PROJECT:
BATTERY INVERTER.
CHARGE CONTROLLER.
TO EARTHING
BUS BAR NO.3 OUTDOOR LIGHTING
1C*10SQ.MM
TO EARTHING
BUS BAR NO.2
1C*10SQ.MM
VENTILATION CONTROL PANEL
CABLE ROUTING
CABLE TRAY EMERGENCY LIGHT
50MMX50MM
3
4"PVCPIPE
SCH. 40.
NOT SCALED
SCALE: 1:75.
PREPARED BY : FUNED BY : PROJECT TITLE : DRAWING TITLE: DESIGN BY: STATUS: NORTH: DRAWING NO:
FINAL ELECTRIC PLAN DETAILS. TENDER DOCUMENTS.
YEMEN EMERGENCY ELECTRICITY
ACCESS PROJECT-II CHECKED BY: PROJECT NO: PAPER SIZE:
A3.
PROJECT LOCATION: DRAWING TYPE: APPROVED BY: DATE: SCALE:
AL-MAHWIT CITY-YEMEN ELECTRIC PLANS. OCTOBER,21,2023 1:75.
COMBINER BOX
PHOTOVOLTAIC MODULE
GI CABLE TRAY
100MM * 50MM
COMBINER BOX
COLD FORMED STEEL
C CHANNEL
ANCHOR
BOLT SOLAR SINGLE CORE CABLE
1C X 6 SQ.MM (RED COLOR)
COVER
PERFORATED CABLE TRAY
CABLE TRAY
CABLE TRAY
SUPPORT
ANCHOR
BOLTS
NOT SCALED
SCALE: 1:75.
PREPARED BY : FUNED BY : PROJECT TITLE : DRAWING TITLE: DESIGN BY: STATUS: NORTH: DRAWING NO:
PV MODULE DISTRIBUTION TENDER DOCUMENTS.
YEMEN EMERGENCY ELECTRICITY
ROOFTOP PLAN DETAILS.
ACCESS PROJECT-II CHECKED BY: PROJECT NO: PAPER SIZE:
A3.
PROJECT LOCATION: DRAWING TYPE: APPROVED BY: DATE: SCALE:
AL-MAHWIT CITY-YEMEN ELECTRIC PLANS. OCTOBER,21,2023 1:75.
TO LIGHTNING PIT
1C*25SQ.MM
PHOTOVOLTAIC MODULE
COMBINER BOX
LIGHTNING ARRESTOR
EARTHING
BUSBAR NO.2
10 sqr.mm
SCALE: 1:75.
PREPARED BY : FUNED BY : PROJECT TITLE : DRAWING TITLE: DESIGN BY: STATUS: NORTH: DRAWING NO:
PV STRINGS & COMBINER BOX TENDER DOCUMENTS.
YEMEN EMERGENCY ELECTRICITY
EARTHING PLAN DETAILS.
ACCESS PROJECT-II CHECKED BY: PROJECT NO: PAPER SIZE:
A3.
PROJECT LOCATION: DRAWING TYPE: APPROVED BY: DATE: SCALE:
AL-MAHWIT CITY-YEMEN ELECTRIC PLANS. OCTOBER,21,2023 1:75.
MCP Bell CONNECTION BOX BETWEEN
CHARGE CONTROLLER AND
BATTERY RACK
BATTERY INVERTER
RACK HAS DC=
MAIN DISTRIBUTION
BOARD WALL MOUNTED.
INLET FAN
EXHAUST FAN
FIRE EXTINGUISHER
CONVENTIONAL SMOKE
SD
DETECTOR
CONVENTIONAL HEAT
HD
DETECTOR
CONVENTIONAL FIRE
ALARM PANEL
Bell BELL
Note:-
1- Ventilation system and Battery room lighting will be supplied
from MDB.
SCALE: 1:25.
PREPARED BY : FUNED BY : PROJECT TITLE : DRAWING TITLE: DESIGN BY: STATUS: NORTH: DRAWING NO:
BATTERY ROOM PLAN DETAILS. TENDER DOCUMENTS.
YEMEN EMERGENCY ELECTRICITY
ACCESS PROJECT-II CHECKED BY: PROJECT NO: PAPER SIZE:
A3.
PROJECT LOCATION: DRAWING TYPE: APPROVED BY: DATE: SCALE:
AL-MAHWIT CITY-YEMEN ELECTRIC PLANS. OCTOBER,21,2023 1:25.
100 cm
40 cm
90mm
250mm 60mm
100mm
SCALE: 1:50.
