VD-10-W-802-200_Foundation Loading Diagram, Support Details and Anchor Plan with Center of Gravity for All Equipment_2
VD-10-W-802-200_Foundation Loading Diagram, Support Details and Anchor Plan with Center of Gravity for All Equipment_2
VD-10-W-802-200
□ 3 : Rejected
□ 4 : Information
I2 J2 K2 L2 M2 N
A2 B2 C2 D2 E2 F2 G2 H2
COOLING COOLING
AIR BLOWER(#1) AIR BLOWER(#2)
DV4
DV5
DIVERTER DAMPER
DV3
DV1
DV2
DVa DVc
A1 B1 C1 D1 E1 F1 H1 I1 K1 L1 M1
G1 A
SEAL AIR FAN DVd
DVb
B
#1 FUEL GAS SKID #2 FUEL GAS SKID
IBD
CBD PL+200
SAMPLING SYSTEM
LINE PROJECT
VD-10-W-802-200 2
VD-10-W-802-200-001 2
A
FOR CONSTRUCTION
LINE PROJECT
VD-10-W-802-200 2
VD-10-W-802-200-002 2
10 11
A
FOR CONSTRUCTION
LINE PROJECT
VD-10-W-802-200 2
VD-10-W-802-200-003 2
1 2 3 4 5 6 7 8 9 10 11
FOR CONSTRUCTION
LINE PROJECT
ASSEMBLY OF
ANCHOR BOLT FOR HRSG(1/2)
VD-10-W-802-200 2
VD-10-W-802-200-004 2
FOR CONSTRUCTION
LINE PROJECT
ASSEMBLY OF
ANCHOR BOLT FOR HRSG(2/2)
VD-10-W-802-200 2
VD-10-W-802-200-005 2
FOR CONSTRUCTION
LINE PROJECT
A2 B2 B1 B2 1 A A 1 2 A
A 1 A A
ABT-1 ( 4-M 48 )
2
1 2
ABT1
M48 ANCHOR BOLT
WA1, WASHER
ATP1
PL+300
PL+0
ABT1
2 POINTS
TEMPLATE & BOLT ATP1
TACK 1
A1 B1 TYP.
WA2
2 POINTS
PLAN PL+0 (LOCATION OF ANCHOR BOLTS) NUT & BOLT / NUT & WASHER
TACK 1 NUT_M36
NUT_M48
TYP.
FOR CONSTRUCTION
1. INDICATED PEDESTAL DIMENSIONS ARE REFERENCED ONLY, SHALL BE DECIDED BY CIVIL PART.
LE
LE
HO
HO
LINE PROJECT
WA1, DETAIL
ATP1, DETAIL ABT1, DETAIL WA2, DETAIL ASSEMBLY OF ANCHOR BOLT
FOR BYPASS STACK SUPPORT
VD-10-W-802-200 2
VD-10-W-802-200-007 2
DV4
DV5
DV3
DV1
DV2
FOR CONSTRUCTION
LINE PROJECT
137.5
2 LOCAL CONTROL 8 SET ANCHOR BOLT / NUT : M20 x 250 LG. A-307B / A-563A (H.D.G.) -
PANEL 8 WASHER : 60 x 60 x 6 THK. A-36 -
TRANSITION
DUCT
WIND LOAD 0.0 2.0 1.6
SILENCER
B
DIVERTER DAMPER
2400
2. MAIN FUEL GAS SKID V (UNIT : KN) K (UNIT : KN) M (UNIT : KN-M)
AIR BLOWER(#1)
COOLING
LIVE LOAD N/A N/A N/A
AIR BLOWER(#2)
COOLING
CONTROL PANEL
BURNER #1
LOCAL
DUCT
WIND LOAD 0.0 16.4 18.4
1062.5
CONTROL PANEL
LOCAL
BURNER #2
DUCT
2nd BURNER
SAMPLING SYSTEM
DEAD LOAD 3.2 0.0 0.0
LIVE LOAD N/A N/A N/A
CBD
DELETED
HP STEAM DRUM
BD COOLER
IBD
LAY-DOWN
SEISMIC LOAD 0.4 0.8 1.2
AREA
MAINTENANCE AREA
SILENCER
GROUT
25
(6)-M20 x 300 LG. ANCHOR B / N / W C
PL.+500
PL.+475
KEY PLAN
PL.+0
NOTE
COOLING AIR BLOWER SKID
FOR #1 & #2 DUCT BURNER SYSTEM 1. ALL DIMENSIONS ARE IN MILLIMETERS AND
ELEVATIONS, CO-ORDINATES ARE IN METERS
(SCALE : 1 : 1) UNLESS OTHERWISE NOTED.
