Professional Documents
Culture Documents
Install Cladding-Layout1-1
Install Cladding-Layout1-1
PROPOSED
BATTERY
ROOM SAG ROD D12 SAG ROD D12
PURLIN C200x76x1.9
@1200mm c/c
SAG ROD D12 SAG ROD D12
TEMPORARY LIGHTING
SAG ROD D12 SAG ROD D12
UP
MAIN
IC
E OFFICE
F
OF SION)
SAG ROD D12 SAG ROD D12
AI AN OOR
N
M XP FL
E nd MAIN OFFICE
HOLD SAG ROD D12 SAG ROD D12
(2
SECOND FLOO
6m
SAG ROD D12 SAG ROD D12
6M WIDE INTERNAL
4M width walkway
TEMPORARY LIGHTING
SAG ROD D12 SAG ROD D12
TEMPORARY LIGHTING BOOM LIFT SAG ROD D12 SAG ROD D12
UP 1.5M WIDE PATHWAY FOR MAN MOVEMENT 1.5M WIDE PATHWAY FOR MAN MOVEMENT
SAG ROD D12 SAG ROD D12
8.3m
RAMP DOWN
SLOPE 1:20
FG MATERIAL CORRIDOR X=538832.792
Y=346585.601
RAMP
SLOPE 1:10 CORRIDOR T2A
9.6m 38.1m 8m 3000mt T8A
RBDPO 1000mt
UP
CUTOUT IN WALL OF SIZE 2003MM X 1003MM AT
BOTTOM OF OPENING EL.+ 5.950 (FOR HVAC)