PREPARED BY : FUNED BY : PROJECT TITLE : DRAWING TITLE: DESIGN BY: STATUS: NORTH: DRAWING NO:
EARTHING PIT AND BUSBAR TENDER DOCUMENTS.
YEMEN EMERGENCY ELECTRICITY
DETAILS.
ACCESS PROJECT-II CHECKED BY: PROJECT NO: PAPER SIZE:
A3.
PROJECT LOCATION: DRAWING TYPE: APPROVED BY: DATE: SCALE:
AL-MAHWIT CITY-YEMEN ELECTRIC PLANS. OCTOBER,21,2023 AS SHOWEN.
Voltage Rating in AC 230V
Busbar Current Rating 160A
Busbar Rating 50kA Conditional
Fully shrouded
Busbar Type
copper and tinned
Inside View
63 A , 15 kA 63 A , 15 kA MDB
32 A , 15 kA 40 A , 15 kA
32 A , 15 kA 40 A , 15 kA
32 A , 15 kA 40 A , 15 kA
32 A , 15 kA 32 A , 15 kA
20 A , 15 kA 32 A , 15 kA
20 A , 15 kA 32 A , 15 kA
20 A , 15 kA
Ventilation 32 A , 15 kA
System
16 A , 15 kA
20 A , 15 kA Battery room
Lighting
20 A , 15 kA 16 A , 15 kA
Fire Alarm Panel
SCALE: 1:50.
PREPARED BY : FUNED BY : PROJECT TITLE : DRAWING TITLE: DESIGN BY: STATUS: NORTH: DRAWING NO:
MAIN DISTRIBUTION BOARD TENDER DOCUMENTS.
YEMEN EMERGENCY ELECTRICITY
DETAILS.
ACCESS PROJECT-II CHECKED BY: PROJECT NO: PAPER SIZE:
A3.
PROJECT LOCATION: DRAWING TYPE: APPROVED BY: DATE: SCALE:
AL-MAHWIT CITY-YEMEN ELECTRIC PLANS. OCTOBER,21,2023 AS SHOWEN.
Connection
DG
PHOTOVOLTAIC MODULE
BATTERY INVERTER
DC=
SPD SPD
CIRCUIT BREAKER (MCB)
1x35SQ.mm 1x70 SQ.mm
(RED& BLACK) (RED& BLACK)
CIRCUIT BREAKER (RCCB)
NEW MDB
DC FUSE
SPD SPD
250 A, 2P Shunt
Battery Rack
1x70 SQ.mm
24 Batteries
2V ,1200 Ah
EARTH PIT
48 Volt
PREPARED BY : FUNED BY : PROJECT TITLE : DRAWING TITLE: DESIGN BY: STATUS: NORTH: DRAWING NO:
SOLAR SYSTEM SCHEMATIC TENDER DOCUMENTS.
YEMEN EMERGENCY ELECTRICITY
DIAGRAM DETAILS.
ACCESS PROJECT-II CHECKED BY: PROJECT NO: PAPER SIZE:
A3.
PROJECT LOCATION: DRAWING TYPE: APPROVED BY: DATE: SCALE:
AL-MAHWIT CITY-YEMEN ELECTRIC PLANS. OCTOBER,21,2023 AS SHOWEN.
STRUCTURAL PLANS.
PROJECT:
DRAWING LIST:-
NO DRAWING TITLE
S2 - 01 MOUNTING STRUCTURE GENERAL SITE PLAN DETAILS.
SCALE: 1:75.
PREPARED BY : FUNED BY : PROJECT TITLE : DRAWING TITLE: DESIGN BY: STATUS: NORTH: DRAWING NO:
MOUNTING STRUCTURE GENERAL TENDER DOCUMENTS.
YEMEN EMERGENCY ELECTRICITY
SITE PLAN DETAILS.
ACCESS PROJECT-II CHECKED BY: PROJECT NO: PAPER SIZE:
A3.
PROJECT LOCATION: DRAWING TYPE: APPROVED BY: DATE: SCALE:
AL-MAHWIT CITY-YEMEN ELECTRIC PLANS. OCTOBER,21,2023 1:75.
ELECTRIC PLANS.
PROJECT:
TO EARTHING TO EARTHING
BUS BAR NO.3 BUS BAR NO.2
1C*10SQ.MM 1C*10SQ.MM
RACK HAS
2 LAYERS. SD
LEGEND:
SYMBOL DESCRIPTION
CONNECTION BUS BAR BETWEEN
CHARGE CONTROLLER AND BATTERY
RACK
HD
BATTERY INVERTER.