D
6000
FOR CONSTRUCTION
1650
2500
CLIENT
PL.+300
PL.+275
G
PL.+0 CONTRACTOR
VENDOR
STATUS
CUSTOMER: HYUNDAI ENGINEERING RELEASED
JOBSITE: CILEGON, INDONESIA 3 RD
PROJECT
END USER: PT LOTTE CHEMICAL INDONESIA
ANGLE
PROJ
LINE PROJECT
MAIN FUEL GAS SKID P.O. NO.: PB2203 DIMS IN MILLIMETRES,
UNLESS OTHERWISE STATED. HEC JOB NO.Rev. TITLE
ZEECO ASIA LTD. TITLE DRAWN START DATE
AAID2102 FOUNDATION DRAWING DRAGRAM &
FOR #1 & #2 DUCT BURNER SYSTEM #1010, NEW T CASTLE, 108,
GASAN DIGITAL 2-RO
EYL 2022-09-19
P/O NO.
GEUMCHEON-GU, SEOUL,
08506, KOREA FOUNDATION DRAWING
CHK SCALE ANCHOR DETAIL FOR BURNER EQUIPMENT H
(SCALE : 1 : 1) PHONE: +82 70 4630 9500
SJY N/S LINE-100-MP-W-002
FAX: +82 2 855 9655
www.zeeco.com FOR BURNER EQUIPMENT APP SHT. No.
zeeco_asia@zeeco.com SCALE DATE DRAWN
PROPRIETARY DATA IS INCLUDED IN THE INFORMATION
DISCLOSED HEREIN AND IS THE PROPERTY OF ZEECO INC.
YHP 1 of 1 *** 2023.03.14 CLIENT DWG. NO : VD-10-W-802-200 Rev.2
THIS INFORMATION IS SUBMITTED IN CONFIDENCE AND
MUST BE USED IN CONNECTION WITH WORK DONE FOR
S.O. NO. DWG. CAT. SUB CAT. SYS. NO. DWG. NO. REV. NO.
ITEM NO. Rev.2
ZEECO, INC. AND ALL RIGHTS OF DESIGN OR INVENTION
ARE RESERVED. UNAUTHORISED DISCLOSURE OR USE IS
PROHIBITED BY LAW. 58217 F 013 A 500 3 **
VENDOR DWG. NO : VD-10-W-802-200-009
1 2 3 4 5 6 7 8 9 10 11
A
FOR CONSTRUCTION
LINE PROJECT
VD-10-W-802-200
VD-10-W-802-200-010
1 2 3 4 5 6 7 8 9 10 11
A
FOR CONSTRUCTION
LINE PROJECT
VD-10-W-802-200
VD-10-W-802-200-011
1 2 3 4 5 6 7 8 9 10 11
A
FOR CONSTRUCTION
LINE PROJECT
VD-10-W-802-200
VD-10-W-802-200-012
1 2 3 4 5 6 7 8 9 10 11
A
FOR CONSTRUCTION
LINE PROJECT
VD-10-W-802-200
VD-10-W-802-200-013
1 2 3 4 5 6 7 8 9 10 11
A
VIEW E-E
D
E E
F
FOR CONSTRUCTION
SIDE ELEVATION
VIEW F-F G
LINE PROJECT
VD-10-W-802-200 2
** VD-10-W-802-200-014 2
1 2 3 4 5 6 7 8 9 10 11
I2 J2 K2 L2 M2 N
I1 K1 L1 M1
FOR CONSTRUCTION
LINE PROJECT
VD-10-W-802-200 2
VD-10-W-802-200-015 2