Debottle Neck Onshore Plant, Safaniyah, Saudi Arabia Project Project name Supply and Fabrication of Steel Work of Fired Heater (Two Units) Document / Documento MOCK UP vertical position
Owner's name ARAMCO Date / Data: 6/10/2024
Unit MOCK UP vertical position Drawing MOCK UP Mixing Logsheet Item No. MOCK UP vertical position Equipment type: Paddle type mixer Water quality Drinking water/ Potable water Shell temperature: °C
Dry Material Mixing Water Mixing Material Ambient Time of
No. Section Date Trade Name Batch No. Poured Temp. Temp. Water Percent Time Temp. T & RH Application Sample No. Start time End time [Bag] [Kg] (°C) (°C) (Lt) (%) (min) (°C) (°C) (min) 1 2 50 31.3 17.3 17.5 35% 6 22.2 27.5/60 3 10.01PM 10.10PM 2 3 4 5 6 7 8 9 Calde Cast LW 1006 10 6/10/2024 124 MIX C/G 2811840 mockup 11 12 13 14 15 16 17 18 19