TO LIGHTNING
ARRESTER
1C*25 SQ.MM CHARGE CONTROLLER.
AC COUPLING PANEL
OUTDOOR LIGHTING
DOWN
UP
NOT SCALED
SCALE: 1:75.
PREPARED BY : FUNED BY : PROJECT TITLE : DRAWING TITLE: DESIGN BY: STATUS: NORTH: DRAWING NO:
FINAL ELECTRIC PLAN DETAILS. TENDER DOCUMENTS.
YEMEN EMERGENCY ELECTRICITY
ACCESS PROJECT-II CHECKED BY: PROJECT NO: PAPER SIZE:
A3.
PROJECT LOCATION: DRAWING TYPE: APPROVED BY: DATE: SCALE:
AL-MAHWIT CITY-YEMEN ELECTRIC PLANS. OCTOBER,22,2023 1:75.
COMBINER BOX
PHOTOVOLTAIC MODULE
GI CABLE TRAY
100MM * 50MM
COMBINER BOX
COLD FORMED STEEL
C CHANNEL
ANCHOR
BOLT SOLAR SINGLE CORE CABLE
1C X 6 SQ.MM (RED COLOR)
DOWN
CABLE TRAY
SUPPORT
ANCHOR
BOLTS
NOT SCALED
UP
SCALE: 1:50.
PREPARED BY : FUNED BY : PROJECT TITLE : DRAWING TITLE: DESIGN BY: STATUS: NORTH: DRAWING NO:
PV MODULE DISTRIBUTION TENDER DOCUMENTS.
YEMEN EMERGENCY ELECTRICITY
ROOFTOP PLAN DETAILS.
ACCESS PROJECT-II CHECKED BY: PROJECT NO: PAPER SIZE:
A3.
PROJECT LOCATION: DRAWING TYPE: APPROVED BY: DATE: SCALE:
AL-MAHWIT CITY-YEMEN ELECTRIC PLANS. OCTOBER,22,2023 1:50.
1C*10SQ.MM
PHOTOVOLTAIC MODULE
COMBINER BOX
EARTHING
BUSBAR NO.2 EARTHING BUS BAR
EARTHING CABLE
LIGHTNING ARRESTOR
TO LIGHTNING PIT
DOWN 1C*25SQ.MM
LIGHTNING ARRESTER
SHALL BE 3 MTR ABOVE
MOUNTING STRUCTURE
UP
SCALE: 1:50.
PREPARED BY : FUNED BY : PROJECT TITLE : DRAWING TITLE: DESIGN BY: STATUS: NORTH: DRAWING NO:
PV STRINGS & COMBINER BOX TENDER DOCUMENTS.
YEMEN EMERGENCY ELECTRICITY
EARTHING PLAN DETAILS.
ACCESS PROJECT-II CHECKED BY: PROJECT NO: PAPER SIZE:
A3.
PROJECT LOCATION: DRAWING TYPE: APPROVED BY: DATE: SCALE:
AL-MAHWIT CITY-YEMEN ELECTRIC PLANS. OCTOBER,22,2023 1:50.
RACK HAS
2 LAYERS. SD CONNECTION BOX BETWEEN
CHARGE CONTROLLER AND
BATTERY RACK
BATTERY INVERTER
DC=
CHARGE CONTROLLER
MAIN DISTRIBUTION
BOARD WALL MOUNTED.
INLET FAN
EXHAUST FAN
HD
FIRE EXTINGUISHER
CONVENTIONAL SMOKE
SD
DETECTOR
CONVENTIONAL HEAT
HD
DETECTOR
CONVENTIONAL FIRE
ALARM PANEL
Bell BELL
MCP
MANUAL CALL POINT
MCP (BREAK GLASS)
Note:-
1- Ventilation system and Battery room lighting will be supplied VENTILATION CONTROL PANEL
from MDB.
SCALE: 1:25.
PREPARED BY : FUNED BY : PROJECT TITLE : DRAWING TITLE: DESIGN BY: STATUS: NORTH: DRAWING NO:
BATTERY ROOM PLAN DETAILS. TENDER DOCUMENTS.
YEMEN EMERGENCY ELECTRICITY
ACCESS PROJECT-II CHECKED BY: PROJECT NO: PAPER SIZE:
A3.
PROJECT LOCATION: DRAWING TYPE: APPROVED BY: DATE: SCALE:
AL-MAHWIT CITY-YEMEN ELECTRIC PLANS. OCTOBER,22,2023 1:25.
100 cm
40 cm
90mm
250mm 60mm
100mm
SCALE: 1:50.
PREPARED BY : FUNED BY : PROJECT TITLE : DRAWING TITLE: DESIGN BY: STATUS: NORTH: DRAWING NO:
EARTHING PIT AND BUSBAR TENDER DOCUMENTS.
YEMEN EMERGENCY ELECTRICITY
DETAILS.
ACCESS PROJECT-II CHECKED BY: PROJECT NO: PAPER SIZE:
A3.
PROJECT LOCATION: DRAWING TYPE: APPROVED BY: DATE: SCALE:
AL-MAHWIT CITY-YEMEN ELECTRIC PLANS. OCTOBER,22,2023 AS SHOWEN.
Voltage Rating in AC 230V
Busbar Current Rating 160A
Busbar Rating 50kA Conditional
Fully shrouded
Busbar Type
copper and tinned
Inside View
63 A , 15 kA 63 A , 15 kA MDB
32 A , 15 kA 40 A , 15 kA
32 A , 15 kA 40 A , 15 kA
32 A , 15 kA 40 A , 15 kA
32 A , 15 kA 32 A , 15 kA
20 A , 15 kA 32 A , 15 kA
20 A , 15 kA 32 A , 15 kA
20 A , 15 kA
Ventilation 32 A , 15 kA
System
16 A , 15 kA
20 A , 15 kA Battery room
Lighting
20 A , 15 kA 16 A , 15 kA
Fire Alarm
System
SCALE: 1:50.
PREPARED BY : FUNED BY : PROJECT TITLE : DRAWING TITLE: DESIGN BY: STATUS: NORTH: DRAWING NO:
MAIN DISTRIBUTION BOARD TENDER DOCUMENTS.
YEMEN EMERGENCY ELECTRICITY
DETAILS.
ACCESS PROJECT-II CHECKED BY: PROJECT NO: PAPER SIZE:
A3.
PROJECT LOCATION: DRAWING TYPE: APPROVED BY: DATE: SCALE:
AL-MAHWIT CITY-YEMEN ELECTRIC PLANS. OCTOBER,22,2023 AS SHOWEN.
Connection
PHOTOVOLTAIC MODULE
BATTERY INVERTER
DC=
50 A 60A to 100A
ISC:10 kA 150 to 300 VDC MANUAL CHANGE OVER
CLASS B 1x25 SQ.mm
SOLAR CABLE
2 CABLES (RED& BLACK)
DC FUSE
1x50 SQ.mm 1x50 SQ.mm
(RED) (BLACK)
150 A, 1P
Shunt
Battery Rack
1x50 SQ.mm
24 Batteries
2V ,800 Ah
48 Volt
EARTH PIT
PREPARED BY : FUNED BY : PROJECT TITLE : DRAWING TITLE: DESIGN BY: STATUS: NORTH: DRAWING NO:
SOLAR SYSTEM SCHEMATIC TENDER DOCUMENTS.
YEMEN EMERGENCY ELECTRICITY
DIAGRAM DETAILS.
ACCESS PROJECT-II CHECKED BY: PROJECT NO: PAPER SIZE:
A3.
PROJECT LOCATION: DRAWING TYPE: APPROVED BY: DATE: SCALE:
AL-MAHWIT CITY-YEMEN ELECTRIC PLANS. OCTOBER,22,2023 AS SHOWEN.
STRUCTURAL PLANS.
PROJECT:
DRAWING LIST:-
NO DRAWING TITLE
S2 - 01 MOUNTING STRUCTURE GENERAL SITE PLAN DETAILS.
DOWN
UP
SCALE: 1:50.
PREPARED BY : FUNED BY : PROJECT TITLE : DRAWING TITLE: DESIGN BY: STATUS: NORTH: DRAWING NO:
MOUNTING STRUCTURE GENERAL TENDER DOCUMENTS.
YEMEN EMERGENCY ELECTRICITY
SITE PLAN DETAILS.
ACCESS PROJECT-II CHECKED BY: PROJECT NO: PAPER SIZE:
A3.
PROJECT LOCATION: DRAWING TYPE: APPROVED BY: DATE: SCALE:
AL-MAHWIT CITY-YEMEN ELECTRIC PLANS. OCTOBER,22,2023 1:50.
ELECTRIC PLANS.
PROJECT:
PREPARED BY: FUNED BY: PROJECT TITLE: DRAWING TITLE: DESIGN BY: STATUS: NORTH: DRAWING NO:
MAIN NOTES. TENDER DOCUMENTS.
