Quality Management System

Format No: GCR-GB-ELV-CL-0001

Rev No: 00 Date: 22.03.2023


GODREJ GCR GURUGRAM
CHECKLIST FOR INSTALLATION OF WIRING
WIR No. Date :

Location / Area :

Drawing No. :

G&B PMC
S.No. INSPECTION POINTS YES/NO/NA REMARKS
SIGN. SIGN.
PRE-INSTALLATION
1 Ensure all materials are as per approved TDS

2 Ensure the approved shop drawing used at site with latest revision.

3 Ensure site clearance, access is available to carry out the work.

4 Check for PTW before start of activity

PROCESS-INSTALLATION
As per the approved shop drawing, select the Cable of FAS/ PA/ CCTV/
5
ACS
6 No Joints shall be allowed at any places without approval

7 Check for any insulation damage in the wire before installation

POST-INSTALLATION

9 Check whether the wire pulling bushes are used in the junction box

10 Check if enough loose wire is provided in the Control Panel/ Enclosure


Conclusion: Work done is satisfactory and conforms to the requirements. YES / NO
Area is clear for further activity. YES / NO
Comments / Remarks ( if any):

Godrej & Boyce PMC/Client

Name

Signature

Date