Download as pdf or txt
Download as pdf or txt
You are on page 1of 192

PAGES 186 PAGE 2

CONTENTS

1.0 PURPOSE

2.0 SCOPE

3.0 REFERENCES

4.0 DEFINITIONS

5.0 ABBREVIATIONS

6.0 RESPONSIBILITIES

7.0 CONFIDENTIALITY

8.0 INSTRUCTIONS

LIST OF APPENDICES

1.0 PRE-INSTALLATION ACTIVITIES

2.0 MECHANICAL COMPLETION AND PRECOMMISSIONING


ACTIVITIES

3.0 COMMISSIONING ACTIVITIES

0000-000-5-EI-O-850-186-1-X
PAGES 186 PAGE 3

1.0 PURPOSE

The purpose of this instruction is to :

1.1 Standardize the Check List Forms of the Electrical activities which will be
performed during the different stages of the project and used by the Site
Discipline Supervisor (SDS) for the Electrical works as per contract bases for the
electrical construction activity.
1.2 Define the responsibilities for different parties involved in this Instruction.

1.3 Standardize the Electrical forms covering :

Electrical Pre-installation Check Lists


Electrical Precommissioning and Mechanical Completion Check Lists
Electrical Commissioning Check Lists

2.0 SCOPE

This instruction shall be applicable partially or totally to ENPPI Electrical works


and activities in all projects according to the contract bases.

3.0 REFERENCES

3.1 ELECTRICAL ENGINEERING INSTRUCTIONS

5-EI-03 Electrical Engineering Quality Control and Assurance


Procedure

3.2 OTHERS

4-PI-0210 Site Quality Record


4-PI-0509 Plant Completion Responsibilities
0-QP-016 Control of Quality Record
(Project Pre-commissioning Procedure)
4-PI-0612 Electrical safety rules
4-P1-0307 Tests of elect. equipment & material at site.

4.0 DEFINITIONS

CIC Company Instructions Coordinator


EDM Electrical Department Manager
ELE Electrical Lead Engineer
EE Electrical Engineer
EL Engineering Leader
EMS Environmental Management System
SM Site Manager
SDS Site Discipline Supervisor for Electrical Works.

0000-000-5-EI-O-850-186-1-X
PAGES 186 PAGE 4

PI-CLF(510-02) Pre-Installation check list for Power Transformers


PC-CLF(500-03) Pre-Commissioning Check List for Motors
C-CLF(510-06) Commissioning Check List for A.C Generators

5.0 ABBREVIATIONS

NOMENCLATURE ELECTRICAL EQUIPMENT

BT BATTERY
BCH BATTERY CHARGER
CB CIRCUIT BREAKER
ELDP EMERGENCY LIGHTING DISTRIBUTION PANEL
EPM ELECTRICAL POWER MODULES
FC FREQUENCY CONVERTER
G GENERATOR
HTS HEAT TRACING SYSTEM
LDP LIGHTING DISTRIBUTION PANEL
MCC MOTOR CONTROL CENTER
NA NAVIGATION AIDS
NGR NEUTRAL GROUND RESISTOR
OHL OVERHEAD LINE
PFCE POWER FACTOR CORRECTION EQUIPMENT
PDP POWER DISTRIBUTION PANEL
RMU RING MAIN UNIT
SCP SYNOPTIC CONTROL PANEL
SSPS SOLAR SYSTEM POWER SUPPLY
SWG SWITCHGEAR
SWR SWITCHRACK
TR TRANSFORMER
UPS UNINTERRUPTABLE POWER SUPPLY SYSTEM

6.0 RESPONSIBILITIES

6.1 ELECTRICAL DEPARTMENT MANAGER (EDM)

EDM shall:

6.1.1 Revise and approve the revisions and/or deviations to this instruction if
specifically required in a project.

6.1.2 Approve this instruction and revise when needed.

6.1.3 Coordinate with Company Instructions Coordinator (CIC) for new official
revision.

0000-000-5-EI-O-850-186-1-X
PAGES 186 PAGE 5

6.2 ELECTRICAL LEAD ENGINEER (ELE)

ELE shall:

6.2.1 Assign Electrical Engineer (EE) for preparing the Electrical Check List Forms.

6.2.2 Review, check and get the approval of the EDM or his authorized delegate on
the Electrical Check List Forms.

6.2.3 Issue the Electrical Check List Forms to EL.

6.2.4 Keep record of the Electrical Check List Forms in project filing.

6.3 ELECTRICAL ENGINEER (EE)

EE shall :

6.3.1 Prepare the Electrical Check List Forms for the electrical construction activity
related to the concerned project in coordination with Construction Department
and Commissioning & Start-up Supervisor.

6.3.2 Submit the Electrical Check List Forms to ELE for checking.

6.4 ENGINEERING LEADER (EL)

EL shall :

- Revise the Electrical Check Lists, as necessary after ELE checking, for
approval and issue to the Construction Site Manager (SM)/ Site Discipline
Supervisor for the Electrical Works (SDS).

6.5 SITE DISCIPLINE SUPERVISOR (SDS)

SDS shall :

- Submit complete set from the Electrical Check Lists to the Construction
Contractor.

- Use the Electrical Check Lists, during the different stages of the project.

- Complete all signatures related to the Check Lists from the authorized
personnel (contractor/client).

0000-000-5-EI-O-850-186-1-X
PAGES 186 PAGE 6

7.0 CONFIDENTIALITY

In general the Electrical Check List Forms shall be issued to the successful
Construction Contractor; unless otherwise required by project instructions.

8.0 INSTRUCTIONS

8.1 GENERAL

8.1.1 Using the Electrical Check List Forms for all projects but it can be adapted in a
special project.

8.1.2 The Electrical Check List Forms shall be issued as a part of the project
documents (depending on the contract bases) to the successful Construction
Contractor.

8.1.3 The Electrical Check List Forms are grouped into three sections :

- Pre-installation activities
- Mechanical completion and pre-commissioning activities
- Commissioning activities

8.1.4 The hard copy of the Electrical Check List Forms listed in Appendices 1.0, 2.0
& 3.0 are available in the Electrical Department and are stored also on the
computer.

8.2 THE ISSUANCE STAGES SHALL BE AS FOLLOWS :

8.2.1 EE shall check the project electrical documents such as : Electrical


specifications, the relevant electrical main equipment, electrical systems, ....
etc; then prepare the applicable Check List Forms.

8.2.2 ELE shall check the conformity between the project electrical
equipment/materials and the Electrical Check List Forms.

8.2.3 The EDM (or EDM authorized delegate) shall approve the Check List Forms.

0000-000-5-EI-O-850-186-1-X
PAGES 186 PAGE 7

APPENDIX 1.0

PRE-INSTALLATION ACTIVITIES

CONTENTS

1.0 GENERAL

2.0 ELECTRICAL PRE-INSTALLATION CHECK LIST FORMS

0000-000-5-EI-O-850-186-1-X
PAGES 186 PAGE 8

PREINSTALLATION ACTIVITIES.

1.0 GENERAL

The Electrical Construction Contractor shall be responsible of the pre-installation


checks of the electrical equipment and materials . This shall include, but not
necessary be limited to, the visual examination and checking of electrical
equipment and materials before the installation stages. These process shall
prevent the installation of electrical equipment and materials that require
replacement at a later stages and shall ensure that the materials received at site are
complete and meet the design specifications and functioning correctly.

These checks shall generally be performed at the warehouse, however, for some
materials, which must be transported to the place of installation (e.g SWG'S &
MCC panels) it can be carried out on this place. Item 2.0 includes all the electrical
preinstallation forms which indicate the checks required to be made for the
electrical equipment and materials. The preinstallation checks shall be carried out
by the Electrical Construction Contractor and supervised/approved by ENPPI
Electrical Construction Supervisor and Client.

0000-000-5-EI-O-850-186-1-X
PAGES 186 PAGE 9

2. 0 LIST OF ELECTRICAL PRE-INSTALLATION CHECK LIST FORMS :

COMM. NO DESCRIPTION CHECK LIST NO

500-02 PACKAGE EQUIPMENT PI- CLF(500-02)

500-03 MOTORS PI- CLF(500-03)

510-01 OVERHEAD LINE PI- CLF(510-01)


(HOLD)

510-02 POWER TRANSFORMER PI- CLF(510-02)

510-03 M.V SWG & MOTOR CONTROL GEAR PI- CLF(510-03)

510-04 L.V SWG & MOTOR CONTROL CENTER PI- CLF(510-04)

510-05 M.V INDEPENDENT CIRCUIT BREAKER PI- CLF(510-05)

510-06 A.C GENERATOR PI- CLF(510-06)

510-07 L.V BUS TRUNKING PI- CLF(510-07)


(HOLD)

510-08 BATTERY AND CHARGER ASSEMBLIES PI- CLF(510-08)

510-09 NEUTRAL GROUNDING RESISTOR PI- CLF(510-09)

510-10 NAVIGATIONAL AIDES PI- CLF(510-10)

510-11 HEAT TRACING SYSTEM PI- CLF(510-11)

510-12 UNINTERRUPTABLE POWER SUPPLY PI- CLF(510-12)

510-13 SMALL POWER DISTRIBUTION PANEL PI- CLF(510-13)

510-14 RING MAIN UNITS PI- CLF(510-14)

510-15 SYNOPTIC CONTROL PANEL PI- CLF(510-15)

510-16 ELECT. POWER MODULES PI- CLF(510-16)


(HOLD)

510-17 L.V EXPLOSION PROOF SWITCHRACKS PI- CLF(510-17)

510-18 SOLAR SYSTEM POWER SUPPLY PI- CLF(510-18)


(HOLD)

510-19 FREQUENCY CONVERTER PI- CLF(510-19)


(HOLD)

510-21 POWER FACTOR CORRECTION EQUIPMENT PI- CLF(510-21)

520-01 LTG AND SMALL POWER SYSTEM PI- CLF(520-01)

0000-000-5-EI-O-850-186-1-X
PAGES 186 PAGE 10

CONT'D LIST OF ELECTRICAL PRE-INSTALLATION CHECK LIST FORMS :

COMM. NO DESCRIPTION CHECK LIST NO

530-01 RACEWAYS AND SUPPORTS PI- CLF(530-01)

540-01 CABLES PI- CLF(540-01)

550-01 GROUNDING PI- CLF(550-01)

560-01 CONTROL STATION PI- CLF(560-01)

570-01 CABLE ACCESSORIES PI- CLF(570-01)

0000-000-5-EI-O-850-186-1-X
PAGES 186 PAGE 11

ENPPI

ELECTRICAL PRE-INSTALLATION CHECK LIST


PACKAGE EQUIPMENT
"PI-CLF(500-02)"
Page 1 of 1
PROJECT NAME: COM. NO:500-02

PROJECT NO : SUPPLIER:

AREA : DATE :

ITEM DESCRIPTION YES NO N/A


1 CABLES :-
Refer to PI-CLF (540-01)
2 CABLE ACCESSORIES :-
Refer to PI-CLF (570-01)
3 RACEWAYS AND SUPPORTS :-
Refer to PI-CLF (530- 01)
4 LOCAL MOTOR CONTROL STATIONS :-
Refer to PI-CLF (530-01)
5 MOTORS :-
Refer to PI-CLF (500-03)
6 BATTERIES AND CHARGER :-
Refer to PI-CLF (510-08)
7 LIGHTING SYSTEM :-
Refer to PI-CLF (520-01)
8 GROUNDING SYSTEM :-
Refer to PI-CLF (550-01)
9 ELECTRICAL POWER DISTRIBUTION BOARD(S):
Refer to PI-CLF (510-04) &CLF (510-17)
10
11
12
13
14
15
16
REMARKS:

CONTRACTOR ENPPI CLIENT

0000-000-5-EI-O-850-186-1-X
PAGES 186 PAGE 12

ENPPI

ELECTRICAL PRE-INSTALLATION CHECK LIST


MOTORS
"PI-CLF(500-03)"

Page 1 of 1
PROJECT NAME: COM. NO:500-03

PROJECT NO : SUPPLIER:

AREA : DATE :

ITEM DESCRIPTION YES NO N/A


1 Name plate rating verified and motors tag number
2 Area classification correct
3 Check final painting is satisfactory
4 Check enclosure for moisture leaks and openings
which may allow dirt accumulation
5 Installation and fixation of Space heaters to be
checked
6 Rotate manually, check bearings and ensure
lubrication is satisfactory
7 Check availability of supplier documents ,including
storage and installation instructions
8 Loose materials availability to be checked w.r.t
approved Documents
9 Electrical components to be visually checked for
compliance with approved drawings
(Heaters,C.T's.... etc)
10 List of spare parts and commissioning spare parts to
be Revised w.r.t their relevant MRP
11 Check availability of inspection certificate including
tests acceptance criteria values
REMARKS:

CONTRACTOR ENPPI CLIENT

0000-000-5-EI-O-850-186-1-X
PAGES 186 PAGE 13

ENPPI

ELECTRICAL PRE-INSTALLATION CHECK LIST


POWER TRANSFORMER
"PI-CLF(510-02)"

Page 1 of 3
PROJECT NAME: COM. NO:510-02

PROJECT NO : SUPPLIER:

AREA : DATE :

ITEM DESCRIPTION YES NO N/A

1 Name plate rating verified and equipment tag number


2 Area classification verified.
3 Quantities ,description and all related information to be Checked

against their related MRP'S.


4 Check external mechanical damage especially cooling fan.
5 Check oil leaks.
6 Check bushing and seals are Free from damage and leaks.
7 Check all auxiliaries installed As per approved drawings.
8 Check gland plates and cable Entries w.r.t approved dwg's
9 Check outgoing terminals Clearly marked
10 Check silica gel ( SILICON OXIDE) of the air dryer is dry
11 Paint finish satisfactory
12 There are no loose or missing Screws or nuts
13 Check foundation fixing details
14 List of spare parts and commissioning spare parts to be
Revised against their related MRP'S
15 Check insulators are clean
REMARKS:

CONTRACTOR ENPPI CLIENT

0000-000-5-EI-O-850-186-1-X
PAGES 186 PAGE 14

PROJECT NAME: COM. NO:510-02

PROJECT NO : SUPPLIER:

AREA : DATE :

0000-000-5-EI-O-850-186-1-X
PAGES 186 PAGE 15

ENPPI

ELECTRICAL PRE-INSTALLATION CHECK LIST


POWER TRANSFORMER
"PI-CLF(510-02)"

Page 2 of 3
PROJECT NAME: COM. NO:510-02

PROJECT NO : SUPPLIER:

AREA : DATE :
ITEM DESCRIPTION YES NO N/A
16 All components are securely fixed and free from damage
17 Earthing connections are Verified
18 Loose material availability to be checked
19 Check availability of supplier documents , Including storage and
installation instructions
20 OFF-CIRCUIT TAP CHANGER :
20.1 Check tap-selector switch moves correctly in all positions
20.2 Check availability of a suitable padlock, complete with two keys
20.3 Robust mechanical stops at the ends shall be provided to prevent
overrunning
20.4 Check tap positions clearly marked in line with the data given on the
rating plate
20.5 Check the tap provided with metallic handle to allow operation
without the need of tools
20.6
20.7
20.8
20.9
20.10
20.11
REMARKS: If neutral ground resistor part of the power transformer, check pre-installation
check list of N.G.R (CLF- 510-09)
CONTRACTOR ENPPI CLIENT

0000-000-5-EI-O-850-186-1-X
PAGES 186 PAGE 16

ENPPI

ELECTRICAL PRE-INSTALLATION CHECK LIST


POWER TRANSFORMER
"PI-CLF(510-02)"

Page 3 of 3
PROJECT NAME: COM. NO:510-02

PROJECT NO : SUPPLIER:

AREA : DATE :
ITEM DESCRIPTION YES NO N/A
21 ON-LOAD TAP CHANGER :

21.1 Check the tap changer oil compartment provided


with the following :
a. Oil level indicator
b. Buchholz oil/gas device
c. Oil sampling connection
d. One filling/filter connection valve
e. One drain/filter connection valve
f. A breather with a silica gel dehydrating capsule
21.2 Check the motor drive shall Include but not limited to
the Following :
a. Pad lockable incoming supply switch
b. Manual operation facilities
c. Local control facilities
d. Local/remote selector switch
e. Local mechanical tap position indicator
f. Direction of rotation protection
g. Tap status indication lamps
21.3
22 Check availability of inspection certificate including
tests acceptance criteria values
23 REMOTE CONTROL PANEL
23.1 The remote control panel shall Include but not
limited to the Following :
a. Manual control facilities
b. Tap position indicator
c. Tap status indication lamps
d. Anti-condensation heater
REMARKS: If neutral ground resistor part of the Power transformer, check pre-installation
Check list of N.G.R (CLF- 510-09).
CONTRACTOR ENPPI CLIENT

0000-000-5-EI-O-850-186-1-X
PAGES 186 PAGE 17

ENPPI

ELECTRICAL PRE-INSTALLATION CHECK LIST


M.V SWITCHGEAR & MOTOR CONTROL GEAR
"PI-CLF(510-03)"
Page 1 of 2
PROJECT NAME: COM. NO:510-03

PROJECT NO : SUPPLIER:

AREA : DATE :

ITEM DESCRIPTION YES NO N/A


1 Name plate rating verified and equipment tag number
2 Area classification correct
3 Check outgoing terminals clearly marked
4 All equipment are free from mechanical damage
5 Check all components are securely fixed and free from
damage
6 Check all meters for loose glass
7 Check signal lamps are correctly rated and as per
approved dwg's
8 Check enclosure for moisture leaks and openings which
may allow dirt accumulation
9 Ventilation openings are not blocked off and are fitted
with gratings and insect nets
10 Installation and fixation of space heaters to be checked
11 Check final painting is Satisfactory
12 Check doors and panels close properly and there are keys
for all locks
13 Loose materials availability to be revised ( fish plates,
bolts, insulation boxes,...etc)

REMARKS:

CONTRACTOR ENPPI CLIENT

0000-000-5-EI-O-850-186-1-X
PAGES 186 PAGE 18

ENPPI

ELECTRICAL PRE-INSTALLATION CHECK LIST


M.V SWITCHGEAR & MOTOR CONTROL GEAR
"PI-CLF (510-03)"
Page 2 of 2
PROJECT NAME: COM. NO:510-03

PROJECT NO : SUPPLIER:

AREA : DATE :

ITEM DESCRIPTION YES NO N/A

14
checked
15 Spare parts and commissioning components to be verified
against their relevant lists
16 Check availability of supplier documents ,including storage and
installation instructions
17 Check availability of inspection certificate including tests
acceptance criteria values
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
REMARKS:

CONTRACTOR ENPPI CLIENT

0000-000-5-EI-O-850-186-1-X
PAGES 186 PAGE 19

ENPPI

ELECTRICAL PRE-INSTALLATION CHECK LIST


L.V SWITCHGEAR & MOTOR CONTROL CENTER
"PI-CLF (510-04)"
Page 1 of 2

PROJECT NAME: COM. NO:510-04

PROJECT NO : SUPPLIER:

AREA : DATE :

ITEM DESCRIPTION YES NO N/A

1 Name plate rating verified and equipment tag


number

2 Area classification correct

3 Check outgoing terminals clearly marked

4 All panels are free from mechanical damage

5 Check doors and panels close properly and there


are keys for all locks

6 Check all components are securely fixed and free


from damage

7 Check all meters for loose glass

8 Check signal lamps are correctly rated and as per


Approved dwg's

9 Check final painting is Satisfactory


Check enclosure for moisture leaks and openings
10
which may allow dirt accumulation
REMARKS:

CONTRACTOR ENPPI CLIENT

0000-000-5-EI-O-850-186-1-X
PAGES 186 PAGE 20

PROJECT NAME: COM. NO:510-04

PROJECT NO : SUPPLIER:

AREA : DATE :

ENPPI

ELECTRICAL PRE-INSTALLATION CHECK LIST


L.V SWITCHGEAR & MOTOR CONTROL CENTER
"PI-CLF (510-04)"
Page 2 of 2

PROJECT NAME: COM. NO:510-04

PROJECT NO : SUPPLIER:

AREA : DATE :

ITEM DESCRIPTION YES NO N/A

11 Installation and fixation of space heaters to be checked

12 Ventilation openings are not blocked off and are fitted


with gratings and insect nets

13 Loose material availability to be revised ( fish plates,


bolts, insulation boxes,.....)

14 "WARNING" tags fitted by supplier for special


indication

16 List of spare parts and commissioning spare parts to be


revised w.r.t their MRP's.

