check list for cast in-situ foundation-1

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Document No:

METHOD STATEMENT FOR FOUNDATION WORKS AND GROUNDING Rev. Date:


Page__ of __
Line Tower No:
Check List For Pad & Chimney Foundation
500 kV Jvari-Tskaltubo OHL Construction. Final.
A- General
Tower Set Level
Tower Type Body Extension Foundation Class Drawings No Rev.
(ASL)
Foundation Drawing
Stub Drawing
Reference Drawing
B - Tower/Stub Material
Cleat Bolts Sketch For
Legs Leg Extension Chimeny Extension Stub Mark No Stub Length (mm) No of Cleat per Leg
Type No Extension
A
B
C
D
C - Excavation
Leg A Leg B Leg C Leg D
Actual Excavation Depth (cm)
Depth Below Setting Level (cm)
Actual Excavation Width (A/B) (cm)
Diwatering (if any)
Shuttering Employed
Change Foundation Class
Comments:

Accepted For Foundation Class


Contractor Consultant Employer
Name Name Name
Date Date Date
Signature Signature Signature

D - Stub Setting
Face Diagonals
Required A-B B-C C-D D-A A-C B-D
As Per Design (mm)
Before Concreting (mm)
Stub Levels (mm) Leg A Leg B Leg C Leg D
Measured (mm)
Required (mm)
Difference (mm)
E - Reinforcement (Y - for as per drawing, N - for not correct)
Diameter (Ф)
Weight (kg)
Accepted For Concreting
Comments:

Contractor Consultant Employer


Name Name Name
Date Date Date
Signature Signature Signature

Note:

page 1