Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 1

FORM: BOOSTER PUMP DAILY CHECKLIST ES-ES1113-F01

POD: LOCATION: ASSET: MONTH: YEAR:

Date

SN Description Day Night Day Night Day Night Day Night Day Night Day Night Day Night Day Night Day Night Day Night Day Night Day Night Day Night Day Night Day Night Day Night

1 Check for any abnormal noise and vibration while running.

2 Check for any leak from Pipe line & flanges and arrest if so.

3 Check for abnormal heat from Motor while running.

4 Check Cut Off set point (3.0 Bar)

5 Check Cut in set point (2.0 Bar)

6 Check the functioning of flow meter

7 Check Water tank level

8 Check the Controller alarm indicator lights

Weekly Checkpoints

1 Put the Pump in Manual Mode

2 Start the pump manually

3 Check the above mentioned daily Points

4 Put the Pump in auto Mode

Ensure cleanliness of equipment and pipelines are free from


5
cobweb.

Name of Technician

Sign of Snr journey man

Date

Other Observations:

Rev. No: 1.0 Date: 01-03-2022

You might also like