FOUNDATION LOADING DIAGRAM, SUPPORT

DETAILS AND ANCHOR PLAN WITH CENTER


OF GRAVITY FOR ALL EQUIPMENT

VD-10-W-802-200

FOUNDATION LOADING DIAGRAM, SUPPORT DETAILS AND ANCHOR


PLAN WITH CENTER OF GRAVITY FOR ALL EQUIPMENT

VENDOR DATA STATUS


□ 1 : Approved without Comment

□ 2 : Approved with Comment

□ 3 : Rejected

□ 4 : Information

NOTE: Permission to proceed does not constitute


acceptance or approval of design details,
calculations, analysis, test methods or
materials developed or selected by the
supplier and does not relieve supplier from
full compliance with contractual obligations.
REVIEW DATE: 2023-04-26
. . .
ENGINEER LEAD ENGINEER
H.D.LEE T.W.KIM

PROJECT : LINE PROJECT


JOB NO. : AAID2102
LOCATION : CILEGON, INDONESIA
OWNER : PT LOTTE CHEMICAL INDONESIA
PO NO. : LINE-100-MP-W-002

2 Mar.14,2023 Issue for Construction J.G.KIM E.C.SON J.J.Song

1 Feb.09,2023 Issue for Construction J.G.KIM J.G.KIM E.C.SON

0 Jan.02,2023 Issue for Construction J.G.KIM J.G.KIM E.C.SON

E Nov. 29, 2022 Issue for Approval U.J.SHIN J.G.KIM E.C.SON

D Oct. 14, 2022 Issue for Approval U.J.SHIN J.G.KIM E.C.SON

C Aug. 22, 2022 Issue for Approval U.J.SHIN J.G.KIM E.C.SON


PREPARED REVIEWED APPROVED
REV. DATE DESCRIPTION
BY BY BY
N
A1 B1 C1 D1 E1 F1 G1 H1 I1 J1 K1 L1 M1

DVa A2 DVb DVd B2 DVe C2 D2 E2 F2 G2 H2 I2 J2 K2 L2 M2

I2 J2 K2 L2 M2 N

A2 B2 C2 D2 E2 F2 G2 H2

FEED WATER LINE

COOLING COOLING
AIR BLOWER(#1) AIR BLOWER(#2)

DV4

DV5

DIVERTER DAMPER

DV3

DV1

DV2

DVa DVc
A1 B1 C1 D1 E1 F1 H1 I1 K1 L1 M1

G1 A
SEAL AIR FAN DVd

DVb

B
#1 FUEL GAS SKID #2 FUEL GAS SKID
IBD

CBD PL+200
SAMPLING SYSTEM

BLOW DOWN COOLER


H3 J1 FOR CONSTRUCTION

LINE PROJECT

FOUNDATION LOADING DIAGRAM

VD-10-W-802-200 2
VD-10-W-802-200-001 2
A

FOR CONSTRUCTION

LINE PROJECT

FOUNDATION LOADING DIAGRAM


H

VD-10-W-802-200 2
VD-10-W-802-200-002 2
10 11
A

FOR CONSTRUCTION

LINE PROJECT

FOUNDATION LOADING DIAGRAM


H

VD-10-W-802-200 2
VD-10-W-802-200-003 2
1 2 3 4 5 6 7 8 9 10 11
FOR CONSTRUCTION

LINE PROJECT

ASSEMBLY OF
ANCHOR BOLT FOR HRSG(1/2)
VD-10-W-802-200 2
VD-10-W-802-200-004 2
FOR CONSTRUCTION

LINE PROJECT

ASSEMBLY OF
ANCHOR BOLT FOR HRSG(2/2)
VD-10-W-802-200 2
VD-10-W-802-200-005 2
FOR CONSTRUCTION

LINE PROJECT

ASSEMBLY OF ANCHOR BOLT


FOR MAIN STACK
VD-10-W-802-200 2
VD-10-W-802-200-006 2
A 1 A B A 1 2 1 A
AB 1 A B 1 12 1 1 A
A1 A A 2 2 1 A
A1 A2 A2 A A 22 11 11 1 2 A

