Professional Documents
Culture Documents
MIM No. 1200.000 - 01-14-2015-6
MIM No. 1200.000 - 01-14-2015-6
MIM No. 1200.000 - 01-14-2015-6
4.2.2.4 The CSPET may modify the passing score or use other options for qualifying a
contractor during safety evaluation if the 70% Pass/Fail criteria turns to be not
realistically achievable.
4.2.2.6 Notify contractors within 60 days of their complete submittal whether or not they
have been pre-qualified in safety.
4.2.2.7 Notify contractors not less than 3 months prior to the expiration of the specified
period of time for their prequalification in safety.
4.3.3 Procedure:
CSPET to perform Contractors Pre-qualification Safety Evaluation in accordance with the
Flowchart specified in Attachment A2 of SMG 07-004-2010. Please refer to schematic
diagram of the procedure in Attachment No. 11.
4.3.4 Records:
5.1 Responsibilities:
5.1.1 Marine Divisions are to ensure proper planning of request and funds allocation for any
services to be requested through the Marine Planning, Programs and Support Services
(PP&SS) Unit. The concerned Marine Division is to ensure customer forecasts are
included for approval in Business and Operation Plans submittals as applicable.