YEMEN EMERGENCY ELECTRICITY
OPERATIONALEXCELLENCE
FORRESULTSTHATMATTER.
SANA'A-YEMEN.
WORLDBANKGROUP.
ACCESS PROJECT-II
PROJECT LOCATION:
AL-MAHWIT CITY-YEMEN
DRAWING TYPE:
ELECTRIC PLANS.
CHECKED BY:
APPROVED BY:
PROJECT NO:
DATE:
OCTOBER,21,2023
PAPER SIZE:
A3.
SCALE:
AS SHOWEN.
S1-01
1. ALL DIMENSIONS AND ELEVATIONS ARE IN
CENTIMETERS AND METERS RESPECTIVELY,
UNLESS OVER WISE MENTIONED.
2. ALL DIMENSIONS TO BE CHECKED AND CONFIRMED
ON SITE BEFORE COMMENCEMENT OF ANY WORK.
3. ANY DISCREPANCY TO BE REPORTED TO THE
UNOPS SITE ENGINEER/ PROJECT MANAGER
PROMPTLY BEFORE PROCEEDING.
4. ALL OUTDOOR OUTLETS, SOCKET OR WIRING
ACCESSORIES SHALL BE WEATHER PROOF TYPE.
5. ALL DISTANCE BETWEEN SYSTEM COMPONENTS INSIDE
BATTERY ROOM TO BE DISTRIBUTE AS PER MANUFACTURE
INSTALLATION INSTRUCTION.
LEGEND:
SYMBOL DESCRIPTION
CONNECTION BUS BAR BETWEEN
CHARGE CONTROLLER AND BATTERY
RACK
MTS
EARTHING AC COUPLING PANEL
BUS BAR NO.1
TO EARTHING
BUS BAR NO.3 OUTDOOR LIGHTING
1C*10SQ.MM
TO EARTHING
BUS BAR NO.2
1C*10SQ.MM
VENTILATION CONTROL PANEL
CABLE ROUTING
CABLE TRAY EMERGENCY LIGHT
50MMX50MM
HD
1C*25 SQ.MM
WATER PROOF 30W LED OUTDOOR
BOX 15CM X 15CM R
M
A
L
AREIF
L
N
E
A
P
LIGHTING DEVICE
SD
O
NIT
A
LIN
T
E
V N
GIC
O
L
U
PCA
STEEL SINGLE ARM
L
N
E
A
P
L
N
E
A
PRO
C
L
N
T
AC≈
Ø15 cm WITH 20 DEGREE
DC =
NOT SCALED
3
4"PVCPIPE
SCH. 40.
NOT SCALED
SCALE: 1:75.
PREPARED BY: FUNED BY: PROJECT TITLE: DRAWING TITLE: DESIGN BY: STATUS: NORTH: DRAWING NO:
FINAL ELECTRIC PLAN DETAILS. TENDER DOCUMENTS.
YEMEN EMERGENCY ELECTRICITY
OPERATIONALEXCELLENCE
FORRESULTSTHATMATTER.
SANA'A-YEMEN.
WORLDBANKGROUP.
ACCESS PROJECT-II
PROJECT LOCATION:
AL-MAHWIT CITY-YEMEN
DRAWING TYPE:
ELECTRIC PLANS.
CHECKED BY:
APPROVED BY:
PROJECT NO:
DATE:
OCTOBER,21,2023
PAPER SIZE:
A3.
SCALE:
1:75.
S1-02
1. ALL DIMENSIONS AND ELEVATIONS ARE IN
CENTIMETERS AND METERS RESPECTIVELY,
UNLESS OVER WISE MENTIONED.
2. ALL DIMENSIONS TO BE CHECKED AND CONFIRMED
ON SITE BEFORE COMMENCEMENT OF ANY WORK.
3. ANY DISCREPANCY TO BE REPORTED TO THE
UNOPS SITE ENGINEER/ PROJECT MANAGER
PROMPTLY BEFORE PROCEEDING.
4. ALL CABLE SHALL BE ROUTE IN PERFORATED GI
CABLE TRAY.
5. CABLE TRAY SHALL BE FIXED ABOVE UNISTRUT NOT
Perforated Cable Tray DIRECT IN ROOFTOP.
100mm x 50mm
COMBINER BOX
100
PHOTOVOLTAIC MODULE
+
+
_
50
GI CABLE TRAY
100MM * 50MM
DC-COMBINER
DC-COMBINER
-
-
BOX-0X COMBINER BOX
BOX-2
COLD FORMED STEEL
+
C CHANNEL
ANCHOR
BOLT SOLAR SINGLE CORE CABLE
1C X 6 SQ.MM (RED COLOR)
-
SOLAR SINGLE CORE CABLE
NOT TO SCALE.
