8.2 Responsibility
8.2.1 Proponent:
The proponent Unit Head should review and approve the following prior to Contractor
invoice submittal through the Service Entry Sheet (SES) system.
a. Check for any possible deductions as per the Proponent review check list in
Attachment No. 9 and respective contract. The Foreman is to sign that check list as
part of the invoice required supporting documents.
b. Refer to Quarterly Inspection Reports and Weekly machinery status reports for any
possible deduction items.
d. The concerned Unit is to review, verify , approve & attach the hardcopies of the
following as applicable: