RAB ACWC 31
RAB ACWC 31
RAB ACWC 31
HARGA TERPAKAI
NO JENIS BAHAN SATUAN HARGA SURVEY HARGA SK KETERANGAN
tertinggi
REKAPITULASI
HSPK BINAMARGA KABUPATEN MAGETAN
( WILAYAH BAWAH )
Nama Kegiatan :
Nama Pekerjaan :
Lokasi :
Tahun Anggaran :
Jumlah Harga
No. Divisi Uraian Pekerjaan
(Rupiah)
1 Umum 6,803,253.33
2 Sistem Manajemen Keselamatan Konstruksi (SMKK) 11,425,000.00
3 Drainase 41,225,157.77
4 Pekerjaan Tanah Dan Geosintetik 3,853,305.98
5 Pelebaran Preventif 187,221.99
6 Pekerasan Berbutir Dan Perkerasan Beton Semen 207,959.03
7 Perkerasan Aspal 5,244,260.80
8 Struktur 12,167,216.04
9 Rehabilitasi Jembatan 56,301.52
10 Pekerjaan Harian Dan Pekerjaan Lain-Lain 3,387,232.32
11 Pekerjaan Pemeliharaan Kinerja 2,997,269.62
(A) Jumlah Harga Pekerjaan ( termasuk Biaya Umum dan Keuntungan ) 87,554,178.40
(B) Pajak Pertambahan Nilai ( PPN ) = 11% x (A) 9,630,959.62
(C) JUMLAH TOTAL HARGA PEKERJAAN = (A) + (B) 97,185,138.02
Terbilang : ……………………………………………………………………………………....................................
……………………………………………………………………………………....................................
Nama Pekerjaan : -
Lokasi Proyek : -
Volume Fisik : Panjang = 353 Lebar = 3 Meter
Tahun Anggaran : 2023
No Jenis Pekerjaan Volume Satuan Harga Satuan (Rp) Jumlah Harga (Rp)
A BIAYA UMUM
1 - Benda Pos dan Materai 1.00 Paket Rp 100,000.00 Rp 100,000.00
2 - Cetak dan Penggandaan+ Dokumentasi 1.00 Paket Rp 120,951.73 Rp 120,951.73
3 - Honorarium Pelaksana Kegiatan 1.00 Paket Rp 800,000.00 Rp 800,000.00
4 - Honorarium TPK PBJ 1.00 Paket Rp 800,000.00 Rp 800,000.00
5 - Honor Pembuatan RAB 1.00 Paket Rp 4,500,000.00 Rp 4,500,000.00
6 - Papan Proyek 1.00 Paket Rp 150,000.00 Rp 150,000.00
7 - Prasasti 1.00 Paket Rp 300,000.00 Rp 300,000.00
Jumlah A Rp 6,770,951.73
UPAH
- Pekerja 22.00 OH Rp 90,000.00 Rp 1,980,000.00
- Tukang 15.00 OH Rp 100,000.00 Rp 1,500,000.00
Jumlah Rp 3,480,000.00
PEKERJAAN ASPAL
Pekerjaan Lataston Lapis Aus (HRS-WC)
- Mobilisasi Alat 1.00 Paket Rp 7,500,000.00 Rp 7,500,000.00
- Lapis Perekat - Aspal Emulsi 252.00 Liter Rp 26,806.17 Rp 6,755,154.84
- Laston Lapis Aus (AC-WC) 85.05 Ton Rp 1,773,288.41 Rp 150,818,179.27
Jumlah Rp 165,073,334.11
JUMLAH TOTAL Rp 175,324,285.84
PANGGUNG ....................................
Disetujui oleh Diferivikasi oleh Dibuat oleh
Kepala Desa Sekretaris Desa Pelaksana Kegiatan Perencana
a b c d e=bxd f
Pekerjaan Lataston Lapis Aus (HRS-WC)
1 Mobilisasi Alat 1.00 Paket Rp 7,500,000.00 Rp 7,500,000.00 Rp 7,500,000.00
1. BAHAN
1.1 Aspal Emulsi CRS-1 atau RS-1 3.00 Drum Rp 2,325,000.00 Rp 6,975,000.00 Rp 6,975,000.00
1.2 Agr Pch Mesin 5-10 & 10-15 22.00 M3 Rp 308,360.00 Rp 6,783,920.00 Rp 6,783,920.00
1.3 Agr Pch Mesin 0 - 5 16.00 M3 Rp 288,650.00 Rp 4,618,400.00 Rp 4,618,400.00
1.4 Pasir Halus 24.00 M3 Rp 274,570.00 Rp 6,589,680.00 Rp 6,589,680.00
1.5 Semen 40.00 Zak Rp 69,470.00 Rp 2,778,800.00 Rp 2,778,800.00
1.6 Aspal 44.00 Drum Rp 2,151,400.00 Rp 94,661,600.00 Rp 94,661,600.00
4.1. Benda Pos dan Materai 1.00 Paket Rp 100,000.00 Rp 100,000.00 Rp 100,000.00
4.2. Cetak dan Penggandaan+ Dokumentasi 1.00 Paket Rp 120,951.73 Rp 120,951.73 Rp 120,951.73
4.3. Honorarium Pelaksana Kegiatan 1.00 Paket Rp 800,000.00 Rp 800,000.00 Rp 800,000.00
4.4. Honorarium TPK PBj 1.00 Paket Rp 800,000.00 Rp 800,000.00 Rp 800,000.00
4.5. Honor PembuataN RAB 1.00 Paket Rp 4,500,000.00 Rp 4,500,000.00 Rp 4,500,000.00
4.6 Papan Proyek 1.00 Paket Rp 150,000.00 Rp 150,000.00 Rp 150,000.00
4.7. Prasasti 1.00 Paket Rp 300,000.00 Rp 300,000.00 Rp 300,000.00
B
Kegiatan : Penyelenggaraan Jalan Kabupaten / Kota
Sub Kegiatan Pemeliharaan Berkala Jalan
Nama Pekerjaan : Pemeliharaan Jalan Petungrejo - Kuwonharjo
lokasi Proyek : Kab. Magetan
Tahun : 2022 WILAYAH BAWAH
Volume Pekerjaan : P= 302 m ,L= 3,5 m
Jumlah Harga Pekerjaan DIVISI 1 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 9,100,000.00
Jumlah Harga Pekerjaan DIVISI 2 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 3,241,550.00
Jumlah Harga Pekerjaan DIVISI 7 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 133,604,536.74
B
HARGA SATUAN POKOK KEGIATAN BIDANG BINA MARGA
( WILAYAH BAWAH )
Nama Kegiatan : ………………………………………………
Nama Pekerjaan : ………………………………………………
Lokasi : …………………………………………………………………..
