R-725

CT - Dammam Stimulation
Date: From 19-Apr-24 to 21-Apr-24

R-725
Pumping Service
End of Well Report

SOR No./29562
CT – Dammam Stimulation Program

OiLTECH
SIU-CTS-ROO-C-60032

Prepared by: Ali Saeed


WS Final Intervention Report Template
Date: 22-Apri-24 Checked by: Lolav Majeed
ROO- Wells-WS-TEM-167-A0
Approved by: Haroon Allawi
R-725
CT - Dammam Stimulation
Date: From 19-Apr-24 to 21-Apr-24

Contents
1. EXECUTIVE SUMMARY:.................................................................................................................3
1.1 HS&E INCIDENTS:.................................................................................................................3
1.2 OBJECTIVE:...........................................................................................................................3
1.3 WELL HISTORY AND OBJECTIVE:.............................................Error! Bookmark not defined.
1.4 INTERVENTION OUTCOME:..................................................................................................3
1.5 MANAGEMENT OF CHANGE / DISPENSATION:.....................................................................5
1.6 OTHER SERVICES INVLOVED IN ACHIEVING SOR OBJECTIVES...............................................5
2. INTERVENTION INFORMATION:....................................................................................................5
2.1 INTERVENTION DATA:..........................................................................................................5
2.2 DAILY OPERATIONS SUMMARY:...........................................................................................7
2.3 Well Schematic:....................................................................................................................8
2.4 BHA DETAILS:..........................................................................Error! Bookmark not defined.
2.5 CHEMICAL (MATERIAL) CONSUMPTION:............................................................................10

Prepared by: Ali Saeed


WS Final Intervention Report Template
Date: 22-Apri-24 Checked by: Lolav Majeed
ROO- Wells-WS-TEM-167-A0
Approved by: Haroon Allawi
R-725
CT - Dammam Stimulation
Date: From 19-Apr-24 to 21-Apr-24

1. EXECUTIVE SUMMARY:
1.1 HS&E INCIDENTS:
 There were zero HSE incidents during this intervention.

1.2 OBJECTIVE:
The program aims to improve the injectivity of Dammam wells by stimulating the open hole
using an HCl acid system to dissolve and bypass any damage present.

 KEY SOR OBJECTIVES:

Achieved Comments
Objective
(Yes/No) (Why objective not achieved?)
Main Objective Yes
Lifting N/A
Other N/A

1.3 INTERVENTION OUTCOME:

 19-Apr-24:
- The Permit to Work (PTW) was printed out, and the team is waiting for the OAA to isolate the well.
- Continued rigging up and conducted the weekly pressure test for BOP (LP 300- HP 5000 Psi) along with the
Pull Test CT Connector (16 K).
- Completed BOP and Pull tests, confirming all systems are in good condition and ready for operations.
 20-Apr-24:

This summary details the well operations conducted on April 18


Pressure Testing and Well Status:

- Executed pressure tests for all equipment ( Inlet FB line, DS, US, SSV) for 5 minutes each, following
the Standard Operating Procedure (SOP).

Pre-Job Injectivity Test:

- The well was opened, and initial shut-in pressures were recorded.
- A pre-job injectivity test was performed, starting at a rate of 1 bpm and increasing to a maximum
of 4 bpm.
- The test concluded with a maximum tubing pressure (TBG) of 274 psi and annular pressure (A
Ann) of 298 psi at 4 bpm.

Prepared by: Ali Saeed


WS Final Intervention Report Template
Date: 22-Apri-24 Checked by: Lolav Majeed
ROO- Wells-WS-TEM-167-A0
Approved by: Haroon Allawi
R-725
CT - Dammam Stimulation
Date: From 19-Apr-24 to 21-Apr-24

Coiled Tubing (CT) Run and Brine Pumping:


- CT was deployed to tag HUD while pumping brine at a minimum rate.
- After tagging the HUD, CT was picked up slightly and flagged.
- Brine with 10% (MS) was then pumped, reaching a TBG pressure of 240 psi and A Ann pressure of
148 psi.
- The CT was retrieved to surface and a soaking period commenced.

Post-M.Solvent Injectivity Test and CT Deployment:


- Brine pumping was restarted for a post-solvent injectivity test, with TBG pressure reaching 20 psi and A Ann
pressure reaching 10 psi.
- CT was then deployed again, this time to a depth of 584 meters while maintaining minimum brine flow.

Acid Treatment:

- In two separate passes, acid was pumped downhole through the CT:
- Pass 1: CT was lowered to a specific depth (HUD-1 meters) while continuously pumping acid at 2.5bpm.
- Pass 2: CT injection was stopped at the same depth, then retrieved to 570 meters while continuing acid
pumping.
- During the acid treatment, circulation pressure reached 4850 psi for the first pass and 4900 psi for the second
pass. A total of 127+27 barrels of acid were used.

Well Shut-In:

- Following the acid treatment, the CT was retrieved to the surface.


- The well was then shut in and allowed to soak.

