DATE: 7-Aug-23
TITLE : CLASHES / ISSUES - STRUCTURAL RELATED ISSUES
c
Drawing Reference:
Reviewed By:
SLT7 Consortium
Muhamad Digitally signed by Muhamad Azarudin
DN: cn=Muhamad Azarudin, o=SL T7
Consortium, ou,
ISSUE NO. ST-02 TARGET DATE: 24/Jul/23 Status: Open / Closed Closed
Acknowledge By :
LOCATION : ACTION BY
Roof of the Hot Transfer PMC - AECOM
GRIDLINE REFERENCE : No objection and Accepted by PMC and COKUL.
X2Bi: Y5ci-Y5a Continue for construction and installation. As long
ISSUE : there the existing lights are relocated.
Please advise on the pipe clashes with beam haunching Client - COKUL
c
Site Visit validated that there isnt any light at the
canopy. Accepted to be dismantled
Reviewed By:
SLT7 Consortium
Drawing Reference: Muhamad Azarudin
Digitally signed by Muhamad Azarudin
DN: cn=Muhamad Azarudin, o=SL T7
Consortium, ou,
email=azarudin@t7global.com.my, c=MY
c
Reviewed By:
SLT7 Consortium
Drawing Reference: Muhamad Digitally signed by Muhamad Azarudin
DN: cn=Muhamad Azarudin, o=SL T7
Consortium, ou,
ISSUE NO. ST-04 TARGET DATE: 24/Jul/23 Status: Open / Closed Closed
Acknowledge By :
LOCATION : ACTION BY
Diversion Box ASVEC Rooms PMC - AECOM
GRIDLINE REFERENCE : No objection and Accepted by PMC and COKUL.
X2C:XYC Continue for construction and installation.
ISSUE :
ASVEC rooms to be removed to make way for new conveyors.
Client - COKUL
c
Reviewed By:
SLT7 Consortium
Muhamad
Digitally signed by Muhamad
c
Reviewed By:
SLT7 Consortium
Drawing Reference: Muhamad Digitally signed by Muhamad Azarudin
DN: cn=Muhamad Azarudin, o=SL T7 Consortium,
Azarudin
ou, email=azarudin@t7global.com.my, c=MY
Date: 2024.05.07 12:24:39 +08'00'
BHSARP-21-MTB-MUM-CS-DWG-220013
BHSARP-21-MTB-MUM-CS-DWG-220014 RFI REFERENCES (if any) :
No. :
Date :
VIRTUAL DESIGN REVIEW (VDR) NO.2
DATE: 7-Aug-23
TITLE : CLASHES / ISSUES - STRUCTURAL RELATED ISSUES
c
Reviewed By:
SLT7 Consortium
Drawing Reference: Muhamad Digitally signed by Muhamad Azarudin
DN: cn=Muhamad Azarudin, o=SL T7 Consortium, ou,
Azarudin
email=azarudin@t7global.com.my, c=MY
Date: 2024.05.07 12:36:17 +08'00'
BHSARP-21-MTB-MUM-CS-DWG-220013
RFI REFERENCES (if any) :
No. :
Date :
ISSUE NO. ST-07 TARGET DATE: 7/Aug/23 Status: Open / Closed Closed
Acknowledge By :
LOCATION : ACTION BY
MSL Zone 1 - Make-up Carousels PMC - AECOM
GRIDLINE REFERENCE :
X2a : Y5a-Y3c
ISSUE :
Plinth level more than 130mm
Client - COKUL
Reviewed By:
SLT7 Consortium
Drawing Reference: Muhamad Digitally signed by Muhamad Azarudin
DN: cn=Muhamad Azarudin, o=SL T7
Consortium, ou,