F08463S-D0609 TERMINAL WIRING DRAWING OF 220KV COUPLER BREAKER BAY LCP
The drawing / document has been checked to ensure compliance with the
Contract. The approval status shall be interpreted as laid down in the
Contract and shall not relieve the Contractor form his contractual
obligations.
Cat. 1 [ ]APPROVED
Cat. 2 [ ]APPROVED EXCEPT AS NOTED
Cat. 3 [ ]NOT APPROVED
Cat. 4 [ ]FOR INFORMATION ONLY
COMMENT SHEET NUMBER:_____________________________________
DATE:__________________________
SIGNATURES:__________________________________________________
K-Electric Limited
CBC CBC
1 Q021:4 53 Q022:4
S430 :7 2 S430 :17 54 K52T2 :1
3 GCB:4 55 CB1:99
4 56
5 57 Q022:2
6 K52T2:A2 58 K632 :72
7 59 K52T2:A1
8 CB1:35 60
9 K471 :3 61 YB2(A):2
10 62
11 63
12 K52CL:A1 64 YB2(B):2
13 CBC:15 65
14 66
CB1:172 15 CBC:13 67 YB2(C):2
16 CB1:179 68
17 Q021:2 69
18 K52A:A2 70 CB1:27
19 S430 :28 71 CB1:29
20 K52CL:A2 72 CB1:31
21 73 CB1:91 Comments sent vide KE/TEG & NESPAK & RE2
Letter No. :_______________Date:_________________
22 CBC:24 74 CB1:93
23 S430 :1 75 CB1:95 900 MW BQPS-III Combined Cycle Plant & Associated Transmission
24 CBC:22 Projects PAKISTAN
25 K52A :71
26 CBC:28 The drawing / document has been checked to ensure compliance with the
27 Contract. The approval status shall be interpreted as laid down in the
CBC:26 28 S430 :3 Contract and shall not relieve the Contractor form his contractual
obligations.
29 K52B :71
30 CBC:32 Cat. 1 [ ]APPROVED
31 Cat. 2 [ ]APPROVED EXCEPT AS NOTED
S430 :5 32 CBC:30 Cat. 3 [ ]NOT APPROVED
33 K52C :71 Cat. 4 [ ]FOR INFORMATION ONLY
34 S430 :9 COMMENT SHEET NUMBER:_____________________________________
35
36 DATE:__________________________
37 S430 :11
38 SIGNATURES:__________________________________________________
39
40 S430 :13
41
42
43 S430 :10
44
45
46 S430 :12
47
48 K-Electric Limited
49 S430 :14
50
51
52
Tractebel Engineering GmbH
CT CT GCB
1 T1:1 48 30:2 1
2 T2:1 49 T4:1 2
3 T3:1 50 T5:1 3
4 51 T6:1 63GA GL1:3 4 CBC:3
5 T1:2 52 5 63GB GL1:3
6 T2:2 53 T4:2 6 63GC GL1:3
7 T3:2 54 T5:2 CB1:102 7 63GA GL2:5
8 T1:3 55 T6:2 8 63GB GL2:5
9 T2:3 56 T4:3 9 63GC GL2:5
10 T3:3 57 T5:3 10
11 :PE 58 T6:3 30:7 11
12 59 :PE 30:8 12
13 T1:4 60 63GC 63GC:213 30:9
14 T2:4 61 T4:4 63GA GL1:4 14 K631:A1
15 T3:4 62 T5:4 15 63GB GL1:4
16 63 T6:4 16 63GC GL1:4
17 T1:5 64 63GA GL2:6 17 K632:A1
18 T2:5 65 T4:5 18 63GB GL2:6
19 T3:5 66 T5:5 19 63GC GL2:6
20 T1:6 67 T6:5
Comments sent vide KE/TEG & NESPAK & RE2
21 T2:6 68 T4:6 Letter No. :_______________Date:_________________
22 T3:6 69 T5:6
23 :PE 70 T6:6 900 MW BQPS-III Combined Cycle Plant & Associated Transmission
24 71 :PE Projects PAKISTAN
25 T1:7 72
26 T2:7 73 T4:7 The drawing / document has been checked to ensure compliance with the
Contract. The approval status shall be interpreted as laid down in the
27 T3:7 74 T5:7
Contract and shall not relieve the Contractor form his contractual
28 75 T6:7 obligations.
