1.40 1.13 2.00 0.67 1.50 3.35 3.85 1.20 3.85 3.35 1.50 0.67 2.00 1.13 1.40
BIKE LANE PLANTING SIDEWALK ISLAND INNER LANE OUTER LANE SHOULDER SIDEWALK PLANTING BIKE LANE
STRIP STRIP
OUT IN
Y
BIKE LANE PLANTING SIDEWALK SHOULDER SHOULDER SIDEWALK PLANTING BIKE LANE
SLOPE 0.5 %
FLOW VARIABLE TO THE ACTUAL FIELD CONDITION
VARIABLE
CHB CATCH BASIN/MANHOLE CHB CATCH BASIN/MANHOLE
W/ CONCRETE COVER W/ CONCRETE COVER
X
OUT
IN
Ht = VARIES
S =1 : 24
S =1 : 24
D
H
H
D
IN
OUT
MIN.
MIN.
0.60
0.60
B = 0.65 H B = 0.65 H
0.30
SECTION "Y"
SCALE: 1:100 MTS.
0.60 Ht = VARIES
Ht = VARIES
S =1 : 24
S =1 : 24
H
H
OUT IN
MIN.
MIN.
0.60
B = 0.65 H
SECTION "X" B = 0.65 H
SCALE: 1:100 MTS.
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO:
REPUBLIC OF THE PHILIPPINES MICHAEL M. MONIS
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS C.Y. 2024 PROJECT TYPICAL PLAN AND SECTION
DETAILED ENGINEERING DESIGN PLAN FOR ENGINEERING ASSISTANT
DETAIL OF MANHOLE & JUCTION BOX
REGIONAL OFFICE I CONSTRUCTION OF BY-PASS AND DIVERSION ROADS,
PREPARED: JOSE B. EGUILOS, JR. ALBERTO B. ESQUEJO,JR MATHIAS L. MALENAB RONNEL M. TAN, CESO III 13
SAN FERNANDO CITY, LA UNION LAOAG-SAN NICOLAS BYPASS ROAD,
(LAOAG CITY- BACARRA SECTION), CHIEF, HIGHWAY DESIGN SECTION CHIEF, PLANNING & DESIGN DIVISION ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
ABRELAINE L. HIPOL 16
ILOCOS NORTE (PACKAGE B) DATE: DATE: DATE: DATE:
LOCATION: LAOAG CITY - BACARRA, ILOCOS NORTE ENGINEER II
Z
0.15
4 12mmØ BARS
0.30
1 12mmØ BARS
2 12mmØ BARS
3 12mmØ BARS
0.04
0.73
C
LIFTING HOCK BAR
0.30
4 12mmØ BARS
0.15
0.04
0.15
C 0.2
0.1 0.73
4 12mmØ BARS
3 12mmØ BARS 3 12mmØ BARS
1 12mmØ BARS
12mmØ BARS 1 12mmØ BARS 12mmØ BARS
2 2
0.05 12mmØ BARS 0.54 0.73 12mmØ BARS
D
1 1
PCCP SIDEWALK, t=0.10 M.
ITEM 311(1)e1 - PORTLAND CEMENT CONCRETE 0.36 D 0.30
PAVEMENT, t= 0.28 m. (CARRIAGEWAY)
0.15
CONSTRUCTION JOINT
SECTION DETAIL OF REINFORCED CONC. COVER
VARIES
CONSTRUCTION JOINT
VARIES
BOX TYPE ( MAN HOLE)
D/3
0.36 D 0.30
0.15 (FOR LATERAL DRAINAGE AND CROSS DRAINAGE)
SCALE: 1:15 MTS.
