EXHIBIT-D
CONTRACT SCHEDULE
1. PART I: this PART will extend from Syrian – Jordan Border to Deir Ali
area with a branch to the Power Generation Plant near Deir Ali area where
A Fiscal Metering Station (FMS) will be installed.
2. PART II : this PART will extend from Deir Ali area to AL RAYAN area at BVS
4905 this PART will be constructed in parallel with PART I
CONTRACTOR is responsible to execute and perform all the work required to finish and
start-up the ARAB GAS PIPELINE PROJECT - PHASE I as per the following criterium: