall not relieve the Contractor form his contractual
25 obligations.
26
27 F3:1 Cat. 1 [ ]APPROVED
28 A:da Cat. 2 [ ]APPROVED EXCEPT AS NOTED
29 DS3:95 Cat. 3 [ ]NOT APPROVED
Cat. 4 [ ]FOR INFORMATION ONLY
A:dn 30 B:da
COMMENT SHEET NUMBER:_____________________________________
31 B:dn
32 C:da DATE:__________________________
33 C:dn
34 VT1:34 SIGNATURES:__________________________________________________
34 F4:1
34 VT1:34
DS3:58 35 QV11:1
QV12:1 36 DS3:62
QV13:1 37 DS3:66
QV14:1 38 DS3:70
QV15:1 39 DS3:74
DS3:78 40 QV16:1
QV17:1 41 DS3:82
QV18:1 42 DS3:86
QV19:1 43 DS3:90
K-Electric Limited
44 QV11:2
45
45
45 Tractebel Engineering GmbH
QV12:2 46
47
47
47
48 QV13:2 Renewable Resources(Pvt.) LTD
49
49
49
Harbin Electric International Co., Ltd
QV21:2 50
51
51
51
QV22:2 52
53
53
53
54 QV23:2
55
55
55
56 QV14:2
57
57
57
58 QV15:2
59
59
59
60 QV16:2
61
61
61
QV24:2 62 Comments sent vide KE/TEG & NESPAK & RE2
63 Letter No. :_______________Date:_________________
63
63 900 MW BQPS-III Combined Cycle Plant & Associated Transmission
QV25:2 64 Projects PAKISTAN
65
The drawing / document has been checked to ensure compliance with the
65
Contract. The approval status shall be interpreted as laid down in the
65
Contract and shall not relieve the Contractor form his contractual
66 QV26:2 obligations.
67
67 Cat. 1 [ ]APPROVED
67 Cat. 2 [ ]APPROVED EXCEPT AS NOTED
68 QV17:2 Cat. 3 [ ]NOT APPROVED
69 Cat. 4 [ ]FOR INFORMATION ONLY
69 COMMENT SHEET NUMBER:_____________________________________
69
DATE:__________________________
70 QV18:2
71 SIGNATURES:__________________________________________________
71
71
QV19:2 72
73
73
73
74 QV27:2
75
75
75
76 QV28:2 K-Electric Limited
77
77
77
78 QV29:2 Tractebel Engineering GmbH
79
79
79
80 DS3:94
81 Renewable Resources(Pvt.) LTD
81
81
Harbin Electric International Co., Ltd