+
1C X 6 SQ.MM (BLACK COLOR)
DC-COMBINER
1C X 35 SQ.MM (RED COLOR)
BOX-1
SOLAR SINGLE CORE CABLE
+
1C X 35 SQ.MM (BLACK
COLOR)
-
-
-
-
+
+
-
-
COVER
PERFORATED CABLE TRAY
CABLE TRAY
+
CABLE TRAY
SUPPORT
ANCHOR
BOLTS
NOT SCALED
SCALE: 1:75.
PREPARED BY: FUNED BY: PROJECT TITLE: DRAWING TITLE: DESIGN BY: STATUS: NORTH: DRAWING NO:
PV MODULE DISTRIBUTION TENDER DOCUMENTS.
YEMEN EMERGENCY ELECTRICITY
S1-03
ROOFTOP PLAN DETAILS.
ACCESS PROJECT-II CHECKED BY: PROJECT NO: PAPER SIZE:
OPERATIONALEXCELLENCE A3.
FORRESULTSTHATMATTER. WORLDBANKGROUP. PROJECT LOCATION: DRAWING TYPE: APPROVED BY: DATE: SCALE:
SANA'A-YEMEN. AL-MAHWIT CITY-YEMEN ELECTRIC PLANS. OCTOBER,21,2023 1:75.
1. ALL DIMENSIONS AND ELEVATIONS ARE IN
CENTIMETERS AND METERS RESPECTIVELY,
UNLESS OVER WISE MENTIONED.
2. ALL DIMENSIONS TO BE CHECKED AND CONFIRMED
ON SITE BEFORE COMMENCEMENT OF ANY WORK.
3. ANY DISCREPANCY TO BE REPORTED TO THE
UNOPS SITE ENGINEER/ PROJECT MANAGER
PROMPTLY BEFORE PROCEEDING.
+
TO LIGHTNING PIT
1C*25SQ.MM
DC-COMBINER
-
BOX-2
PHOTOVOLTAIC MODULE
+
_
+
+
6sqr.mm DC-COMBINER
BOX-0X COMBINER BOX
-
+
+
EARTHING BUS BAR
LIGHTNING ARRESTER
SHALL BE 3 MTR ABOVE
MOUNTING STRUCTURE EARTHING CABLE
DC-COMBINER
-
BOX-1
+
+
LIGHTNING ARRESTOR
-
EARTHING
BUSBAR NO.2
-
+
+
-
-
10 sqr.mm
+
NOT SCALED
SCALE: 1:75.
PREPARED BY: FUNED BY: PROJECT TITLE: DRAWING TITLE: DESIGN BY: STATUS: NORTH: DRAWING NO:
PV STRINGS & COMBINER BOX TENDER DOCUMENTS.
YEMEN EMERGENCY ELECTRICITY
S1-04
EARTHING PLAN DETAILS.
ACCESS PROJECT-II CHECKED BY: PROJECT NO: PAPER SIZE:
OPERATIONALEXCELLENCE A3.
FORRESULTSTHATMATTER. WORLDBANKGROUP. PROJECT LOCATION: DRAWING TYPE: APPROVED BY: DATE: SCALE:
SANA'A-YEMEN. AL-MAHWIT CITY-YEMEN ELECTRIC PLANS. OCTOBER,21,2023 1:75.
1. ALL DIMENSIONS AND ELEVATIONS ARE IN CENTIMETERS
AND METERS RESPECTIVELY, UNLESS OVER WISE
MENTIONED.
2. ALL DIMENSIONS TO BE CHECKED AND CONFIRMED ON
SITE BEFORE COMMENCEMENT OF ANY WORK.
3. ANY DISCREPANCY TO BE REPORTED TO THE UNOPS SITE
ENGINEER/ PROJECT MANAGER PROMPTLY BEFORE
PROCEEDING.
4. ALL OUTDOOR OUTLETS, SOCKET OR WIRING
ACCESSORIES SHALL BE WEATHER PROOF TYPE.
5. ALL DISTANCE BETWEEN SYSTEM COMPONENTS INSIDE BATTERY ROOM
TO BE DISTRIBUTE AS PER MANUFACTURE INSTALLATION INSTRUCTION.
6. AIR FLOW INSIDE BATTERY ROOM SHALL BE CONSIDER
AND MANUFACTURE INSTRUCTION TO TAKE IN ACCOUNT.
