Checklist for FAS PANEL

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Quality Management System

Format No: GCR-GB-ELV-CL-0005

Rev No: 00 Date: 22.03.2023


GODREJ GCR GURUGRAM
CHECKLIST FOR INSTALLATION OF FAS PANEL
WIR No. Date :

Location / Area :

Drawing No. :

G&B PMC
S.No. INSPECTION POINTS YES/NO/NA REMARKS
SIGN. SIGN.

PRE-INSTALLATION
1 Ensure all materials are as per approved TDS

2 Ensure the approved shop drawing used at site with latest revision.

3 Ensure site clearance, access is available to carry out the work.

4 Check for PTW before start of activity

PROCESS-INSTALLATION
Check the alignment of Panel
5

6 Check the Height of Panel should be easily Accessible

7 Check for damage of Panel before installation

POST-INSTALLATION

9 Check if enough loose wire is provided in the Control Panel/ Enclosure

10 Power up the panel with availability of UPS power


Conclusion: Work done is satisfactory and conforms to the requirements. YES / NO
Area is clear for further activity. YES / NO
Comments / Remarks ( if any):

Godrej & Boyce PMC/Client

Name

Signature

Date

You might also like