VIRTUAL DESIGN REVIEW (VDR) NO.

2
DATE: 7-Aug-23
TITLE : CLASHES / ISSUES - STRUCTURAL RELATED ISSUES

ISSUES and RESOLUTIONS


ISSUE NO. ST-01 TARGET DATE: 24/Jul/23 Status: Open / Closed Closed
Acknowledge By :
LOCATION : RESOLUTION : ACTION BY
Diversion Box Roof PMC - AECOM
GRIDLINE REFERENCE : No objection and Accepted by PMC and COKUL.
X2Bi: Y5ci-Y5a Continue for construction and installation.
ISSUE :
Diversion Box Roof and Wall Panel required to be partially open
to construct and install on the existing RC beam of the Client - COKUL
Diversion Box.

c
Drawing Reference:
Reviewed By:

SLT7 Consortium
Muhamad Digitally signed by Muhamad Azarudin
DN: cn=Muhamad Azarudin, o=SL T7
Consortium, ou,

BHSARP-21-MSL-RL-CS-DWG-220202_D01 Azarudin email=azarudin@t7global.com.my, c=MY


Date: 2024.05.07 12:23:18 +08'00'

RFI REFERENCES (if any) :


No. :
Date :

ISSUE NO. ST-02 TARGET DATE: 24/Jul/23 Status: Open / Closed Closed
Acknowledge By :
LOCATION : ACTION BY
Roof of the Hot Transfer PMC - AECOM
GRIDLINE REFERENCE : No objection and Accepted by PMC and COKUL.
X2Bi: Y5ci-Y5a Continue for construction and installation. As long
ISSUE : there the existing lights are relocated.

Please advise on the pipe clashes with beam haunching Client - COKUL

c
Site Visit validated that there isnt any light at the
canopy. Accepted to be dismantled
Reviewed By:

SLT7 Consortium
Drawing Reference: Muhamad Azarudin
Digitally signed by Muhamad Azarudin
DN: cn=Muhamad Azarudin, o=SL T7
Consortium, ou,
email=azarudin@t7global.com.my, c=MY

BHSARP-21-MSL-RL-CS-DWG-220202_D01 Date: 2024.05.07 12:23:42 +08'00'

RFI REFERENCES (if any) :


No. :
Date :
VIRTUAL DESIGN REVIEW (VDR) NO.2
DATE: 7-Aug-23
TITLE : CLASHES / ISSUES - STRUCTURAL RELATED ISSUES

ISSUES and RESOLUTIONS


ISSUE NO. ST-03 TARGET DATE: 24/Jul/23 Status: Open / Closed Closed
Acknowledge By :
LOCATION : ACTION BY
MTB Lower Mezzanine PMC - AECOM
GRIDLINE REFERENCE : No objection and Accepted by PMC and COKUL. PAAT
X3:Y5C Continue for construction and installation.
ISSUE :
New BHS conveyor through existing framing and steel platform
Client - COKUL

c
Reviewed By:

SLT7 Consortium
Drawing Reference: Muhamad Digitally signed by Muhamad Azarudin
DN: cn=Muhamad Azarudin, o=SL T7
Consortium, ou,

BHSARP-22-MSL-ZZ-AR-DWG-610101_D01 Azarudin email=azarudin@t7global.com.my, c=MY


Date: 2024.05.07 12:23:58 +08'00'

RFI REFERENCES (if any) :


No. :
Date :

ISSUE NO. ST-04 TARGET DATE: 24/Jul/23 Status: Open / Closed Closed
Acknowledge By :
LOCATION : ACTION BY
Diversion Box ASVEC Rooms PMC - AECOM
GRIDLINE REFERENCE : No objection and Accepted by PMC and COKUL.
X2C:XYC Continue for construction and installation.
ISSUE :
ASVEC rooms to be removed to make way for new conveyors.
Client - COKUL

c
Reviewed By:

SLT7 Consortium
Muhamad
Digitally signed by Muhamad

Drawing Reference: Azarudin


DN: cn=Muhamad Azarudin, o=SL T7
Consortium, ou,

BHSARP-22-MSL-ZZ-AR-DWG-610101_D01 Azarudin email=azarudin@t7global.com.my,


c=MY
Date: 2024.05.07 12:24:22 +08'00'

RFI REFERENCES (if any) :


No. :
Date :
VIRTUAL DESIGN REVIEW (VDR) NO.2
DATE: 7-Aug-23
TITLE : CLASHES / ISSUES - STRUCTURAL RELATED ISSUES

ISSUES and RESOLUTIONS


ISSUE NO. ST-05 TARGET DATE: 7/Aug/23 Status: Open / Closed Closed
Acknowledge By :
LOCATION : ACTION BY
OOG Line - OC2 PMC - AECOM
GRIDLINE REFERENCE :
X3 - Y4
ISSUE :
New BHS conveyor layout lower than the existing conveyor due
to double decker on Section 2. Client - COKUL

c
Reviewed By:

SLT7 Consortium
Drawing Reference: Muhamad Digitally signed by Muhamad Azarudin
DN: cn=Muhamad Azarudin, o=SL T7 Consortium,

Azarudin
ou, email=azarudin@t7global.com.my, c=MY
Date: 2024.05.07 12:24:39 +08'00'

BHSARP-21-MTB-MUM-CS-DWG-220013
BHSARP-21-MTB-MUM-CS-DWG-220014 RFI REFERENCES (if any) :
No. :
Date :
VIRTUAL DESIGN REVIEW (VDR) NO.2
DATE: 7-Aug-23
TITLE : CLASHES / ISSUES - STRUCTURAL RELATED ISSUES

ISSUES and RESOLUTIONS


ISSUE NO. ST-06 TARGET DATE: 7/Aug/23 Status: Open / Closed Closed
Acknowledge By :
LOCATION : ACTION BY
OOG Black Box PMC - AECOM
GRIDLINE REFERENCE :
X3:Y3a-Y3c
ISSUE :
New Conveyor through OOG Black Box from the new delivery
line of Section 1 Client - COKUL

c
Reviewed By:

SLT7 Consortium
Drawing Reference: Muhamad Digitally signed by Muhamad Azarudin
DN: cn=Muhamad Azarudin, o=SL T7 Consortium, ou,

Azarudin
email=azarudin@t7global.com.my, c=MY
Date: 2024.05.07 12:36:17 +08'00'

BHSARP-21-MTB-MUM-CS-DWG-220013
RFI REFERENCES (if any) :
No. :
Date :

ISSUE NO. ST-07 TARGET DATE: 7/Aug/23 Status: Open / Closed Closed
Acknowledge By :
LOCATION : ACTION BY
MSL Zone 1 - Make-up Carousels PMC - AECOM
GRIDLINE REFERENCE :
X2a : Y5a-Y3c
ISSUE :
Plinth level more than 130mm
Client - COKUL

Reviewed By:

SLT7 Consortium
Drawing Reference: Muhamad Digitally signed by Muhamad Azarudin
DN: cn=Muhamad Azarudin, o=SL T7
Consortium, ou,

BHSARP-21-MSL-ZZ-BM-DWG-900116_D01 Azarudin email=azarudin@t7global.com.my, c=MY


Date: 2024.05.07 12:36:41 +08'00'

RFI REFERENCES (if any) :


No. :
Date :

You might also like