 19-Apr-24:

FIT and Rig Down Instruction and Crew Activity:

 Start pumping brine (Final-injectivity test), (TBG Shut-in= 138 psi), (Ann A Shut-in= 50psi),
 Received instruction from ROO WSC to commence rig down the equipment.
 OT crew held a TBT with all crew members for flushing and rig down.
 Continue R/D and move to next well

Prepared by: Ali Saeed


WS Final Intervention Report Template
Date: 22-Apri-24 Checked by: Lolav Majeed
ROO- Wells-WS-TEM-167-A0
Approved by: Haroon Allawi
R-725
CT - Dammam Stimulation
Date: From 19-Apr-24 to 21-Apr-24

1.4 JOB CHART

F
Fig: 1 per-injectivity test

Fig:2 Jetting_HCL 15% +10%and MS

Prepared by: Ali Saeed


WS Final Intervention Report Template
Date: 22-Apri-24 Checked by: Lolav Majeed
ROO- Wells-WS-TEM-167-A0
Approved by: Haroon Allawi
R-725
CT - Dammam Stimulation
Date: From 19-Apr-24 to 21-Apr-24

Fig 3 : Post MS Injectivity Test

Fig: 4 open hole Acid-Jetting

Prepared by: Ali Saeed


WS Final Intervention Report Template
Date: 22-Apri-24 Checked by: Lolav Majeed
ROO- Wells-WS-TEM-167-A0
Approved by: Haroon Allawi
R-725
CT - Dammam Stimulation
Date: From 19-Apr-24 to 21-Apr-24

Fig:5 Final injectivity test

1.5 MANAGEMENT OF CHANGE / DISPENSATION:

 N/A
1.6 OTHER SERVICES INVLOVED IN ACHIEVING SOR OBJECTIVES
Date Service Service provider Details/Comments

2. INTERVENTION INFORMATION:
2.1 INTERVENTION DATA:
Wellbore Clearance Fish left in hole:
Depth OD: Details of BHA left in hole: Depth OD
HUD 789.6 m
EOT 563m 4.5”
Depth ID:
Restriction 3.95

Zonal Isolation (Cement Squeeze) Details


Reservoir isolated Top Bottom Cement Type Fluid Loss Leak off test result
N/A

Prepared by: Ali Saeed


WS Final Intervention Report Template
Date: 22-Apri-24 Checked by: Lolav Majeed
ROO- Wells-WS-TEM-167-A0
Approved by: Haroon Allawi
R-725
CT - Dammam Stimulation
Date: From 19-Apr-24 to 21-Apr-24

Zonal Isolation (Mech Plug/Cement Plug) Details


Reservoir isolated Top Bottom Plug Type Plug depth Plug tagged/ MIT results
N/A

Perforating Details
Reservoir Top Bottom Thickness Gun type Gun SPF Double Perfs
size
N/A N/A

Stimulation Details
Stimulation Type Fluid type Rate Pressure Comment
Acid Stimulation (15%HCl) +10%MS) 2.5 bpm 4900

Logging Details
Logging Type Bottom Top Interpretation summary (Comment)

Wellhead Pressures
As Found: As Left: Flowing Parameters:
Well Status: Shut-in Shut-in
THP 0 psi 138psi Choke size N/A S.G water N/A
A Ann 50 psi 50psi USP N/A Salinity N/A
N/A
B Ann 207N/A 0 psi DSP S.G oil --

C Ann N/A 0 psi BSW N/A H2S --

Well Integrity Details


Integrity items Status:
Xmas tree valves TBG closed, Ann A closed, Ann B & C are closed.
Wellhead valves
MIT Details

2.2 DAILY OPERATIONS SUMMARY:

Prepared by: Ali Saeed


WS Final Intervention Report Template
Date: 22-Apri-24 Checked by: Lolav Majeed
ROO- Wells-WS-TEM-167-A0
Approved by: Haroon Allawi
R-725
CT - Dammam Stimulation
Date: From 19-Apr-24 to 21-Apr-24

Date Daily Summary

17-Mar-24 Spot equipment & rig up & pressure test

18-Mar-24 Continue Rig up and Pressure Test, CT purge , RIH for acid pumping

The well was opened with specific pressures and total acid volume was pumped
19-Mar-24
Rig Down and start mobilize the equipment then PTW closed
2.3 Well Schematic:

Prepared by: Ali Saeed


WS Final Intervention Report Template
Date: 22-Apri-24 Checked by: Lolav Majeed
ROO- Wells-WS-TEM-167-A0
Approved by: Haroon Allawi
R-725
CT - Dammam Stimulation
Date: From 19-Apr-24 to 21-Apr-24

2.4 BHA Details

Prepared by: Ali Saeed


WS Final Intervention Report Template
Date: 22-Apri-24 Checked by: Lolav Majeed
ROO- Wells-WS-TEM-167-A0
Approved by: Haroon Allawi
R-725
CT - Dammam Stimulation
Date: From 19-Apr-24 to 21-Apr-24

2.5 CHEMICAL (MATERIAL) CONSUMPTION: