Bill Of Quantity

Project name : Duplex Villa Pererenan


Work item : Outdoor
Location : Pererenan, Badung, Bali
Year : 2023
Area : Struktur Bangunan Villa 1
UNIT PRICE TOTAL PRICE
NO Description QTY SAT
( Rp ) ( Rp )
I. EXCAVATION WORK AND FOUNDATION
1 Manual excavation work for continuous foundation on normal soil 55,00 m3 72.215 3.971.825
2 Sandfill below stone masonry 4,50 m3 181.478 816.651
3 Stone foundation 42,00 m3 891.733 37.452.769
4 Aan stamping 17,00 m3 473.459 8.048.802
5 Infil soil stone foundation 18,50 m3 52.910 978.835

Sub total work. I 51.268.882


II. WORK WALL
A Fence Work
1 Barick wall ( Batako 1 x thk. 100 mm ) 311,00 m2 122.191 38.001.401
2 Smooth plastered 622,00 m2 61.573 38.298.232
3 Smooth render 622,00 m2 35.857 22.303.210
4 Sloof practice 150 x 250 mm 5,50 m3 14.510.635 79.808.490
5 Beam practice 150 x 250 mm 5,50 m3 14.510.635 79.808.490
6 Column practice 150 x 150 120,00 m' 79.241 9.508.899
7 Concrete floor 6,50 m3 1.143.571 7.433.213
8 Stair concrete 1,00 lot 1.500.000 1.500.000
9 Wall finish
● Wall pain ng with dulux weathershield 622,00 m2 61.548 38.282.856
B Dump Work
1 Barick wall 3,00 m2 386.213 1.158.638
2 Smooth plastered 6,00 m2 61.573 369.436
3 Smooth render 6,00 m2 35.857 215.144
4 Concrete slab 0,15 m3 1.143.571 171.536
5 Cement polised 8,00 m2 48.721 389.769

Sub total work. II 317.249.312


III. DOOR
1 Gate Door 1,00 unit 15.000.000 15.000.000
2 Dump Door 1,00 unit 2.500.000 2.500.000
3 Door 1,00 unit 1.500.000 1.500.000

Sub total work. III 19.000.000


IV. Floor Work
1 Parking (andesit) 35,00 m2 332.467 11.636.336
2 Access to Villa 2 ( andesit ) 15,00 m2 332.467 4.987.001
3 Stair finishing 5,00 m2 65.000 325.000

Sub total work. III 16.948.338


TOTAL 404.466.532