ADNOC GAS PROCESSING

EXECUTE STAGE RUWAIS CAPACITY ENHANCEMENT OF NGL TRAINS 1, 2, 3 & 4

INSULATION RESISTANCE AND CONTINUITY TEST RECORD OF INSTRUMENT BRANCH/SECONDARY CABLES AFTER GLANDING/TERMINATION
Company: ADNOC GAS PROCESSING ITR No. ATTACHMENTS OF I-004

Contractor: Larsen & Toubro Unit/Area:


Train 2
Sub-Contractor: GEGC System No.
NA
Area/Plant: TRAIN 2 Rated Voltage:500v

Manufacturer:MESC Cable Schedule No:5289-SCH-52-JB-5502 Test Voltage: 500 VDC


Insulation Resistance/Continuity Test
#
SL CABLE TAG NO. Cable type and Size From To Continuity *Shield Checks Cable Insulation
Resistance (MΩ)

Individu
Shield to Shield to Core to Core to Core to Shield

Conduc

Individu

Gland -
Shield
tor

Earth
No. Earth Shield Core Earth

al

al
1 52-JE-009
52-JE-009-13 XLPE-PVC-SWA-PVC-OSCR-FL / 1 PR X 1.5mm² 52-TT-2377
(EXISTING JB)
OK OK OK OK NA >2000 NA >2000
2 52-JE-009
52-JE-009-14 XLPE-PVC-SWA-PVC-OSCR-FL / 1 PR X 1.5mm² 52-TT-2583
(EXISTING JB)
OK OK OK OK NA >2000 NA >2000

Test Equipment Type: Make Model No: Sl. No: Cal Due Date:
Insulation Resistance Tester HIOKI IR4056-20 200941686 04/12/2024
TRMS Digital Multimeter FLUKE 115 44983956WS 16/4/2024
Remarks:

VERIFIED BY SUBCONTRACTOR QA/QC CONTRACTOR QA/QC COMPANY/ TPI

Name

Signature

Date