Tahun Anggaran : ………………………………………………
DIVISI 1. UMUM
1.2 MOBILISASI
1.2.1 Transportasi Peralatan Paket 1.00 - 0.00
Jumlah Harga Pekerjaan DIVISI 1 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 6,803,253.33
Jumlah Harga Pekerjaan DIVISI 2 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 11,425,000.00
DIVISI 3. DRAINASE
3.1 Selokan dan Saluran Air
3.1.(1) Galian untuk Selokan Drainase dan Saluran Air M3 1.00 74,645.05 74,645.05
Jumlah Harga Pekerjaan DIVISI 3 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 41,225,157.77
4.2 Timbunan
4.2.(1a) Timbunan Biasa dari sumber galian M3 1.00 157,889.41 157,889.41
4.2.(1b) Timbunan Biasa dari galian M3 1.00 66,960.91 66,960.91
4.2.(2a) Timbunan Pilihan dari sumber galian M3 1.00 218,942.76 218,942.76
4.2.(2b) Timbunan Pilihan dari galian M3 1.00 59,256.05 59,256.05
4..5 Geotekstil
4.5.(6) Lapisan Plastik Tebal 0,08 mm M2 1.00 4,903.49 4,903.49
Jumlah Harga Pekerjaan DIVISI 4 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 3,853,305.98
5.4 Lapis Penutup Bubur Aspal Emulsi (Emulsified Asphalt Slurry Seal)
5.4.(5) Penghamparan lapis penutup bubur aspal emulsi, tipe 3, CSS-1h SS-1h M2 1.00 76,407.91 76,407.91
5.4.(6) Penghamparan lapis penutup bubur aspal emulsi, tipe 3, CQS-1h QS-1h M2 1.00 85,653.67 85,653.67
Jumlah Harga Pekerjaan DIVISI 5 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 187,221.99
Jumlah Harga Pekerjaan DIVISI 6 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 207,959.03
7.2 Laburan Aspal Satu Lapis (Burtu) Dan Laburan Aspal Dua Lapis (BURDA)
7.2 (1) Agregat Penutup BURTU M2 1.00 49,680.48 49,680.48
7.2 (2) Agregat Penutup BURDA M2 1.00 77,163.54 77,163.54
No. Mata Uraian Satuan Perkiraan Harga Jumlah
Pembayaran Kuantitas Satuan Harga-Harga
(Rupiah) (Rupiah)
a b c d e f = (d x e)
Jumlah Harga Pekerjaan DIVISI 7 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 5,244,260.80
DIVISI 8. STRUKTUR
8.1 Beton dan Beton Kinerja Tinggi
8.1 (5a) Beton struktur, fc’30 MPa M3 1.00 1,380,612.06 1,380,612.06
8.1 (6a) Beton struktur, fc’25 Mpa M3 1.00 1,304,139.91 1,304,139.91
8.1 (7a) Beton strukur, fc’20 MPa M3 1.00 1,149,991.73 1,149,991.73
8.1 (8) Beton , fc’15 Mpa M3 1.00 1,097,866.40 1,097,866.40
8.1 (9) Beton Siklop, fc’15 Mpa M3 1.00 1,018,863.94 1,018,863.94
8.1 (10) Beton, fc’10 Mpa M3 1.00 991,082.43 991,082.43
8.1 (11) Perancah/Begesting/Acuan M2 1.00 84,395.00 84,395.00
8.1 (12) Perancah/Begesting/Acuan Untuk Konstruksi Jembatan M2 1.00 201,634.00 201,634.00
Jumlah Harga Pekerjaan DIVISI 8 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 12,167,216.04
Jumlah Harga Pekerjaan DIVISI 9 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 56,301.52
Jumlah Harga Pekerjaan DIVISI 10 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 3,387,232.32
Jumlah Harga Pekerjaan DIVISI 11 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 2,997,269.62
DIDIEK BUDIMAN, ST
NIP. 19790227 200901 1 009
VOL.PEKERJAAN
Kegiatan :
Sub Kegiatan :
Nama Pekerjaan :
lokasi Proyek :
Tahun :
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 3.3.(13) PERKIRAAN VOL. PEK. : Err:509
: Gorong-gorong Kotak Beton Bertulang,
JENIS PEKERJAAN ukuran dalam 60 x 60 cm TOTAL HARGA (Rp.) : 2,458,785.58
SATUAN PEMBAYARAN : Buah % THD. BIAYA PROYEK : 2.53
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 5.4.(6) PERKIRAAN VOL. PEK. : Err:509