A2 B2 B1 B2 1 A A 1 2 A

A 1 A A

ABT-1 ( 4-M 48 )
2

1 2

ABT1
M48 ANCHOR BOLT

WA1, WASHER

ATP1

PL+300

PL+0

ABT1

2 POINTS
TEMPLATE & BOLT ATP1
TACK 1
A1 B1 TYP.
WA2

2 POINTS
PLAN PL+0 (LOCATION OF ANCHOR BOLTS) NUT & BOLT / NUT & WASHER
TACK 1 NUT_M36
NUT_M48
TYP.

ANCHOR BOLT ASSEMBLY

FOR CONSTRUCTION

1. INDICATED PEDESTAL DIMENSIONS ARE REFERENCED ONLY, SHALL BE DECIDED BY CIVIL PART.

LE

LE
HO

HO
LINE PROJECT

WA1, DETAIL
ATP1, DETAIL ABT1, DETAIL WA2, DETAIL ASSEMBLY OF ANCHOR BOLT
FOR BYPASS STACK SUPPORT
VD-10-W-802-200 2
VD-10-W-802-200-007 2
DV4
DV5

DV3

DV1
DV2

DVa DVb DVc DVd

FOR CONSTRUCTION

LINE PROJECT

ASSEMBLY OF ANCHOR BOLT


FOR DIVERTER & GUILLOTINE DAMPER
VD-10-W-802-200 2
** VD-10-W-802-200-008 2
PARTS LIST
1850 Q'TY DESCRIPTION MATERIAL REMARK
16 SET ANCHOR BOLT / NUT : M20 x 300 LG. A-307B / A-563A (H.D.G.) -
1675 MAIN FUEL SKID
16 WASHER : 60 x 60 x 6 THK. A-36 -
122.5 1605 COOLING AIR 12 SET ANCHOR BOLT / NUT : M20 x 300 LG. A-307B / A-563A (H.D.G.) -
FAN SKID 12 WASHER : 60 x 60 x 6 THK. A-36 - A

137.5
2 LOCAL CONTROL 8 SET ANCHOR BOLT / NUT : M20 x 250 LG. A-307B / A-563A (H.D.G.) -
PANEL 8 WASHER : 60 x 60 x 6 THK. A-36 -

LOADING DATA FOR FOUNDATION


1. COOLING AIR FAN SKID V (UNIT : KN) K (UNIT : KN) M (UNIT : KN-M)
1062.5

DEAD LOAD 6.5 0.0 0.0


LIVE LOAD N/A N/A N/A

TRANSITION
DUCT
WIND LOAD 0.0 2.0 1.6

SEAL AIR FAN


SEISMIC LOAD 0.6 1.0 0.8

SILENCER
B

DIVERTER DAMPER
2400

2. MAIN FUEL GAS SKID V (UNIT : KN) K (UNIT : KN) M (UNIT : KN-M)

#1 FUEL GAS SKID


DEAD LOAD 27.0 0.0 0.0

AIR BLOWER(#1)
COOLING
LIVE LOAD N/A N/A N/A

AIR BLOWER(#2)
COOLING
CONTROL PANEL
BURNER #1

LOCAL
DUCT
WIND LOAD 0.0 16.4 18.4
1062.5

#2 FUEL GAS SKID


2 SEISMIC LOAD 2.3 4.3 4.8
3. LOCAL CONTROL PANEL V (UNIT : KN) K (UNIT : KN) M (UNIT : KN-M)

CONTROL PANEL
LOCAL
BURNER #2
DUCT
2nd BURNER

SAMPLING SYSTEM
DEAD LOAD 3.2 0.0 0.0
LIVE LOAD N/A N/A N/A

CBD
DELETED
HP STEAM DRUM

WIND LOAD 0.0 2.8 3.6

BD COOLER

IBD

LAY-DOWN
SEISMIC LOAD 0.4 0.8 1.2

AREA
MAINTENANCE AREA

SILENCER
GROUT
25
(6)-M20 x 300 LG. ANCHOR B / N / W C
PL.+500
PL.+475
KEY PLAN

PL.+0

NOTE
COOLING AIR BLOWER SKID
FOR #1 & #2 DUCT BURNER SYSTEM 1. ALL DIMENSIONS ARE IN MILLIMETERS AND
ELEVATIONS, CO-ORDINATES ARE IN METERS
(SCALE : 1 : 1) UNLESS OTHERWISE NOTED.
D

2. FOUNDATION FOR #1 AND #2 DUCT BURNER


SYSTEM IS APPLIED SAMELY.

6000

240 1840 1840 1840


420

FOR CONSTRUCTION
1650
2500

2 2023.03.14 ISSUE FOR CONSTRUCTION EYL SJY YHP

1 2023.02.09 ISSUE FOR CONSTRUCTION EYL SJY YHP

0 2023.01.02 ISSUE FOR CONSTRUCTION EYL SJY YHP

E 2022.12.02 ISSUE FOR APPROVAL EYL SJY YHP


Description
GROUT

Rev. Date PREP. CHKD. APPR.


