Professional Documents
Culture Documents
BLACK_DRAGON_650W_INSTALLATION MANUAL_Rev4.5
BLACK_DRAGON_650W_INSTALLATION MANUAL_Rev4.5
Laser Machine
650W Peak Power
INSTALLATION MANUAL
Despite having taken every precaution that the information in this document is correct the
illustrations, tables, specifications and diagrams contained in this manual are subject to
change without prior notice.
İzmir / TURKEY
Techincal Support
E-mail: support@vavtechnology.com
VAV Technology guarantees its Black Dragon machines against functional and manufacturing
defects during the following period;
The warranty does not include optical parts (lenses, mirrors, and glass parts), keyboard, the
touch screen, control buttons and the plexiglasses. A full price list of these parts is available
upon request from VAV Technology After Sales Service.
- The transport cost of the return of faulty parts to the manufacturer provided the chosen
mode of transport and shipper has been accepted in writing by VAV Technology.
- The cost of travel, stay, and expenses of our authorised technical service personnel.
- The transportation and any customs clearance costs derived from the shipment of a
repaired or replacement part to the client.
- The cost of repairation of the damaged parts during transit due to incorrect packaging on
the client’s part.
- Any customs costs or expenses if applicable during the return of faulty parts.
- The warranty does not include optical parts (lenses, mirrors, and glass parts), keyboard,
the touch screen, control buttons and the plexiglasses.
This guarantee will be valid provided the working, maintenance, cleanliness and installation
conditions specified by VAV Technology are followed but shall be invalid if any problems or
faults occur due to negligence, bad manipulation, and lack of care or having exceeded the
functional limits of the machine. Damage caused by fire, freezing, accident, wars, natural
disasters, terrorism or other causes beyond human control.
MACHINE DETAILS
Serial Number: Date of Installation:
VAV Technician’s Signature: Customer’s Signature:
Warning
1) It is very important to carry out the inspection of the interior of the packaging within 24
hours of receptions, because if any damage was detected, the time is in which any complaint
to the insurance company can be made is limited.
2) If any damages can be seen by visual control, please contact with VAV Technology and
your internal insurance company as soon as possible.
3) Please make sure that your customs office personnel has to guide your government
customs personnel during the container check. Before closing the container, they have to
check that all of the spanzets are tight again in like its original form.
Check the number of Please check the Check the layout of the
the containers. security seals. The machine component in the
Please make sure doors must be sealed. container. If there are any
that the containers If the seal is missing, damages, take a photo and
number are correct. please inform inform the authorized
authorized personnel personnel immediately.
immediately.
The layout in the container must be as shown in the figure. You can see the 2 main groups
in the container.
Spanzet is used to fix the device for transportation safety. Please remove all spanzets
carefully. the device will come to naught after spanzets are removed.
Pull the main unit to the door of the container. Unload it by forklift as shown in the figure.
Only remove the main laser unit as shown in the figure. Do not pull from the pallet.
Wheels must touch the ground as shown in the figure. All bolts of the wheel's bracket must
be their slot. (If available)
Unload the sliding table units using by a forklift as it shown in the figure above.
1. Electrical Requirements:
Nominal Power: 10 kW
Electrical Consumption: 380 VAC (3 Phase+Earth) 32A, 50 Hz
Cable Diameter: 4mm for a maximum distance of 10 m.
Breaker : 40 A (3 Phase)
RCD Main swich: 50 A (3 Phase), 300mA
ONLINE UPS (For 380V) 20 kVA 3 Phase+Notr 380 VAC, 50 Hz(Filtered Notr)
Regulator 40 kVA 380 VAC 50 Hz
The voltage difference between ground and neutral is lower than 2.0 Vollts.
3. Environment Requirements:
Operating Temperature: From 15 °C to 30 °C
Humidity: Less than 80%
Air conditioning must be installed in the working room
The floor is covered with ceramic and the walls are painted
4. Extraction Requirements:
Pipe Diameter: 300 mm,
Max. Tube (or canal) length: 15 m
Maximum number of 90° 2
joints:
BACK
SIDE
There is one fan on the chiller’s top side that provides the air circulation around the
condenser of the chiller. Condenser increases the air temperature flows around it therefore
hot air leaves the condenser should be released out of environment. The picture below show
the chiller fan’s air connection.
EVERY MONTH CHANGE THE CHILLER WATER AND ADD VAV ANTI-ALG
CHILLER CHEMICAL.
Our laser machine has elastic 300mm diametered pipe connection. In below figure, circle
figures are demonstrating the point that the customer has to arrange their factory suction
system. Factory suction pipes, fans and also the pipe adaptor arrangement are under the
customer’s responsiblity.