17 Check availability of supplier Documents ,including


storage and installation instructions

18 Check availability of inspection certificate including tests


acceptance criteria values

19

20

0000-000-5-EI-O-850-186-1-X
PAGES 186 PAGE 21

PROJECT NAME: COM. NO:510-04

PROJECT NO : SUPPLIER:

AREA : DATE :

21
REMARKS:

CONTRACTOR ENPPI CLIENT

ENPPI

ELECTRICAL PRE-INSTALLATION CHECK LIST


M.V INDEPENDENT CIRCUIT BREAKER
"PI-CLF (510-05)"
Page 1 of 2

PROJECT NAME: COM. NO:510-05

PROJECT NO : SUPPLIER:

AREA : DATE :

ITEM DESCRIPTION YES NO N/A

1 Name plate rating verified and Equipment tag number

2 Aria classification correct

3 Check outgoing terminals Clearly marked

4 All equipment are free from Mechanical damage

5 Check all components are Securely fixed and free from


Damage

6 Check all meters for loose Glass

7 Check signal lamps are Correctly rated and as per


Approved dwg's

0000-000-5-EI-O-850-186-1-X
PAGES 186 PAGE 22

PROJECT NAME: COM. NO:510-05

PROJECT NO : SUPPLIER:

AREA : DATE :

8 Check enclosure for moisture Leaks and openings


which may allow dirt accumulation

9 Ventilation openings are not Blocked off and are fitted


with Gratings and insect nets

10 "WARNING" tags fitted by supplier for special


indications to be checked
REMARKS:

CONTRACTOR ENPPI CLIENT

ENPPI

ELECTRICAL PRE-INSTALLATION CHECK LIST


M.V INDEPENDENT CIRCUIT BREAKER
"P I - CLF (510-05)"
Page 2 of 2

PROJECT NAME: COM. NO:510-05

PROJECT NO : SUPPLIER:

AREA : DATE :

ITEM DESCRIPTION YES NO N/A


11 Installation and fixation of space heaters to be
checked
12 Check final painting is Satisfactory
13 Check doors and panels close properly and there
are keys for all locks
14 Loose materials availability to be revised ( fish

0000-000-5-EI-O-850-186-1-X
PAGES 186 PAGE 23

PROJECT NAME: COM. NO:510-05

PROJECT NO : SUPPLIER:

AREA : DATE :

plates, bolts, insulation boxes,...etc)


15 Spare parts and commissioning components to be
verified against their relevant lists
16 Check availability of supplier Documents,
including storage and installation instructions
17 Check availability of inspection certificate
including tests acceptance criteria values
18
19
20
REMARKS:

CONTRACTOR ENPPI CLIENT

ENPPI

ELECTRICAL PRE-INSTALLATION CHECK LIST


A.C GENERATOR
"PI-CLF (510-06)"
Page 1 of 3

PROJECT NAME: COM. NO:510-06

PROJECT NO : SUPPLIER:

AREA : DATE :

ITEM DESCRIPTION YES NO N/A

1 ALTERNATOR :

0000-000-5-EI-O-850-186-1-X
PAGES 186 PAGE 24

PROJECT NAME: COM. NO:510-06

PROJECT NO : SUPPLIER:

AREA : DATE :

1.1 Name plate rating verified and equipment tag number

1.2 Area classification correct

1.3 Installation and fixation of space heaters to be checked

1.4 A.C generator are free from Mechanical damage

1.5 Earthing connections to be checked w.r.t approved dwg's

1.6 Check all components are securely fixed and free from damage

1.7 Check all meters for loose Glass

1.8 Ensure that all covers giving access for connections are

fastened down

1.9 Check final painting is Satisfactory

1.10 Check enclosure for moisture leaks and openings which may

allow dirt accumulation


REMARKS:

CONTRACTOR ENPPI CLIENT

0000-000-5-EI-O-850-186-1-X
PAGES 186 PAGE 25

ENPPI

ELECTRICAL PRE-INSTALLATION CHECK LIST


A.C GENERATOR
"PI-CLF (510-06)"
Page 2 of 3

PROJECT NAME: COM. NO:510-06

PROJECT NO : SUPPLIER:

AREA : DATE :

ITEM DESCRIPTION YES NO N/A

1.11 Check outgoing terminals clearly marked

1.12 Ventilation openings are not blocked off and are fitted with
gratings and insect nets

1.13 Loose material availability to be revised

1.14 "WARNING" tags fitted by supplier for special


indication

1.15 List of spare parts and commissioning spare parts to be


revised w.r.t their related MRP

1.16 Generator control/protection panel to be checked as per


P1-CLF(510-04) & CLF(510-17)

1.17 All related motors to be checked as per PI-CLF (500-03)

1.18 Check availability of supplier documents, including storage


and installation instructions

1.19 Check availability of inspection certificate including tests


acceptance criteria values
REMARKS:

CONTRACTOR ENPPI CLIENT

0000-000-5-EI-O-850-186-1-X
PAGES 186 PAGE 26

ENPPI

ELECTRICAL PRE-INSTALLATION CHECK LIST


A.C GENERATOR
"PI-CLF (510-06)"

Page 3 of 3
PROJECT NAME: COM. NO:510-06

PROJECT NO : SUPPLIER:

AREA : DATE :

ITEM DESCRIPTION YES NO N/A

2 BATTERIES :-

2.1 Batteries are compliance with approved documents and data


sheet

2.2 Battery rack mechanically undamaged and paint work


satisfactory

2.3 Check availability and type of Electrolyte w.r.t approved


documents

2.4 All accessories to be revised (connectors, bolts, bridges,..) w.r.t


their related MRP's

2.5 Battery cells mechanically Undamaged

2.6 Battery charger panels to be checked as per PI-CLF (510-08)

2.7

2.8
2.9
2.10

2.11
REMARKS:

CONTRACTOR ENPPI CLIENT

0000-000-5-EI-O-850-186-1-X
PAGES 186 PAGE 27

PROJECT NAME: COM. NO:510-06

PROJECT NO : SUPPLIER:

AREA : DATE :

ENPPI

ELECTRICAL PRE-INSTALLATION CHECK LIST


BATTERIES AND BATTERY CHARGER
"PI-CLF (510-08)"

Page 1 of 3
PROJECT NAME: COM. NO:510-08

PROJECT NO : SUPPLIER:

AREA : DATE :

ITEM DESCRIPTION YE NO N/A


S

1 BATTERY CHARGER AND D.C


DISTRIBUTION PANEL:-

1.1 Name plate rating verified and equipment tag Number


1.2 Installation and fixation of space heaters to be checked
1.3 Check outgoing terminals clearly marked

1.4 All panels and fans are free from mechanical damage
1.5 Check doors and panels close properly and there are keys for all
locks

1.6 Check all components are securely fixed and free from damage
1.7 Check all meters for loose glass

1.8 Check signal lamps are correctly rated and as per approved
dwg's

1.9 Check final painting is satisfactory

0000-000-5-EI-O-850-186-1-X
PAGES 186 PAGE 28

PROJECT NAME: COM. NO:510-08

PROJECT NO : SUPPLIER:

AREA : DATE :
REMARKS:

CONTRACTOR ENPPI CLIENT

0000-000-5-EI-O-850-186-1-X
PAGES 186 PAGE 29

ENPPI

ELECTRICAL PRE-INSTALLATION CHECK LIST


BATTERIES AND BATTERY CHARGER
"PI-CLF(510-08)"

Page 2 of 3
PROJECT NAME: COM. NO: 510-08

PROJECT NO : SUPPLIER:

AREA : DATE :

ITEM DESCRIPTION YES NO N/A

1.10 Check enclosure for moisture leaks and openings which


may
allow dirt accumulation

1.11 Ventilation openings are not blocked off and are fitted with
gratings and insect nets

1.12 Loose material availability to be revised ( fish plates,


glands, bolts, insulation boxes,...etc.)

1.13 "WARNING" tags fitted by supplier for special indication

1.14 List of spare parts and commissioning spare parts to be


revised w.r.t their related MRP

1.15 Check availability of supplier documents ,including storage


and installation instructions

1.16 Check availability of inspection certificate including tests


acceptance criteria values

1.17

REMARKS:

CONTRACTOR ENPPI CLIENT

0000-000-5-EI-O-850-186-1-X
PAGES 186 PAGE 30

PROJECT NAME: COM. NO: 510-08

PROJECT NO : SUPPLIER:

AREA : DATE :

ENPPI

ELECTRICAL PRE-INSTALLATION CHECK LIST


BATTERIES AND BATTERY CHARGER
"PI-CLF (510-08)"

Page 3 of 3
PROJECT NAME: COM. NO:510-08

PROJECT NO : SUPPLIER:

AREA : DATE :

ITEM DESCRIPTION YES NO N/A

2 BATTERIES :-

2.1 Batteries are compliance with approved documents and data sheet

2.2 Battery rack mechanically undamaged and paint work satisfactory

2.3 Check availability and type of electrolyte w.r.t approved documents

2.4 All accessories to be revised (connectors, bolts, bridges,..)

2.5 Battery cells mechanically undamaged

2.6

2.7

2.8

2.9

2.10

2.11
2.12
REMARKS:

0000-000-5-EI-O-850-186-1-X
PAGES 186 PAGE 31

PROJECT NAME: COM. NO:510-08

PROJECT NO : SUPPLIER:

AREA : DATE :

CONTRACTOR ENPPI CLIENT

0000-000-5-EI-O-850-186-1-X
PAGES 186 PAGE 32

ENPPI

ELECTRICAL PRE-INSTALLATION CHECK LIST


NEUTRAL GROUNDING RESISTOR
"PI-CLF (510-09)"

Page 1 of 1

PROJECT NAME: COM. NO:510-09

PROJECT NO : SUPPLIER:

AREA : DATE :

ITEM DESCRIPTION YES NO N/A

1 Name plate rating verified and equipment tag number

2 Check final painting is satisfactory

3 Neutral earth connections are satisfactory

4 N.E.R is free from mechanical damage

5 Check all components are securely fixed and free from damage.

6 List of spare parts and commissioning spare parts to be

revised w.r.t their related MRP

7 Loose materials availability to be revised w.r.t their related MRP

8 Check availability of supplier documents ,including storage


and installation instructions

9 Check availability of inspection certificate including tests

acceptance criteria values

EMARKS:

CONTRACTOR ENPPI CLIENT

0000-000-5-EI-O-850-186-1-X
PAGES 186 PAGE 33

ENPPI

ELECTRICAL PRE-INSTALLATION CHECK LIST


NAVIGATION AIDS
"PI-CLF (510-10)"

Page 1 of 5

PROJECT NAME: COM. NO:510-10

PROJECT NO : SUPPLIER:

AREA : DATE :

ITEM DESCRIPTION YES NO N/A

1 Name plate rating verified and equipment tag number

2 Area classification correct

3 Terminal box connections clearly marked

4 Check all materials as indicated on the related data sheet

(highly corrosion resistant, suitable for salty,..etc)

5 Control panels close properly and there are keys for all locks

6 Check all components are securely fixed and free from


damage

7 Check all meters for loose glass

8 Check indication lamps are correctly rated and as per


approved dwg's

9 Check degree of mechanical protection (IP 56 for outdoor,


IP31 for indoor)

REMARKS:

CONTRACTOR ENPPI CLIENT

0000-000-5-EI-O-850-186-1-X
PAGES 186 PAGE 34

EN P P I

ELECTRICAL PRE-INSTALLATION CHECK LIST


NAVIGATION AIDS
"PI-CLF (510-10)"

Page 2 of 5

PROJECT NAME: COM. NO:510-10

PROJECT NO : SUPPLIER:

AREA : DATE :

ITEM DESCRIPTION YES NO N/A

10 Check final painting is satisfactory

11 Earthing connections are provided

12 Check all equipment and aux. materials supplied with complete

wiring

13 Check availability of interconnecting cables and all related

accessories

14 Check availability of inspection certificate including tests acceptance

criteria values

15

16 BATTERIES :-

Batteries type: 24 d.c volt

16.1 Batteries are compliance with approved documents and data sheet

16.2 Battery rack mechanically undamaged and paint work satisfactory

REMARKS:

CONTRACTOR ENPPI CLIENT

0000-000-5-EI-O-850-186-1-X
PAGES 186 PAGE 35

PROJECT NAME: COM. NO:510-10

PROJECT NO : SUPPLIER:

AREA : DATE :

ENPPI

ELECTRICAL PRE-INSTALLATION CHECK LIST


NAVIGATION AIDS
"PI-CLF (510-10)"

Page 3 of 5

PROJECT NAME: COM. NO:510-10

PROJECT NO : SUPPLIER:

AREA : DATE :

ITEM DESCRIPTION YES NO N/A

16.3 Check availability and type of electrolyte w.r.t approved documents

16.4 All accessories to be revised (connectors, bolts, bridges,..)

16.5 Battery cells mechanically undamaged

16.6 Check availability of supplier documents ,including storage

and installation instructions

Batteries type: solar cells

16.7 Cells are mechanically undamaged

16.8 Batteries are compliance with approved documents and data sheet

16.9 All accessories to be revised

17 MAIN WHITE FLASHING LIGHT AND

SUBSIDIARY LIGHTS :

17.1 Characteristics of main white flashing light to be checked


w.r.t their related MRP and approved documents

0000-000-5-EI-O-850-186-1-X
PAGES 186 PAGE 36

PROJECT NAME: COM. NO:510-10

PROJECT NO : SUPPLIER:

AREA : DATE :

REMARKS:

CONTRACTOR ENPPI CLIENT

0000-000-5-EI-O-850-186-1-X
PAGES 186 PAGE 37

ENPPI

ELECTRICAL PRE-INSTALLATION CHECK LIST


NAVIGATION AIDS
"PI-CLF (510-10)"

Page 4 of 5
PROJECT NAME: COM. NO:510-10
PROJECT NO : SUPPLIER:

AREA : DATE :
ITEM DESCRIPTION YES NO N/A

17.2 List of spare parts and commissioning spare parts to be revised

w.r.t their related MRP

17.3 Loose materials availability to be revised w.r.t their related MRP

17.4 Check availability of supplier documents ,including storage and

installation instructions

18 FOG HORN :

18.1 Characteristics of fog horn to be checked w.r.t their related MRP

and approved documents

18.2 List of spare parts and commissioning spare parts to be revised

w.r.t their related MRP

18.3 Loose materials availability to be revised w.r.t their related MRP

18.4 Check availability of supplier documents ,including storage and

installation instructions

REMARKS:

CONTRACTOR ENPPI CLIENT

0000-000-5-EI-O-850-186-1-X
PAGES 186 PAGE 38

ENPPI

ELECTRICAL PRE-INSTALLATION CHECK LIST


NAVIGATION AIDS
"PI-CLF (510-10)"

Page 5 of 5
PROJECT NAME: COM. NO:510-10

PROJECT NO : SUPPLIER:

AREA : DATE :
ITEM DESCRIPTION YES NO N/A
19 FIXED RED LIGHT, RED FLASHING LIGHT AND
HELIDECK LIGHTING :

19.1 Characteristics of fixed red light, red flashing light and helideck
lighting to be checked w.r.t their related MRP and approved
documents

19.2 List of spare parts and commissioning spare parts to be revised


w.r.t their related MRP
19.3 Loose materials availability to be revised w.r.t their related MRP

19.4 Check availability of supplier documents ,including storage and


installation instructions

19.5
19.6
19.7
19.8
19.9
REMARKS:

CONTRACTOR ENPPI CLIENT

0000-000-5-EI-O-850-186-1-X
PAGES 186 PAGE 39

ENPPI

ELECTRICAL PRE-INSTALLATION CHECK LIST


HEAT TRACING SYSTEM
"PI-CLF (510-11)"
Page 1 of 2
PROJECT NAME: COM. NO:510-11

PROJECT NO : SUPPLIER:

AREA : DATE :
ITEM DESCRIPTION YES NO N/A

1 All components are free from mechanical damage

2 Check availability of vendor documents ,including storage and I

nstallation instructions

3 Loose materials availability to be checked (cold lead, J.B's temp.

switches,....etc) w.r.t their related MRP

4 Electrical components to be visually checked for compliance

with approved drawings

5 Type of heat tracing cables to checked w.r.t approved documents

6 Check equipment tag number's

7 Area classification correct

8 Check the continuity and insulation of heat tracing cables

immediately upon receiving these cables and without removing

any cable from the shipping container to ensure that the heat

tracing cables were received in satisfactory conditions

REMARKS:

CONTRACTOR ENPPI CLIENT

0000-000-5-EI-O-850-186-1-X
PAGES 186 PAGE 40

ENPPI

ELECTRICAL PRE-INSTALLATION CHECK LIST


HEAT TRACING SYSTEM
"PI-CLF (510-11)"
Page 2 of 2
PROJECT NAME: COM. NO:510-11

PROJECT NO : SUPPLIER:

AREA : DATE :

ITEM DESCRIPTION YES NO N/A

9 List of spare parts and commissioning spare parts to be revised

w.r.t their related MRP

10 The heat tracing cables shall be tested again as per item (8) after

unrolling and before installation on the pipes

11 Check availability of supplier documents ,including storage and

installation instructions

12 Check availability of inspection certificate including tests

acceptance criteria values

13

14

15

16

17

18

19
20

REMARKS:
(*) Continuity and insulation tests according to the supplier recommendations.

CONTRACTOR ENPPI CLIENT

0000-000-5-EI-O-850-186-1-X
PAGES 186 PAGE 41

ENPPI

ELECTRICAL PRE-INSTALLATION CHECK LIST


UNINTERRUPTABLE POWER SUPPLY
"PI-CLF (510-12)"

Page 1 of 4
PROJECT NAME: COM. NO:510-12

PROJECT NO : SUPPLIER:

AREA : DATE :

ITEM DESCRIPTION YES NO N/A

1 D.C CHARGER PANEL :

1.1 Name plate rating verified and equipment tag number

1.2 Installation and fixation of space heaters to be checked

1.3 Check outgoing terminals clearly marked

1.4 panel is free from mechanical damage

1.5 Check doors and panel close properly and there are keys for

all locks

1.6 Check all components are securely fixed and free from damage

1.7 Check all meters for loose glass

1.8 Check signal lamps are correctly rated and as per approved

dwg's

1.9 Check final painting is Satisfactory

REMARKS:

CONTRACTOR ENPPI CLIENT

0000-000-5-EI-O-850-186-1-X
PAGES 186 PAGE 42

ENPPI

ELECTRICAL PRE-INSTALLATION CHECK LIST


UNINTERRUPTABLE POWER SUPPLY
"PI-CLF (510-12)"

Page 2 of 4
PROJECT NAME: COM. NO:510-12

PROJECT NO : SUPPLIER:

AREA : DATE :

ITEM DESCRIPTION YES NO N/A

1.10 Check enclosure for moisture leaks and openings which may allow dirt

accumulation

1.11 Ventilation openings are not blocked off and are fitted with gratings and

insect nets

2 INVERTER & STATIC SWITCH COMPARTMENTS :

2.1 Name plate rating verified and equipment tag number

2.2 Installation and fixation of space heaters to be checked

2.3 panel is free from mechanical damage

2.4 Check doors and panel close properly and there are keys for all locks

2.5 Check all components are securely fixed and free from damage

2.6 Check final painting is satisfactory

2.7 Check enclosure for moisture leaks and openings which may

allow dirt accumulation

REMARKS:

CONTRACTOR ENPPI CLIENT

0000-000-5-EI-O-850-186-1-X
PAGES 186 PAGE 43

ENPPI

ELECTRICAL PRE-INSTALLATION CHECK LIST


UNINTERRUPTABLE POWER SUPPLY
"PI-CLF (510-12)"

Page 3 of 4
PROJECT NAME: COM. NO:510-12
PROJECT NO : SUPPLIER:
AREA : DATE :
ITEM DESCRIPTION YES NO N/A
2.8 Ventilation openings are not blocked off and are fitted with
gratings and insect nets

3.0 BATTERIES :-

3.1 Batteries are compliance with approved documents and data


sheet

3.2 Battery rack mechanically undamaged and paint work satisfactory

3.3 Check availability and type of electrolyte w.r.t approved


documents

3.4 All accessories to be revised w.r.t their relevant MRP such as :


(connectors, bolts, bridges,..)

3.5 Battery cells mechanically undamaged

4 Loose material availability to be revised w.r.t their related MRP


such as : ( fish plates, cables,wires, glands bolts, insulation
boxes,lugs,...etc)

REMARKS:

CONTRACTOR ENPPI CLIENT

0000-000-5-EI-O-850-186-1-X
PAGES 186 PAGE 44

ENPPI

ELECTRICAL PRE-INSTALLATION CHECK LIST


UNINTERRUPTABLE POWER SUPPLY
"PI-CLF (510-12)"

Page 4 of 4
PROJECT NAME: COM. NO:510-12
PROJECT NO : SUPPLIER:
AREA : DATE :
ITEM DESCRIPTION YES NO N/A
5 List of spare parts and commissioning spare parts to be revised
w.r.t their relevant MRP

6 "WARNING" tags fitted by supplier for special indication

7 Check availability of supplier documents ,including storage and


installation instructions

8 Check availability of inspection certificate including tests


acceptance criteria values

9
10
11
12
13
14
15
16
REMARKS:

CONTRACTOR ENPPI CLIENT

0000-000-5-EI-O-850-186-1-X
PAGES 186 PAGE 45

ENPPI

ELECTRICAL PRE-INSTALLATION CHECK LIST


SMALL POWER DISTRIBUTION PANEL

"PI-CLF (510-13)"

Page 1 of 2
PROJECT NAME: COM. NO:510-13

PROJECT NO : SUPPLIER:

AREA : DATE :

ITEM DESCRIPTION YES NO N/A

1 Name plate rating verified and equipment tag number

2 Installation and fixation of space heaters to be checked

3 Check In/outgoing terminals clearly marked

4 All panels are free from mechanical damage

5 Check doors and panels close properly and there are keys for all locks

6 Check all components are securely fixed and free from damage

7 Check all meters for loose glass

8 Check signal lamps are correctly rated and as per approved dwg's

9 Earthing connections to be checked

10 Check final painting is Satisfactory


REMARKS:

CONTRACTOR ENPPI CLIENT

0000-000-5-EI-O-850-186-1-X
PAGES 186 PAGE 46

ENPPI

ELECTRICAL PRE-INSTALLATION CHECK LIST


SMALL POWER DISTRIBUTION PANEL
"PI-CLF (510-13)"

Page 2 of 2

PROJECT NAME: COM. NO:510-13

PROJECT NO : SUPPLIER:

AREA : DATE :

ITEM DESCRIPTION YES NO N/A

11 Check enclosure for moisture leaks and openings which may allow

dirt accumulation

12 Ventilation openings are not blocked off and are fitted with

gratings and insect nets

13 Loose material availability such as: ( fish plates, bolts, insulation

boxes,.....) to be revised w.r.t their relevant MRP

14 "WARNING" tags fitted by supplier for special indication

15 List of spare parts and commissioning spare parts to be revised

w.r.t their relevant MRP

16 Check availability of supplier documents ,including storage and

installation instructions

17 Check availability of inspection certificate including tests

acceptance criteria values


REMARKS:

CONTRACTOR ENPPI CLIENT

0000-000-5-EI-O-850-186-1-X
PAGES 186 PAGE 47

ENPPI

ELECTRICAL PRE-INSTALLATION CHECK LIST


RING MAIN UNITS
"PI-CLF (510-14)"

Page 1 of 2

PROJECT NAME: COM. NO:510-14

PROJECT NO : SUPPLIER:

AREA : DATE :

ITEM DESCRIPTION YES NO N/A

1 Name plate rating verified and equipment tag number

2 Installation and fixation of space heaters to be checked

3 Check In/outgoing terminals clearly marked

4 All panels are free from mechanical damage

5 Check doors and panels close properly and there are keys for all locks

6 Check all components are securely fixed and free from damage

7 Check all meters for loose glass

8 Check signal lamps are correctly rated and as per approved dwg's

9 Check final painting is satisfactory

10 Earthing connections to be checked


REMARKS: In case of M.V C.B's equipment to be checked as per PI-CLF (510-03).

CONTRACTOR ENPPI CLIENT

0000-000-5-EI-O-850-186-1-X
PAGES 186 PAGE 48

ENPPI

ELECTRICAL PRE-INSTALLATION CHECK LIST


RING MAIN UNITS
"PI-CLF (510-14)"

Page 2 of 2

PROJECT NAME: COM. NO:510-14

PROJECT NO : SUPPLIER:

AREA : DATE :

ITEM DESCRIPTION YES NO N/A

11 Check enclosure for moisture leaks and openings which may allow

dirt accumulation

12 Ventilation openings are not blocked off and are fitted with

gratings and insect nets

13 Loose material availability to be revised such as : ( fish plates,

bolts, insulation boxes,etc) w.r.t their relevant MRP

14 "WARNING" tags fitted by supplier for special indication

15 List of spare parts and commissioning spare parts to be revised

w.r.t their relevant MRP

16 Check availability of supplier documents ,including storage and


installation instructions

17 Check availability of inspection certificate including tests


acceptance criteria values
REMARKS:

CONTRACTOR ENPPI CLIENT

0000-000-5-EI-O-850-186-1-X
PAGES 186 PAGE 49

ENPPI

ELECTRICAL PRE-INSTALLATION CHECK LIST


SYNOPTIC CONTROL PANEL
"PI-CLF (510-15)"

Page 1 of 2

PROJECT NAME: COM. NO:510-15

PROJECT NO : SUPPLIER:

AREA : DATE :

ITEM DESCRIPTION YES NO N/A

1 Name plate rating verified and equipment tag number

2 Installation and fixation of space heaters to be checked

3 Check In/outgoing terminals clearly marked

4 All panels are free from mechanical damage

5 Check doors and panels close properly and there are keys for all

locks

6 Check all components are securely fixed and free from damage

7 Check all meters for loose glass

8 Check signal lamps are correctly and as per approved dwg's

9 Check final painting is satisfactory

10 Check enclosure for moisture leaks and openings which may allow

dirt accumulation
REMARKS:

CONTRACTOR ENPPI CLIENT

0000-000-5-EI-O-850-186-1-X
PAGES 186 PAGE 50

ENPPI

ELECTRICAL PRE-INSTALLATION CHECK LIST


SYNOPTIC CONTROL PANEL
"PI-CLF (510-15)"

Page 2 of 2

PROJECT NAME: COM. NO:510-15

PROJECT NO : SUPPLIER:

AREA : DATE :

ITEM DESCRIPTION YES NO N/A

11 Earthing connections to be checked


12 Ventilation openings are not blocked off and are fitted with
gratings and insect nets
13 Loose material availability to be revised ( fish plates, bolts,
insulation boxes,etc.) w.r.t their relevant MRP
14 "WARNING" tags fitted by supplier for special indication
15 List of spare parts and commissioning spare parts to be revised
w.r.t their relevant MRP
16 Indication lamps are of the correct color
17 Check availability of supplier documents ,including storage and
installation instructions
18 Check availability of inspection certificate including tests
acceptance criteria values

REMARKS:

CONTRACTOR ENPI CLIENT

0000-000-5-EI-O-850-186-1-X
PAGES 186 PAGE 51

ENPPI

ELECTRICAL PRE-INSTALLATION CHECK LIST


L.V EXPLOSION PROOF SWITCHRACK
"PI-CLF (510-17)"

Page 1 of 2

PROJECT NAME: COM. NO:510-17

PROJECT NO : SUPPLIER:

AREA : DATE :

ITEM DESCRIPTION YES NO N/A

1 Name plate rating verified and equipment tag number

2 Area classification correct

3 Cable entries to be checked w.r.t approved dwg's

4 All equipment are free from mechanical damage

5 Check doors and panels close properly and there are keys for all locks

6 Check all devices and components are securely fixed and free from damage

7 Check all meters for loose glass

8 Check signal lamps are correctly as per approved dwg's

9 Check final painting is satisfactory

10 Check enclosure for moisture leaks and openings which may allow dirt
accumulation

REMARKS:

CONTRACTOR ENPPI CLIENT

0000-000-5-EI-O-850-186-1-X
PAGES 186 PAGE 52

ENPPI

ELECTRICAL PRE-INSTALLATION CHECK LIST


L.V EXPLOSION PROOF SWITCHRACK
"PI-CLF (510-17)"

Page 2 of 2

PROJECT NAME: COM. NO:510-17

PROJECT NO : SUPPLIER:

AREA : DATE :

ITEM DESCRIPTION YES NO N/A

11 Installation and fixation of space heaters to be checked

12 Loose material availability to be revised w.r.t their relevant MRP

such as: ( fish plates, bolts, insulation boxes,...etc.)

