Professional Documents
Culture Documents
RFB013!21!22 Bill of Quantities
RFB013!21!22 Bill of Quantities
Material Labour
2 CONTROLLERS
of Compliance Sum 1
Material Labour
Refer to Conditions and Special Conditions of Contract. P&G Items shall be detailed
in the Schedule below and the total amount shall be carried forward to the
Summary to Bill of Quantities for each Section.
Related Items)
program)
person
1.3 Items related to tender amount
site
Material Labour
1200).
ii) Installation m 12
2.2.2 110mm dia flexible BLACK sleeves, incl. draw
wire
(Kableflex, DN110)
SLEEVES
of work
Material Labour
3.1 PV PANELS
3.2.1 OPTIMISERS
950W Optimiser
3.2.2 INVERTER/S
arrestors
ii) Commissioning No 4
3.3 COMBINER/S
3.3.1 Combiner Boxes as Required
3.4 DC CABLING
3.5 AC CABLING
Material Labour
similar approved
a) Inception Item 1
b) Stage 1 Item 1
c) Stage 2 Item 1
Material Labour
5.3 CONTROLLER
5.4 MISCELLANEOUS
All other items not included above to complete
the
installation
Certificates of Compliance
Material Labour
6.1 INVERTER
6.4.2
5.4 MISCELLANEOUS
Certificates of Compliance
No.
IT & HR SECTION 1
SUB-TOTAL
Material Labour
Refer to Conditions and Special Conditions of Contract. P&G Items shall be detailed
in the Schedule below and the total amount shall be carried forward to the
Summary to Bill of Quantities for each Section.
Related Items)
program)
person
1.3 Items related to tender amount
site
Material Labour
1200).
ii) Installation m 12
2.2.2 110mm dia flexible BLACK sleeves, incl. draw
wire
(Kableflex, DN110)
SLEEVES
of work
Material Labour
3.1 PV PANELS
3.2.1 OPTIMISERS
950W Optimiser
3.2.2 INVERTER/S
arrestors
ii) Commissioning No 9
3.3 COMBINER/S
3.3.1 Combiner Boxes as Required
3.4 DC CABLING
3.5 AC CABLING
Material Labour
similar approved
a) Inception Item 1
b) Stage 1 Item 1
c) Stage 2 Item 1
Material Labour
AC PROTECTION
5.3 CONTROLLER
5.4 MISCELLANEOUS
All other items not included above to complete
the
installation
Certificates of Compliance
No.
SERUM SECTION 2
5 AC PROTECTION
SERUM SECTION 2
SUB-TOTAL
HIV SECTION 3
Material Labour
Refer to Conditions and Special Conditions of Contract. P&G Items shall be detailed in
the Schedule below and the total amount shall be carried forward to the Summary to
Bill of Quantities for each Section.
Related Items)
program)
site
HIV SECTION 3
Material Labour
ii) Installation m 12
2.2.2 110mm dia flexible BLACK sleeves, incl. draw wire
(Kableflex, DN110)
SLEEVES
of work
HIV SECTION 3
Material Labour
3.1 PV PANELS
3.2.1 OPTIMISERS
950W Optimiser
3.2.2 INVERTER/S
arrestors
ii) Commissioning No 16
3.3 COMBINER/S
3.4 DC CABLING
3.5 AC CABLING
HIV SECTION 3
Material Labour
similar approved
a) Inception Item 1
b) Stage 1 Item 1
c) Stage 2 Item 1
HIV SECTION 3
Material Labour
AC PROTECTION
5.3 CONTROLLER
installation
Certificates of Compliance
No.
HIV SECTION 3
5 AC PROTECTION
HIV SECTION 3
SUB-TOTAL
NICD SECTOIN 4
Material Labour
Refer to Conditions and Special Conditions of Contract. P&G Items shall be detailed in
the Schedule below and the total amount shall be carried forward to the Summary to
Bill of Quantities for each Section.
Related Items)
program)
site
NICD SECTOIN 4
Material Labour
ii) Installation m 12
2.2.2 110mm dia flexible BLACK sleeves, incl. draw wire
(Kableflex, DN110)
SLEEVES
of work
NICD SECTOIN 4
Material Labour
3.1 PV PANELS
3.2.1 OPTIMISERS
950W Optimiser
3.2.2 INVERTER/S
arrestors
ii) Commissioning No 9
3.3 COMBINER/S
3.4 DC CABLING
3.5 AC CABLING
NICD SECTOIN 4
Material Labour
similar approved
a) Inception Item 1
b) Stage 1 Item 1
c) Stage 2 Item 1
NICD SECTOIN 4
Material Labour
AC PROTECTION
5.3 CONTROLLER
installation
Certificates of Compliance
No.
NICD SECTOIN 4
5 AC PROTECTION
NICD SECTOIN 4
SUB-TOTAL
6 SUB-TOTAL
SUB-TOTAL B
TENDER DOCUMENT