JENIS PEKERJAAN : Penghamparan Lapis penutup bubur TOTAL HARGA : Err:509
SATUAN PEMBAYARAN : Meter Persegi % THD. BIAYA PROYEK : Err:509
A. TENAGA
B. BAHAN
C. PERALATAN
1. Air Compresor E05 Jam 0.0011 242,376.57 266.61
2 Power Boom E94 Jam 0.0000 75,480.09 0.00
3 Wheel Loader E15 Jam 0.0000 581,107.36 0.00
4 Dump Truck E908 Jam 0.0096 638,944.51 6,133.87
5 Asphalt Slurriy Seal T E49a Jam 0.0125 554,701.11 6,933.76
6 Tandem Roller E17 Jam 0.0000 518,554.53 0.00
7 Alat Bantu Ls 1.0000 1,000.00 1,000.00
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 6.1.(1) PERKIRAAN VOL. PEK. : Err:509
JENIS PEKERJAAN : Lapis Fondasi Agregat Kelas A TOTAL HARGA : Err:509
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : Err:509
A. TENAGA
B. BAHAN
C. PERALATAN
1. Wheel Loader (E15) jam 0.1146 581,107.36 66,606.85
2. Dump Truck (E09) jam 0.5129 638,944.51 327,712.41
3. Motor Grader (E13) jam 0.0073 601,220.04 4,400.82
4. Vibratory Roller (E19a) jam 0.0226 365,964.01 8,272.24
5 Alat Bantu Ls 1.0000 5,000.00 5,000.00
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 6.1.(2) PERKIRAAN VOL. PEK. : Err:509
JENIS PEKERJAAN : Lapis Fondasi Agregat Kelas B TOTAL HARGA : 339,775.20
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : #REF!
A. TENAGA
B. BAHAN
C. PERALATAN
1. Wheel Loader (E15) jam 0.0102 581,107.36 5,913.06
2. Dump Truck (E09) jam 0.3775 638,944.51 241,231.89
3. Motor Grader (E13) jam 0.0010 601,220.04 575.49
4. Vibratory Roller (E19a) jam 0.0231 365,964.01 8,450.52
5 Alat Bantu Ls 1.0000 0.00 0.00
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 6.1.(3) PERKIRAAN VOL. PEK. : 1.00
JENIS PEKERJAAN : Lapis Fondasi Agregat Kelas S TOTAL HARGA : 339,726.12
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : #REF!
A. TENAGA
B. BAHAN
C. PERALATAN
1. Wheel Loader (E15) jam 0.0103 581,107.36 5,994.62
2. Dump Truck (E09) jam 0.3831 638,944.51 244,774.67
3. Motor Grader (E13) jam 0.0010 601,220.04 575.49
4. Vibratory Roller (E19a) jam 0.0231 365,964.01 8,450.52
5 Alat Bantu Ls 1.0000 0.00 0.00
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 6.1.(4) PERKIRAAN VOL. PEK. : 1.00
JENIS PEKERJAAN : Lapis Drainase TOTAL HARGA : 356,668.94
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : #REF!
A. TENAGA
B. BAHAN
C. PERALATAN
1. Wheel Loader (E15) jam 0.0086 581,107.36 4,986.92
2. Dump Truck (E09) jam 0.1627 638,944.51 103,939.90
3. Motor Grader (E13) jam 0.0010 601,220.04 575.49
4. Vibratory Roller (E19b) jam 0.0058 365,964.01 2,138.08
5 Alat Bantu Ls 1.0000 0.00 0.00
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 6.2.(1) PERKIRAAN VOL. PEK. : 1.00
JENIS PEKERJAAN : Lapis Permukaan Agregat Tanpa PenutuTOTAL HARGA : 382,101.20
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : #REF!
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 6.2.(2) PERKIRAAN VOL. PEK. : 1.00
JENIS PEKERJAAN : Lapis Fondasi Agregat Tanpa Penutup ATOTAL HARGA : 339,463.69
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : #REF!
A. TENAGA
B. BAHAN
C. PERALATAN
1. Wheel Loader (E15) jam 0.0087 581,107.36 5,055.70
2. Dump Truck (E09) jam 0.1652 638,944.51 105,526.79
3. Motor Grader (E13) jam 0.0010 601,220.04 575.49
4. Vibratory Roller (E19a) jam 0.0097 365,964.01 3,563.47
6. Alat Bantu Ls 1.0000 0.00 0.00
PROYEK :
NAMA PAKET : …………………………………………………………………..