13 "WARNING" tags fitted by supplier for special indication

14 List of spare parts and commissioning spare parts to be revised

w.r.t their relevant MRP

15 Earthing connections to be checked

16 Identification lamps are of the correct color

17 Check availability of supplier documents ,including storage and

installation instructions

18 Check availability of inspection certificate including tests

acceptance criteria values


REMARKS:

CONTRACTOR ENPPI CLIENT

0000-000-5-EI-O-850-186-1-X
PAGES 186 PAGE 53

ENPPI

ELECTRICAL PRE-INSTALLATION CHECK LIST


POWER FACTOR CORRECTION EQUIPMENT.
"PI-CLF (510-21)"

Page 1 of 2

PROJECT NAME: COM. NO:510-21

PROJECT NO : SUPPLIER:

AREA : DATE :

ITEM DESCRIPTION YES NO N/A

1 Name plate rating verified and equipment tag number

2 Installation and fixation of space heaters to be checked

3 In/outgoing terminals clearly marked

4 All equipment are free from mechanical damage

5 Check doors and panels close properly and there are keys for all locks

6 Check all components are securely fixed and free from damage

7 Check all meters for loose glass

8 Check signal lamps are correctly as per approved dwg's

9 Check final painting is satisfactory

10 Check enclosure for moisture leaks and openings which may allow dirt

accumulation

REMARKS:

CONTRACTOR ENPPI CLIENT

0000-000-5-EI-O-850-186-1-X
PAGES 186 PAGE 54

ENPPI

ELECTRICAL PRE-INSTALLATION CHECK LIST


POWER FACTOR CORRECTION EQUIPMENT
"PI-CLF (510-21)"

Page 2 of 2

PROJECT NAME: COM. NO:510-21

PROJECT NO : SUPPLIER:

AREA : DATE :

ITEM DESCRIPTION YES NO N/A

11 Earthing connections to be checked

12 Ventilation openings are not blocked off and are fitted with gratings

and insect nets

13 Loose material availability to be revised w.r.t their relevant MRP

14 "WARNING" tags fitted by supplier for special indication

15 List of spare parts and commissioning spare parts to b revised w.r.t

their relevant MRP

16 Indication lamps are of the correct color

17 Check availability of supplier documents ,including storage and

installation instructions

18 Check availability of inspection certificate including tests acceptance

criteria values

19
REMARKS:

CONTRACTOR ENPPI CLIENT

0000-000-5-EI-O-850-186-1-X
PAGES 186 PAGE 55

ENPPI

ELECTRICAL PRE-INSTALLATION CHECK LIST


LIGHTING AND SMALL POWER SYSTEM
"PI-CLF (520-01)"

Page 1 of 2

PROJECT NAME: COM. NO:520-01

PROJECT NO : SUPPLIER:

AREA : DATE :

ITEM DESCRIPTION YES NO N/A

1 Name plate rating verified and equipment tag number

2 Area classification correct

3 Terminals boxes clearly marked

4 All equipment are free from mechanical damage

5 Earthing and equiptential connections are provided of ltg fixtures, power

outlets, ...etc

6 Check all components are securely fixed and free from damage

7 Check all meters for loose glass

8 Check signal lamps are correctly and as per approved dwg's

9 List of spare parts and commissioning spare parts to be revised w.r.t their

relevant MPR
REMARKS:

CONTRACTOR ENPPI CLIENT

0000-000-5-EI-O-850-186-1-X
PAGES 186 PAGE 56

ENPPI

ELECTRICAL PRE-INSTALLATION CHECK LIST


LIGHTING AND SMALL POWER SYSTEM
"PI-CLF (520-01)"

Page 2 of 2
PROJECT NAME: COM. NO:520-01

PROJECT NO : SUPPLIER:

AREA : DATE :

ITEM DESCRIPTION YES NO N/A

10 Check final painting is satisfactory

11 Loose material availability to be revised w.r.t their relevant MPR

12 Check availability of supplier documents ,including storage and

installation instructions

13 Check availability of inspection certificate including tests

acceptance criteria values

14

15

16

17

18

19

REMARKS:

CONTRACTOR ENPPI CLIENT

0000-000-5-EI-O-850-186-1-X
PAGES 186 PAGE 57

ENPPI

ELECTRICAL PRE-INSTALLATION CHECK LIST


RACEWAYS AND SUPPORTS
"PI-CLF (530-01)"

Page 1 of 1

PROJECT NAME: COM. NO:530-01

PROJECT NO : SUPPLIER:

AREA : DATE :

ITEM DESCRIPTION YES NO N/A

1 There is no obvious damage to cable trays or conduits

2 Paint finish satisfactory

3 Earthing connections are provided

4 Free ends of conduits have no sharp edges which can damage the

cables

5 Threaded ends of conduits are completely protected

6 Materials to be visually inspected, to check compliance with approved

drawings of size, type and workman ship

7 Check availability of inspection certificate including tests acceptance

criteria values

8 Loose material availability to be revised w.r.t their relevant MRP

9 Check availability of supplier documents ,including storage and

installation instructions
REMARKS:

CONTRACTOR ENPPI CLIENT

0000-000-5-EI-O-850-186-1-X
PAGES 186 PAGE 58

PROJECT NAME: COM. NO:530-01

PROJECT NO : SUPPLIER:

AREA : DATE :

0000-000-5-EI-O-850-186-1-X
PAGES 186 PAGE 59

ENPPI

ELECTRICAL PRE-INSTALLATION CHECK LIST


CABLES
"PI-CLF (540-01)"

Page 1 of 1
PROJECT NAME: COM. NO:540-01

PROJECT NO : SUPPLIER:

AREA : DATE :

ITEM DESCRIPTION YES NO N/A

1 Visual inspection of cables to discover any physical damage

2 Check color coding or other identification marking

3 Check that cable drum has a full data of size, type, quantity , cable

ratings and to be revised w.r.t their relevant MRP

4 Cables to sealed at the beginning and cable ends on the drums

5 Check availability of supplier documents ,including storage and

installation instructions

6 Check availability of inspection certificate including tests acceptance

criteria values

10
REMARKS:

CONTRACTOR ENPPI CLIENT

0000-000-5-EI-O-850-186-1-X
PAGES 186 PAGE 60

ENPPI

ELECTRICAL PRE-INSTALLATION CHECK LIST


GROUNDING
"PI-CLF (550-01)"

Page 1 of 1
PROJECT NAME: COM. NO:550-01

PROJECT NO : SUPPLIER:

AREA : DATE :

ITEM DESCRIPTION YES NO N/A

1 Grounding materials (grounding cables, rods,grounding pits,

lugs,.....etc , to be checked w.r.t their relevant MRP

2 Check all materials are free from mechanical damage

3 Loose materials availability to be checked w.r.t their relevant MRP

4 Check availability of supplier documents ,including storage and

installation instructions

5 Check availability of inspection certificate including tests acceptance

criteria values

10

11
REMARKS:

CONTRACTOR ENPPI CLIENT

0000-000-5-EI-O-850-186-1-X
PAGES 186 PAGE 61

ENPPI

ELECTRICAL PRE-INSTALLATION CHECK LIST


CONTROL STATIONS
"PI-CLF (560-01)"

Page 1 of 2

PROJECT NAME: COM. NO:560-01

PROJECT NO : SUPPLIER:

AREA : DATE :

ITEM DESCRIPTION YES NO N/A

1 Name plate rating verified and equipment tag number

2 Area classification correct

3 Terminal blocks clearly marked

4 All equipment are free from mechanical damage

5 Indication lamp are of the correct colour and revised w.r.t approved

documents

6 Check all components are securely fixed and free from damage

7 Check all meters for loose glass

8 Loose materials availability to be checked w.r.t their relevant MRP

9 Check final painting is satisfactory

10 Tag number of Control stations to be revised w.r.t approved documents

REMARKS:

CONTRACTOR ENPPI CLIENT

0000-000-5-EI-O-850-186-1-X
PAGES 186 PAGE 62

ENPPI

ELECTRICAL PRE-INSTALLATION CHECK LIST


CONTROL STATIONS
"PI-CLF (560-01)"

Page 2 of 2
PROJECT NAME: COM. NO:560-01

PROJECT NO : SUPPLIER:

AREA : DATE :

ITEM DESCRIPTION YES NO N/A

11 Boxes are complete with all bolts and are securely closed

12 Earthing connections to be checked

13 "WARNING" tags fitted by supplier for special indication

14 List of spare parts and commissioning spare parts to be revised w.r.t

their related MRP

15 Check availability of supplier documents ,including storage and

installation instructions

16 Check availability of inspection certificate including tests acceptance

criteria values

17

18

19

20

21
REMARKS:

CONTRACTOR ENPPI CLIENT

0000-000-5-EI-O-850-186-1-X
PAGES 186 PAGE 63

ENPPI

ELECTRICAL PRE-INSTALLATION CHECK LIST


CABLE ACCESSORIES
"PI-CLF (570-01)"

Page 1 of 1
PROJECT NAME: COM. NO:570-01

PROJECT NO : SUPPLIER:

AREA : DATE :

ITEM DESCRIPTION YES NO N/A

1 Type of cable accessories to be checked w.r.t hazardous area classification

2 All accessories are free from mechanical damage

3 Check final painting is satisfactory

4 materials availability to be checked w.r.t their relevant MRP

5 Check availability of supplier documents ,including storage and

installation instructions

6 Check availability of inspection certificate including tests acceptance

criteria values

10

11

12
REMARKS:

CONTRACTOR ENPPI CLIENT

0000-000-5-EI-O-850-186-1-X
PAGES 186 PAGE 64

APPENDIX 2.0

MECHANICAL COMPLETION AND PRE-COMMISSIONING ACTIVITIES

CONTENTS

1.0 GENERAL

2.0 ELECTRICAL MECHANICAL COMPLETION AND PRE-


COMMISSIONING CHECK LIST FORMS

0000-000-5-EI-O-850-186-1-X
PAGES 186 PAGE 65

MECHANICAL COMPLETION AND PRECOMMISSIONING

ACTIVITIES

1.0 GENERAL

Electrical precommissioning , inspection and tests should be carried out to prove that
the quality of installation works are of the required standard and that the function of
electrical systems in a safe and proper manner.

Item 2.0 include all the electrical Mechanical completion and pre-commissioning forms
which indicates the checks required to be made for the electrical equipment and
materials.The pre-commissioning checks shall be carried out by the electrical
construction contractor and supervised/ approved by ENPPI electrical construction
supervisor and client.

0000-000-5-EI-O-850-186-1-X
PAGES 186 PAGE 66

2.0 LIST OF MECHANICAL COMPLETION AND PRE- COMMISSION


CHECK LIST FORMS

COMM. NO DESCRIPTION CHECK LIST NO

500-02 PACKAGE EQUIPMENT PC-CLF(500-02)

500-03 MOTORS PC-CLF(500-03)

510-01 OVER HEAD LINES PC-CLF(510-01)


(HOLD)

510-02 POWER TRANSFORMER PC-CLF(510-02)

510-03 M.V SWG & MOTOR CONTROL GEAR PC-CLF(510-03)

510-04 L.V SWG & MOTOR CONTROL CENTER PC-CLF(510-04)

510-05 M.V INDEPENDENT CIRCUIT BREAKER PC-CLF(510-05)

510-06 A.C GENERATOR PC-CLF(510-06)

510-07 L.V BUS TRUNKING PC-CLF(510-07)


(HOLD)

510-08 BATTERY AND CHARGER ASSEMBLIES PC-CLF(510-08)

510-09 NEUTRAL GROUNDING RESISTOR PC-CLF(510-09)

510-10 NAVIGATION AIDS PC-CLF(510-10)

510-11 HEAT TRACING SYSTEM PC-CLF(510-11)

510-12 UNINTERRUPTABLE POWER SUPPLY PC-CLF(510-12)

510-13 SMALL POWER DISTRIBUTION PANEL PC-CLF(510-13)

510-14 RING MAIN UNITS PC-CLF(510-14)

510-15 SYNOPTIC CONTROL PANEL PC-CLF(510-15)

510-16 ELECTRICAL POWER MODULES PC-CLF(510-16)


(HOLD)

CONT.' LIST OF MECHANICAL COMPLETION AND PRE-COMMISSION

0000-000-5-EI-O-850-186-1-X
PAGES 186 PAGE 67

CHECK LIST FORMS

COMM. NO DESCRIPTION CHECK LIST NO

510-17 L.V EXPLOSION PROOF SWITCHRACKS PC-CLF(510-17)

510-18 SOLAR SYSTEM POWER SUPPLY PC-CLF(510-18)


(HOLD)

510-19 FREQUENCY CONVERTER PC-CLF(510-19)


(HOLD)

510-21 POWER FACTOR CORRECTION EQUIPMENT PC-CLF(510-21)

520-01 LTG AND SMALL POWER SYSTEM PC-CLF(520-01)

530-01 RACEWAYS & SUPPORTS PC-CLF(530-01)

541-01 L.V CABLES PC-CLF(541-01)

542-01 M.V CABLES PC-CLF(541-01)

550-01 GROUNDING PC-CLF(550-01)

560-01 CONTROL STATION PC-CLF(560-01)

0000-000-5-EI-O-850-186-1-X
PAGES 186 PAGE 62

ENPPI

ELECTRICAL MECHANICAL COMPLETION &


PRE-COMMISSIONING CHECK LIST
PACKAGE EQUIPMENT.
"PC-CLF (500-02)"

Page 1 of 1
PROJECT NAME: COM. NO:500-02
PROJECT NO : SUPPLIER:
AREA : DATE :
ITEM DESCRIPTION YES NO N/A
1 CABLES :-
Refer to PC-CLF (540-01).

2 CABLE ACCESSORIES :-
Refer to PC-CLF (570-01).

3 RACEWAYS AND SUPPORTS :-


Refer to PC-CLF (530-01).
4 LOCAL MOTOR CONTROL STATIONS :-
Refer to PC-CLF (530-01).

5 MOTORS :-
Refer to PC-CLF (500-03).

6 BATTERIES AND CHARGER :-


Refer to PC-CLF (510-08).

7 LIGHTING SYSTEM :-
Refer to PC-CLF (520-01).
8 GROUNDING SYSTEM :-
Refer to PC- CLF (550-01).
9 ELECTRICAL POWER DISTRIBUTION BOARD(S) :-
Refer to PC-CLF (510-04) and CLF (510-17).

10
11
REMARKS:

CONTRACTOR ENPPI CLIENT

0000-000-5-EI-O-850-186-1-X
PAGES 186 PAGE 63

ENPPI

ELECTRICAL MECHANICAL COMPLETION &


PRE-COMMISSIONING CHECK LIST
MOTORS.
"PC-CLF (500-03)"

page 1 of 2

PROJECT NAME: COM. NO:500-03

PROJECT NO : SUPPLIER:

AREA : DATE :
ITEM DESCRIPTION YES NO N/A
1 Check rating of anti- condensation heaters.

2 Check insulation resistance of motor windings.(*)

3 Check insulation resistance of space heaters.(**)

4 Check termination of power cables.(connections, lugs, phase


rotation,...etc.)

5 Check earthing connections to the earthing system.

6 Cable glands to be checked (type, size, tightness,..etc).

7 Whether the winding system star or delta connection, check the


stator winding connections.

8 There is no obvious damage to the mounting devices.

REMARKS: (*) Measure the phase to frame insulation resistance and phase to phase if the windings can
be separated, a 5000 v and 1000 v megger insulation tester should be used on M.V and L.V motors.
## H.V (5000 v megger , min. 150 M.OHMS)
## L.V (1000 v megger , min.10 M.OHMS).

(**) 500 v megger, min. 10 M.OHMS, before meggering ensure instrument cable disconnected.

CONTRACTOR ENPPI CLIENT

0000-000-5-EI-O-850-186-1-X
PAGES 186 PAGE 64

ENPPI

ELECTRICAL MECHANICAL COMPLETION &


PRE-COMMISSIONING CHECK LIST
MOTORS.
"PC-CLF (500-03)"

page 2 of 2

PROJECT NAME: COM. NO:500-03

PROJECT NO : SUPPLIER:

AREA : DATE :

ITEM DESCRIPTION YES NO N/A


9 Check connections of C.T's or RTD's w.r.t approved supplier

documents (motor schematic and wiring diagrams)

10 Test results to be checked w.r.t inspection certificate and

acceptance criteria values.

11 Motor's control at SWG or MCC to be checked w.r.t schematic

and wiring diagrams.

12 Check C.T rating and polarity.

13
14
15
16
17
18
REMARKS: (*) Measure the phase to frame insulation resistance and phase to phase if the windings can be
separated, a 5000 v and 1000 v megger insulation tester should be used on M.V and L.V motors.
## H.V (5000 v megger , min. 150 M.OHMS)
## L.V (1000 v megger , min.10 M.OHMS).
(**) 500 v megger, min. 10 M.OHMS, before meggering ensure instrument cable disconnected.
CONTRACTOR ENPPI CLIENT

0000-000-5-EI-O-850-186-1-X
PAGES 186 PAGE 65

ENPPI

ELECTRICAL MECHANICAL COMPLETION &


PRE-COMMISSIONING CHECK LIST
POWER TRANSFORMER.
"PC-CLF (510-02)"

page 1 of 4
PROJECT NAME: COM. NO:510-02

PROJECT NO : SUPPLIER:

AREA : DATE :

ITEM DESCRIPTION YES NO N/A

1 Perform dielectric tests. (*)

2 Check oil level or supply and fill up with oil as per specifications.

3 Check grounding connections to the earthing grid.

4 Check gas purge.

5 Check H.V & L.V cable termination and fixation.

6 Check C.T rating and polarity.

7 Check for proper tap position.

8 Check winding insulation resistance ( H.V to earth ,L.V to earth & H.V to
L.V). (**)

9 Apply 15 k.v D.C test voltage for one minute, H.V winding to earth.
record leakage current ,discharge H.V and L.V windings for a minimum
(30) minutes [leakage current in uA].

REMARKS:
(*) Insulation on transformer oil sample (Breakdown test)
(**) - H.V terminals: 5000 V megger, min. 150 M.
- L.V terminals: 1000 V megger, min. 10 M.
- H.V/L.V term.: 5000 V megger, min. 150 M.

CONTRACTOR ENPPI CLIENT

0000-000-5-EI-O-850-186-1-X
PAGES 186 PAGE 66

ENPPI

ELECTRICAL MECHANICAL COMPLETION &


PRE-COMMISSIONING CHECK LIST
POWER TRANSFORMER.
"PC-CLF (510-02)"

page 2 of 4
PROJECT NAME: COM. NO:510-02

PROJECT NO : SUPPLIER:

AREA : DATE :

ITEM DESCRIPTION YES NO N/A


10 Measure insulation resistance of all auxiliaries, wiring and
and devices, using 500 V megger

11 Installation and termination of meters, relays, indicators etc.


to be checked.

12 All supports needed for power and control cables to be checked

13 Check cable glands (size/tightness) and gland plates.

14 Wiring of control and protection devices to be checked.

15 Check installation against supplier installation procedure and


instructions

16 Bus duct(s) connections to be checked and inspected according


to the approved supplier documents and recommendations.

17 Equipment test inspection report and certificate to be checked


and acceptance criteria values of the above mentioned tests to
be revised.

REMARKS:

CONTRACTOR ENPPI CLIENT

0000-000-5-EI-O-850-186-1-X
PAGES 186 PAGE 67

ENPP I

ELECTRICAL MECHANICAL COMPLETION &


PRE-COMMISSIONING CHECK LIST
POWER TRANSFORMER.
"PC-CLF (510-02)"

page 3 of 4
PROJECT NAME: COM. NO:510-02

PROJECT NO : SUPPLIER:

AREA : DATE :

ITEM DESCRIPTION YES NO N/A

18 ON-LOAD TAP CHANGER

18.1 Check devices (tap and physical check, assembly, connections as per
approved documents, ..etc)of the tap changer oil compartment :
a. Oil level indicator.
b. Buchholz oil/gas device.
c. Oil sampling connection.
d. One filling/filter connection valve.
e. One drain/filter connection valve.
f. A breather with a silica gel dehydrating capsule.

18.2 Check the motor drive shall include but not limited to the following :
a. Padlockable incoming supply switch.
b. Manual operation facilities.
c. Local control facilities.
d. Local/remote selector switch.
e. Local mechanical tap position indicator.
f. Direction of rotation protection
g. Tap status indication lamps.

REMARKS:

CONTRACTOR ENPPI CLIENT

0000-000-5-EI-O-850-186-1-X
PAGES 186 PAGE 68

ENPPI

ELECTRICAL MECHANICAL COMPLETION &


PRE-COMMISSIONING CHECK LIST
POWER TRANSFORMER.
"PC-CLF (510-02)"

page 4 of 4
PROJECT NAME: COM. NO:510-02

PROJECT NO : SUPPLIER:
AREA : DATE :
ITEM DESCRIPTION YES NO N/A
19 OFF-LOAD TAP CHANGER
19.1 Check tap-selector switch moves correctly in all positions.

19.2 Check tap positions clearly marked in line with the data given
on the rating plate.
19.3 Check the tap provided with metallic handle to allow operation
without the need of tools.
20 Check components of the remote control panel (function, tap
and physical check, assembly, connections as per approved
documents, ..etc) :
a. Manual control facilities.
b. Tap position indicator.
c. Tap status indication lamps.
d. Anti-condensation heater.
21
22
23
24
25
REMARKS:

CONTRACTOR ENPPI CLIENT

0000-000-5-EI-O-850-186-1-X
PAGES 186 PAGE 69

ENPPI

ELECTRICAL MECHANICAL COMPLETION &


PRE-COMMISSIONING CHECK LIST
M.V SWITCHGEAR & MOTOR CONTROL GEAR.
"PC-CLF (510-03)"

page 1 of 5
PROJECT NAME: COM. NO:510-03

PROJECT NO : SUPPLIER:

AREA : DATE :

ITEM DESCRIPTION YES NO N/A

1 Check switchgear assembly for alignment, levelness and foundation


fixing details w.r.t approved supplier instructions.

2 Check all busbar connections (Torque check with a torque


wrench) and covers according to the approved documents and
supplier recommendations.

3 Check switchgear earthing connections.

4 Check availability of vendor documents ,including commissioning


and start-up instructions.

5 Check mechanical alignment of C.B's and free movement.

6 All compartments to be cleaned internally and externally.

7 Check main, aux. fuses and relays correctly rated and undamaged.

8 Wire identifications and cable markers to be checked w.r.t cable


list.

REMARKS:

CONTRACTOR ENPPI CLIENT

0000-000-5-EI-O-850-186-1-X
PAGES 186 PAGE 70

ENPPI

ELECTRICAL MECHANICAL COMPLETION &


PRE-COMMISSIONING CHECK LIST
M.V SWITCHGEAR & MOTOR CONTROL GEAR.
"PC-CLF (510-03)"

page 2 of 5
PROJECT NAME: COM. NO:510-03

PROJECT NO : SUPPLIER:

AREA : DATE :

ITEM DESCRIPTION YES NO N/A

9 Remove any accidental connections between phases and from phases


to ground.

10 Insulation resistance test of busbar bolted connections (Between


phases and phases to ground) (*)

11 Check switchgear anti-condensation heaters and test insulation


resistance.(**)

12 Check for proper phase rotation of incoming feeders.

13 Termination of power and control cables to be checked.

14 Check connection , polarity and ratio of C.T's.

15 Voltage withstand test of both the main and aux. circuits, this shall be
carried out between phases and phases to ground. (***).

16 Apply 15 k.v D.C (Bus-bar system)for one minute connect phases to


ground,record leakage current in m.amp.

REMARKS:
(*) Refer to table [II]
(**) 500 v megger, min. 10 meg.ohm
(***) Refer to table [I]

CONTRACTOR ENPPI CLIENT

0000-000-5-EI-O-850-186-1-X
PAGES 186 PAGE 71

E N P PI

ELECTRICAL MECHANICAL COMPLETION &


PRE-COMMISSIONING CHECK LIST
M.V SWITCHGEAR & MOTOR CONTROL GEAR.
"PC-CLF (510-03)"

page 3 of 5
PROJECT NAME: COM. NO:510-03

PROJECT NO : SUPPLIER:

AREA : DATE :

ITEM DESCRIPTION YES NO N/A

17 Check connection of gland plate to the earthing busbar.

18 Cable entries to be sealed wherever indicated in the dwg,s

19 Tie raps to be used for cables and wires fixation.

Holes that are not used but are planned for future equipments
20
or instruments are correctly blanked off.

21 Check D.C system Refer to PC-CLF 510-08).

22 All supports needed for power and control cables to be checked.

23 All internal wiring connection are secure and fixed.

24 Check cable glands (sizes,tighting,....etc) and gland plates.

Check rating and type of all internal components such as:


25 Relays,fuses,....etc. w.r.t approved documents.

REMARKS:

(*) Refer to table [II]


(**) 500 v megger, min. 10 meg.ohm
(***) Refer to table [I]
CONTRACTOR ENPPI CLIENT

0000-000-5-EI-O-850-186-1-X
PAGES 186 PAGE 72

ENPPI

ELECTRICAL MECHANICAL COMPLETION &


PRE-COMMISSIONING CHECK LIST
M.V SWITCHGEAR & MOTOR CONTROL GEAR.
"PC-CLF (510-03)"

page 4 of 5
PROJECT NAME: COM. NO:510-03

PROJECT NO : SUPPLIER:

AREA : DATE :

ITEM DESCRIPTION YES NO N/A


26 Check mechanical operation of circuit breakers ( operation
mechanism).

27 Wiring of control and protection devices to be checked W.R.


approved documents.

28 Equipment test report and certificate to be checked and


acceptance criteria values of the above mentioned tests to be
revised.
29 Check connection and data of voltage transformers.

30 Check polarity of D.C supplies.

31 Conductivity tests shall be carried out on switchgear busbar


connections and switchgear earth system joints in order to check
their tightness.(****)
32 Check inter-changeability of identical C.B's.

33
34

REMARKS:
(****) Conductivity testing shall be carried
with a low-resistance test set,
e.g. a "Ducter" with 20 A (d.c) output.

CONTRACTOR ENPPI CLIENT

0000-000-5-EI-O-850-186-1-X
PAGES 186 PAGE 73

page 5 of 5
"PC-CLF(510-03)"
VOLTAGE WITHSTAND TEST
TABLE OF TEST VOLTAGES.

EQUIPMENT RATED VOLTAGE (KV) TEST VOLTAGE (KV)


0.66 2
3.3 8.6
6.6 15.2
11 24
15 32
22 46

TABLE [I]

N.B :
- All current transformer secondaries shall be short circuit for the duration
of the test.

- All voltage transformers shall be disconnected by removal of primary


and secondary fuses for the duration of the test.

- Test shall be carried out with all circuit breakers, isolators and switches
closed, but with all the cable cores disconnected.

INSULATION TEST.

TABLE OF MINIMUM TEST VOLTAGES.

SWITCHGEAR VOLTAGE TEST MINIMUM INSULATION


(KV) VOLTAGE(V) RESISTANCE (M.OHMS)
33 5000 200
22 5000 200
11 5000 200
6.6 1000 200
3.3 1000 200
0.6 1000 100
0.4 1000 100
CONTROL WIRING 500 10

TABLE [II]

0000-000-5-EI-O-850-186-1-X
PAGES 186 PAGE 74

ENPPI

ELECTRICAL MECHANICAL COMPLETION &


PRE-COMMISSIONING CHECK LIST
L.V SWITCHGEAR & MOTOR CONTROL CENTER.
"PC-CLF (510-04)"

page 1 of 5

PROJECT NAME: COM. NO:510-04

PROJECT NO : SUPPLIER:

AREA : DATE :

ITEM DESCRIPTION YES NO N/A


1 Check switchgear assembly for alignment, levelness and foundation

fixing details w.r.t approved supplier instructions.

2 Check all busbar connections (Torque check with a torque wrench) and

covers according to the approved documents and supplier

recommendations.

3 Check switchgear earthing connections.

4 Check availability of vendor documents ,including commissioning and start-

up instructions.

5 Check mechanical alignment of C.B's and free movement.

6 All compartments to be cleaned internally & externally

7 Check polarity of D.C supplies.

8 Check main, aux. fuses and relays correctly rated and undamaged.

9 Check connection , polarity and ratio of C.T's.

REMARKS:

CONTRACTOR ENPPI CLIENT

0000-000-5-EI-O-850-186-1-X
PAGES 186 PAGE 75

ENPPI

ELECTRICAL MECHANICAL COMPLETION &


PRE-COMMISSIONING CHECK LIST
L.V SWITCHGEAR & MOTOR CONTROL CENTER.
"PC-CLF (510-04)"

page 2 of 5

PROJECT NAME: COM. NO:510-04

PROJECT NO : SUPPLIER:

AREA : DATE :

ITEM DESCRIPTION YES NO N/A

10 Remove any accidental connections between phases and from phases

to ground.

11 Resistance test of busbar bolted connections (Between phases and

phases to ground) (*)

12 Apply 15 k.v D.C (Bus-bar system)for one minute connect phases to

ground, record leakage current in m.amp.

13 Check for proper phase rotation of incoming feeders.

14 Termination of power and control cables to be checked.

15 Wire identifications and cable markers to be checked w.r.t cable list.

16 Voltage withstand test of both the main and aux. circuits, this shall be

carried out between phases and phases to ground. (***).


REMARKS:

(*) Refer to table [II]


(**) 500 v megger, min. 10 meg.ohm
(***) Refer to table [I]
CONTRACTOR ENPPI CLIENT

0000-000-5-EI-O-850-186-1-X
PAGES 186 PAGE 76

ENPPI

ELECTRICAL MECHANICAL COMPLETION &


PRE-COMMISSIONING CHECK LIST
L.V SWITCHGEAR & MOTOR CONTROL CENTER.
"PC-CLF (510-04)"

page 3 of 5

PROJECT NAME: COM. NO:510-04

PROJECT NO : SUPPLIER:

AREA : DATE :

ITEM DESCRIPTION YES NO N/A

17 Check connection of gland plate to the earthing busbar.

18 Cable entries to be sealed wherever indicated in the dwg,s

19 Tie raps to be used for cables and wires fixation.

20 Holes that are not used but are planned for future equipments or
instruments are correctly blanked off.

21 Check D.C system Refer to PC-CLF 510-08).

22 All supports needed for power and control cables to be checked.

23 All internal wiring connection are secure.

24 Check cable glands (sizes,tightness,....etc) and gland plate.

25 Bus duct(s) connections to be checked according to the approved


documents.

REMARKS:
(*) Refer to table [II]
(**) 500 v megger, min. 10 meg.ohm
(***) Refer to table [I]
CONTRACTOR ENPPI CLIENT

0000-000-5-EI-O-850-186-1-X
PAGES 186 PAGE 77

ENPPI

ELECTRICAL MECHANICAL COMPLETION &


PRE-COMMISSIONING CHECK LIST
L.V SWITCHGEAR & MOTOR CONTROL CENTER.
"PC-CLF (510-04)"

page 4 of 5

PROJECT NAME: COM. NO:510-04

PROJECT NO : SUPPLIER:

AREA : DATE :

ITEM DESCRIPTION YES NO N/A

26 Check rating and type of all internal components such as:


Relays,fuses,....etc, w.r.t approved documents.

27 Check mechanical operation of circuit breakers ( operation


mechanism).

28 Equipment test report and inspection certificate to bechecked.


Acceptance criteria values of the above mentioned tests to be revised.

29 Check connection and data of voltage transformers.

30 Conductivity tests shall be carried out on switchgear bus- bar


connections and switchgear earth system joints in order to check
their tightness.(****)

31 Check switchgear anti-condensation heaters and test insulation


resistance.(**)

32 Check inter-changeability of identical C.B's.

REMARKS:
(****) Conductivity testing shall be carried
with a low-resistance test set,
e.g. a "Ducter" with 20 A (d.c) output.
CONTRACTOR ENPPI CLIENT

0000-000-5-EI-O-850-186-1-X
PAGES 186 PAGE 78

page 5 of 5
"PC-CLF(510-04)"
VOLTAGE WITHSTAND TEST
TABLE OF TEST VOLTAGES.

EQUIPMENT RATED VOLTAGE (KV) TEST VOLTAGE (KV)


0.66 2

TABLE [I]

N.B :
- All current transformer secondaries shall be short circuit for the duration
of the test.

- All voltage transformers shall be disconnected by removal of primary


and secondary fuses for the duration of the test.

- Test shall be carried out with all circuit breakers, isolators and switches
closed, but with all the cable cores disconnected.

INSULATION TEST.
TABLE OF MINIMUM TEST VOLTAGES.

SWITCHGEAR VOLTAGE TEST MINIMUM INSULATION


(KV) VOLTAGE(V) RESISTANCE (M.OHMS)
0.6 1000 100
0.4 1000 100
CONTROL WIRING 500 10

TABLE [II]

0000-000-5-EI-O-850-186-1-X
PAGES 186 PAGE 79

ENPPI

ELECTRICAL MECHANICAL COMPLETION &


PRE-COMMISSIONING CHECK LIST
M.V INDEPENDENT CIRCUIT BREAKER.
"PC-CLF (510-05)"

page 1 of 5

PROJECT NAME: COM. NO:510-05

PROJECT NO : SUPPLIER:

AREA : DATE :

ITEM DESCRIPTION YES NO N/A


1 Check switchgear assembly for alignment, levelness and foundation fixing
details w.r.t approved supplier instructions.

2 Check all busbar connections (Torque check with a torque wrench)and


covers according to the approved documents and supplier
recommendations.

3 Check switchgear earthing connections.

4 Check availability of vendor documents ,including commissioning and


start- up instructions.

5 All compartments to be cleaned internally and externally.

6 Check mechanical operation of circuit breakers ( operation mechanism).

7 Check polarity of D.C supplies.

8 Check main, aux. fuses and relays correctly rated and undamaged.

REMARKS:

CONTRACTOR ENPPI CLIENT

0000-000-5-EI-O-850-186-1-X
PAGES 186 PAGE 80

ENPPI

ELECTRICAL MECHANICAL COMPLETION &


PRE-COMMISSIONING CHECK LIST
M.V INDEPENDENT CIRCUIT BREAKER.
"PC-CLF (510-05)"

page 2 of 5

PROJECT NAME: COM. NO:510-05

PROJECT NO : SUPPLIER:

AREA : DATE :

ITEM DESCRIPTION YES NO N/A


9 Remove any accidental connections between phases and from phases
to ground.
10 Resistance test of busbar bolted connections (Between phases and
phases to ground)(*)
11 Check switchgear anti- condensation heaters and test insulation
resistance.(**)
12 Check for proper phase rotation of incoming feeders.

13 Termination of power and control cables to be checked.

14 Wire identifications and cable markers to be checked w.r.t cable list.

15 Voltage withstand test of both the main and aux. circuits, this shall
be carried out between phases and phases to ground (***).
16 Apply 15 k.v (Bus-bar system) D.C for one minute connect phases to
ground,record leakage current in m.amp.
REMARKS:

(*) Refer to table [II]


(**) 500 v megger, min. 10 meg.ohm
(***) Refer to table [I]
CONTRACTOR ENPPI CLIENT

0000-000-5-EI-O-850-186-1-X
PAGES 186 PAGE 81

ENPPI

ELECTRICAL MECHANICAL COMPLETION &


PRE-COMMISSIONING CHECK LIST
M.V INDEPENDENT CIRCUIT BREAKER.
"PC-CLF (510-05)"

page 3 of 5

PROJECT NAME: COM. NO:510-05

PROJECT NO : SUPPLIER:

AREA : DATE :

ITEM DESCRIPTION YES NO N/A


17 Check connection of gland plate to the earthing busbar.

18 Cable entries to be sealed wherever indicated in the dwg,s

19 Tie raps to be used for cables and wires fixation.

20 Holes that are not used but are planned for future equipments or
instruments are correctly blanked off.

21 Check D.C system Refer to PC-CLF 510-08).

22 All supports needed for power and control cables to be checked.

23 All internal wiring connection are secure.

24 Check cable glands (sizes,tigh- tened,....etc) and gland plates.

25 Check mechanical alignment of C.B's and free movement.

REMARKS:

(*) Refer to table [II]


(**) 500 v megger, min. 10 meg.ohm
(***) Refer to table [I]
CONTRACTOR ENPPI CLIENT

0000-000-5-EI-O-850-186-1-X
PAGES 186 PAGE 82

ENPPI

ELECTRICAL MECHANICAL COMPLETION &


PRE-COMMISSIONING CHECK LIST
M.V INDEPENDENT CIRCUIT BREAKER.
"PC-CLF ( 510-05)"

page 4 of 5

PROJECT NAME: COM. NO:510-05

PROJECT NO : SUPPLIER:

AREA : DATE :

ITEM DESCRIPTION YES NO N/A


26 Check connection and data of voltage transformers.

27 Wiring of control and protec- tion devices to be checked w.r.t approved


documents.

28 Equipment test report and certificate to be checked and acceptance


criteria values of the above mentioned tests to be revised.

29 Check connection , polarity and ratio of C.T's.

30 Check rating and type of all internal components such as


Relays,fuses,....etc, w.r.t approved documents.

31 Conductivity tests shall be carried out on switchgear bus- bar


connections and switchgear earth system joints in order to check their
tightness.(****)

32

33

34

REMARKS:
(****) Conductivity testing shall be carried with a low-resistance test set,
e.g. a "Ducter" with 20 A (d.c) output.
CONTRACTOR ENPPI CLIENT

0000-000-5-EI-O-850-186-1-X
PAGES 186 PAGE 83

page 5 of 5
"PC-CLF (510-05)"
VOLTAGE WITHSTAND TEST
TABLE OF TEST VOLTAGES.
EQUIPMENT RATED VOLTAGE (KV) TEST VOLTAGE (KV)
0.66 2
3.3 8.6
6.6 15.2
11 24
15 32
22 46

TABLE [I]

N.B :
- All current transformer secondaries shall be short circuit for the duration
of the test.

- All voltage transformers shall be disconnected by removal of primary


and secondary fuses for the duration of the test.

- Test shall be carried out with all circuit breakers, isolators and switches
closed, but with all the cable cores disconnected.

INSULATION TEST.
TABLE OF MINIMUM TEST VOLTAGES.
SWITCHGEAR VOLTAGE TEST MINIMUM INSULATION
(KV) VOLTAGE(V) RESISTANCE (M.OHMS)
33 5000 200
22 5000 200
11 5000 200
6.6 1000 200
3.3 1000 200
0.6 1000 100
0.4 1000 100
CONTROL WIRING 500 10

TABLE [II]

0000-000-5-EI-O-850-186-1-X
PAGES 186 PAGE 84

ENPPI

ELECTRICAL MECHANICAL COMPLETION &


PRE-COMMISSIONING CHECK LIST
A.C GENERATOR.
"PC-CLF (510-06)"

page 1 of 5

PROJECT NAME: COM. NO:510-06

PROJECT NO : SUPPLIER:

AREA : DATE :

ITEM DESCRIPTION YES NO N/A


1.0 ALTERNATOR :
1.1 Check generator earthing connections.

1.2 All equipments to be cleaned .

1.3 Check polarity of D.C supplies.

1.4 Check connection , polarity and ratio of C.T's.

1.5 Check connection and data of voltage transformers.

1.6 Remove any accidental connections between phases and from phases to
ground.

1.7 all mechanical checks to be verified.

1.8 Check for proper phase rotation of outgoing feeders.

1.9 All supports needed for power and control cables to be checked.

1.10 Holes that are not used but are planned for future equipments or
instruments are correctly blanked off.

REMARKS:

CONTRACTOR ENPPI CLIENT

0000-000-5-EI-O-850-186-1-X
PAGES 186 PAGE 85

ENPPI

ELECTRICAL MECHANICAL COMPLETION &


PRE-COMMISSIONING CHECK LIST
A.C GENERATOR.
"PC-CLF (510-06)"
page 2 of 5

PROJECT NAME: COM. NO:510-06

PROJECT NO : SUPPLIER:

AREA : DATE :

ITEM DESCRIPTION YES NO N/A


1.11 High voltage dielectric test and insulation resistance of winding to be
measured.(*)

1.12 Termination of power and control cables to be checked.

1.13 Check connection of gland plate to the earthing busbar.

1.14 Cable entries to be sealed wherever indicated in the dwg,s

1.15 Cable markers to be checked w.r.t approved cable list.

1.16 Tie raps to be used for cables and wires fixation.

1.17 Check cable glands (sizes,tightened,....etc) and gland plates.

1.18 Check auxiliary motors ref. To PC-CLF (500-03).

1.19

1.20

1.21
REMARKS:

(*) Refer to table [I]

CONTRACTOR ENPPI CLIENT

0000-000-5-EI-O-850-186-1-X
PAGES 186 PAGE 86

ENPPI

ELECTRICAL MECHANICAL COMPLETION &


PRE-COMMISSIONING CHECK LIST
A.C GENERATOR.
"PC-CLF (510-06)"

page 3 of 5

PROJECT NAME: COM. NO:510-06

PROJECT NO : SUPPLIER:

AREA : DATE :

ITEM DESCRIPTION YES NO N/A


2.0 BATTERIES, B.CHARGER, AND D.C
DISTRIBUTION PANEL

2.1 Check D.C system (Refer to PC-CLF 510-08).

2.2
2.3

3.0 GENERATOR CONTROL PANEL

3.1 Check generator control panel refer to PC-CLF (510-04) and CLF
(510-13)

3.2 All internal wiring connection are fixed and secure.

3.3 Check cable glands (sizes,tigh- tened,....etc) and gland plates.

3.4 Check all components such as: meters, lamps,....etc. w.r.t approved
drawings.

3.5 Cable entries to be sealed wherever indicated in the dwg,s

3.6 Tie raps to be used for cables and wires fixation.

REMARKS:

CONTRACTOR ENPPI CLIENT

0000-000-5-EI-O-850-186-1-X
PAGES 186 PAGE 87

ENPPI

ELECTRICAL MECHANICAL COMPLETION &


PRE-COMMISSIONING CHECK LIST
A.C GENERATOR.
"PC-CLF (510-06)"

page 4 of 5

PROJECT NAME: COM. NO:510-06

PROJECT NO : SUPPLIER:

AREA : DATE :

ITEM DESCRIPTION YES NO N/A

3.7 Wire identifications and cable markers to be checked w.r.t cable list.

3.8 Insulation test of both the main and aux. circuits, this shall be carried
out between phases and phases to ground. (*).

3.9

3.10

3.11

4 Check availability of vendor documents ,including commissioning


and start-up instructions.

5 Equipment test report and inspection certificate to be checked.


Acceptance criteria values of the above mentioned tests to be revised.

8
REMARKS:
(*) Refer to table [I]

CONTRACTOR ENPPI CLIENT

0000-000-5-EI-O-850-186-1-X
PAGES 186 PAGE 88

"PC-CLF (510-06)"

page 5 of 5

TABLE OF MINIMUM INSULATION TEST VOLTAGES.

EQUIPMENT VOLTAGE TEST MINIMUM INSULATION


(KV) VOLTAGE(V) RESISTANCE (M.OHMS)
33 5000 200
22 5000 200
11 5000 200
6.6 1000 200
3.3 1000 200
0.6 1000 100
0.4 1000 100
CONTROL WIRING 500 10

TABLE [I]

0000-000-5-EI-O-850-186-1-X
PAGES 186 PAGE 89

ENPPI

ELECTRICAL MECHANICAL COMPLETION &


PRE-COMMISSIONING CHECK LIST
BATTERIES AND BATTERY CHARGER.
"PC-CLF (510-08)"

page 1 of 5

PROJECT NAME: COM. NO:510-08

PROJECT NO : SUPPLIER:

AREA : DATE :

ITEM DESCRIPTION YES NO N/A


1 BATTERY CHARGER AND D.C DIST- RIBUTION
PANEL.

1.1 Check equipment earthing connections to the earthing system.

1.2 All equipments to be cleaned internally and externally.

1.3 Remove any accidental connections between components.

1.4 Check termination of D.C / A.C cables.

1.5 Check all components such as: meters, lamps,....etc, w.r.t approved
rawings.

1.6 Check connection of gland plate to the earthing busbar.

1.7 Cable entries to be sealed wherever indicated in the dwg,s

1.8 Wire identifications and cable markers to be checked w.r.t cable list.

1.9 Tie raps to be used for cables and wires fixation.

REMARKS:

CONTRACTOR ENPPI CLIENT

0000-000-5-EI-O-850-186-1-X
PAGES 186 PAGE 90

ENPPI

ELECTRICAL MECHANICAL COMPLETION &


PRE-COMMISSIONING CHECK LIST
BATTERIES AND BATTERY CHARGER.
"PC-CLF (510-08)"

page 2 of 5

PROJECT NAME: COM. NO:510-08

PROJECT NO : SUPPLIER:

AREA : DATE :

ITEM DESCRIPTION YES NO N/A


1.10 Insulation test of both the main and aux. circuits, this shall be carried

out between phases and phases to ground. (*).


1.11 Holes that are not used but are planned for uture equipments or

instruments are correctly blanked off.

1.12 All supports needed for power and control cables to be checked.

1.13 All internal wiring connection are secure.

1.14 Check cable glands (sizes,tigh- tened,....etc) and gland plates.

1.15 Check equipment assembly for alignment, levelness and foundation


fixing details.

1.16 Check connected loads to ensure that it is still in accordance with


approved drawings.
REMARKS:
(*) Refer to table [I]

CONTRACTOR ENPPI CLIENT

0000-000-5-EI-O-850-186-1-X
PAGES 186 PAGE 91

ENPPI

ELECTRICAL MECHANICAL COMPLETION &


PRE-COMMISSIONING CHECK LIST
BATTERIES AND BATTERY CHARGER.
"PC-CLF (510-08)"

page 3 of 5

PROJECT NAME: COM. NO:510-08

PROJECT NO : SUPPLIER:

AREA : DATE :

ITEM DESCRIPTION YES NO N/A

1.17 Check availability of vendor documents ,including commissioning


and start-up instructions.

2 BATTERIES :
2.1 Batteries are installed as Indicated in the design.

2.2 Batteries rack to be connected to the earthing system.

2.3 There is no leakage of the electrolyte there is no cracks in the cell


enclosures.

2.4 Connections between cells to be checked.

2.5 Terminals are clean, well tightened and fitted with protective caps.

2.6 Check the electrolyte level in all cells after filling and measure the
specific gravity of the electrolyte and compare this with the
recommended value
REMARKS:

CONTRACTOR ENPPI CLIENT

0000-000-5-EI-O-850-186-1-X
PAGES 186
PAGE 92

ENPPI

ELECTRICAL MECHANICAL COMPLETION &


PRE-COMMISSIONING CHECK LIST
BATTERIES AND BATTERY CHARGER.
"PC-CLF (510-08)"

page 4 of 5

PROJECT NAME: COM. NO:510-08

PROJECT NO : SUPPLIER:

AREA : DATE :

ITEM DESCRIPTION YES NO N/A


2.7 Ensure terminals of cells have been given vaseline coating on their
contact surfaces.
3 Equipment test report and inspection certificate to be checked.
Acceptance criteria values of the above mentioned tests to be revised.
4
5
6
7
8
9
10
11
12
13
14
15
REMARKS:

CONTRACTOR ENPPI CLIENT

0000-000-5-EI-O-850-186-1-X
PAGES 186 PAGE 93

"PC-CLF(510-08)"
page 5 of 5

TABLE OF MINIMUM INSULATION TEST VOLTAGES.

EQUIPMENT VOLTAGE TEST MINIMUM INSULATION


(KV) VOLTAGE(V) RESISTANCE (M.OHMS)
0.6 1000 100
0.4 1000 100
CONTROL WIRING 500 10

TABLE [I]

0000-000-5-EI-O-850-186-1-X
PAGES 186 PAGE 94

ENPPI

ELECTRICAL MECHANICAL COMPLETION &


PRE-COMMISSIONING CHECK LIST
NEUTRAL EARTHING RESISTOR.
"PC-CLF (510-09)"

page 1 of 2
PROJECT NAME: COM. NO:510-09
PROJECT NO : SUPPLIER:
AREA : DATE :
ITEM DESCRIPTION YES NO N/A
1 Fixation, alignment and installation of N.E.R to
be checked.
2
Inspect the frame earthing arrangement and
3
measure the equipment earth path resistance at the
main earthing terminal to the general earthing
system.
4 Check the space heater and circuit where fitted.
5 Measure the insulation resistance of the resistor
to earth with incoming outgoing connections
disconnected , measure the vaiue of the
N.E.R.
6 All supports needed for cables to be checked.
7 All equipments to be cleaned.
8 Check availability of vendor documents,
including commissioning and start-up
instruction.
REMARKS:

CONTRACTOR ENPPI CLIENT

0000-000-5-EI-O-850-186-1-X
PAGES 186 PAGE 95

ENPPI

ELECTRICAL MECHANICAL COMPLETION &


PRE-COMMISSIONING CHECK LIST
NEUTRAL EARTHING RESISTOR.
"PC-CLF (510-09)"

page 2 of 2
PROJECT NAME: COM. NO:510-09
PROJECT NO : SUPPLIER:
AREA : DATE :
ITEM DESCRIPTION YES NO N/A
9 Equipment test report and inspection certificate
to be checked.
Acceptance criteria values of the above
mentioned tests to be revised.
10
11
12
13
14
15
16
17
18
19
20
21
22
REMARKS:

CONTRACTOR ENPPI CLIENT

0000-000-5-EI-O-850-186-1-X
PAGES 186 PAGE 96

ENPPI

ELECTRICAL MECHANICAL COMPLETION &


PRE-COMMISSIONING CHECK LIST
NAVIGATION AIDS SYSTEM.
"PC-CLF (510-10)"

page 1 of 5
PROJECT NAME: COM. NO:510-10
PROJECT NO : SUPPLIER:
AREA : DATE :
ITEM DESCRIPTION YES NO N/A
1 Check size, type, and rating of all fuses and
protectective devices w.r.t approved
documents.
2 Check earthing connections to the earthing
system.
3 Measure the equipment earthing path resistance
at the earthing terminal to the general earthing.
4 Cable terminations to be checked w.r.t
approved
documents
5 Fixation of all components to be checked such
as: Fog horns, flashing devices,..etc.
6 Wire identifications and cable markers to be
checked w.r.t approved documents.
7 Check D.C system Refer to PC-CLF 510-08).
8 Holes that are not used but are planned for
future equipments or instruments are correctlyt
blanked off.
REMARKS:

CONTRACTOR ENPPI CLIENT

0000-000-5-EI-O-850-186-1-X
PAGES 186 PAGE 97

ENPPI

ELECTRICAL MECHANICAL COMPLETION &


PRE-COMMISSIONING CHECK LIST
NAVIGATION AIDS SYSTEM.
"PC-CLF (510-10)"

page 2 of 5
PROJECT NAME: COM. NO:510-10
PROJECT NO : SUPPLIER:
AREA : DATE :
ITEM DESCRIPTION YES NO N/A
9 All equipments to be cleaned internally and
externally.
10 Cable entries to be sealed wherever indicated in
the dwg,s
11 Remove any accidental connections between
components.
12 Tie raps to be used for cables and wires
fixation.
13 All supports needed for cables to be checked.

14 Control panels close properly and there are


keys for all locks.
15 Check cable glands (sizes,tightened,....etc) and
gland plates.
16 Check equipment assembly for alignment,
levelness and foundation fixing details.
17 Check all materials as indicated on the related
data sheet (highly corrosion resistant, suitable
for salty,..etc)
REMARKS:

CONTRACTOR ENPPI CLIENT

0000-000-5-EI-O-850-186-1-X
PAGES 186 PAGE 98

ENPPI

ELECTRICAL MECHANICAL COMPLETION &


PRE-COMMISSIONING CHECK LIST
NAVIGATION AIDS SYSTEM.
"PC-CLF (510-10)"

Page 3 of 5
PROJECT NAME: COM. NO:510-10
PROJECT NO : SUPPLIER:
AREA : DATE :
ITEM DESCRIPTION YES NO N/A
18 All internal wiring connection are secure.

19 Check type and rating of all meters.

20 Check indication lamps are correctly rated and


as per approved dwg's.
21 Check all components are securely fixed and
free from damage.
22 Check wiring of all equipment and aux.
components w.r.t approved documents.
23 Check availability of inspection certificate
including tests acceptance criteria values
BATTERIES :-
24 Batteries type: 24 d.c volt
24.1 Battery connections to be checked with
approved documents
24.2 Batteries rack assembly to be checked with
approved documents
REMARKS:

CONTRACTOR ENPPI CLIENT

0000-000-5-EI-O-850-186-1-X
PAGES 186 PAGE 99

ENPPI

ELECTRICAL MECHANICAL COMPLETION &


PRE-COMMISSIONING CHECK LIST
NAVIGATION AIDS SYSTEM.
"PC-CLF(510-10)"

Page 4 of 5
PROJECT NAME: COM. NO:510-10
PROJECT NO : SUPPLIER:
AREA : DATE :
ITEM DESCRIPTION YES NO N/A
24.3 Check availability , type, and preparation of
electrolyte w.r.t approved documents.
24.4 Check availability of supplier documents
,including storage and installation instructions.
25 Batteries type: solar cells.
25.1 Cells are mechanically undamaged.

25.2 Batteries are compliance with approved


documents and data sheet.
25.3 Assembly of all accessories to be checked.

26 MAIN WHITE FLASHING LIGHT AND


SUBSIDIARY LIGHTS :
26.1 Characteristics of main white flashing light to
be checked w.r.t their related MRP and
approved documents.
26.2 Equipment installation to be checked w.r.t
approved supplier documents and installation
instructions.
REMARKS:

CONTRACTOR ENPPI CLIENT

0000-000-5-EI-O-850-186-1-X
PAGES 186 PAGE 100

ENPPI

ELECTRICAL MECHANICAL COMPLETION &


PRE-COMMISSIONING CHECK LIST
NAVIGATION AIDS SYSTEM.
"PC-CLF (510-10)"

Page 5 of 5
PROJECT NAME: COM. NO:510-10
PROJECT NO : SUPPLIER:
AREA : DATE :
ITEM DESCRIPTION YES NO N/A
27 FOG HORN :
Characteristics of fog horn to be checked w.r.t their
27.1
related MRP and approved documents.
Equipment installation to be checked w.r.t
27.2
approved supplier documents and installation
instructions.
28 FIXED RED LIGHT, RED FLASHING
LIGHT, AND HELIDECK LIGHTING :
Characteristics of fog horn to be checked w.r.t their
28.1
related MRP and approved documents.
28.2 Equipment installation to be checked w.r.t
approved supplier documents and installation
instructions.
28.3
28.4
Check availability of vendor documents ,including
29
commissioning and start-up instructions.
30
REMARKS:

CONTRACTOR ENPPI CLIENT

0000-000-5-EI-O-850-186-1-X
PAGES 186 PAGE 101

ENPPI

ELECTRICAL MECHANICAL COMPLETION &


PRE-COMMISSIONING CHECK LIST
HEAT TRACING SYSTEM.
"PC-CLF (510-11)"

page 1 of 4
PROJECT NAME: COM. NO:510-11
PROJECT NO : SUPPLIER:
AREA : DATE :
ITEM DESCRIPTION YES NO N/A
1 Insulation resistance and continuity of all
connections to be carried out. ( applied 500v
D.C
and insulation resistance not less than 5
M.ohm)
2 Stainless steel strapping to be used to hold the
cables to the pipe surfaces as per supplier
installation recommendation and on small
diameter, low temp. pipe, nylon ties or glass
tape may be used.
3 Heat tracing cables to be laid according to the
installation recommendation.
4 Thermostat bulb to be located as per supplier
recommendation.
5 Thermostat capillary and control wires shall
have mechanical protection between the
equipments and pipe lines.
6 pipe line to be insulated within (24) hours upon
tracer installation and acceptance.
REMARKS:

CONTRACTOR ENPPI CLIENT

0000-000-5-EI-O-850-186-1-X
PAGES 186 PAGE 102

ENPPI

ELECTRICAL MECHANICAL COMPLETION &


PRE-COMMISSIONING CHECK LIST
HEAT TRACING SYSTEM.
"PC-CLF (510-11)"

page 2 of 4
PROJECT NAME: COM. NO:510-11
PROJECT NO : SUPPLIER:
AREA : DATE :
ITEM DESCRIPTION YES NO N/A
8 Check that traced pipe line to be clearly marked
by labels.
9 All internal wiring connection are secure.

10 All supports needed for cables to be checked.

11 Remove any accidenta connections between


components.
12 Check cable glands (sizes,tightened,....etc) and
gland plates.
13 Check equipment assembly for alignment,
levelness and foundation fixing details.
14 Check earthing connections to the earthing
system.
15 Cable entries to be sealed wherever indicated in
the dwg,s
16 Heaters to be installed in accordance with the

17 All equipments to be cleaned internally and


externally.
REMARKS:

CONTRACTOR ENPPI CLIENT

0000-000-5-EI-O-850-186-1-X
PAGES 186 PAGE 103

ENPPI

ELECTRICAL MECHANICAL COMPLETION &


PRE-COMMISSIONING CHECK LIST
HEAT TRACING SYSTEM.
"PC-CLF (510-11)"

page 3 of 4
PROJECT NAME: COM. NO:510-11
PROJECT NO : SUPPLIER:
AREA : DATE :
ITEM DESCRIPTION YES NO N/A
18 Check continuity and insulation of heater cables
after insulation has been put on the pipes
and the installation is complete and if the heater
cables test satisfactory, connect the power
cables.
19 Cold-lead joints including a small portion of the
cold] lead. shall be fixed to the heated surface
to ensure a good contact of the heater.
20 Check that heating cables fixed to the pumps,
valves, flanges,...etc shall allow easy removal
of the equipment without damaging the cable.
21 Additional fixing straps shall be provided on
both sides of the pumps, valves, flanges, ..etc.
to avoid loosing of the heater from the
associated pipes.
22 Check that J.B's, thermostat.. ...etc, not to be
attached to the insulation, but shall be
mounted on brackets.
REMARKS:

CONTRACTOR ENPPI CLIENT

0000-000-5-EI-O-850-186-1-X
PAGES 186 PAGE 104

ENPPI

ELECTRICAL MECHANICAL COMPLETION &


PRE-COMMISSIONING CHECK LIST
HEAT TRACING SYSTEM.
PC-CLF (510-11)"

page 4 of 4
PROJECT NAME: COM. NO:510-11
PROJECT NO : SUPPLIER:
AREA : DATE :
ITEM DESCRIPTION YES NO N/A
23 Check all materials as indicated on the related
data
sheet (highly corrosion resistant, suitable for
salty,..etc)
24 DISTRIBUTION PANEL
24.1 Distr. panels close properly and there are keys
for all locks.
24.2 Equipment test report and inspection certificate
to b checked. Acceptance criteria values of the
above mentioned tests to be revised.
24.3 All internal wiring connection are secure.

24.4 All supports needed for cables to be checked.

24.5 Check availability of vendor documents


,including commissioning and start-up
instructions.
24.6
REMARKS:

CONTRACTOR ENPPI CLIENT

0000-000-5-EI-O-850-186-1-X
PAGES 186 PAGE 105

ENPPI

ELECTRICAL MECHANICAL COMPLETION &


PRE-COMMISSIONING CHECK LIST
UNINTERRUPTABLE POWER SUPPLY.
"PC-CLF (510-12)"

page 1 of 5
PROJECT NAME: COM. NO:510-12
PROJECT NO : SUPPLIER:
AREA : DATE :
ITEM DESCRIPTION YES NO N/A
1 D.C CHARGER PANEL :
1.1 Check equipment assembly for alignment,
levelness and foundation fixing details.
1.2 Check equipment earthing connections.

1.3 All compartments to be cleaned internally and


externally.
1.4 Check main, aux. fuses and relays correctly
rated and undamaged.
1.5 Remove any accidental connections between
phases and from phases to ground.
1.6 Check equipment space heater and test
insulation resistance.(*)
1.7 Termination of power (A.C/D.C) cables to be
checked.
1.8 Wire identifications and cable markers to be
checked w.r.t cable list.
1.9 Check for proper phase identification of
incoming feeders.
REMARKS:
(*) 500 v megger, min. 10 meg.ohm

CONTRACTOR ENPPI CLIENT

0000-000-5-EI-O-850-186-1-X
PAGES 186 PAGE 106

ENPPI

ELECTRICAL MECHANICAL COMPLETION &


PRE-COMMISSIONING CHECK LIST
UNINTERRUPTABLE POWER SUPPLY.
"PC-CLF (510-12)"

page 2 of 5
PROJECT NAME: COM. NO:510-12
PROJECT NO : SUPPLIER:
AREA : DATE :
ITEM DESCRIPTION YES NO N/A
1.10 Insulation test of both the main and aux.
circuits, this shall be carried out between phases
and phases to ground. (**).
1.11 Check connection of gland plate to the earthing
busbar.
1.12 Cable entries to be sealed wherever indicated in
the dwg,s
1.13 Tie raps to be used for cables and wires
fixation.
1.14 All supports needed for power and control
cables to be checked.
1.15 All internal wiring connection are secure.

1.16 Check all internal components such as:


Relays,fuses,....etc
1.17 Holes that are not used but are planned for
future equipments or instruments are correctly
blanked off.
REMARKS:
(**) Refer to table [I]

CONTRACTOR ENPPI CLIENT

0000-000-5-EI-0-850-186-1-X
PAGES 186 PAGE 107

ENPPI

ELECTRICAL MECHANICAL COMPLETION &


PRE-COMMISSIONING CHECK LIST
UNINTERRUPTABLE POWER SUPPLY.
"PC-CLF (510-12)"

page 3 of 5
PROJECT NAME: COM. NO:510-12
PROJECT NO : SUPPLIER:
AREA : DATE :
ITEM DESCRIPTION YES NO N/A
1.18 Check cable glands (sizes, tightened,....etc) and
gland plates.
2 INVERTER & STATIC SWITCH
COMPARTMENT :
2.1 Check equipment earthing connections.

2.2 Wire identifications and cable markers to be


checked w.r.t cable list.
2.3 Check all internal components such as:
Relays,fuses,....etc
2.4 Check main, aux. fuses and relays correctly
rated and undamaged.
2.5 All internal wiring connections are secure and
to be checked w.r.t supplier document.
3 Equipment test report and inspection certificate
to be checked. Acceptance criteria values of
the above mentioned tests to be revised.
REMARKS:

CONTRACTOR ENPPI CLIENT

0000-000-5-EI-0-850-186-1-X
PAGES 186 PAGE 108

ENPPI

ELECTRICAL MECHANICAL COMPLETION &


PRE-COMMISSIONING CHECK LIST
UNINTERRUPTABLE POWER SUPPLY.
"PC-CLF(510-12)"

page 4 of 5
PROJECT NAME: COM. NO:510-12
PROJECT NO : SUPPLIER:
AREA : DATE :
ITEM DESCRIPTION YES NO N/A
4 Check availability of vendor documents,
including commissioning and start-up
instructions.
5 BATTERIES :
5.1 Batteries are installed as indicated in the design.

5.2 Batteries rack to be connected to the earthing


system.
5.3 There is no leakage of the electrolyte and no
cracks in the cell enclosures.
5.4 Connections between cells to be checked.

5.5 Terminals are clean, well tightened,coated by


vaseline and fitted with protective caps.
5.6 Check the electrolyte level in all cells after filling
and measure the specific gravity of the
electrolyte and compare this with the
recommended value
REMARKS:

CONTRACTOR ENPPI CLIENT

0000-000-5-EI-0-850-186-1-X
PAGES 186 PAGE 109

"PC-CLF (510-12)"

page 5 of 5

TABLE OF MINIMUM INSULATION TEST VOLTAGES.

SWITCHGEAR VOLTAGE TEST MINIMUM INSULATION


(KV) VOLTAGE(V) RESISTANCE (M.OHMS)
0.6 1000 100
0.4 1000 100
CONTROL WIRING 500 10

TABLE [I]

0000-000-5-EI-0-850-186-1-X
PAGES 186 PAGE 110

ENPPI

ELECTRICAL MECHANICAL COMPLETION &


PRE-COMMISSIONING CHECK LIST
SMALL POWER DISTRIBUTION PANEL .
"PC-CLF (510-13)"

page 1 of 5
PROJECT NAME: COM. NO:510-13
PROJECT NO : SUPPLIER:
AREA : DATE :
ITEM DESCRIPTION YES NO N/A
1 Check equipment assembly for alignment,
levelness and foundation fixing details.
2 Check all busbar connections and covers
according to the approved documents and
supplier recommendations.
3 Check equipment earthing connections.

4 All compartments to be cleaned internally and


externally.
5 Check for proper phase rotation of incoming /
outgoing feeders.
6 Check mechanical operation of circuit breakers
( operation mechanism).
7 Check polarity of D.C supplies.
8 Check main, aux. fuses and relays correctly
rated and undamaged.
9 Check connection , polarity and ratio of C.T's.

10 Check connection and data of voltage


transformers.
REMARKS:

CONTRACTOR ENPPI CLIENT

0000-000-5-EI-0-850-186-1-X
PAGES 186 PAGE 111

ENPPI

ELECTRICAL MECHANICAL COMPLETION &


PRE-COMMISSIONING CHECK LIST
SMALL POWER DISTRIBUTION PANEL .
"PC-CLF (510-13)"

page 2 of 5
PROJECT NAME: COM. NO:510-13
PROJECT NO : SUPPLIER:
AREA : DATE :
ITEM DESCRIPTION YES NO N/A
11 Remove any accidental connections between
phases and from phases to ground.
12 Insulation resistance test of busbar bolted
connections (Between phases and phases to
ground) (*)
13 Check equipment anti- condensation heaters
and test insulation resistance.(**)
14 Voltage withstand test of both the main and
aux. circuits, this shall be carried out between
phases and phases to ground (***).
15 Termination of power and control cables to be
checked.
16 Wire identifications and cable markers to be
checked w.r.t cable list.
17 Check all internal components such as:
Relays,fuses,....etc
REMARKS:
(*) Refer to table [II]
(**) 500 v megger, min. 10 meg.ohm
(***) Refer to table [I]
CONTRACTOR ENPPI CLIENT

0000-000-5-EI-0-850-186-1-X
PAGES 186 PAGE 112

ENPPI

ELECTRICAL MECHANICAL COMPLETION &


PRE-COMMISSIONING CHECK LIST
SMALL POWER DISTRIBUTION PANEL .
"PC-CLF (510-13)"

page 3 of 5
PROJECT NAME: COM. NO:510-13
PROJECT NO : SUPPLIER:
AREA : DATE :
ITEM DESCRIPTION YES NO N/A
18 Check cable glands (sizes,tightness,...etc) and
gland plates.
19 Check connection of gland plate to the earthing
busbar.
20 Cable entries to be sealed wherever indicated in
the dwg,s
21 Tie raps to be used for cables and wires
fixation.
22 Holes that are not used but are planned for
future equipments or instruments are correctly
blanked off.
23 Check D.C system (Refer to PC-CLF 510-08).

24 All supports needed for power and control


cables to be checked.
25 Equipment test report and inspection certificate
to be checked. Acceptance criteria values of
the all mentioned tests to be revised.
REMARKS:

CONTRACTOR ENPPI CLIENT

0000-000-5-EI-0-850-186-1-X
PAGES 186 PAGE 113

ENPPI

ELECTRICAL MECHANICAL COMPLETION &


PRE-COMMISSIONING CHECK LIST
SMALL POWER DISTRIBUTION PANEL .
"PC-CLF (510-13)"

page 4 of 5
PROJECT NAME: COM. NO:510-13
PROJECT NO : SUPPLIER:
AREA : DATE :
ITEM DESCRIPTION YES NO N/A
26 All internal wiring connection are secure.

27 Check the phase rotation of bus-bars.

28 Check availability of vendor documents,


including commissioning and start-up
instructions.
29 Conductivity tests shall be carried out on
switchgear bus-bar connections and switchgear
earth system joints in order to check their
tightness.(****)
30 Check inter-changeability of identical C.S's.

31
32
33
34
35
36
REMARKS: (****) Conductivity testing shall be carried
with a low-resistance test set,
e.g. a "Ducter" with 20 A (d.c) output.
CONTRACTOR ENPPI CLIENT

0000-000-5-EI-0-850-186-1-X
PAGES 186 PAGE 114

"PC-CLF (510-13)"
page 5 of 5

VOLTAGE WITHSTAND TEST

TABLE OF TEST VOLTAGES.

EQUIPMENT RATED VOLTAGE (KV) TEST VOLTAGE (KV)


0.66 2

TABLE [I]

N.B :
- All current transformer secondaries shall be short circuit for the duration
of the test.

- All voltage transformers shall be disconnected by removal of primary


and secondary fuses for the duration of the test.

- Test shall be carried out with all circuit breakers, isolators and switches
closed, but with all the cable cores disconnected.

INSULATION TEST.

TABLE OF MINIMUM TEST VOLTAGES.

SWITCHGEAR VOLTAGE TEST MINIMUM INSULATION


(KV) VOLTAGE(V) RESISTANCE (M.OHMS)
0.6 1000 100
0.4 1000 100
CONTROL WIRING 500 10

TABLE [II]

0000-000-5-EI-0-850-
186-1-X
PAGES 186 PAGE 115

ENPPI

ELECTRICAL MECHANICAL COMPLETION &


PRE-COMMISSIONING CHECK LIST
RING MAIN UNITS.
"PC-CLF (510-14)"

page 1 of 5
PROJECT NAME: COM. NO:510-14
PROJECT NO : SUPPLIER:
AREA : DATE :
ITEM DESCRIPTION YES NO N/A
1 Check equipment assembly for alignment,
levelness and foundation fixing details.
2 Check all busbar connections (Torque check
with a torque wrench) and covers according to
the approved documents and supplier
recommendations.
3 Check equipment earthing connections.

4 All compartments to be cleaned internally and


externally.
5 Check for proper phase rotation of
incoming/outgoing feeders.
6 Check mechanical operation of circuit breakers
OR load break switches (operation
mechanism).
7 Check polarity of D.C supplies.
8 Check main, aux. fuses and relays correctly
rated and undamaged.
9 Check connection , polarity and ratio of C.T's.

REMARKS:

CONTRACTOR ENPPI CLIENT

0000-000-5-EI-0-850-186-1-X
PAGES 186 PAGE 116

ENPPI

ELECTRICAL MECHANICAL COMPLETION &


PRE-COMMISSIONING CHECK LIST
RING MAIN UNITS.
"PC-CLF (510-14)"

page 2 of 5
PROJECT NAME: COM. NO:510-14
PROJECT NO : SUPPLIER:
AREA : DATE :
ITEM DESCRIPTION YES NO N/A
10 Check connection and data of voltage
transformers.
11 Remove any accidental connections between
phases and from phases to ground.
12 Insulation resistance test of busbar bolted
connections (Between phases and phases to
ground). (*)
13 Check equipment anti- condensation heaters
and test insulation resistance.(**)
14 Voltage withstand test of both the main and
aux. circuits, this shall be carried out between
phases and phases to ground (***).
15 Termination of power and control cables to be
checked.
16 Wire identifications and cable markers to be
checked w.r.t cable list.
REMARKS:
(*) Refer to table [II]
(**) 500 v megger, min. 10 meg.ohm
(***) Refer to table [I]
CONTRACTOR ENPPI CLIENT

0000-000-5-EI-0-850-186-1-X
PAGES 186 PAGE 117

ENPPI

ELECTRICAL MECHANICAL COMPLETION &


PRE-COMMISSIONING CHECK LIST
RING MAIN UNITS.
"PC-CLF (510-14)"

page 3 of 5
PROJECT NAME: COM. NO:510-14
PROJECT NO : SUPPLIER:
AREA : DATE :
ITEM DESCRIPTION YES NO N/A
17 Check cable glands (sizes,tightness,....etc) and
gland plates.
18 All internal wiring connection are secure.

19 Check connection of gland plate to the earthing


busbar.
20 Cable entries to be sealed wherever indicated in
the dwg,s
21 Tie raps to be used for cables and wires
fixation.
22 Holes that are not used but are planned for
future equipments or instruments are correctly
blanked off.
23 All supports needed for power and control
cables to be checked.
24 Equipment test report and inspection certificate
to be checked. Acceptance criteria values of
the all mentioned tests to be revised.
REMARKS:
(*) Refer to table [II]
(**) 500 v megger, min. 10 meg.ohm
(***) Refer to table [I]
CONTRACTOR ENPPI CLIENT

0000-000-5-EI-0-850-186-1-X
PAGES 186 PAGE 118

ENPPI

ELECTRICAL MECHANICAL COMPLETION &


PRE-COMMISSIONING CHECK LIST
RING MAIN UNITS.
"PC-CLF (510-14)"

page 4 of 5
PROJECT NAME: COM. NO:510-14
PROJECT NO : SUPPLIER:
AREA : DATE :
ITEM DESCRIPTION YES NO N/A
25 Check D.C system [Refer to PC-CLF(510-08)].

26 Check rating and type of all internal


componentssuch as: Relays,fuses,....etc. w.r.t
approved documents.
27 Check the phase rotation of bus-bars.

28 Check availability of vendor documents


,including commissioning and start-up
instructions.
29 Apply 15 k.v D.C (Bus-bar system)for one
minute connect phases to ground,record
leakage current in m.amp.
30 Wiring of control and protection devices to be
checked w.r.t approved documents.
31 Conductivity tests shall be carried out on
switchgear bus- bar connections and
switchgear
earth system joints in order to check their
tightness.(****)
32
REMARKS: (****) Conductivity testing shall be carried
with a low-resistance test set,
e.g. a "Ducter" with 20 A (d.c) output.
CONTRACTOR ENPPI CLIENT

0000-000-5-EI-0-850-186-1-X
PAGES 186 PAGE 119

"PC-CLF (510-14)"
page 5 of 5
VOLTAGE WITHSTAND TEST

TABLE OF TEST VOLTAGES.

EQUIPMENT RATED VOLTAGE (KV) TEST VOLTAGE (KV)


3.3 8.6
6.6 15.2
11 24
15 32
22 46

TABLE [I]

N.B :
- All current transformer secondaries shall be short circuit for the duration
of the test.

- All voltage transformers shall be disconnected by removal of primary


and secondary fuses for the duration of the test.

- Test shall be carried out with all circuit breakers, isolators and switches
closed, but with all the cable cores disconnected.

INSULATION TEST.

TABLE OF MINIMUM TEST VOLTAGES.

SWITCHGEAR VOLTAGE TEST MINIMUM INSULATION


(KV) VOLTAGE(V) RESISTANCE (M.OHMS)
33 5000 200
22 5000 200
11 5000 200
6.6 1000 200
3.3 1000 200
CONTROL WIRING 500 10

TABLE [II]

0000-000-5-EI-0-850-186-1-X
PAGES 186 PAGE 120

ENPPI

ELECTRICAL MECHANICAL COMPLETION &


PRE-COMMISSIONING CHECK LIST
SYNOPTIC CONTROL PANEL.
"PC-CLF (510-15)"

page 1 of 4
PROJECT NAME: COM. NO:510-15
PROJECT NO : SUPPLIER:
AREA : DATE :
ITEM DESCRIPTION YES NO N/A
1 Check equipment assembly for alignment,
evelness and foundation fixing details.
2 Remove any accidental connections between
components.
3 Check equipment earthing connections.

4 All compartments to be cleaned internally and


externally.
5 Check all internal components such as:
Relays,fuses,....etc
6 Wire identifications and cable markers to be
checked w.r.t cable list.
7 Check polarity of D.C supplies.
8 Check main, aux. fuses, circuit breakers and
relays correctly rated and undamaged.
9 Check connection of gland plate to the earthing
busbar.
10 Cable entries to be sealed wherever indicated I
the dwg,s
REMARKS:

CONTRACTOR ENPPI CLIENT

0000-000-5-EI-0-850-186-1-X
PAGES 186 PAGE 121

ENPPI

ELECTRICAL MECHANICAL COMPLETION &


PRE-COMMISSIONING CHECK LIST
SYNOPTIC CONTROL PANEL.
"PC-CLF (510-15)"

page 2 of 4
PROJECT NAME: COM. NO:510-15
PROJECT NO : SUPPLIER:
AREA : DATE :
ITEM DESCRIPTION YES NO N/A
11 Tie raps to be used for cable and wires fixation.

12 Check D.C system Refer to PC-CLF 510-08).

13 Check equipment anti condensation heaters and


test insulation resistance.(*)
14 Insulation test of both the main and aux.
circuits, this shall be carried out between phases
and Tie phases to ground. (**).
15 Termination of control cables to be checked
w.r.t approved documents.
16 All supports needed control cables to be
checked.
17 All internal wiring connection are secure.

18 Check cable glands (sizes,tightness,....etc) and


gland plates.
19 Check control circuits to be protected by
miniature C.B's.
REMARKS:
(*) 500 v megger, min. 10 meg.ohm
(**) Refer to table [I]
CONTRACTOR ENPPI CLIENT

0000-000-5-EI-0-850-186-1-X
PAGES 186 PAGE 122

ENPPI

ELECTRICAL MECHANICAL COMPLETION &


PRE-COMMISSIONING CHECK LIST
SYNOPTIC CONTROL PANEL.
"PC-CLF (510-15)"

page 3 of 4
PROJECT NAME: COM. NO:510-15
PROJECT NO : SUPPLIER:
AREA : DATE :
ITEM DESCRIPTION YES NO N/A
20 Check wire ends to be fitted with crimped type
terminals.
21 Holes that are not used but are planned for
future equipments or instruments are correctly
blanked off.
22 Equipment test report and inspection certificate
to be checked. Acceptance criteria values of
the all mentioned tests to be revised.
23 Check availability of vendor documents
,including commissioning and start-up
instructions.
24 Wiring of control and protection devices to be
checked w.r.t approved documents.
25
26
27
28
29
REMARKS:

CONTRACTOR ENPPI CLIENT

0000-000-5-EI-0-850-186-1-X
PAGES 186 PAGE 123

"PC-CLF(510-15)"

page 4 of 4

TABLE OF MINIMUM TEST VOLTAGES.

EQUIPMENT VOLTAGE TEST MINIMUM INSULATION


(KV) VOLTAGE(V) RESISTANCE (M.OHMS)
0.6 1000 100
0.4 1000 100
CONTROL WIRING 500 10

TABLE [I]

0000-000-5-EI-0-850-186-1-X
PAGES 186 PAGE 124

ENPPI

ELECTRICAL MECHANICAL COMPLETION &


PRE-COMMISSIONING CHECK LIST
L.V EXPLOSION PROOF SWR.
"PC-CLF (510-17)"

page 1 of 5
PROJECT NAME: COM. NO:510-17
PROJECT NO : SUPPLIER:
AREA : DATE :
ITEM DESCRIPTION YES NO N/A
1 Check equipment assembly for alignment,
evelness and foundation fixing details.
2 Check all busbar connections (Torque check
with a torque wrench)and covers according to
the approved documents and supplier
recommendations.
3 Check equipment earthing connections.

4 All compartments to be cleaned internally and


externally.
5 Check for proper phase rotation of
incoming/outgoing feeders.
6 Check mechanical operation of circuit breakers
OR load break switches (operation
mechanism).
7 Check polarity of D.C supplies.
8 Check main, aux. fuses,circuit breakers and
relays correctly rated and undamaged.
9 Check connection , polarity and ratio of C.T's.

REMARKS:

CONTRACTOR ENPPI CLIENT

0000-000-5-EI-0-850-186-1-X
PAGES 186 PAGE 125

ENPPI

ELECTRICAL MECHANICAL COMPLETION &


PRE-COMMISSIONING CHECK LIST
L.V EXPLOSION PROOF SWR.
"PC-CLF (510-17)"

page 2 of 5
PROJECT NAME: COM. NO:510-17
PROJECT NO : SUPPLIER:
AREA : DATE :
ITEM DESCRIPTION YES NO N/A
10 Check connection and data of voltage
transformers.
11 Remove any accidental connections between
phases and from phases to ground.
12 Insulation resistance test of busbar bolted
connections (Between phases and phases to
ground). (*)
13 Check equipment anti- condensation heaters
and test insulation resistance.(**)
14 Voltage withstand test of both the main and au,
this shall be carried out between phases and
phases to ground (***).
15 Wire identifications and cable markers to be
checked w.r.t cable list.
16 Check cable glands (sizes,tightened,....etc) and
gland plates.
REMARKS:
(*) Refer to table [II]
(**) 500 v megger, min. 10 meg.ohm
(***) Refer to table [I]
CONTRACTOR ENPPI CLIENT

0000-000-5-EI-0-850-186-1-X
PAGES 186 PAGE 126

ENPPI

ELECTRICAL MECHANICAL COMPLETION &


PRE-COMMISSIONING CHECK LIST
L.V EXPLOSION PROOF SWR.
"PC-CLF (510-17)"

page 3 of 5
PROJECT NAME: COM. NO:510-17
PROJECT NO : SUPPLIER:
AREA : DATE :
ITEM DESCRIPTION YES NO N/A
17 Termination of power and control cables to be
checked.
18 Check all internal components such as:
Relays,fuses,....etc
19 Check connection of gland plate to the earthing
busbar.
20 Cable entries to be sealed wherever indicated in
the dwg,s
21 Tie raps to be used for cables and wires
fixation.
22 Holes that are not used but are planned for
future equipments or instruments are correctly
blanked off.
23 Check D.C system Refer to PC-CLF(510-08).

24 All supports needed for power and control


cables to be checked.
25 Check availability of vendor documents,
including commissioning and start-up
instructions.
REMARKS:
(*) Refer to table [II]
(**) 500 v megger, min. 10 meg.ohm
(***) Refer to table [I]
CONTRACTOR ENPPI CLIENT

0000-000-5-EI-0-850-186-1-X
PAGES 186 PAGE 127

ENPPI
ELECTRICAL MECHANICAL COMPLETION &
PRE-COMMISSIONING CHECK LIST
L.V EXPLOSION PROOF SWR.
"PC-CLF (510-17)"

page 4 of 5
PROJECT NAME: COM. NO:510-17
PROJECT NO : SUPPLIER:
AREA : DATE :
ITEM DESCRIPTION YES NO N/A
26 All internal wiring connection are secure.

27 Check the phase rotation of bus-bars.

28 Check rating and type of all internal


components such as: Relays,fuses,....etc, w.r.t
approved documents.
29 Equipment test report and inspection certificate
to be checked. Acceptance criteria values of
all mentioned tests to be revised.
30 Conductivity tests shall be carried out on
switchgear bus- bar connections and
switchgear
earth system joints in order to check their
tightness.(****)
31 Apply 15 k.v D.C (Bus-bar system)for one
minute connect phases to ground, record
leakage current in m.amp.
32
33
REMARKS: (****) Conductivity testing shall be carried
with a low-resistance test set,
e.g. a "Ducter" with 20 A (d.c) output.
CONTRACTOR ENPPI CLIENT

0000-000-5-EI-0-850-186-1-X
PAGES 186 PAGE 128

"PC-CLF (510-17)"

page 5 of 5

VOLTAGE WITHSTAND TEST

TABLE OF TEST VOLTAGES.

EQUIPMENT RATED VOLTAGE (KV) TEST VOLTAGE (KV)


0.66 2

TABLE [I]

N.B :
- All current transformer secondaries shall be short circuit for the duration
of the test.

- All voltage transformers shall be disconnected by removal of primary


and secondary fuses for the duration of the test.

- Test shall be carried out with all circuit breakers, isolators and switches
closed, but with all the cable cores disconnected.

INSULATION TEST.

TABLE OF MINIMUM TEST VOLTAGES.

SWITCHGEAR VOLTAGE TEST MINIMUM INSULATION


(KV) VOLTAGE(V) RESISTANCE (M.OHMS)
0.6 1000 100
0.4 1000 100
CONTROL WIRING 500 10

TABLE [II]

0000-000-5-EI-0-850-186-1-X
PAGES 186 PAGE 129

ENPPI

ELECTRICAL MECHANICAL COMPLETION &


PRE-COMMISSIONING CHECK LIST
POWER FACTOR CORRECTION EQUIPMENT.
"PC-CLF (510-21)"

page 1 of 4
PROJECT NAME: COM. NO:510-21
PROJECT NO : SUPPLIER:
AREA : DATE :
ITEM DESCRIPTION YES NO N/A
1 Check equipment assembly for alignment,
levelness and foundation fixing details.
2 Check all internal connections related to the
capacitor banks and to be according to the
approved documents and supplier
recommendations.
3 Check equipment earthing connections.

4 All compartments to be cleaned internally and


externally.
5 Check for proper phase rotation of
ncoming/outgoing connections.
6 Check main, aux. fuses,circuit breaker and
relays correctly rated and undamaged.
7 Remove any accidental connections between
phases and from phases to ground.
8 Resistance test of busbar bolted connections
(Between phases and phases to ground)(*)
REMARKS:
(*) Refer to table [II]

CONTRACTOR ENPPI CLIENT

0000-000-5-EI-0-850-186-1-X
PAGES 186 PAGE 130

ENPPI

ELECTRICAL MECHANICAL COMPLETION &


PRE-COMMISSIONING CHECK LIST
POWER FACTOR CORRECTION EQUIPMENT.
"PC-CLF (510-21)"

page 2 of 4
PROJECT NAME: COM. NO:510-21
PROJECT NO : SUPPLIER:
AREA : DATE :
ITEM DESCRIPTION YES NO N/A
9 Voltage withstand test of both the main and
aux. circuits, this shall be carried out between
phases and phases to ground (***).
10 Check all internal components such as:
Relays,fuses,....etc
11 Check equipment anti condensation heaters and
test insulation resistance.(**)
12 Wire identifications and cable markers to be
checked w.r.t cable list.
13 Check cable glands (sizes,tightened,....etc) and
gland plates.
14 Check connection , polarity and ratio of C.T's.

15 Check connection and data of voltage


transformers.
16 Check availability of vendor documents,
including commissioning and start-up
instructions.
REMARKS:

(**) 500 v megger, min. 10 meg.ohm


(***) Refer to table [I]
CONTRACTOR ENPPI CLIENT

0000-000-5-EI-0-850-186-1-X
PAGES 186 PAGE 131

ENPPI

ELECTRICAL MECHANICAL COMPLETION &


PRE-COMMISSIONING CHECK LIST
POWER FACTOR CORRECTION EQUIPMENT.
"PC-CLF (510-21)"

page 3 of 4
PROJECT NAME: COM. NO:510-21
PROJECT NO : SUPPLIER:
AREA : DATE :
ITEM DESCRIPTION YES NO N/A
17 Check rating and type of all internal
components such as: Relays,fuses,....etc, w.r.t
approved documents.
18 Equipment test report and inspection certificate
to be checked. Acceptance criteria values of
all mentioned tests to be revised.
19 Conductivity tests shall be carried out on
switchgear bus- bar connections and
switchgear
earth system joints in order to check their
tightness.(****)
20 Apply 15 k.v D.C (Bus-bar system)for one
minute connect phases to ground, record
leakage current in m.amp.
21
22
23
24
25
REMARKS: (****) Conductivity testing shall be carried
with a low-resistance test set,
e.g. a "Ducter" with 20 A (d.c) output.
CONTRACTOR ENPPI CLIENT

0000-000-5-EI-0-850-186-1-X
PAGES 186 PAGE 132

"PC-CLF (510-21)"
page 4 of 4

VOLTAGE WITHSTAND TEST

TABLE OF TEST VOLTAGES.

EQUIPMENT RATED VOLTAGE (KV) TEST VOLTAGE (KV)


0.66 2
3.30 8.6
6.60 15.2
11 24
15 32
22 46

TABLE [I]

N.B :
- All current transformer secondaries shall be short circuit for the duration
of the test.

- All voltage transformers shall be disconnected by removal of primary


and secondary fuses for the duration of the test.

- Test shall be carried out with all circuit breakers, isolators and switches
closed, but with all the cable cores disconnected.

INSULATION TEST.
TABLE OF MINIMUM TEST VOLTAGES.

SWITCHGEAR VOLTAGE TEST MINIMUM INSULATION


(KV) VOLTAGE(V) RESISTANCE (M.OHMS)
33 5000 200
22 5000 200
11 5000 200
6.6 1000 200
3.3 1000 200
0.6 1000 100
0.4 1000 100
CONTROL WIRING 500 10

TABLE [II]

0000-000-5-EI-0-850-186-1-X
PAGES 186 PAGE 133

ENPPI

ELECTRICAL MECHANICAL COMPLETION &


PRE-COMMISSIONING CHECK LIST
LIGHTING AND SMALL POWER SYSTEM.
"PC-CLF (520-01)"

page 1 of 3
PROJECT NAME: COM. NO:520-01
PROJECT NO : SUPPLIER:
AREA : DATE :
ITEM DESCRIPTION YES NO N/A
1 Check that lighting equipments are correctly
located and not obstructed by other
equipments.
2 Check that lighting panels are correctly fixed to
the structure or walls (as per installation
details).
3 Check mechanical operation of circuit breakers.

4 Earthing connections to the earthing grid to be


checked.
5 Road lighting equipments and floodlights are
orientated as per approved documents.
6 Lighting panels and junction boxes are well
sealed and holes that are not used to be
plugged with plugs suiting hazardous area
classification.
7 Junction boxes are correctly fixed to
their supports.
8 Plugs of socket outlets fit properly and
mechanical intrlocks operate correctly.
REMARKS:

CONTRACTOR ENPPI CLIENT

0000-000-5-EI-0-850-186-1-X
PAGES 186 PAGE 134

ENPPI

ELECTRICAL MECHANICAL COMPLETION &


PRE-COMMISSIONING CHECK LIST
LIGHTING AND SMALL POWER SYSTEM.
"PC-CLF (520-01)"

page 2 of 3
PROJECT NAME: COM. NO:520-01
PROJECT NO : SUPPLIER:
AREA : DATE :
ITEM DESCRIPTION YES NO N/A
9 Position of socket outlets as per approved
documents.
10 Check the distribution board circuit numbering
and the fuse ratings & check any safety
features such as interlocks, padlocks ,...etc.
11 Check that the distribution board supply cable
has been tested in accordance with the cable
inspection and test procedures.
12 Check cable termination at circuit j.box's and
each fixture.
13 Insulation resistance (500 v megger, min. 10 M.
OHMS).
14 Check availability of vendor documents,
including commissioning and start-up
instructions.
15 Equipment test report and inspection certificate
to be checked. Acceptance criteria values of all
mentioned tests to be revised.
REMARKS:

CONTRACTOR ENPPI CLIENT

0000-000-5-EI-0-850-186-1-X
PAGES 186 PAGE 135

ENPPI

ELECTRICAL MECHANICAL COMPLETION &


PRE-COMMISSIONING CHECK LIST
LIGHTING AND SMALL POWER SYSTEM.
"PC-CLF (520-01)"

page 3 of 3
PROJECT NAME: COM. NO:520-01

PROJECT NO : SUPPLIER:

AREA : DATE :
ITEM DESCRIPTION YES NO N/A
16 Connection and function of photo-cells to be checked as
per approved documents.
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32

REMARKS:

CONTRACTOR ENPPI CLIENT

0000-000-5-EI-0-850-186-1-X
PAGES 186 PAGE 136

ENPPI

ELECTRICAL MECHANICAL COMPLETION &


PRE-COMMISSIONING CHECK LIST
RACEWAYS AND SUPPORTS.
"PC-CLF (530-01)"

page 1 of 2
PROJECT NAME: COM. NO:530-01
PROJECT NO : SUPPLIER:
AREA : DATE :
ITEM DESCRIPTION YES NO N/A
1 Trays, supports and conduits are correctly fixed
to structure and aligned.
2 Check that bending radius of conduits is not
less the minimum established.
3 Check trays to be fitted with covers and
correctly fixed, if anticipated in the design.
4 Check threaded joints of conduits, fittings are
well tightened and oiled.
5 Check that conduits for road crossings, that are
not used are internally cleaned and plugged.
6 Earthing loops of cable trays to be checked.

