F E D C B A

THIS DRAWING IS THE PROPERTY OF STUP CONSULTANTS P. LIMITED.

1 2 1 2 1 2 IT SHOULD NOT BE USED, COPIED OR REPRODUCED WITHOUT THEIR


WRITTEN PERMISSION.
7500 7500
7500
DRAWING REFERENCES
DRG. NO TITLE

BAGGAGE 2 4
2 4
+0.00 m CLAIM
1:20

70-0003 70-0003
1:20

70-0003 70-0003
1260

7500

4 4

KEYPLAN
N

1:10
J01- TERMINAL BLDG
G G DEPARTURE
G
HALL
FIRE RATED GLASS
1260 7

PARTITION AS PER +7.40 m FFL FIRE RATED GLASS UP

RMA P
S L
O E
- 0
4
. 5

P 1
m

: 1
0

UP
RM
- 0

A P
S L
O E
4
. 5
m

P 1
: 1
0
UP

DETAIL
P
U
UP P T
H
N
L
I
P R O T
E
COT
I N

3700

3700

3700
PARTITION AS PER
RMA P RMA P
S L
O E P 1
: 1
0 S L
O E P 1
: 1
0

UP UP

- 0
4
. 5
m - 0
4
. 5
m

B OU
N
D
R
A W
Y L
A

ARRIVAL 1260 DETAIL


1-01 CORRIDOR
+4.10 m FFL
-0.60 m FFL 2-01

350
50
H H H

400
UP

1500
GENERAL NOTES
+7.40 m FFL 1) ALL DIMENSIONS ARE IN MILLIMETERS UNLESS STATED OTHERWISE.
2) ALL LEVELS SHOWN ARE IN MILLIMETERS UNLESS STATED OTHERWISE.
50MM WIDE 50MM WIDE 3) ONLY WRITTEN DIMENSIONS SHALL BE FOLLOWED. THE DRAWING SHALL NOT
EXPANSION JOINT EXPANSION JOINT BE SCALED
AS PER DETAIL AS PER DETAIL 4) ALL DIMENSIONS INDICATE UNFINISHED SURFACES.
5) LEVEL ±0.00M. CORRESPONDS TO +489.79m. SURVEY LEVEL.
6) THIS DRAWING SHALL BE READ IN CONJUNCTION WITH ALL RELEVANT
ARCHITECTURAL, STRUCTURAL & SERVICES DRAWINGS & DISCREPANCIES/

9000

9000
1:100

AMBIGUITIES IF ANY SHALL BE BROUGHT TO THE NOTICE OF THE CONSULTANTS


BEFORE COMMENCEMENT OF THE WORK AT SITE.

SLOPE 1:12
ROOF 7) ALL LEVELS & DIMENSIONS STATED SHALL BE VERIFIED AT SITE &

SLOPE 1:12
PROJECTION DISCREPANCIES / AMBIGUITIES IF ANY SHALL BE BROUGHT TO THE NOTICE OF
RL-04

9000
THE CONSULTANTS BEFORE COMMENCEMENT OF THE WORK AT SITE.

13000

13000

13000
ABOVE

ROOF
ROOF PROJECTION
SERVICE ROAD ABOVE
PROJECTION
ABOVE
3 3

+4.85 m FFL
COVERED DRAIN CHANEL EF-04 FA-02
UP
FT-21

1500
FT-21 +6.65 m FFL

J J J
RL-04
RL-04
FA-02
RL-04
+4.85 m FFL
FIXED LINK
FIXED LINK 2400 WIDE
BRIDGE
BRIDGE ABOVE 2400 WIDE CORRIDOR
CORRIDOR
2