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 6.3.(1a) PERKIRAAN VOL. PEK. : 1.00
JENIS PEKERJAAN : Perkerasan Beton Semen TOTAL HARGA (Rp.) : 1,187,073.25
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : #REF!
A. TENAGA
1. Pekerja (L01) jam 0.2892 11,214.29 3,243.17
B. BAHAN
1. Semen (M12) Kg 391.7900 1,736.75 680,441.28
2 Pasir (M01a) M3 0.5096 402,710.00 205,221.02
3 Agregat Kasar (M03) M3 0.8593 216,190.32 185,772.34
4 Air (M170) M3 161.3850 14.65 2,364.29
5 Plasticizer (M171) M3 1.1754 Err:509 Err:509
6 Baja Tulangan Polos (M39a) Kg 7.1680 13,612.47 97,574.21
7 Joint Sealent (M94) Kg 1.5930 Err:509 Err:509
8 Cat Anti Karat (M95) Kg 0.0010 Err:509 Err:509
9 Expansion Cap (M96) M2 0.0000 Err:509 Err:509
10 Polytene 125 mikron (M97) Kg 0.4830 Err:509 Err:509
11 Curing Compound (M98) Ltr 1.2700 Err:509 Err:509
C. PERALATAN
1 Wheel Loader E43 jam 0.0373 581,107.36 21,703.36
2 Concrete Mixing Plant E43 jam 0.2143 103,356.29 22,147.78
3 Truck Mixer Agitator E49 jam 0.8177 891,634.42 729,128.38
4 Concrete Paver E42 jam 0.0023 2,615,645.06 5,931.17
5 Alat Bantu Ls 1.0000 0.00 0.00
PROYEK :
NAMA PAKET : …………………………………………………………………..
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 6.3.(1a) PERKIRAAN VOL. PEK. : 1.00
JENIS PEKERJAAN : Perkerasan Beton Semen TOTAL HARGA (Rp.) : #REF!
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : #REF!
A. TENAGA
1. Pekerja (L01) jam 0.5020 11,214.29 5,629.66
2 Mandor (L03) jam 0.1004 15,071.43 1,513.20
B. BAHAN
1. Semen (M12) Kg 334.7500 1,736.75 581,377.06
2 Pasir (M01a) M3 0.5163 402,710.00 207,923.34
3 Agregat Kasar (M03) M3 0.9414 216,190.32 203,517.09
4 Air (M170) M3 163.7700 14.65 2,399.23
5 Plasticizer (M67a) M3 1.0043 Err:509 Err:509
6 Baja Tulangan Polos (M39a) Kg 15.8750 13,612.47 216,098.01
7 Joint Sealent (M94) Kg 0.9900 Err:509 Err:509
8 Cat Anti Karat (M95) Kg 0.0200 Err:509 Err:509
9 Expansion Cap (M96) M2 0.1700 Err:509 Err:509
10 Polytene 125 mikron (M97) Kg 0.4375 Err:509 Err:509
11 Curing Compound (M98) Ltr 0.8700 Err:509 Err:509
12 Formwork Plate (M195) M2 0.5700 Err:509 Err:509
C. PERALATAN
1 Wheel Loader E15 jam 0.0071 581,107.36 4,118.41
2 Concrete Mixing Plant E43 jam 0.0502 103,356.29 5,188.57
3 Truck Mixer Agitator E49 jam 0.2762 891,634.42 246,293.30
4 Concrete Vibrator (for manual) E20 jam 0.3012 47,790.11 14,394.61
5 Alat Bantu Ls 1.0000 0.00 0.00
PROYEK :
NAMA PAKET : …………………………………………………………………..
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 6.3.(1b) PERKIRAAN VOL. PEK. : 1.00
JENIS PEKERJAAN : Perkerasan Beton Semen Fas TrackTOTAL HARGA (Rp.) : 3,685,387.62
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : #REF!
A. TENAGA
1. Pekerja (L01) jam 0.5020 11,214.29 5,629.66
B. BAHAN
1 Semen (M12) Kg 409.425 1,736.75 711,068.87
2 Fly Ash (M05) Kg 136.475 Err:509 Err:509
3 Pasir (M01a) M3 0.416 402,710.00 167,680.11
4 Agregat Kasar (M03) M3 0.923 216,190.32 199,603.30
5 Air (M170) Liter 163.770 14.65 2,399.23
6 Super Plasticizer (M67a) Kg 4.913 Err:509 Err:509
7 Accelerator (M256) Kg 24.566 Err:509 Err:509
8 Baja Tulangan Polos (M39a) Kg 15.875 13,612.47 216,098.01
9 Joint Sealent (M94) Kg 0.990 Err:509 Err:509
10 Cat Anti Karat (M95) Kg 0.020 Err:509 Err:509
11 Expansion Cap (M96) M2 0.170 Err:509 Err:509
12 Polytene 125 mikron (M97) Kg 0.438 Err:509 Err:509
13 Curing Compound (M98) Ltr 0.870 Err:509 Err:509
14 Formwork Plate (M195) M2 0.570 Err:509 Err:509
15 Insulasi (M257) M2 3.500 Err:509 Err:509
C. PERALATAN
1 Wheel Loader E15 jam 0.0071 581,107.36 4,118.41
2 Concrete Mixing Plant E80 jam 0.0502 103,356.29 5,188.57
3 Truck Mixer Agitator E49 jam 0.2382 891,634.42 212,426.50
4 Concrete Vibrator (for manual) E20 jam 0.3012 47,790.11 14,394.61
5 Alat Bantu Ls 1.0000 0.00 0.00
PROYEK :
NAMA PAKET : …………………………………………………………………..
