Professional Documents
Culture Documents
Checklist for FAS PANEL
Checklist for FAS PANEL
Checklist for FAS PANEL
Location / Area :
Drawing No. :
G&B PMC
S.No. INSPECTION POINTS YES/NO/NA REMARKS
SIGN. SIGN.
PRE-INSTALLATION
1 Ensure all materials are as per approved TDS
2 Ensure the approved shop drawing used at site with latest revision.
PROCESS-INSTALLATION
Check the alignment of Panel
5
POST-INSTALLATION
Name
Signature
Date