9000
15465
BELOW

2400 WIDE CORRIDOR


70-0002

15465
200 200
1 900 2400 2400 1200
70-0002

SLOPE 1:12
GSE PARKING 200
06-04-2021 R2 GENERALLY REVISED IPM D. PATIL D. PAL
14515

14515

14515
27-04-2020 R1 GENERALLY REVISED IPM D. PATIL D. PAL
DATE NO. DESCRIPTION DRN BY CHK BY APP BY

REVISIONS
200 200 UP CLIENT
900 1200

1500
2400 200 2400
+5.90 m FFL
1 1
70-0003 70-0003 AIRPORTS AUTHORITY OF INDIA
2 2
1 PROJECT
EF-04
1:9

50-0005
CONSTRUCTION OF NEW TERMINAL BUILDING, ATC

SLOPE 1:12
EDGE OF
SLOPE 1:12

TOWER CUM TECHNICAL BLOCK, FIRE STATION

4365
FT-16 APRON +3.14 m
CATEGORY VII AND ALL OTHER ASSOCIATED
SLOPE 1:12

SLOPE 1:12
ST-05 50MM WIDE 50MM WIDE
1000

WORKS AT JABALPUR AIRPORT, JABALPUR,


2400

2400
RWP EXPANSION JOINT EXPANSION JOINT
+0.49 m FFL RWP +5.16 m FFL RWP AS PER DETAIL MADHYA PRADESH, INDIA
+5.16 m FFL

50
50

UP TITLE
UP
K UP UP
K UP
2400
UP
2400 4600 2400
K FLB - ENLARGED PLANS
1-05
200

UP

2400

2700
RL-04 +5.54 m FFL SLOPE 1:12 SLOPE 1:12
6 UP 6 UP
+5.54 m FFL
J01- TERMINAL BUILDING
50-0005 SERVICES ALUMINIUM 3500 200 2400 4600 50-0005

200
ROOM Z SHAPED
+4.65 m FFL ARCHITECTURE
5200

5200

5200
LOUVERS
200
75 58 m²
+4.65 m FFL PROJECT ID STAGE DOC TYPE DRAWING NUMBER REVISION
UP 6120 2400
+0.69 m FFL
ST-05
1-02 SLOPE 1:12 3 ST-05
900 RL-04
FT-21 9785 E DRG AR-J01-70-0001 R2
2400

2455 UP
70-0003 UP SLOPE 1:12
DRY WALL

450 600
SCALE 1 : 100 DATE: 10/08/2018
1500 * 6120 2400
DRN BY: SM CHK BY: D.PATIL
L +1.69 m L L OFFICE OF
APP BY: D.PAL NAVI MUMBAI
ORIGIN:
7500 5800 ROOF ACCESS
EF-04 ABOVE Revit Path BIM 360://Jabalpur Airport/AR-J01-ASM-FLB.rvt

EF-04 N ISSUED FOR:


BUILDING LINE
ABOVE
EXECUTION
PASSENGER
BOARDING BRIDGE
PASSENGER BOARDING
BRIDGE ABOVE SUB-CONSULTANT

3 FLB ENLARGED PLAN -LEVEL 2 Draft Print 1

SCALE: 1 : 100 Keynote Legend 06-04-2021 19:30:01


Key Value Keynote Text
EF-04 ACP CLADDING
FLB ENLARGED PLAN -LEVEL 0 FLB ENLARGED PLAN -LEVEL 1 PMC-CONSULTANT

1 SCALE: 1 : 100 2 SCALE: 1 : 100


FA-02

FT-16
LAMINATED DGU GREEN SUBSTRATED
GLASS
CONCRETE FLOORING WITH HARDENER STUP Consultants Pvt. Ltd.
REGISTERED OFFICE:
FT-21 CARPET FLOORING 1004 & 5, RAHEJA CHAMBERS, NARIMAN POINT,
MUMBAI-400 021. TEL.: 22832334, 22832371
RL-04 1000 HIGH S S RAILING - WITH HORIZONTAL

06-04-2021 19:26:23
E-MAIL : mumbai@stupmail.com
BARS Web : http://www.stupworld.com

F E D C B A SIZE - A1

You might also like