FORM 1

ARCHITECT'S CERTIFICATE
Date: 18-April-2024
To
M/s. LALITHA SHRIRAM INFRA PROJECTS PRIVATE LIMITED
4-19-135/1, 1/1 Cross Road,
Vikas Nagar, Guntur
Guntur Dist.- 522007

Subject: Certificate of Percentage of Completion of Construction Work of “Ramsri Homes” of 2No. of


Buildings of the B Phase of the Project [P07450052534] situated on the Plot bearing R.S.NO: 180/A-
D,180/A-C demarcated by its boundaries 16.108526N, 80.153677(NW), 16.108055, 80.154660(NE),
16.107298, 80.154274(SE), 16.107739, 80.153170(SW) to the North _____to the East of
Purushothapatnam under Chilakaluripet Municipality & mandal Guntur District- 522616 a d ea sur ing
3177.80 sq.mts. area being developed by M/s. LALITHA SHRIRAM INFRA PROJECTS PRIVATE LIMITED

Sir,
We M/s Akshaya Infra Consultants Pvt Ltd have undertaken assignment as Architect /Licensed
Surveyor of certifying Percentage of Completion of Construction Work of the 2 No’s Buildings of the B
Phase of the Project, situated on the plot bearing R.S.NO: 180/A-D,180/A-C of Purushothapatnam
under Chilakaluripet Municipality & mandal Guntur District- 522616, ad measuring 3177.80 sq.mts.
area being developed by M/s. LALITHA SHRIRAM INFRA PROJECTS PRIVATE LIMITED.

1. Following technical professionals are appointed by Owner / Promoter: -


(i) M/s Akshaya Infra Consultants Pvt Ltd as Architect
(ii) M/s Akshaya Infra Consultants Pvt Ltd as Structural Consultant
(iii) M/s Akshaya Infra Consultants Pvt Ltd as MEP Consultant
(iv) Shri G.Harish as Site Engineer

Based on Site Inspection, with respect to each of the Building/Wing of the fore said Real Estate Project,
I certify that as on the date of this certificate, the percentage of work done for each of the building of
the Real Estate Project as registered vide number P07450052534 under APRERA is as per table A
herein below. The percentage of the work executed with respect to each of the activity of the entire
phase is detailed in Table B.
Table A
Building Padmavathy (2 Upper Floors)
S.No Task/Activity Percentage of Work Done
1 Excavation NA
2 0 Number of Basement(s) and Plinth NA
3 0 Number of Podiums NA
4 Stilt Floor/Ground Floor NA
5 2 Upper Floors number of slabs of Super Structure 100%
Internal Walls, Internal Plaster, Flooring's with 95%
6 Flats/Premises, Doors and Windows to each of the
Flat/Premises
Sanitary Fittings within the Flat/Premises, Electrical 90%
7
Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level 100%
8 connecting Staircases and Lifts, Overhead and
Underground Water Tanks
The external plumbing and external plaster, elevation, 100%
9 completion of terraces with waterproofing of the
Building/Wing,
Installation of lifts, water pumps, Fire Fighting Fittings and 75%
Equipment as per CFO NOC, Electrical fittings to Common
Areas, elector, mechanical equipment, Compliance to
10 conditions of environment /CRZ NOC, finishing to entrance
lobby/s, plinth protection, paving of areas appurtenant to
Building/Wing, Compound Wall and all other requirements
as may be required to Obtain Occupation Certificate
Table A
Building Rajyalakshmi (Stilt+5 Upper Floors)
S.No Task/Activity Percentage of Work Done
1 Excavation 100%
2 0 Number of Basement(s) and Plinth 100%
3 0 Number of Podiums NA
4 Stilt Floor/Ground Floor 100%
5 5 Upper Floors number of slabs of Super Structure 100%
Internal Walls, Internal Plaster, Flooring's with 75%
6 Flats/Premises, Doors and Windows to each of the
Flat/Premises
Sanitary Fittings within the Flat/Premises, Electrical 40%
7
Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level 65%
8 connecting Staircases and Lifts, Overhead and
Underground Water Tanks
The external plumbing and external plaster, elevation, 70%
9 completion of terraces with waterproofing of the
Building/Wing,
Installation of lifts, water pumps, Fire Fighting Fittings and 50%
Equipment as per CFO NOC, Electrical fittings to Common
Areas, elector, mechanical equipment, Compliance to
10 conditions of environment /CRZ NOC, finishing to entrance
lobby/s, plinth protection, paving of areas appurtenant to
Building/Wing, Compound Wall and all other requirements
as may be required to Obtain Occupation Certificate
TABLE-B
Internal & External Development Works in Respect of the entire Registered Phase
Common Area and Proposed Percentage of
S.No Details
Facilities,Amenities (Yes/No) Work Done
1 Internal Roads & Footpaths Yes 90%
2 Water Supply Yes 0%
Sewerage Yes 90%
3
(Chamber Line, Septic Tank, STP)
4 Storm Water Drains Yes 90%
5 Landscaping & Tree Plantation Yes 50%
6 Street Lighting Yes 80%
7 Community Building No 0%
Treatment and disposal of Yes 100%
8
sewage and spillage water
Solid Waste Management and No 0%
9
Disposal
Water Conservation, Rain Water Yes 90%
10
Harvesting
11 Energy Management No 0%
Fire Protection and Fire Safety No 0%
12
Requirements
Electrical Meter Room, Yes 55%
13
substation, receiving station
14 Others (option to add more)

Yours Faithfully