pdfcoffee.com_painting-report-pdf-free
pdfcoffee.com_painting-report-pdf-free
Prepared by Approved by
M. Romli
Painting Inspector Petrokimia Gresik
Date : October 22, 2018
Doc. No : 001/HFC-Paint/072018
PRESENCE REQUIRED
DATE TIME INSPECTION ITEM PLACE
K3PG PETROKIMIA
Remaks :
PRESENCE REQUIRED
DATE TIME INSPECTION ITEM PLACE
K3PG PETROKIMIA
Remaks :
PRESENCE REQUIRED
DATE TIME INSPECTION ITEM PLACE
K3PG PETROKIMIA
Remaks :
PROCEDURE SHEET 1
ACTIVITY FORM
Subcontractor : HF Construction
Photo Activities
Description
Work
Photo Activities
Description
Work
FORM - 1
PKG PORT AREA PROJ NO : 007/HFC-Paint/072018
PROCEDURE SHEET 1
ACTIVITY FORM
Subcontractor : HF Construction
Photo Activities
Description
Work
Photo Activities
Description
Work
FORM - 1
PKG PORT AREA PROJ NO : 008/HFC-Paint/072018
PROCEDURE SHEET 1
ACTIVITY FORM
Subcontractor : HF Construction
Photo Activities
Description
Work
Photo Activities
Description
Work
FORM - 1
PAINTING REPORT
Weather conditon :
Time Date Air temp ( ⁰C ) Retative huml(%) Dew point ta (⁰C)
Comment / Remaks :
Accepted or not
Inspected By
Inspection Date
Inspection Date
PAINTING REPORT
Weather conditon :
Time Date Air temp ( ⁰C ) Retative huml(%) Dew point ta (⁰C)
Comment / Remaks :
Accepted or not
Inspected By
Inspected By
Inspection Date
PKG EQUIPMENT PROJECT Report No 008/HFC-Paint/072018
Quality Control Form Unit 1
SIGNATURE
DATE
PETROKIMIA GRESIK PORT FACILITY
PORTABLE HOPPER NO. 3
K3PG - PROJECT EQUIPMENT
CV. HF CONSTRUCTION
Documentation Portable Hopper No. 3