7 Check cable conduits to be fitted with bushings


at a proper locations.
8 CONDUITS COMPOUND:
Check availability of conduits compound, used
in a proper way and correct locations
REMARKS:

CONTRACTOR ENPPI CLIENT

0000-000-5-EI-0-850-186-1-X
PAGES 186 PAGE 137

ENPPI

ELECTRICAL MECHANICAL COMPLETION &


PRE-COMMISSIONING CHECK LIST
RACEWAYS AND SUPPORTS.
"PC-CLF (530-01)"

page 2 of 2
PROJECT NAME: COM. NO:530-01
PROJECT NO : SUPPLIER:
AREA : DATE :
ITEM DESCRIPTION YES NO N/A
Check installation of conduits and cable trays as
9
per supplier instructions and approved documents.
Check cable conduits to be fitted with conduit
10
clamps at a proper locations, enough quantities
and suitable size.
11
12
13
14
15
16
17
18
19
20
21
22
23
REMARKS:

CONTRACTOR ENPPI CLIENT

0000-000-5-EI-0-850-186-1-X
PAGES 186 PAGE 138

ENPPI

ELECTRICAL MECHANICAL COMPLETION &


PRE-COMMISSIONING CHECK LIST
LOW VOLTAGE CABLES.
"PC-CLF (541-01)"

page 1 of 6
PROJECT NAME: COM. NO:541-01
PROJECT NO : SUPPLIER:
AREA : DATE :
ITEM DESCRIPTION YES NO N/A
1 Check that all cables (power/ control) are
installed in accordance with cable lists and
approved documents.
2 Check that the bending radius of cables is not
less than the minimum stablished.
3 Cables to be tested ( continuity/insulation
resistance) between phases and phases to
ground and in both directions at splice points
before
splicing and then retested after completion of
splicing.(*)
4 Cable markers to be installed before covering
buried cables or cables in cable trays.
5 Check that buried cables are correctly covered
and protected.
6 Check connection, termination and joints of
cables are correctly executed.
REMARKS:

(*) Refer to table (III).

CONTRACTOR ENPPI CLIENT

0000-000-5-EI-0-850-186-1-X
PAGES 186 PAGE 139

ENPPI

ELECTRICAL MECHANICAL COMPLETION &


PRE-COMMISSIONING CHECK LIST
LOW VOLTAGE CABLES.
"PC-CLF (541-01)"

page 2 of 6
PROJECT NAME: COM. NO:541-01
PROJECT NO : SUPPLIER:
AREA : DATE :
ITEM DESCRIPTION YES NO N/A
7 Check cables are correctly fixed to trays and
supports.
8 Check cables through walls or ceilings are
correctly sealed.
9 Check identification tag's of all conductors and
wires.
10 Check cable glands for tightnss and good work
manship and check the correct type of gland
has been used for the size and type of installed
cables.
11 Check that the gland plates has been
manufactured from non-magnetic materials.
12 Check where conductors have been terminated
using crimped connections, ensure that the
correct size and type of crimping lugs has
been used.
13 Cables test report and inspection certificate to
be
checked. Acceptance criteria values of all
mentioned tests to be revised.
REMARKS:
(*) Refer to table (III).

CONTRACTOR ENPPI CLIENT

0000-000-5-EI-0-850-186-1-X
PAGES 186 PAGE 140

ENPPI

ELECTRICAL MECHANICAL COMPLETION &


PRE-COMMISSIONING CHECK LIST
LOW VOLTAGE CABLES.
"PC-CLF (541-01)"

page 3 of 6
PROJECT NAME: COM. NO:541-01
PROJECT NO : SUPPLIER:
AREA : DATE :
ITEM DESCRIPTION YES NO N/A
14 Trench markers to be checked w.r.t approved
documents.
15 SUBMARINE POWER CABLES :
15.1 Check installation and erection as per supplier
instruction of all accessories required for
submarine power cables protection, laying,
termination and testing. These shall include,
but not limited to, kits for cable splicing and
termination, clamping system, interfacing
joint boxes,...etc.
15.2 Cables test report and inspection certificate to
be
checked. Acceptance criteria values of all tests
to be revised.
15.3 Check that route of submarine cables according
to the site survey report to avoid any
unexpected situation that may affect the correct
cable positioning.
REMARKS:
(*) Refer to table (III).

CONTRACTOR ENPPI CLIENT

0000-000-5-EI-0-850-186-1-X
PAGES 186 PAGE 141

ENPPI

ELECTRICAL MECHANICAL COMPLETION &


PRE-COMMISSIONING CHECK LIST
LOW VOLTAGE CABLES.
"PC-CLF (541-01)"

page 4 of 6
PROJECT NAME: COM. NO:541-01
PROJECT NO : SUPPLIER:
AREA : DATE :
ITEM DESCRIPTION YES NO N/A
15 SUBMARINE POWER CABLES : cont'n
15.4 D.C insulation test to be performed before
energizing the cables .
15.5 Check that submarine cables laid in J-tubes up
to the platform deck.
15.6 sealing ends connections and termination to the
interface junction boxes to be executed
according to the supplier instructions.
15.7 Cable armour should be protected against
corrosion, which is due to the cathodic
reaction.
15.8 Check that submarine cables when crossing
coral reef is to be protected by a suitable
method, recommended by the supplier (e.g
split cast iron
shells).
15.9 check anchoring and clamping of submarine
cables.
REMARKS:
(*) Refer to table (III).

CONTRACTOR ENPPI CLIENT

0000-000-5-EI-0-850-186-1-X
PAGES 186 PAGE 142

ENPPI

ELECTRICAL MECHANICAL COMPLETION &


PRE-COMMISSIONING CHECK LIST
LOW VOLTAGE CABLES.
"PC-CLF (541-01)"

page 5 of 6
PROJECT NAME: COM. NO:541-01
PROJECT NO : SUPPLIER:
AREA : DATE :
ITEM DESCRIPTION YES NO N/A
15 SUBMARINE POWER CABLES : cont'n
15.10 Check that submarine cables in the proximity of
the platform, the cable shall be protected by
sand/cement bags for an extension of 50
meters sea- wards.
15.11 The submarine cables to be tested after the two
relevant sealing-ends are assembles and before
connecting the cables to the junction box.
15.12 The submarine cables to be tested after the two
relevant sealing-ends are assembles and before
connecting the cables to the junction box.
15.13
15.14
15.15
16
17
18
REMARKS:
(*) Refer to table (III).

CONTRACTOR ENPPI CLIENT

0000-000-5-EI-0-850-186-1-X
PAGES 186 PAGE 143

"PC-CLF (541-01)"

INSULATION TEST

LOW VOLTAGE CABLES

page 6 of 6

D.C TEST VOLTAGE MINIMUM


CABLE INSULATION
VOLTAGE RESISTANCE
(M.OHMS).
BETWEEN CONDUCTORS
CONDUCTORS. TO EARTH.
600/1000 V 1000 V 1000 V 10

TABLE (III)

0000-000-5-EI-0-850-186-1-X
PAGES 186 PAGE 144

ENPPI

ELECTRICAL MECHANICAL COMPLETION &


PRE-COMMISSIONING CHECK LIST
MEDIUM VOLTAGE CABLES.
"PC-CLF (542-01)"

page 1 of 6
PROJECT NAME: COM. NO:542-01
PROJECT NO : SUPPLIER:
AREA : DATE :
ITEM DESCRIPTION YES NO N/A
1 Check that all cables are installed in accordance
with cable lists and approved documents.
2 Check that the bending radius of cables is not
less than the minimum stablished.
3 Cables to be tested ( continuity/insulation
resistance) between phases and phases to
ground and in both directions at splice points
before
splicing and then retested after completion of
splicing.(*)
4 Cable markers to be installed before covering
buried cables or cables in cable trays.
5 Check that buried cables are correctly covered
and protected.
6 Check connection, termination and joints of
cables are correctly executed.
REMARKS:

(*) Refer to table (III).

CONTRACTOR ENPPI CLIENT

0000-000-5-EI-0-850-186-1-X
PAGES 186 PAGE 145

ENPPI

ELECTRICAL MECHANICAL COMPLETION &


PRE-COMMISSIONING CHECK LIST
MEDIUM VOLTAGE CABLES.
"PC-CLF (542-01)"

page 2 of 6
PROJECT NAME: COM. NO:542-01
PROJECT NO : SUPPLIER:
AREA : DATE :
ITEM DESCRIPTION YES NO N/A
7 Check cables are correctly fixed to trays and
supports.
8 Check cables through walls or ceilings are
correctly sealed.
9 Check identification tag's of all conductors and
wires.
10 Check cable glands for tightness and good work
manship and check the correct type of gland
has been used for the size and type of installed
cables.
11 Check that the gland plates has been
manufactured from non-magnetic materials.
12 Check where conductors have been terminated
using crimped connections, ensure that the
correct size and type of crimping lugs have
been used.
13 Apply 15 K.V D.C test voltage leakage for (15)
min. between phases and earth and record
leakage current in m.amp.
REMARKS:

(*) Refer to table (III).


CONTRACTOR ENPPI CLIENT

0000-000-5-EI-0-850-186-1-X
PAGES 186 PAGE 146

ENPPI

ELECTRICAL MECHANICAL COMPLETION &


PRE-COMMISSIONING CHECK LIST
MEDIUM VOLTAGE CABLES.
"PC-CLF (542-01)"

page 3 of 6
PROJECT NAME: COM. NO:541-01
PROJECT NO : SUPPLIER:
AREA : DATE :
ITEM DESCRIPTION YES NO N/A
14 Trench markers to be checked w.r.t approved
documents.
15 SUBMARINE POWER CABLES :
15.1 Check installation and erection as per supplier
instruction of all accessories required for
ubmarine power cables protection, laying,
termination and testing. These shall include,
but not limited to, kits for cable splicing and
termination, clamping system, interfacing
joint boxes,...etc.
15.2 Cables test report and inspection certificate to
be
checked. Acceptance criteria values of all tests
to be revised.
15.3 Check that route of submarine cables according
to the site survey report to avoid any
unexpected situation that may affect the correct
cable
positioning.
REMARKS:

CONTRACTOR ENPPI CLIENT

=
0000-000-5-EI-0-850-186-1-X
PAGES 186 PAGE 147

ENPPI
ELECTRICAL MECHANICAL COMPLETION &
PRE-COMMISSIONING CHECK LIST
MEDIUM VOLTAGE CABLES.
"PC-CLF (542-01)"

page 4 of 6
PROJECT NAME: COM. NO:541-01
PROJECT NO : SUPPLIER:
AREA : DATE :
ITEM DESCRIPTION YES NO N/A
15 SUBMARINE POWER CABLES : cont'n
15.4 The following tests to be performed before
energizing the cables
- D.C insulation test
- D.c voltage test
15.5 Check that submarine cables laid in J-tubes up
to the platform deck.
15.6 check anchoring and clamping of submarine
cables.
15.7 sealing ends connections and termination to the
interface junction boxes to be executed
according to the supplier instructions.
15.8 Check that submarine cables when crossing
coral reef is to be protected by a suitable
method, recommended by the supplier (e.g
split cast iron
shells).
15.9 Cable armour should be protected against
corrosion, which is due to the cathodic
reaction.
REMARKS:

CONTRACTOR ENPPI CLIENT

0000-000-5-EI-0-850-186-1-X
PAGES 186 PAGE 148

ENPPI

ELECTRICAL MECHANICAL COMPLETION &


PRE-COMMISSIONING CHECK LIST
MEDIUM VOLTAGE CABLES.
"PC-CLF (542-01)"

page 5 of 6
PROJECT NAME: COM. NO:541-01
PROJECT NO : SUPPLIER:
AREA : DATE :
ITEM DESCRIPTION YES NO N/A
15 SUBMARINE POWER CABLES : cont'n
15.10 Check that submarine cables in the proximity of
the platform, the cable shall be protected by
sand/cement bags for an extension of 50
meters sea- wards.
15.11 The submarine cables to be tested after the two
relevant sealing-ends are assembles and before
connecting the cables to the junction box.
15.12 The submarine cables to be tested after the two
relevant sealing-ends are assembles and before
connecting the cables to the junction box.
15.13
14.14
15.15
16
17
18
REMARKS:

CONTRACTOR ENPPI CLIENT

0000-000-5-EI-0-850-186-1-X
PAGES 186 PAGE 149

"PC-CLF (542-01)"

INSULATION TEST

MEDIUM VOLTAGE CABLES.

page 6 of 6

D.C TEST VOLTAGE MINIMUM


CABLE NSULATION
OLTAGE RESISTANCE
(M.OHMS).
BETWEEN CONDUCTORS
CONDUCTORS. TO EARTH.
1900/3300 V 10000 V 7000 V 200
3800/6600 V 20000 V 15000 V 200
6350/11000 V 34000 V 25000 V 200
8700/15000 V 34000 V 37000 V 200
12700/22000 V 34000 V 50000 V 200
19000/33000 V 34000 V 75000 V 200

TABLE (III)

0000-000-5-EI-0-850-186-1-X
PAGES 186 PAGE 150

ENPPI

ELECTRICAL MECHANICAL COMPLETION &


PRE-COMMISSIONING CHECK LIST
GROUNDING .
"PC-CLF (550-01)"

page 1 of 2
PROJECT NAME: COM. NO:550-01
PROJECT NO : SUPPLIER:
AREA : DATE :
ITEM DESCRIPTION YES NO N/A
1 Calibration test certificate of testing equipment
to be checked.
2 Check that cables rising from ground are
protected means of a conduits ( PVC
CONDUITS).
3 Check that buried connections of cables are
protected against damp with adhesive tape.
4 All Grounding terminals to be cleaned by wire
brush and greased with petroleum jelly.
5 Check that all Grounding bus- bar joints or
conductor fixing bolts are well tightened.
6 All Grounding bus-bars to be cleaned by wire
brush and greased with petroleum jelly.
7 Check connections of all grounding well rods.

8 Grounding resistance measurments shall be


made by the (3- electrodes method) using a
megger ground tester with two reference
ground electrodes.
REMARKS:

CONTRACTOR ENPPI CLIENT

0000-000-5-EI-0-850-186-1-X
PAGES 186 PAGE 151

ENPPI

ELECTRICAL MECHANICAL COMPLETION &


PRE-COMMISSIONING CHECK LIST
GROUNDING .
"PC-CLF (550-01)"

page 2 of 2
PROJECT NAME: COM. NO:550-01
PROJECT NO : SUPPLIER:
AREA : DATE :
ITEM DESCRIPTION YES NO N/A
9 Check continuity test of grounding branches.

10 Check that all equipments, steel structure, tanks,...etc


are grounded as per grounding layout and installation
details

11
12
13
14
15

..... 16
17
18
19
20
21
22
23

REMARKS:

CONTRACTOR ENPPI CLIENT

0000-000-5-EI-0-850-186-1-X
PAGES 186 PAGE 152

ENPPI

ELECTRICAL MECHANICAL COMPLETION &


PRE-COMMISSIONING CHECK LIST
CONTROL STATIONS.
"PC-CLF (560-01)"

page 1 of 1
PROJECT NAME: COM. NO:560-01
PROJECT NO : SUPPLIER:
AREA : DATE :
ITEM DESCRIPTION YES NO N/A
1 Type of control stations and selector switches
to be checked w.r.t approved documents.
2 Location of control stations are correctly as per
approved documents.
3 Termination of control cables to be checked.

4 Type and size of cable glands to be checked.

5 Insulation resistance of contacts, terminals,


...etc.
(500 v D.C megger, min. 10 M.OHM).
6 Check continuity of contacts.
7 Check weather proofing seal fitted if specified.

8 Control stations are correctly fixed to the


ground.
10 Installation, assembly and fixation of control
stations to be as per installation details and
manufacture's instruction.
REMARKS:

CONTRACTOR ENPPI CLIENT

0000-000-5-EI-0-850-186-1-X
PAGES 186 PAGE 153

APPENDIX 3.0

COMMISSIONING ACTIVITIES

CONTENTS

1.0 GENERAL.

2.0 ELECTRICAL COMMISSIONING CHECK LIST FORMS.

0000-000-5-EI-0-850-186-1-X
PAGES 186 PAGE 154

COMMISSIONING ACTIVITIES

1.0 GENERAL

The commissioning activities will follow the mechanical completion and


precommissioning stages (the works have been mechanically
completed,inspected, cleaned, made good and precommissioned for efficient
operation in accordance with the specification and approved documents ).
The commissioning activities associated with initial operation of the electrical
systems as a part of the plant including necessary adjustment and
maintenance. Item 2.0 include all the electrical commissioning forms which
indicates the checks required to be made for the electrical equipment and
materials.
The commissioning checks shall be carried out by the electrical construction
contractor or equipment's supplier under supervision from the client, the main
contractor or suppliers (according to the contract bases).

0000-000-5-EI-0-850-186-1-X
PAGES 186 PAGE 155

2.0 LIST OF ELECTRICAL COMMISSIONING CHECK


LIST FORMS :
COMM. NO DESCRIPTION CHECK LIST NO
500-02 PACKAGE EQUIPMENT C-CLF(500-02)
500-03 MOTORS. C-CLF(500-03)
510-01 OVER HEAD LINES. C-CLF(510-01)
(HOLD)
510-02 POWER TRANSFORMER C-CLF(510-02)
510-03 M.V SWG & MOTOR CONTROL GEAR. C-CLF(510-03)
510-04 L.V SWG & MOTOR C-CLF(510-04)
CONTROL CENTER.
510-05 M.V INDEPENDENT C-CLF(510-05)
CIRCUIT BREAKER.
510-06 A.C GENERATOR. C-CLF(510-06)
510-07 L.V BUS TRUNKING C-CLF(510-07)
(HOLD)
510-08 BATTERY AND CHARGER C-CLF(510-08)
ASSEMBLIES.
510-10 NAVIGATIONAL AIDS. C-CLF(510-10)
510-11 HEAT TRACING SYSTEM. C-CLF(510-11)
510-12 UNINTERRUPTABLE POWER SUPPLY. C-CLF(510-12)
510-13 SMALL POWER DISTRIBUTION PANEL C-CLF(510-13)
510-14 RING MAIN UNITS. C-CLF(510-14)
510-15 SYNOPTIC CONTROL PANEL. C-CLF(510-15)
510-16 ELECT. POWER MODULES C-CLF(510-16)
(HOLD)
510-17 LTV EXPLOSION PROOF C-CLF(510-17)
SWITCHBACKS.
510-18 SOLAR SYSTEM POWER SUPPLY. C-CLF(510-18)
(HOLD)
510-19 FREQUENCY CONVERTS. C-CLF(510-19)
(HOLD)
510-21 POWER FACTOR CORRECTION C-CLF(510-21)
EQUIPMENTS.
520-01 LTG AND SMALL POWER SYSTEM. C-CLF(520-01)
560-01 CONTROL STATION. C-CLF(560-01)

0000-000-5-EI-0-850-186-1-X
PAGES 186 PAGE 156

ENPPI
ELECTRICAL COMMISSIONING CHECK LIST
PACKAGE EQUIPMENT.
"C-CLF (500-02)"
Page 1 of 1
PROJECT NAME: COM. NO:500-02
PROJECT NO : SUPPLIER:
AREA : DATE :
ITEM DESCRIPTION YES NO N/A
1 Vendor document to checked for
commissioning and start-up instructions
2 Calibration test certificate of testing equipment
to be checked.
3 BATTERIES AND CHARGER :-
Refer to C-CLF (510-08).
4 LIGHTING SYSTEM :-
Refer to C-CLF (520-01).
5 ELECTRICAL POWER DISTRIBUTION
BOARD(S) :- Refer to C-CLF (510-13) and
C-CLF (510-04).
6 LOCAL MOTOR CONTROL STATIONS :-
Refer to C-CLF (530-01).
7 MOTORS :-
Refer to C-CLF (500-03).
8 Approved test result record forms to be used.
9
10
11
12
13
14
15
16
REMARKS:

CONTRACTOR ENPPI CLIENT

0000-000-5-EI-0-850-186-1-X
PAGES 186 PAGE 157

ENPPI
ELECTRICAL COMMISSIONING CHECK LIST.
MOTORS.
"C-CLF (500-03)"
page 1 of 2
PROJECT NAME: COM. NO: 500-03
PROJECT NO : SUPPLIER:
AREA : DATE :
ITEM DESCRIPTION YES NO N/A
1 Vendor document to checked for
commissioning and start-up instructions
2 Calibration test certificate of testing equipment
to be checked.
3 Running test of two hours and maintain
constant check of bearing and housing temp. to
detect abnormal temp raise or vibration.
4 Check that all instrument such as : oil level
indicators are calibrated and functioning
correctly (applicable to H.V motors).
5 Measure the terminals voltage and line current
of the free running motors.
6 Functional checking of motors from remote
locations such as: control room and local
control
stations.
7 Test report including test results and test
acceptance criteria values to be attached
with commissioning check list forms.
REMARKS:

CONTRACTOR ENPPI CLIENT

0000-000-5-EI-0-850-186-1-X
PAGES 186 PAGE 158

ENPPI
ELECTRICAL COMMISSIONING CHECK LIST.
MOTORS.
"C-CLF (500-03)"
page 2 of 2
PROJECT NAME: COM. NO: 500-03
PROJECT NO : SUPPLIER:
AREA : DATE :
ITEM DESCRIPTION YES NO N/A
8 Check functional operation of space heater.
9 Approved test result record forms to be used.

10 Check functional operation of control circuits and


protection devices (protection setting to be
checked).
11 Inspection, testing and functional checks to be
performed according to supplier instructions :-
11.1

11.2

11.3

11.4

11.5

12

13

14

15

16

REMARKS:

CONTRACTOR ENPPI CLIENT

0000-000-5-EI-0-850-186-1-X
PAGES 186 PAGE 159

ENPPI
ELECTRICAL COMMISSIONING CHECK LIST.
POWER TRANSFORMER.
"C-CLF 510-02)"
page 1 of 2
PROJECT NAME: COM. NO:510-02
PROJECT NO : SUPPLIER:
AREA : DATE :
ITEM DESCRIPTION YES NO N/A
1 Vendor document to checked for
commissioning and start-up instructions
2 Calibration test certificate of testing equipment
to be checked.
3 check fan controls.
4 Check alarm indications.
5 Check no load and full load voltages at main
bus.
6 Mechanical and electrical operation of aux.
devices such as: tap changer, breathers, shut
off valves, meters, temp. indicators,
relays,....etc. to be checked.
7 Check with transformer energized at rated
voltage record tap position and secondary open
circuit voltage at switch board terminals.
8 Test reports including test results and
acceptance certificate values to be attached with
commissioning check list forms.
9 Check alarm and trip controls for proper
operation.
10 Inspection, testing and functional checks to be
performed according to supplier instructions.
11 Approved test result record forms to be used.

REMARKS:

CONTRACTOR ENPPI CLIENT

0000-000-5-EI-0-850-186-1-X
PAGES 186 PAGE 160

ENPPI
ELECTRICAL COMMISSIONING CHECK LIST.
POWER TRANSFORMER.
"C-CLF (510-02)"
page 2 of 2
PROJECT NAME: COM. NO:510-02
PROJECT NO : SUPPLIER:
AREA : DATE :
ITEM DESCRIPTION YES NO N/A
12 Check for correct phase, rotation and polarity
before energizing.
13

14

15

16

17

18

19

20

21

22

23

24

25

REMARKS:

CONTRACTOR ENPPI CLIENT

0000-000-5-EI-0-850-186-1-X
PAGES 186 PAGE 161

ENPPI
ELECTRICAL COMMISSIONING CHECK LIST.
M.V SWITCHGEAR AND MOTOR CONTROL GEAR
"C-CLF (510-03)"
page 1 of 2
PROJECT NAME: COM. NO: 510-03
PROJECT NO : SUPPLIER:
AREA : DATE :
ITEM DESCRIPTION YES NO N/A
1 Calibration test certificate of testing equipment
to be checked.
2 Approved test result record forms to be used.
3 Test and calibration of all relays and, meters
using secondary injection & setting of all
protective devices to be checked w.r.t
approved documents.
4 Check operation and function of C.B's(
outgoing, bus-tie, ...etc) and motor starters.
5 Check breaker electrical indications at all
positions.
6 Functional checking of switchgear from remote
locations such as: control room, motor local
control stations.
7 Check function operation of space heaters.