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 6.3.(1c) PERKIRAAN VOL. PEK. : 1.00
JENIS PEKERJAAN : Perkerasan Beton Semen Fas TrackTOTAL HARGA (Rp.) : 2,875,142.71
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : #REF!
A. TENAGA
1. Pekerja (L01) jam 0.5020 11,214.29 5,629.66
B. BAHAN
1. Semen (M12) Kg 409.4250 1,736.75 711,068.87
2 Fly Ash (M05) Kg 136.475 Err:509 Err:509
3 Pasir (M01a) M3 0.4164 402,710.00 167,680.11
4 Agregat Kasar (M03) M3 0.9233 216,190.32 199,603.30
5 Air (M170) Liter 163.770 14.65 2,399.23
6 Super Plasticizer (M67a) Kg 4.913 Err:509 Err:509
7 Water Reducing & Retarder (M256) Kg 0.819 Err:509 Err:509
8 Baja Tulangan Polos (M39a) Kg 15.8750 13,612.47 216,098.01
9 Joint Sealent (M94) Kg 0.9900 Err:509 Err:509
10 Cat Anti Karat (M95) Kg 0.0200 Err:509 Err:509
11 Expansion Cap (M96) M2 0.1700 Err:509 Err:509
12 Polytene 125 mikron (M97) Kg 0.4375 Err:509 Err:509
13 Curing Compound (M98) Ltr 0.8700 Err:509 Err:509
14 Formwork Plate (M195) M2 0.5700 Err:509 Err:509
15 Insulasi (M257) M2 3.5000 Err:509 Err:509
C. PERALATAN
1 Wheel Loader E15 jam 0.0071 581,107.36 4,118.41
2 Concrete Mixing Plant E43 jam 0.0502 103,356.29 5,188.57
3 Truck Mixer Agitator E49 jam 0.2762 891,634.42 246,293.30
4 Concrete Vibrator (for manual) E20 jam 0.3012 47,790.11 14,394.61
5 Alat Bantu Ls 1.0000 0.00 0.00
PROYEK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 6.3.(2a) PERKIRAAN VOL. PEK. : 1.00
JENIS PEKERJAAN : Perkerasan Beton Semen dengan A TOTAL HARGA (Rp.) : 1,791,965.07
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : #REF!
A. TENAGA
1. Pekerja (L01) jam 0.6024 11,214.29 6,755.59
B. BAHAN
1. Semen (M12) Kg 334.7500 1,736.75 581,377.06
2 Pasir (M01a) M3 0.5163 402,710.00 207,923.34
3 Agregat Kasar (M03) M3 0.9414 216,190.32 203,517.09
4 Air (M170) M3 163.7700 14.65 2,399.23
5 Plasticizer (M67a) M3 1.0043 Err:509 Err:509
6 Baja Tulangan Polos (M39a) Kg 15.8750 13,612.47 216,098.01
7 Anyaman Kawat Baja Dilas (M258) Kg 12.1839 Err:509 Err:509
8 Joint Sealent (M94) Kg 0.9900 Err:509 Err:509
9 Cat Anti Karat (M95) Kg 0.0200 Err:509 Err:509
10 Expansion Cap (M96) M2 0.1700 Err:509 Err:509
11 Polytene 125 mikron (M97) Kg 0.3281 Err:509 Err:509
12 Curing Compound (M98) Ltr 0.6525 Err:509 Err:509
13 Formwork Plate (M195) M2 0.5700 Err:509 Err:509
C. PERALATAN
1 Wheel Loader E15 jam 0.0071 581,107.36 4,118.41
2 Concrete Mixing Plant E80 jam 0.0502 - 0.00
3 Truck Mixer Agitator E49 jam 0.2762 891,634.42 246,293.30
4 Concrete Vibrator (for manual) E20 jam 0.3012 47,790.11 14,394.61
5 Alat Bantu Ls 1.0000 0.00 0.00
PROYEK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 6.3.(2b) PERKIRAAN VOL. PEK. : 1.00
JENIS PEKERJAAN : Perkerasan Beton Semen Fast Trac TOTAL HARGA (Rp.) : 70,646,670.00
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : #REF!
