WARNING: BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S IN
STRUCTIONS AND YOUR LOCAL REGULATIONS.
A. Consumable Materials
REFERENCE DESIGNATION
C. Referenced Information
REFERENCE DESIGNATION
Ref. 24-42-00-861-001-A Energize the Ground Service Network from the External Power
Ref. 24-42-00-862-001-A De-energize the Ground Service Network Supplied from the External P
ower
Ref. Fig. Longitudinal Beam Flange at Stringer 20A LH and Stringer 20A RH, between FR38 and FR39 and
between FR40 and FR41
3. Job Set-up
SUBTASK 53-31-00-861-074-A
A. Energize the ground service network Ref. AMM TASK 24-42-00-861-001.
SUBTASK 53-31-00-010-153-A
B. Get Access
(1) Remove the emergency exit hatches Ref. AMM TASK 52-21-11-000-001 and/or Ref. AMM TASK 52-
21-11-000-004.
(2) Remove the applicable lower side-wall panel Ref. AMM TASK 25-23-44-000-001.
(3) Remove the applicable insulation blankets from the inspection area Ref. AMM TASK 25-80-00-000-
001.
SUBTASK 53-31-00-110-156-A
C. Preparation of the Inspection Area
(1) Make sure that the inspection area is sufficiently clean to do a satisfactory inspection of the area.
(2) If not, clean the inspection area with Non Aqueous Cleaner-General - - (Material Ref. 08BAA9) and t
he Textile-Lint free Cotton - (Material Ref. 14SBA1).
4. Procedure
© AIRBUS S.A.S. ALL RIGHTS RESERVED. CONFIDENTIAL AND PROPRIETARY DOCUMENT.
AIRCRAFT REVISION REVISION
CUSTOMIZATION DOCTYPES TITLE
TYPES DATE NUMBER
A318 A319 A321 53-31-00-220-817-A - Detailed Inspection of Longitudinal Beam Flange
BNL AMM 01-Feb-2024 14
A320 at Stringer 20A LH and Stringer 20A RH
TAIL NUMBER - MSN - FSN:
Ref. Fig. Longitudinal Beam Flange at Stringer 20A LH and Stringer 20A RH, between FR38 and FR39 and between
FR40 and FR41
SUBTASK 53-31-00-210-119-B
A. Inspection
(1) Do a detailed inspection of the longitudinal beam flanges at left and right stringers 20A for damage
or discontinuities. Do this inspection between FR38 and FR39 and between FR40 and FR41.
(2) Make sure that there is no:
5. Close-up
SUBTASK 53-31-00-410-150-A
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the removed insulation blankets Ref. AMM TASK 25-80-00-400-001.
(3) Install the applicable lower side-wall panel Ref. AMM TASK 25-23-44-400-001.
(4) Install the removed emergency exit hatches Ref. AMM TASK 52-21-11-400-001 and/or Ref. AMM T
ASK 52-21-11-400-004.
SUBTASK 53-31-00-862-070-A
B. De-energize the ground service network Ref. AMM TASK 24-42-00-862-001.
A STGR4LH
FR42
Z241
FR35
STGR24LH
STGR24RH
FR42
STGR18LH
STGR19LH
STGR20LH STGR30LH
STGR20ALH
STGR21LH
STGR22LH A 01
NOTE: STGR23LH
STGR24LH
INSPECTION AREA
01 LH SHOWN, RH SYMMETRICAL
N_MM_533100_6_LAM2_01_00
Figure 53-31-00-991-10700-00-B (SHEET 1) - Longitudinal Beam Flange at Stringer 20A LH and Stringer 20A RH, between FR38 and
FR39 and between FR40 and FR41
** ON A/C FSN ALL