HD
BATTERY RACK 2V,2500Ah.
MAIN DISTRIBUTION
FIREALARM
BOARD WALL MOUNTED.
PANEL
INLET FAN
SD
EXHAUST FAN
CONVENTIONAL FIRE
ALARM PANEL
Bell BELL
LIGHTING SWITCH.
Note:-
1- Ventilation system and Battery room lighting will be supplied VENTILATIONCONTROLPANEL
from MDB.
SCALE: 1:25.
PREPARED BY: FUNED BY: PROJECT TITLE: DRAWING TITLE: DESIGN BY: STATUS: NORTH: DRAWING NO:
BATTERY ROOM PLAN DETAILS. TENDER DOCUMENTS.
YEMEN EMERGENCY ELECTRICITY
OPERATIONALEXCELLENCE
FORRESULTSTHATMATTER.
SANA'A-YEMEN.
WORLDBANKGROUP.
ACCESS PROJECT-II
PROJECT LOCATION:
AL-MAHWIT CITY-YEMEN
DRAWING TYPE:
ELECTRIC PLANS.
CHECKED BY:
APPROVED BY:
PROJECT NO:
DATE:
OCTOBER,21,2023
PAPER SIZE:
A3.
SCALE:
1:25.
S1-05
1. ALL DIMENSIONS AND ELEVATIONS ARE IN
CENTIMETERS AND METERS RESPECTIVELY,
UNLESS OVER WISE MENTIONED.
2. ALL DIMENSIONS TO BE CHECKED AND CONFIRMED
ON SITE BEFORE COMMENCEMENT OF ANY WORK.
3. ANY DISCREPANCY TO BE REPORTED TO THE
UNOPS SITE ENGINEER/ PROJECT MANAGER
PROMPTLY BEFORE PROCEEDING.
4. EARTHING PIT SHALL BE CARRY OUT AS BE SITE
ENGINEER INSTRUCTION.
100 cm
40 cm
90mm
250mm 60mm
100mm
SCALE: 1:50.
PREPARED BY: FUNED BY: PROJECT TITLE: DRAWING TITLE: DESIGN BY: STATUS: NORTH: DRAWING NO:
EARTHING PIT AND BUSBAR TENDER DOCUMENTS.
YEMEN EMERGENCY ELECTRICITY
S1-06
DETAILS.
ACCESS PROJECT-II CHECKED BY: PROJECT NO: PAPER SIZE:
OPERATIONALEXCELLENCE A3.
FORRESULTSTHATMATTER. WORLDBANKGROUP. PROJECT LOCATION: DRAWING TYPE: APPROVED BY: DATE: SCALE:
SANA'A-YEMEN. AL-MAHWIT CITY-YEMEN ELECTRIC PLANS. OCTOBER,21,2023 AS SHOWEN.
Voltage Rating in AC 230V 1. ALL DIMENSIONS AND ELEVATIONS ARE IN
CENTIMETERS AND METERS RESPECTIVELY,
UNLESS OVER WISE MENTIONED.
Busbar Current Rating 160A 2. ALL DIMENSIONS TO BE CHECKED AND CONFIRMED
ON SITE BEFORE COMMENCEMENT OF ANY WORK.
Busbar Rating 50kA Conditional 3. ANY DISCREPANCY TO BE REPORTED TO THE
UNOPS SITE ENGINEER/ PROJECT MANAGER
Fully shrouded PROMPTLY BEFORE PROCEEDING.
Busbar Type 4. EARTHING PIT SHALL BE CARRY OUT AS BE SITE
copper and tinned ENGINEER INSTRUCTION.
63 A , 15 kA 63 A , 15 kA MDB
32 A , 15 kA 40 A , 15 kA
32 A , 15 kA 40 A , 15 kA
32 A , 15 kA 40 A , 15 kA
32 A , 15 kA 32 A , 15 kA
20 A , 15 kA 32 A , 15 kA
20 A , 15 kA 32 A , 15 kA
20 A , 15 kA
Ventilation 32 A , 15 kA
System
16 A , 15 kA
50
20 A , 15 kA Battery room
Lighting
20 A , 15 kA 16 A , 15 kA
Fire Alarm Panel
ABB
DDA204 AC
In=0.3A
PUSH
RCBO
100A,300mA N
SCALE: 1:50.
PREPARED BY: FUNED BY: PROJECT TITLE: DRAWING TITLE: DESIGN BY: STATUS: NORTH: DRAWING NO:
MAIN DISTRIBUTION BOARD TENDER DOCUMENTS.