A. TENAGA
1. Pekerja (L01) jam 0.6024 11,214.29 6,755.59
B. BAHAN
1. Semen (OPC Tipe I) (M12) Kg 409.4250 1,736.75 711,068.87
2 Abu Terbang (M05) Kg 136.4750 Err:509 Err:509
3 Pasir Beton (M01a) M3 0.4164 402,710.00 167,680.11
4 Agregat Kasar (M03) M3 0.9233 216,190.32 199,603.30
5 Air (M170) Ltr 163.7700 14.65 2,399.23
6 Super Plastizier (M67a) Kg 4.9131 Err:509 Err:509
7 Accelerator (M256) Kg 24.5655 Err:509 Err:509
8 Baja Tulangan Polos (M39a) Kg 15.8750 13,612.47 216,098.01
9 Anyaman Kawat Baja Dilas (M258) Kg 12.1839 Err:509 Err:509
10 Joint Sealent (M94) Kg 0.9900 Err:509 Err:509
11 Cat Anti Karat (M95) Kg 0.0200 Err:509 Err:509
12 Expansion Cap (M96) M2 0.1700 Err:509 Err:509
13 Polytene 125 mikron (M97) Kg 0.4375 Err:509 Err:509
14 Curing Compound (M98) Ltr 0.8700 Err:509 Err:509
15 Formwork Plate (M195) M2 0.5700 Err:509 Err:509
16 Insulasi (M257) M2 3.5000 Err:509 Err:509
C. PERALATAN
1 Wheel Loader E15 jam 0.0071 581,107.36 4,118.41
2 Concrete Mixing Plant E80 jam 0.0502 - 0.00
3 Truck Mixer Agitator E49 jam 0.2762 2,344,635.74 647,651.16
4 Concrete Vibrator (for manual) E20 jam 0.3012 47,790.11 14,394.61
5 Alat Bantu Ls 1.0000 0.00 0.00
PROYEK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 6.3.(2c) PERKIRAAN VOL. PEK. : 1.00
JENIS PEKERJAAN : Perkerasan Beton Semen Fast Trac TOTAL HARGA (Rp.) : 3,356,831.42
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : #REF!
A. TENAGA
1. Pekerja (L01) jam 0.6024 11,214.29 6,755.59
B. BAHAN
1. Semen (OPC Tipe I) (M12) Kg 409.4250 1,736.75 711,068.87
2 Abu Terbang (M05) Kg 136.4750 Err:509 Err:509
3 Pasir Beton (M01a) M3 0.4164 402,710.00 167,680.11
4 Agregat Kasar (M03) M3 0.9233 216,190.32 199,603.30
5 Air (M170) Ltr 163.7700 14.65 2,399.23
6 Super Plastizier (M171) Kg 4.9131 Err:509 Err:509
7 W.Reducing&Retarder (M256) Kg 0.8189 Err:509 Err:509
8 Baja Tulangan Polos (M39a) Kg 15.8750 13,612.47 216,098.01
9 Anyaman Kawat Baja Dilas (M258) Kg 0.9900 Err:509 Err:509
10 Joint Sealent (M94) Kg 12.1839 Err:509 Err:509
11 Cat Anti Karat (M95) Kg 0.0200 Err:509 Err:509
12 Expansion Cap (M96) M2 0.1700 Err:509 Err:509
13 Polytene 125 mikron (M97) Kg 0.4375 Err:509 Err:509
14 Curing Compound (M98) Ltr 0.8700 Err:509 Err:509
15 Formwork Plate (M195) M2 0.5700 Err:509 Err:509
16 Insulasi (M257) M2 3.5000 Err:509 Err:509
C. PERALATAN
1 Wheel Loader E15 jam 0.0071 581,107.36 4,118.41
2 Concrete Mixing Plant E80 jam 0.0502 - 0.00
3 Truck Mixer Agitator E49 jam 0.2762 2,344,635.74 647,651.16
4 Concrete Vibrator (for manual) E20 jam 0.3012 47,790.11 14,394.61
5 Alat Bantu Ls 1.0000 0.00 0.00
PROYEK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 6.3.(3) PERKIRAAN VOL. PEK. : 1.00
JENIS PEKERJAAN : Lapis Pondasi Bawah Beton Kurus TOTAL HARGA (Rp.) : #REF!
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : #REF!
A. TENAGA
1. Pekerja (L01) jam 0.4016 11,214.29 4,503.73
B. BAHAN #REF!
1. Semen (M12) Kg 233.8100 1,736.75 406,069.52 #REF!
2 Pasir (M01a) M3 0.5996 402,710.00 241,459.36 #REF!
3 Agregat Kasar (M03) M3 0.9247 216,190.32 199,916.40 #REF!
4 Air (M170) Ltr 163.7700 14.65 2,399.23 #REF!
5 Plasticizer (M171) Kg 0.7014 Err:509 Err:509 #REF!
6 Formwork Plate (M195) M2 0.1900 Err:509 Err:509 #REF!
#REF!
JUMLAH HARGA BAHAN Err:509 #REF!
#REF!
C. PERALATAN #REF!
1 Wheel Loader E15 jam 0.0071 581,107.36 4,118.41 #REF!
2 Batching Plant (Concrete Pan Mixe E80 jam 0.0502 - 0.00 #REF!
3 Concrete Truck Mixer E49 jam 0.2762 891,634.42 246,293.30 #REF!
4 Concrete Vibrator (for manual) E20 jam 0.3012 47,790.11 14,394.61 #REF!
5 Alat Bantu Ls 1.0000 0.00 0.00 #REF!
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 6.4.(1) PERKIRAAN VOL. PEK. : 1.00
JENIS PEKERJAAN : Stabilisasi Tanah Dasar dengan Se TOTAL HARGA : 165,951.26
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : #REF!