Ø 0.610 mm
a 10mmØ BARS @ 150 B.W.E.W. NUMBER OF BARRELS D 1.200 1.500 1.650 1.800 2.100
10mmØ BARS @ 150 B.W.E.W. SINGLE C 1.210 1.510 1.670 1.820 2.120
a c 10mmØ BARS @ 150 B.W.E.W. DOUBLE C 2.230 3.030 3.460 3.860 4.660
0.03 0.03 2 a b
0.05 0.10m GRANULAR GRAVEL BASE 0.05 0.10m GRANULAR GRAVEL BASE
a c a c a c
0.1
0.1
b b b
0.15 C 0.15
3 d e
0.15 D 0.2
SECTION "V" SECTION "Z" a
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO:
REPUBLIC OF THE PHILIPPINES MICHAEL M. MONIS
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS C.Y. 2024 PROJECT SECTION DETAIL OF CONCRETE CATCH BASIN/
DETAILED ENGINEERING DESIGN PLAN FOR ENGINEERING ASSISTANT
MANHOLE FOR LATERAL RCPC DRAINAGE
REGIONAL OFFICE I CONSTRUCTION OF BY-PASS AND DIVERSION ROADS,
BAR BENDING DIAGRAM FOR CONCRETE PREPARED: JOSE B. EGUILOS, JR. ALBERTO B. ESQUEJO,JR MATHIAS L. MALENAB RONNEL M. TAN, CESO III 14
SAN FERNANDO CITY, LA UNION LAOAG-SAN NICOLAS BYPASS ROAD, CATCH BASIN/MANHOLE WITH CONCRETE COVER
(LAOAG CITY- BACARRA SECTION), CHIEF, HIGHWAY DESIGN SECTION CHIEF, PLANNING & DESIGN DIVISION ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
SCHEDULE OF BAR REINFORCEMENT ABRELAINE L. HIPOL 16
ILOCOS NORTE (PACKAGE B) DATE: DATE: DATE: DATE:
LOCATION: LAOAG CITY - BACARRA, ILOCOS NORTE ENGINEER II
STEEL GRATING EVERY 20.00MTS
75
15
0.27
0
7 - 12mmØ PLAIN ROUND BAR
25
6 " THINK CHB Z
0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 INNER FACE OF CHB
0.08 0.75 0.08 20mmØ GRAY IRON OR STEEL BAR
200 0.40mm SPACING
0.9
0.15
20.0 MTS RROW
0.73 4 12mmØ BARS
0.73 0.225 0.28 0.225
0.30
LIFTING HANDLE
0.225 0.28 0.225 20mmØ GRAY IRON OR STEEL BAR 0.40MM SPACING 1 12mmØ BARS
20 mmØ BOLT HOLES
2 12mmØ BARS @ 0.10M BOTH WAYS
2 12mmØ BARS
2 12mmØ BARS @ 0.10M BOTH WAYS
3 12mmØ BARS
0.08
0.08
0.08
0.25 0.25 0.25 0.25
BOLTS AND WASHERS BOLTS AND WASHERS
C
D
D
LIFTING HOCK BAR
SECTION "K" SECTION "L"
V
0.73
0.30
4 12mmØ BARS
0.225 0.28 0.225
0.45
0.04
0.225
0.15
LIFTING HANDLE
20mmØ GRAY IRON OR STEEL BAR 0.40MM SPACING
0.04
K
0.73
0.28 0.225
D
0.36 D 0.30
PLAN 0.15 C 0.2
TYPICAL DETAIL OF CONCRETE MANHOLE COVER SECTION DETAIL OF REINFORCED CONC. COVER BOX TYPE ( MAN HOLE)
SCALE: 1:15 MTS.
(FOR LATERAL DRAINAGE AND CROSS DRAINAGE)
SCALE: 1:15 MTS.