8 Check alarm and trip indication of protection


and control signaling.
9 Test report including test results and test
acceptance certificate values to be attached
with commissioning check list forms.
10 Inspection, testing and functional checks to be
performed according to supplier instructions.
REMARKS:

CONTRACTOR ENPI CLIENT

0000-000-5-EI-0-850-186-1-X
PAGES 186 PAGE 162

E N P P.I
ELECTRICAL COMMISSIONING CHECK LIST.
MV SWITCHER AND MOTOR CONTROL GEAR
"C-CLEF (510-03)"
Page 2 of 2
PROJECT NAME: COM. NO: 510-03
PROJECT NO : SUPPLIER:
AREA : DATE :
ITEM DESCRIPTION YES NO N/A
11 Check operation of truck/tray aux. contacts.

12 Check bus bar and circuit shutters.

13 Check D.C. system Refer to C CLEF (510-08).

14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
REMARKS:

CONTRACTOR ENPI CLIENT

================================================================
0000-000-5-EI-0-850-186-1-X
PAGES 186 PAGE 163

ENPPI
ELECTRICAL COMMISSIONING CHECK LIST.
L.V SWITCHGEAR AND MOTOR CONTROL CENTER.
"C-CLF (510-04)"
page 1 of 2
PROJECT NAME: COM. NO: 510-04
PROJECT NO : SUPPLIER:
AREA : DATE :
ITEM DESCRIPTION YES NO N/A
1 Calibration test certificate of testing equipment
to be checked.
2 Approved test result record forms to be used.

3 Test and calibration of all relays and, meters


using secondary injection & setting of all
protective devices to be checked w.r.t
approved
documents.
4 Check operation and function of C.B's(
outgoing, and motor starters).
5 Check breaker electrical indications at all
positions.
6 Functional checking of switchgear from remote
locations such as: control room, motor local
control stations.
7 Check function operation of space heaters.

8 Check alarm and trip indication of protection


and control signaling.
9 Test report including test results and acceptance
criteria values to be attached with
commissioning check list forms.
10 Inspection, testing and functional checks to be
performed according to supplier instructions .
REMARKS:

CONTRACTOR ENPPI CLIENT

0000-000-5-EI-0-850-186-1-X
PAGES 186 PAGE 164

ENPPI
ELECTRICAL COMMISSIONING CHECK LIST.
L.V SWITCHGEAR AND MOTOR CONTROL CENTER.
"C-CLF (510-04)"
page 2 of 2
PROJECT NAME: COM. NO: 510-04
PROJECT NO : SUPPLIER:
AREA : DATE :
ITEM DESCRIPTION YES NO N/A
11 Check operation of truck/tray aux. contacts

12 Check bus bar and circuit shutters.

13 Check D.C system Refer to C-CLF (510-08).

14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
REMARKS:

CONTRACTOR ENPPI CLIENT

0000-000-5-EI-0-850-186-1-X
PAGES 186 PAGE 165

ENPPI
ELECTRICAL COMMISSIONING CHECK LIST.
M.V INDEPENDENT CIRCUIT BREAKERS.
"C-CLF (510-05)"
page 1 of 2
PROJECT NAME: COM. NO: 510-05
PROJECT NO : SUPPLIER:
AREA : DATE :
ITEM DESCRIPTION YES NO N/A
1 Calibration test certificate of testing equipment
to be checked.
2 Approved test result record forms to be used.

3 Test and calibration of all relays and, meters


using secondary injection & setting of all
devices to be checked w.r.t approved
documents.
4 Check operation and function of C.B's(
outgoing, bus-tie, ...etc) and motor starters.
5 Check breaker electrical indications at all
positions.
6 Functional checking of switchgear from remote
locations such as: control room, motor local
control stations.
7 Check function operation of space heaters.

8 Check alarm and trip indication of protection


and control signaling.
9 Test report including test results and test
acceptance certificate values to be attached
with commissioning check list forms.
10 Inspection, testing and functional checks to be
performed according to supplier instructions .
REMARKS:

CONTRACTOR ENPPI CLIENT

0000-000-5-EI-0-
850-186-1-X
PAGES 186 PAGE 166

ENPPI
ELECTRICAL COMMISSIONING CHECK LIST.
M.V INDEPENDENT CIRCUIT BREAKERS.
"C-CLF (510-05)"
page 2 of 2
PROJECT NAME: COM. NO: 510-05
PROJECT NO : SUPPLIER:
AREA : DATE :
ITEM DESCRIPTION YES NO N/A
11 Check operation of truck/tray aux. contacts.

12 Check bus bar and circuit shutters.

13 Check D.C system Refer to C-CLF (510-08).

14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
REMARKS:

CONTRACTOR ENPPI CLIENT

0000-000-5-EI-0-850-186-1-X
PAGES 186 PAGE 167

ENPPI
ELECTRICAL COMMISSIONING CHECK LIST.
A.C GENERATOR .
"C-CLF (510-06)"
page 1 of 3
PROJECT NAME: COM. NO: 510-06
PROJECT NO : SUPPLIER:
AREA : DATE :
ITEM DESCRIPTION YES NO N/A
1 Calibration test certificate of testing equipment
to be checked.
2 Functional checking of A.C generator from
remote location such as : control panel.
3 Test report including test results and test criteria
values to be attached with commissioning
check list forms.
4 Inspection, testing and functional checks to be
performed according to supplier instructions.
5 Check operation and function of C.B's, relays,
indicators, protection devices,.....etc.
6 Approved test result record forms to be used.

7 Pre-synchronizing checks (generator


running, no-load).
7.1 Open circuit tests: verify the excitation system
and generator C/C's by gradually increasing
excitation and check output voltage against
exci-
tation current.
7.2 Synchronizing circuit checks: verify that
operation of the synchroscope, voltmeter i.e.
the difference between generator and network
frequency and voltage
REMARKS:

CONTRACTOR ENPPI CLIENT

0000-000-5-EI-0-850-186-1-X
PAGES 186 PAGE 168

ENPPI
ELECTRICAL COMMISSIONING CHECK LIST.
A.C GENERATOR.
"C-CLF (510-06)"
page 2 of 3
PROJECT NAME: COM. NO: 510-06
PROJECT NO : SUPPLIER:
AREA : DATE :
ITEM DESCRIPTION YES NO N/A
7.3 Generator phase rotation: verify phase rotation
of
generator by means of an L.V phase rotation
meter.
7.4 Protection tests:
- Differential relay stability check.
- Differential relay sensi tivity check.
- Other items of protection and indication
devices may also be verified at this time if
not already done by primary current injection.
- Over speed test.
- Over temp. test.
- Vibration measurement.
- Noise level test.
8 Post synchronizing checks (generator
running, loaded).
8.1 Synchronize test to grid. (As interfacing with
L.V swg)
8.2 Function tests: the following shall be
confirmed:
- Auto and manual synchronizing
- Control of power factor over full range of
power generation.
- The change over of AVR from power factor to
voltage control.
- Over load test.
8.3 12 hours full load test.
9 Protection tests:
9.1 Functions of governor to be checked.

REMARKS:

CONTRACTOR ENPPI CLIENT

0000-000-5-EI-0-850-186-1-X
PAGES 186 PAGE 169

ENPPI
ELECTRICAL COMMISSIONING CHECK LIST.
A.C GENERATOR.
"C-CLF (510-06)"
page 3 of 3
PROJECT NAME: COM. NO: 510-06
PROJECT NO : SUPPLIER:
AREA : DATE :
ITEM DESCRIPTION YES NO N/A
9.2 The operation of the reverse power relay to be
verified by decreasing the governor setting.
9.3 The operation of the field failure relay to be
verified by decreasing the excitation at
minimum load. setting.
9.4 Functions of AVR to be checked.
10 Check D.C system Refer to C-CLF (510-08).

11 Check enclosure or package of A.C generator


Refer to C-CLF (500-02).
12 All related mechanical checks and functions to
be verified.
13

14

15

16

17

18

19

REMARKS:

CONTRACTOR ENPPI CLIENT

0000-000-5-EI-0-850-186-1-X
PAGES 186 PAGE 170

ENPPI
ELECTRICAL COMMISSIONING CHECK LIST.
BATTERIES AND BATTERY CHARGER.
"C-CLF (510-08)"
page 1 of 2
PROJECT NAME: COM. NO: 510-08
PROJECT NO : SUPPLIER:
AREA : DATE :
ITEM DESCRIPTION YES NO N/A
1 Calibration test certificate of testing equipment
to be checked.
2 Approved test result record forms to be used.

3 Check equipment/ ventilation interlock.

4 Inspection, testing and functional checks to be


performed according to supplier instructions.
5 Check operation of room exha ust, ventilation
and controls.
6 Check correct operation and function of the
following :
a) Indication lamps.
b) Pushbuttons.
c) Indicating instrument.
d) Alarms of each charger and batteries.
e) Protection of each charger and batteries.
7 Load test at different loads.
8 Check correct operation of all indication lamps
and remote indications.
REMARKS:

CONTRACTOR ENPPI CLIENT

0000-000-5-EI-0-850-186-1-X
PAGES 186 PAGE 171

ENPPI
ELECTRICAL COMMISSIONING CHECK LIST.
BATTERIES AND BATTERY CHARGER.
"C-CLF (510-08)"
page 2 of 2
PROJECT NAME: COM. NO: 510-08
PROJECT NO : SUPPLIER:
AREA : DATE :
ITEM DESCRIPTION YES NO N/A
9 Check connected loads to ensure that it is still
accordance with approved documents.
10 Test report including test results and test criteria
values to be attached with commissioning
check list forms.
11 Inspection, testing and functional checks to be
performed according to supplier instructions.
12 Check operation and function of C.B's, relays,
indicators, protection devices,.....etc.
13 Check function operation of space heaters.

14 Check the rectifier system shall meet the sound


pressure limits as specified in the approved
document.
15

16

17

18

19

20

REMARKS:

CONTRACTOR ENPPI CLIENT

0000-000-5-EI-0-850-186-1-X
PAGES 186 PAGE 172

ENPPI
ELECTRICAL COMMISSIONING CHECK LIST.
NAVIGATION AIDS SYSTEM.
"C-CLF (510-10)"
page 1 of 2
PROJECT NAME: COM. NO: 510-10
PROJECT NO : SUPPLIER:
AREA : DATE :
ITEM DESCRIPTION YES NO N/A
1 Approved test result record forms to be used.
2 Check of all power, control, auxiliary circuits
and equipment.
3 Tests shall be carried out on the completed
equipment and not limited to the following:
* charger/batteries tests. and functional
operation, interlocks,..etc
* operation of white lights, including lamp
changeover.
* operation of subsidiary lights including lamp
changeover.
* synchronizing between existing and new
equipments.
* operation of fog horns,helideck lights,...etc.
* Operation of controls & alarms on battery
charger
* Photo-cell control operation.
4 Check operation of protective devices such as :
* Battery earth fault alarm.
* Charge failure alarm.
* D.C over and under voltage alarms.
* Battery charger rectifier failure alarm.
5 Test report including test results and test criteria
values to be attached with commissioning
check list forms.
REMARKS:

CONTRACTOR ENPPI CLIENT

0000-000-5-EI-0-850-186-1-X
PAGES 186 PAGE 173

ENPPI
ELECTRICAL COMMISSIONING CHECK LIST.
NAVIGATION AIDS SYSTEM .
"C-CLF (510-10)"
page 2 of 2
PROJECT NAME: COM. NO: 510-10
PROJECT NO : SUPPLIER:
AREA : DATE :
ITEM DESCRIPTION YES NO N/A
Calibration test certificate of testing equipment to be
checked.
8 Check operation and function of C.B's, relays, indicators,
protection devices,.....etc.
9 Inspection, testing and functional checks to be performed
according to supplier instructions.
10

11

12

13

14

15

16

17

18

19

20

REMARKS:

CONTRACTOR ENPPI CLIENT

0000-000-5-EI-0-850-186-1-X
PAGES 186 PAGE 174

ENPPI
ELECTRICAL COMMISSIONING CHECK LIST.
HEAT TRACING SYSTEM .
"C-CLF (510-11)"
page 1 of 1
PROJECT NAME: COM. NO: 510-11
PROJECT NO : SUPPLIER:
AREA : DATE :
ITEM DESCRIPTION YES NO N/A
1 Calibration test certificate of testing equipment
to be checked.
2 Check correct operation of all indication lamps
and remote indications.
3 Approved test result record forms to be used.

4 Inspection, testing and functional checks to be


performed according to supplier instructions.
5 Check operation and function of C.B's, relays,
indicators, protection devices,.....etc.
6 Test report including test results and test
acceptance criteria values to be attached with
commissioning check list forms.
7

10

11

12

REMARKS:

CONTRACTOR ENPPI CLIENT

0000-000-5-EI-0-850-186-1-X
PAGES 186 PAGE 175

ENPPI
ELECTRICAL COMMISSIONING CHECK LIST.
UNINTERRUPTABLE POWER SUPPLY.
C-CLF (510-12)"
page 1 of 2
PROJECT NAME: COM. NO: 510-12
PROJECT NO : SUPPLIER:
AREA : DATE :
ITEM DESCRIPTION YES NO N/A
1 Calibration test certificate of testing equipment
to be checked.
2 Approved test result record forms to be used.

3 Check equipment/ ventilation interlock.

4 Check operation of room exhaust, ventilation


and controls.
5 Check correct operation and function of the
following :
a) Indication lamps.
b) Pushbuttons.
c) Indicating instrument.
d) Alarms of each inverter, charger and
batteries.
e) Protection of each inverter, charger and
batteries.
6 Load test at different loads.
7 Check inverter output voltage and frequency
regulation test at varying U.P.S power factor.
8 Check connected loads to ensure that it is still in
accordance with approved documents.
9 Test report including test results and test
acceptance certificate values to be attached
with commissioning check list forms.
REMARKS:

CONTRACTOR ENPPI CLIENT

0000-000-5-EI-0-850-186-1-X
PAGES 186 PAGE 176

ENPPI
ELECTRICAL COMMISSIONING CHECK LIST.
UNINTERRUPTABLE POWER SUPPLY.
"C-CLF (510-12)"
page 2 of 2
PROJECT NAME: COM. NO: 510-12
PROJECT NO : SUPPLIER:
AREA : DATE :
ITEM DESCRIPTION YES NO N/A
10 Check function operation of space heaters.
11 Inspection, testing and functional checks to be
performed according to supplier instructions.
12 Check alarm and trip indication of protection
and control signaling.
13 Check operation and functions of BY-PASS
circuits.
14 Check operation and functions
of TRANSFER SWITCH circuits.
15 Check functions of INVERTER CIRCUITS
operation.
16 Check D.C system Refer to C-CLF (510-08).

17 Check the rectifier system shall meet the sound


pressure limits as specified in the approved
document.
18

19

20

21

22

REMARKS:

CONTRACTOR ENPPI CLIENT

0000-000-5-EI-0-850-186-1-X
PAGES 186 PAGE 177

ENPPI
ELECTRICAL COMMISSIONING CHECK LIST.
SMALL POWER DISTRIBUTION PANEL.
"C-CLF (510-13)"
page 1 of 2
PROJECT NAME: COM. NO: 510-13
PROJECT NO : SUPPLIER:
AREA : DATE :
ITEM DESCRIPTION YES NO N/A
1 Calibration test certificate of testing equipment
to be checked.
2 Approved test result record forms to be used.

3 Test and calibration of all relays and, meters


using primary and secondary injection &
setting of all protective devices to be checked
w.r.t
approved documents.
4 Check operation and function of C.B's(
outgoing, and motor starters).
5 Check breaker electrical indications at all
positions.
6 Functional checking of switchgear from remote
locations such as: control room, motor local
control stations.
7 Check function operation of space heaters.

8 Test report including test results and test criteria


values to be attached with commissioning
check list forms.
9 Check alarm and trip indication of protection
and control signaling.
10 Inspection, testing and functional checks to be
performed according to supplier instructions.
REMARKS:

CONTRACTOR ENPPI CLIENT

0000-000-5-EI-0-850-186-1-X
PAGES 186 PAGE 178

ENPPI
ELECTRICAL COMMISSIONING CHECK LIST.
SMALL POWER DISTRIBUTION PANEL.
"C-CLF (510-13)"
page 2 of 2
PROJECT NAME: COM. NO: 510-13
PROJECT NO : SUPPLIER:
AREA : DATE :
ITEM DESCRIPTION YES NO N/A
11 Check bus bar and circuit shutters.

12 Check operation of truck/tray aux. contacts.

13 Check D.C system Refer to C-CLF(510-08).

14

15

16

17

18

19

20

21

22

23

24

25

REMARKS:

CONTRACTOR ENPPI CLIENT

0000-000-5-EI-0-850-186-1-X
PAGES 186 PAGE 179

ENPPI
ELECTRICAL COMMISSIONING CHECK LIST.
RING MAIN UNITS.
"C-CLF (510-14)"
page 1 of 2
PROJECT NAME: COM. NO: 510-14
PROJECT NO : SUPPLIER:
AREA : DATE :
ITEM DESCRIPTION YES NO N/A
1 Calibration test certificate of testing equipment
to be checked.
2 Approved test result record forms to be used.

3 Test and calibration of all relays and, meters


using primary and secondary injection &
setting of all protective devices to be checked
w.r.t
approved documents.
4 Check operation and function of C.B's, L.B.S's
and outgoing.
5 Check breaker electrical indications at all
positions.
6 Functional checking of R.M.U's from remote
locations such as: control room, motor local
control stations.
7 Check function operation of space heaters.

8 Check alarm and trip indication of protection


and control signaling.
9 Test report including test results and test criteria
values to be attached with commissioning
check list forms.
10 Inspection, testing and functional checks to be
performed according to supplier instructions.
REMARKS:

CONTRACTOR ENPPI CLIENT

0000-000-5-EI-0-850-186-1-X
PAGES 186 PAGE 180

ENPPI
ELECTRICAL COMMISSIONING CHECK LIST.
RING MAIN UNITS.
"C-CLF (510-14)"
page 2 of 2
PROJECT NAME: COM. NO: 510-14
PROJECT NO : SUPPLIER:
AREA : DATE :
ITEM DESCRIPTION YES NO N/A
11 Check bus bar and circuit shutters.

12 Check operation of truck/tray aux. contacts.

13 Check D.C system Refer to C-CLF (510-08).

14

15

16

17

18

19

20

21

17

18

19

20

REMARKS:

CONTRACTOR ENPPI CLIENT

0000-000-5-EI-0-850-186-1-X
PAGES 186 PAGE 181

ENPPI
ELECTRICAL COMMISSIONING CHECK LIST.
SYNOPTIC CONTROL PANEL.
"C-CLF (510-15)"
page 1 of 1
PROJECT NAME: COM. NO: 510-15
PROJECT NO : SUPPLIER:
AREA : DATE :
ITEM DESCRIPTION YES NO N/A
1 Calibration test certificate of testing equipment
to be checked.
2 Approved test result record forms to be used.
3 Functional checking of synoptic control panel
and all related elect. equipment such as :
M.Vswitchgear & low voltage M.C.C,...etc.
4 Check function operation of space heaters.

5 Check alarm and trip indication of protection


and control signaling.
6 Test report including test results and test criteria
values to be attached with commissioning
check list forms.
7 Inspection, testing and functional checks to be
performed according to supplier instructions.
8 Check D.C system Refer to C-CLF (510-08).

9 Function check of all meters and selector


switches.
10 Operation of aux. contacts to be Checked.

11

12

REMARKS:

CONTRACTOR ENPPI CLIENT

0000-000-5-EI-0-850-186-1-X
PAGES 186 PAGE 182

ENPPI
ELECTRICAL COMMISSIONING CHECK LIST.
LOW VOLTAGE EXPLOSION PROOF SWITCHRACK.
"C-CLF (510-17)"
page 1 of 2
PROJECT NAME: COM. NO: 510-17
PROJECT NO : SUPPLIER:
AREA : DATE :
ITEM DESCRIPTION YES NO N/A
1 Calibration test certificate of testing equipment
to be checked.
2 Approved test result record forms to be used.

3 Test and calibration of all relays and, meters


using primary and secondary injection &
setting of all protective devices to be checked
w.r.t
approved documents.
4 Check operation and function of C.B's(
outgoing, and motor starters).
5 Check breaker electrical indications at all
positions.
6 Functional checking of switch- rack from
remote locations such as: control room, motor
local
control stations.
7 Check function operation of space heaters.
8 Check alarm and trip indication of protection
and control signaling.
9 Test report including test results and test criteria
values to be attached with commissioning
check list forms.
10 Inspection, testing and functional checks to be
performed according to supplier instructions.
REMARKS:

CONTRACTOR ENPPI CLIENT

0000-000-5-EI-0-850-186-1-X
PAGES 186 PAGE 183

ENPPI
ELECTRICAL COMMISSIONING CHECK LIST.
LOW VOLTAGE EXPLOSION PROOF SWITCHRACK.
"C-CLF (510-17)"
page 2 of 2
PROJECT NAME: COM. NO: 510-17
PROJECT NO : SUPPLIER:
AREA : DATE :
ITEM DESCRIPTION YES NO N/A
11 Check bus bar and circuit shutters.

12 Check operation of truck/tray aux. contacts.

13 Check D.C system Refer to C-CLF (510-08).

14

15

16

17

18

19

20

21

22

23

24

25

REMARKS:

CONTRACTOR ENPPI CLIENT

0000-000-5-EI-0-850-186-1-X
PAGES 186 PAGE 184

ENPPI
ELECTRICAL COMMISSIONING CHECK LIST.
POWER FACTOR CORRECTION EQUIPMENT.
"C-CLF (510-21)"
page 1 of 1
PROJECT NAME: COM. NO: 510-21
PROJECT NO : SUPPLIER:
AREA : DATE :
ITEM DESCRIPTION YES NO N/A
1 Check function operation of power factor
regulator.
2 Mechanical and electrical operation of all
functional parts to be checked.
3 Test report including test results and test criteria
values to be attached with commissioning
check list forms.
4 Inspection, testing and functional checks to be
performed according to supplier instructions.
5

10

11

12

13

REMARKS:

CONTRACTOR ENPPI CLIENT

0000-000-5-EI-0-850-186-1-X
PAGES 186 PAGE 185

ENPPI
ELECTRICAL COMMISSIONING CHECK LIST.
LIGHTING AND SMALL POWER.
"C-CLF (520-01)"
page 1 of 1
PROJECT NAME: COM. NO: 520-01
PROJECT NO : SUPPLIER:
AREA : DATE :
ITEM DESCRIPTION YES NO N/A
1 Illumination levels of out door and indoor
locations to be measured and compared w.r.t
approved documents.
2 Check functional operation of photo-cells.
3 Normal lighting shall be momentirily
interrupted for checking of functional operation
of
emergency lighting system.
4 Test report including test results and test
acceptance criteria values to be attached with
commissioning check list forms.
5
6
7
8
9
10
11
12
13
14
15
16
REMARKS:

CONTRACTOR ENPPI CLIENT

0000-000-5-EI-0-850-186-1-X
PAGES 186 PAGE 186

ENPPI
ELECTRICAL COMMISSIONING CHECK LIST.
CONTROL STATIONS.
"C-CLF (560-01)"
page 1 of 1
PROJECT NAME: COM. NO: 560-01
PROJECT NO : SUPPLIER:
AREA : DATE :
ITEM DESCRIPTION YES NO N/A
1 Approved test result record forms to be used.
2 Check functional operation of control stations
and selector switches from remote or local
locations.
3 Check functional operation of indication lamps
or ammeters.
4 Inspection, testing and functional checks to be
performed according to supplier instructions.
5 Check selector switch operation and locking
facilities.
6 Test report including test results and test criteria
values to be attached with commissioning
check list forms.
7
8
9
10
11
12
13
14
15
REMARKS:

CONTRACTOR ENPPI CLIENT

0000-000-5-EI-0-850-186-1-X

You might also like