A. TENAGA
B. BAHAN
1. Semen (M12) Kg 56.2380 1,736.75 97,671.35
2. Curing Membrane (M259) M2 2.7111 Err:509 Err:509
C. PERALATAN
1. Dump Truck (E09) Jam 0.1775 638,944.51 113,419.43
2. Motor Grader (E13) Jam 0.0006 601,220.04 383.66
3. Watertank Truck (E23) Jam 0.0462 520,768.39 24,051.55
4. Pneumatic Tire Roller (E18) Jam 0.0073 131,835.27 960.47
5. Pulvimixer (E27) Jam 0.0030 532,814.31 1,585.05
6 Alat Bantu Ls 1.0000 0.00 0.00
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 6.4.(2) PERKIRAAN VOL. PEK. : 1.00
JENIS PEKERJAAN : Lapis Fondasi Tanah Semen TOTAL HARGA : 337,956.14
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : 0.02
A. TENAGA
B. BAHAN
C. PERALATAN
1. Wheel Loader (E15) Jam 0.0084 581,107.36 4,881.08
2. Dump Truck (E09) Jam 0.0852 638,944.51 54,434.43
3. Motor Grader (E13) Jam 0.0006 601,220.04 383.66
4 Pneumatic Tire Roller (E18) Jam 0.0102 647,535.67 6,604.56
5 Watertank truck (E23) Jam 0.0462 520,768.39 24,051.55
6 Pulvimixer (E27) Jam 0.0030 532,814.31 1,585.05
7. Alat Bantu Ls 1.0000 0.00 0.00
PROYEK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 6.5.(1) PERKIRAAN VOL. PEK. : 1.00
JENIS PEKERJAAN : Lapis Fondasi Agregat Semen Kela TOTAL HARGA (Rp.) : 483,069.36
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : #REF!
A. TENAGA
1. Pekerja (L01) jam 0.0112 11,214.29 125.10
2. Tukang (L02) jam 0.0000 12,714.29 0.00
3. Mandor (L03) jam 0.0011 15,071.43 16.81
B. BAHAN
C. PERALATAN
1 Wheel Loader E15 jam 0.0087 581,107.36 5,055.70
2 Self Propelled Mixer jam 0.0011 550,000.00 613.57
3 Dump Truck E09 jam 0.0879 638,944.51 56,188.52
4 Vibratory Padfoot Roller 25T jam 0.0065 386,887.65 2,511.47
5 Watertank Truck E23 jam 0.0141 520,768.39 7,320.04
6 Alat Bantu Ls 1.0000 0.00 0.00
PROYEK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 6.5.(2) PERKIRAAN VOL. PEK. : 1.00
JENIS PEKERJAAN : Lapis Fondasi Agregat Semen Kela TOTAL HARGA (Rp.) : 121,774.03
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : #REF!
A. TENAGA
1. Pekerja (L01) jam 0.0112 11,214.29 125.10
2. Tukang (L02) jam 0.0000 12,714.29 0.00
3. Mandor (L03) jam 0.0011 15,071.43 16.81
B. BAHAN
1. Semen (M12) Kg 87.0865 1,736.75 151,247.48
2 Lapis Fondasi Agregat Kelas B (M27) M3 1.0500 256,029.92 268,831.42
C. PERALATAN
1 Wheel Loader E15 jam 0.0086 581,107.36 4,986.92
2 Self Propelled Mixer jam 0.0011 550,000.00 613.57
3 Dump Truck E09 jam 0.0865 638,944.51 55,284.65
4 Vibratory Padfoot Roller 25 T jam 0.0065 386,887.65 2,511.47
5 Watertank Truck E23 jam 0.0141 520,768.39 7,320.04
6 Alat Bantu Ls 1.0000 0.00 0.00
Analisa EI-653
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : Jawa Timur / Kabupaten Magetan
ITEM PEMBAYARAN NO. : 6.5.(3) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : LAPIS PONDASI BATU BELAH ( TELFORD ) TEBAL 20 CM
SATUAN PEMBAYARAN : M2 % THD. BIAYA PROYEK : 0.00
PERKIRAAN HARGA JUMLAH
NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)
A. TENAGA
B. BAHAN
C. PERALATAN
1. Tandem Roller (E17) jam 0.0002 518,554.53 128.24
2. Water Tank truk (E23) jam 0.0141 520,768.39 7,320.04
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Analisa EI-654
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : Jawa Timur / Kabupaten Magetan
ITEM PEMBAYARAN NO. : 6.5.(4) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : LAPIS PONDASI BATU BELAH ( TELFORD ) TEBAL 15 CM
SATUAN PEMBAYARAN : M2 % THD. BIAYA PROYEK : 0.00
A. TENAGA
B. BAHAN
C. PERALATAN
1. Tandem Roller (E17) jam 0.0007 463,368.86 343.76
2. Water Tank truk (E23) jam 0.0141 520,768.39 7,320.04