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO:
REPUBLIC OF THE PHILIPPINES MICHAEL M. MONIS
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS C.Y. 2024 PROJECT STEEL GRATING DETAIL
DETAILED ENGINEERING DESIGN PLAN FOR ENGINEERING ASSISTANT
DETAIL ON STEP OR RUNG
REGIONAL OFFICE I CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, TYPICAL DETAIL OF CONCRETE MANHOLE
PREPARED: JOSE B. EGUILOS, JR. ALBERTO B. ESQUEJO,JR MATHIAS L. MALENAB RONNEL M. TAN, CESO III 15
SAN FERNANDO CITY, LA UNION LAOAG-SAN NICOLAS BYPASS ROAD, COVER AND SECTIONS
(LAOAG CITY- BACARRA SECTION), SECTION DET. OF REINFORCED CONC. COVER BOX TYPE CHIEF, HIGHWAY DESIGN SECTION CHIEF, PLANNING & DESIGN DIVISION ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
ABRELAINE L. HIPOL 16
ILOCOS NORTE (PACKAGE B) ( MAN HOLE)(FOR LATERAL DRAINAGE DATE: DATE: DATE: DATE:
LOCATION: LAOAG CITY - BACARRA, ILOCOS NORTE AND CROSS DRAINAGE) ENGINEER II
BAR BENDING DIAGRAM FOR CONCRETE CANAL WITH COVER (MANHOLE) PIPE DIAMETER (mm) 610 910 1070 1220 1520
COMMON TO ALL H 1.910 2.210 2.370 2.520 2.820
a c a e a e NUMBER OF BARRELS D 1.200 1.500 1.650 1.800 2.100
b
SINGLE C 1.210 1.510 1.670 1.820 2.120
1
b d b d DOUBLE C 2.230 3.030 3.460 3.860 4.660
b
2
c a
c b
a c a c a c
b b b
3 d e
a
a c a c
0.15 C 0.2 b
b b
0.1 0.73
4 12mmØ BARS 4 5 c c
3 12mmØ BARS 3 12mmØ BARS
1 12mmØ BARS
12mmØ BARS 1 12mmØ BARS 12mmØ BARS
2 2
0.05 12mmØ BARS 0.54 0.73 12mmØ BARS
1 1
PCCP SIDEWALK, t=0.10 M.
ITEM 311(1)e1 - PORTLAND CEMENT CONCRETE
PAVEMENT, t= 0.28 m. (CARRIAGEWAY)
0.15
ITEM 200 - AGGREGATE SUB BASE COURSE
0.30 M. MINIMUM
ITEM 105 - SUB-GRADE PREPARATION
CONSTRUCTION JOINT
VARIES
CONSTRUCTION JOINT
20.0 MTS RROW
D/3
0.36 D 0.30
0.15
VARIES
Ø 0.610 mm
10mmØ BARS @ 150 E.W. e e 10mmØ BARS @ 150 B.W.E.W.
0.30 D 0.30
Ø 0.61 m. LATERAL RCPC
H
VARIES
d 10mmØ BARS @ 150 E.W.
D
D
b 10mmØ BARS @ 150 E.W.
0.30
0.30
CONSTRUCTION JOINT CONSTRUCTION JOINT CONSTRUCTION JOINT
10mmØ BARS @ 150 E.W.
CONSTRUCTION JOINT
0.2
0.03 0.03
0.05 0.10m GRANULAR GRAVEL BASE 0.05 0.10m GRANULAR GRAVEL BASE
0.1
0.1
0.15 C 0.15
0.15 D 0.2
SECTION "V" SECTION "Z"
SECTION DETAIL OF REINFORCED CONCRETE CATCH BASIN /MANHOLE
(FOR LATERAL DRAINAGE AND CROSS DRAINAGE) 0 1 2 4
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO:
REPUBLIC OF THE PHILIPPINES MICHAEL M. MONIS
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS C.Y. 2024 PROJECT SECTION DETAIL OF CONCRETE CATCH BASIN/
DETAILED ENGINEERING DESIGN PLAN FOR ENGINEERING ASSISTANT
REGIONAL OFFICE I CONSTRUCTION OF BY-PASS AND DIVERSION ROADS,
MANHOLE FOR LATERAL DRAINAGE
PREPARED: JOSE B. EGUILOS, JR. ALBERTO B. ESQUEJO,JR MATHIAS L. MALENAB RONNEL M. TAN, CESO III 16
SAN FERNANDO CITY, LA UNION LAOAG-SAN NICOLAS BYPASS ROAD, BAR BENDING DIAGRAM FOR CONCRETE
CANAL WITH COVER (MANHOLE)
(LAOAG CITY- BACARRA SECTION), CHIEF, HIGHWAY DESIGN SECTION CHIEF, PLANNING & DESIGN DIVISION ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
SCHEDULE OF BAR REINFORCEMENT ABRELAINE L. HIPOL 16
ILOCOS NORTE (PACKAGE B) DATE: DATE: DATE: DATE:
LOCATION: LAOAG CITY - BACARRA, ILOCOS NORTE ENGINEER II