29 T1:8 76
30 T2:8 77 T4:8 Cat. 1 [ ]APPROVED
31 T3:8 78 T5:8 Cat. 2 [ ]APPROVED EXCEPT AS NOTED
32 T1:9 79 T6:8 Cat. 3 [ ]NOT APPROVED
33 T2:9 80 T4:9 Cat. 4 [ ]FOR INFORMATION ONLY
34 T3:9 81 T5:9 COMMENT SHEET NUMBER:_____________________________________
35 :PE 82 T6:9
36 83 :PE DATE:__________________________
37 T1:10 84
SIGNATURES:__________________________________________________
38 T2:10 85 T4:10
39 T3:10 86 T5:10
40 87 T6:10
41 T1:11 88
42 T2:11 89 T4:11
43 T3:11 90 T5:11
44 T1:12 91 T6:11
45 T2:12 92 T4:12
46 T3:12 93 T5:12
47 :PE 94 T6:12
95 :PE K-Electric Limited
96
J J J
1 SIL :3 CB1:199 61 DS1:57 121 KEX5 :82
DS1:22 2 CB1:180 DS2:57 62 KEX9 :74 122 KEX6 :11
CB1:183 3 ES1:44 KEX1:A2 65 Q31:2 123 KEX6 :12
ES2:44 4 ES1:45 66 DS1:48 124 KEX6 :21
5 ES2:45 67 DS1:49 125 KEX6 :22
SIL :4 6 DS1:28 68 KEX1 :11 126 KEX6 :31
7 69 KEX1 :12 127 KEX6 :32
8 70 KEX1 :21 128 KEX6 :41
CB1:204 9 DS2:22 71 KEX1 :22 129 KEX6 :42
10 SIL :5 72 KEX1 :31 130 KEX6 :61
ES1:46 11 CB1:207 73 KEX1 :32 131 KEX6 :62
ES2:46 12 ES1:47 74 KEX1 :41 132 KEX6 :81
ES2:47 13 FES1:46 75 KEX1 :42 133 KEX6 :82
14 SIL :7 76 KEX1 :61 134 KEX7 :11
ES2:22 15 DS1:44 77 KEX1 :62 135 KEX7 :12
DS2:44 16 DS1:45 78 KEX1 :81 136 KEX7 :21
DS2:28 17 SIL :6 79 KEX1 :82 137 KEX7 :22
18 FES1:47 80 KEX2 :11 138 KEX7 :31
DS2:45 19 81 KEX2 :12 139 KEX7 :32
DS3:22 20 ES3:48 82 KEX2 :21 140 KEX7 :41 Comments sent vide KE/TEG & NESPAK & RE2
21 SIL :9 83 KEX2 :22 141 KEX7 :42 Letter No. :_______________Date:_________________
ES3:49 22 FES1:48 84 KEX2 :31 142 KEX7 :61
900 MW BQPS-III Combined Cycle Plant & Associated Transmission
23 SIL :11 85 KEX2 :32 143 KEX7 :62
Projects PAKISTAN
ES1:22 24 DS1:46 86 KEX3 :11 144 KEX7 :81
DS2:46 25 DS1:47 87 KEX3 :12 145 KEX7 :82 The drawing / document has been checked to ensure compliance with the
26 88 KEX3 :21 146 KEX8 :11 Contract. The approval status shall be interpreted as laid down in the
27 FES1:49 89 KEX3 :22 147 KEX8 :12 Contract and shall not relieve the Contractor form his contractual
SIL :10 28 DS3:28 90 KEX3 :31 148 KEX8 :21 obligations.