(8)-M20 x 300 LG. ANCHOR B / N / W
25

CLIENT
PL.+300
PL.+275
G
PL.+0 CONTRACTOR

VENDOR

STATUS
CUSTOMER: HYUNDAI ENGINEERING RELEASED
JOBSITE: CILEGON, INDONESIA 3 RD
PROJECT
END USER: PT LOTTE CHEMICAL INDONESIA
ANGLE
PROJ
LINE PROJECT
MAIN FUEL GAS SKID P.O. NO.: PB2203 DIMS IN MILLIMETRES,
UNLESS OTHERWISE STATED. HEC JOB NO.Rev. TITLE
ZEECO ASIA LTD. TITLE DRAWN START DATE
AAID2102 FOUNDATION DRAWING DRAGRAM &
FOR #1 & #2 DUCT BURNER SYSTEM #1010, NEW T CASTLE, 108,
GASAN DIGITAL 2-RO
EYL 2022-09-19
P/O NO.
GEUMCHEON-GU, SEOUL,
08506, KOREA FOUNDATION DRAWING
CHK SCALE ANCHOR DETAIL FOR BURNER EQUIPMENT H
(SCALE : 1 : 1) PHONE: +82 70 4630 9500
SJY N/S LINE-100-MP-W-002
FAX: +82 2 855 9655
www.zeeco.com FOR BURNER EQUIPMENT APP SHT. No.
zeeco_asia@zeeco.com SCALE DATE DRAWN
PROPRIETARY DATA IS INCLUDED IN THE INFORMATION
DISCLOSED HEREIN AND IS THE PROPERTY OF ZEECO INC.
YHP 1 of 1 *** 2023.03.14 CLIENT DWG. NO : VD-10-W-802-200 Rev.2
THIS INFORMATION IS SUBMITTED IN CONFIDENCE AND
MUST BE USED IN CONNECTION WITH WORK DONE FOR
S.O. NO. DWG. CAT. SUB CAT. SYS. NO. DWG. NO. REV. NO.
ITEM NO. Rev.2
ZEECO, INC. AND ALL RIGHTS OF DESIGN OR INVENTION
ARE RESERVED. UNAUTHORISED DISCLOSURE OR USE IS
PROHIBITED BY LAW. 58217 F 013 A 500 3 **
VENDOR DWG. NO : VD-10-W-802-200-009
1 2 3 4 5 6 7 8 9 10 11
A

FOR CONSTRUCTION

LINE PROJECT

FOUNDATION LOADING DIAGRAM &


ANCHOR DETAIL FOR CBD TANK H

VD-10-W-802-200
VD-10-W-802-200-010
1 2 3 4 5 6 7 8 9 10 11
A

FOR CONSTRUCTION

LINE PROJECT

FOUNDATION LOADING DIAGRAM &


ANCHOR DETAIL FOR IBD TANK H

VD-10-W-802-200
VD-10-W-802-200-011
1 2 3 4 5 6 7 8 9 10 11
A

FOR CONSTRUCTION

LINE PROJECT

FOUNDATION LOADING DIAGRAM &


ANCHOR DETAIL FOR BLOWDOWN COOLER H

VD-10-W-802-200
VD-10-W-802-200-012
1 2 3 4 5 6 7 8 9 10 11
A

FOR CONSTRUCTION

LINE PROJECT

FOUNDATION LOADING DIAGRAM &


ANCHOR DETAIL FOR SEAL AIR FAN H

VD-10-W-802-200
VD-10-W-802-200-013
1 2 3 4 5 6 7 8 9 10 11
A

VIEW E-E
D

E E
F
FOR CONSTRUCTION

SIDE ELEVATION
VIEW F-F G

LINE PROJECT

FOUNDATION LOADING DIAGRAM &


ANCHOR DETAIL FOR SAMPLING SYSTEM H

VD-10-W-802-200 2
** VD-10-W-802-200-014 2
1 2 3 4 5 6 7 8 9 10 11
I2 J2 K2 L2 M2 N

I1 K1 L1 M1

FOR CONSTRUCTION

LINE PROJECT

FOUNDATION LOADING DIAGRAM &


ANCHOR DETAIL FOR FEED WATER LINE

VD-10-W-802-200 2
VD-10-W-802-200-015 2