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Analisa EI-656
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : Jawa Timur / Kabupaten Magetan
ITEM PEMBAYARAN NO. : 6.5.(6) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : LAPIS PONDASI BATU BELAH TEBAL 6 CM
SATUAN PEMBAYARAN : M2 % THD. BIAYA PROYEK : 0.00
A. TENAGA
B. BAHAN
C. PERALATAN
1. Tandem Roller (E17) jam 0.0004 518,554.53 192.35
2. Water Tank truk (E23) jam 0.0141 520,768.39 7,320.04
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
ITEM PEMBAYA: 7.3(5a) Analisa EI-735a
JENIS PEKERJ : Laston Lapis Aus (AC-WC)
SATUAN PEMB: Ton URAIAN ANALISA HARGA SATUAN
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 10.83 KM
5 Tebal Lapis (AC-WC) padat t 0.04 M Tabel 6.3.11
6 Jam kerja efektif per-hari Tk 7.00 Jam
7 Faktor kehi- Agregat Fh1 1.05 - 1.05
- Aspal Fh2 1.02 - 1.02
8 Berat isi Agregat (padat) Bip 1.80 ton/m3
9 Berat Isi Agregat (lepas) Bil 1.50 ton/m3
10 Komposisi campuran AC-WC : 1.65
- Agr Pch Mesin 5 - 10 & 10 - 15 mm 5-10&10-15 40.28 % Gradasi harus -
- Agregat Pecah Mesin 0 - 5 mm 0-5 52.68 % memenuhi -
- Semen FF 0.94 % Spesifikasi
- Asphalt As 5.80 %
- Anti Stripping Agent Asa 0.30 %As
11 Berat isi bahan :
- AC-WC D1 2.25 ton / M3
- Agr Pch Mesin 5 - 10 & 10 - 15 mm D2 1.42 ton / M3
- Agr Pch Mesin 0 - 5 mm D3 1.57 ton / M3
12 Jarak Stock pile ke Cold Bin l 0.10 km
1. BAHAN
1.a. Agr 5= ("5-10&10-15" x Fh1) : D2 (M92) 0.2978 M3
1.b. Agr 0= ("0-5" x Fh1) : D3 (M91) 0.3523 M3
1.c. Seme= (FF x Fh2) x 1000 (M12) 9.5880 Kg
1.d. Aspal= (As x Fh2) x 1000 (M10) 59.1600 Kg
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3 panduan
Faktor bucket Fb 0.85 -
Faktor efisiensi alat Fa 0.70 -
WaktuT1 + T2 + T3 Ts1
- Kecepatan maju rata rata Vf 10.00 km/jam panduan
- Kecepatan kembali rata rata Vr 15.00 km/jam panduan
- Muat (l x 60) / Vf T1 0.60 menit
- Kembali ke Stock pile = (l x 60) / Vr T2 0.40 menit
- Lain - lain (waktu pasti) T3 10.00 menit
Ts1 11.00 menit
Kap.P
V x Fa Q2 57.00 ton
Kap.P
V x Fa x 60 x D1 Q4 7.71 ton
Ts2
3. TENAGA
Produksi menentukan : A M P Q2 57.00 ton / Jam
Produksi AC-WC / hari = Tk x Q2 Qt 399.00 ton
Kebutuhan tenaga :
- Pekerja P 10.00 orang
- Mandor M 1.00 orang
ANGGARAN
KODE URAIAN
VOLUME HARGA SATUAN JUMLAH
5.3.8.01 Belanja Modal Jalan - Honor Tim Pelaksana Kegiatan Rp. 1,125,000.00
1 Lapis Perekat - Aspal Emulsi DDS 252.00 Liter Rp. 26,800.00 Rp. 6,753,600.00
2 Laston Lapis Aus (AC-WC) DDS 85.05 Ton Rp. 1,450,000.00 Rp. 123,322,500.00
1 ATK Dan Benda Pos DDS 1.00 Paket Rp. 123,900.00 Rp. 123,900.00
2 Cetak Penggandaan Dan Dokumentasi DDS 1.00 Paket Rp. 185,000.00 Rp. 185,000.00
3 Konsumsi Musyawarah DDS 1.00 Paket Rp. 120,000.00 Rp. 120,000.00
4 Honor Pembuatan RAB DDS 1.00 Paket Rp. 4,500,000.00 Rp. 4,500,000.00
5 Papan Proyek DDS 1.00 Paket Rp. 200,000.00 Rp. 200,000.00
6 Prasasti DDS 1.00 Paket Rp. 450,000.00 Rp. 450,000.00
26 Maret 2024
4%
4%
8%
PROVINSI JAWA TIMUR
KABUPATEN MAGETAN
KECAMATAN BARAT
Desa Panggung
JENIS PRASARANA
lokasi
Dusun Boro
Potongan Melintang Jalan Datar (Pot I-I) Dibuat dan Di Gambar Oleh:
Pelaksana Kegiatan
Lap.Aspal Permukaan Baru (Laston AC-WC,t=3 Cm
4% PURHADI
Perencana
6% - 8%
ALI ROFI''I
Diperiksa dan Disetujui oleh:
Kepala Desa
KETERANGAN
Detail A
PROVINSI JAWA TIMUR
KABUPATEN MAGETAN
KECAMATAN BARAT
Desa Panggung
JENIS PRASARANA
lokasi
Dusun Boro
Dibuat dan Di Gambar Oleh:
Pelaksana Kegiatan
PURHADI
Perencana
ALI ROFI''I
Diperiksa dan Disetujui oleh:
Kepala Desa
WIWIK WIDYASTUTIK
JUDUL GAMBAR
Peta Lokasi
KETERANGAN