29 91 KEX3 :32 149 KEX8 :22
30 SIL :15 92 KEX3 :41 150 KEX8 :31 Cat. 1 [ ]APPROVED
ES3:22 31 DS3:46 93 KEX3 :42 151 KEX8 :32 Cat. 2 [ ]APPROVED EXCEPT AS NOTED
DS3:47 32 ES3:28 94 KEX3 :61 152 KEX8 :41 Cat. 3 [ ]NOT APPROVED
Cat. 4 [ ]FOR INFORMATION ONLY
33 SIL :16 95 KEX3 :62 153 KEX8 :42
COMMENT SHEET NUMBER:_____________________________________
ES1:28 34 96 KEX3 :81 154 KEX8 :61
35 97 KEX3 :82 155 KEX8 :62 DATE:__________________________
36 SIL :13 98 KEX4 :11 156 KEX8 :81
FES1:22 37 DS2:48 99 KEX4 :12 157 KEX8 :82 SIGNATURES:__________________________________________________
DS3:48 38 DS2:49 100 KEX4 :21 158 KEX9 :11
39 DS3:49 101 KEX4 :22 159 KEX9 :12
40 102 KEX4 :31 160 KEX9 :21
41 103 KEX4 :32 161 KEX9 :22
42 104 KEX4 :41
43 105 KEX4 :42
44 106 KEX4 :61
45 107 KEX4 :62
46 108 KEX4 :81
47 109 KEX4 :82
48 SIL :14 110 KEX5 :11 K-Electric Limited
49 FES1:28 111 KEX5 :12
50 112 KEX5 :21
51 113 KEX5 :22
52 KEX2 :41 114 KEX5 :31 Tractebel Engineering GmbH
53 KEX2 :42 115 KEX5 :32
54 116 KEX5 :41
Q31:4 55 FES1:52 117 KEX5 :42
CB1:195 56 DS1:52 118 KEX5 :61
57 DS1:56 119 KEX5 :62 Renewable Resources(Pvt.) LTD
CB1:191 59 DS1:53 120 KEX5 :81
60 DS2:53
Harbin Electric International Co., Ltd
VT1
DS3:59 1 A:1a
B:1a 2 DS3:63
C:1a 3 DS3:67
4 A:1n
5 B:1n
6 C:1n
7
8
8
8
8
8
V1:2 9 F1:1
A:2a 10 DS3:71
DS3:75 11 B:2a
DS3:79 12 C:2a
13 A:2n
14 B:2n
15 C:2n
16
17
17
17 Comments sent vide KE/TEG & NESPAK & RE2
17 Letter No. :_______________Date:_________________
18 F2:1
900 MW BQPS-III Combined Cycle Plant & Associated Transmission
DS3:83 19 A:3a Projects PAKISTAN
B:3a 20 DS3:87
C:3a 21 DS3:91 The drawing / document has been checked to ensure compliance with the
22 A:3n Contract. The approval status shall be interpreted as laid down in the
23 B:3n Contract and shall not relieve the Contractor form his contractual
24 C:3n obligations.
25
26
Cat. 1 [ ]APPROVED
Cat. 2 [ ]APPROVED EXCEPT AS NOTED
27 F3:1
Cat. 3 [ ]NOT APPROVED
28 A:da
Cat. 4 [ ]FOR INFORMATION ONLY
29 DS3:95 COMMENT SHEET NUMBER:_____________________________________
B:da 30 A:dn
31 B:dn DATE:__________________________
32 C:da
C:dn 33 SIGNATURES:__________________________________________________
F4:1 34
34
34
QV11:1 35 DS3:58
QV12:1 36 DS3:62
DS3:66 37 QV13:1
QV14:1 38 DS3:70
DS3:74 39 QV15:1
DS3:78 40 QV16:1
DS3:82
QV18:1
41
42
QV17:1
DS3:86
K-Electric Limited
QV19:1 43 DS3:90
44 QV11:2
45
45 Tractebel Engineering GmbH
45
46 QV12:2
47
47
47
Renewable Resources(Pvt.) LTD
48 QV13:2
49 Harbin Electric International Co., Ltd
49
49
NORTHEAST ELECTRIC POWER DESIGN INSTITUTE CO.,LTD.
CHINA POWER ENGINEERING CONSULTING GROUP
BUS COUPLER&BUS PT
VT1
50 QV21:2
51
51
51
52 QV22:2
53
53
53
QV23:2 54
55
55
55
56 QV14:2
57
57
57
58 QV15:2
59
59
59
60 QV16:2
61
61 Comments sent vide KE/TEG & NESPAK & RE2
61 Letter No. :_______________Date:_________________
62 QV24:2
900 MW BQPS-III Combined Cycle Plant & Associated Transmission
63 Projects PAKISTAN
63
63 The drawing / document has been checked to ensure compliance with the
64 QV25:2 Contract. The approval status shall be interpreted as laid down in the
65 Contract and shall not relieve the Contractor form his contractual
65 obligations.
65
66 QV26:2
Cat. 1 [ ]APPROVED
Cat. 2 [ ]APPROVED EXCEPT AS NOTED
67
Cat. 3 [ ]NOT APPROVED
67
Cat. 4 [ ]FOR INFORMATION ONLY
67 COMMENT SHEET NUMBER:_____________________________________
QV17:2 68
69 DATE:__________________________
69
69 SIGNATURES:__________________________________________________
70 QV18:2
71
71
71
QV19:2 72
73
73
73
QV27:2 74
75
75
K-Electric Limited
75
76 QV28:2
77
77 Tractebel Engineering GmbH
77
78 QV29:2
79
79
79
Renewable Resources(Pvt.) LTD
80 DS3:94
81 Harbin Electric International Co., Ltd
81
81
NORTHEAST ELECTRIC POWER DESIGN INSTITUTE CO.,LTD.
CHINA POWER ENGINEERING CONSULTING GROUP
30 SG
K-Electric Limited