YEMEN EMERGENCY ELECTRICITY
S1-07
DETAILS.
ACCESS PROJECT-II CHECKED BY: PROJECT NO: PAPER SIZE:
OPERATIONALEXCELLENCE A3.
FORRESULTSTHATMATTER. WORLDBANKGROUP. PROJECT LOCATION: DRAWING TYPE: APPROVED BY: DATE: SCALE:
SANA'A-YEMEN. AL-MAHWIT CITY-YEMEN ELECTRIC PLANS. OCTOBER,21,2023 AS SHOWEN.
1. ALL DIMENSIONS AND ELEVATIONS ARE IN
CENTIMETERS AND METERS RESPECTIVELY,
UNLESS OVER WISE MENTIONED.
2. ALL DIMENSIONS TO BE CHECKED AND CONFIRMED
ON SITE BEFORE COMMENCEMENT OF ANY WORK.
3. ANY DISCREPANCY TO BE REPORTED TO THE
UNOPS SITE ENGINEER/ PROJECT MANAGER
PROMPTLY BEFORE PROCEEDING.
PV Module Combiner Box Battery Charger Off Grid Inverter Integration With Changeover 4. NEW DISTRIBUTION BOARD SHALL BE INSTALL IN
THE SAME LOCATION OF EXISTING ONE.
+
_
AC≈
BATTERY INVERTER
DC=
Total: 1.1 to 1.34Kwp
2 PV MODULE
STR NO.1
80 A 85A to 100A
ISC:10 kA 150 to 300 VDC
CLASS B 1x35 SQ.mm
SOLAR CABLE XPLE/PVC/CU1.0KV
XPLE/PVC/CU1.0KV XPLE/PVC/AL1.0KV CHARGE CONTROLLER
Off Grid Inverter 4X6 SQ.mm
Total: 1.1 to 1.34Kwp
40A 2P 40A 2P
STR NO.2
10KVA
RCCB,300mA MCCB,25KA
AC≈ HYBRID SOLAR SYSTEM INVERTER OUTPUT
SURGE ARRESTER
_
DC =
+
SPD SPD
CIRCUIT BREAKER (MCB)
1x35SQ.mm 1x70 SQ.mm
Total: 1.1 to 1.34Kwp
XPLE/PVC/CU1.0KV
2 PV MODULE
STR NO.3
NEW MDB
250A,2P DC FUSE
1x70 SQ.mm
(RED& BLACK)
Total: 1.1 to 1.34Kwp
SPD SPD
250 A, 2P Shunt
Battery Rack
Total: 1.1 to 1.34Kwp
2 PV MODULE
STR NO.6
_
+
1x70 SQ.mm
24 Batteries
2V ,1200 Ah
EARTH PIT
48 Volt
PREPARED BY: FUNED BY: PROJECT TITLE: DRAWING TITLE: DESIGN BY: STATUS: NORTH: DRAWING NO:
SOLAR SYSTEM SCHEMATIC TENDER DOCUMENTS.
YEMEN EMERGENCY ELECTRICITY
S1-08
DIAGRAM DETAILS.
ACCESS PROJECT-II CHECKED BY: PROJECT NO: PAPER SIZE:
OPERATIONALEXCELLENCE A3.
FORRESULTSTHATMATTER. WORLDBANKGROUP. PROJECT LOCATION: DRAWING TYPE: APPROVED BY: DATE: SCALE:
SANA'A-YEMEN. AL-MAHWIT CITY-YEMEN ELECTRIC PLANS. OCTOBER,21,2023 AS SHOWEN.
STRUCTURAL PLANS.
PROJECT:
DRAWING LIST:-
N RA N T TL
S MOUNTING STRUCTURE GENERAL SITE PLAN DETAILS.
C1
C1
C1
C1
SCALE: 1:75.
PREPARED BY: FUNED BY: PROJECT TITLE: DRAWING TITLE: DESIGN BY: STATUS: NORTH: DRAWING NO:
MOUNTING STRUCTURE GENERAL TENDER DOCUMENTS.
YEMEN EMERGENCY ELECTRICITY
S2-01
SITE PLAN DETAILS.
ACCESS PROJECT-II CHECKED BY: PROJECT NO: PAPER SIZE:
OPERATIONALEXCELLENCE A3.
FORRESULTSTHATMATTER. WORLDBANKGROUP. PROJECT LOCATION: DRAWING TYPE: APPROVED BY: DATE: SCALE:
SANA'A-YEMEN. AL-MAHWIT CITY-YEMEN ELECTRIC PLANS. OCTOBER,21,2023 1:75.