Air Drying LOG

PROJECT: Arab Gas Pipeline - Phase 1 KM №


CONTRACT: 91/2005 Drawing No:
COMPANY: Syrian Gas Company Report No:
CONTRACTOR: PJSC «Stroytransgaz» Date:
Page:

Dewpoint
Inlet Dewpoint
Time
) C° ( Outlet
)hrs(
) C° (
1st Dryer Unit 2nd Dryer Unit
1.00
2.00
3.00
4.00
5.00
6.00
7.00
8.00
9.00
10.00
11.00
12.00
13.00
14.00
15.00
16.00
17.00
18.00
19.00
20.00
21.00
22.00
23.00
24.00
……………………………………………………………………………………………………… : Remarks
.…………………………………………………………………………………………………………………
...………………………………………………………………………………………………………………

Subcontractor Contractor Company


Name
Signature
Date