MIM No. 1200.000 - 01-14-2015-14
MIM No. 1200.000 - 01-14-2015-14
6.3.3 Responsibilities
6.3.3.1.6 If timely corrective actions are not taken or if contractor company has
persistent ‘unsatisfactory’ safety performance (multiple Safety
Performance Codes of 5 or repeated ratings of 5 in the same evaluation
categories of Safety Management Guide 07-002-2010 attachment A3),
then request contractor personnel changes, re-evaluate contractor’s pre-
qualification, and/or suspend/terminate contract(s).