PIC-8192

Project Manager-ABC Engr. Ehab SRCM: Engr -Mohammad Tariq


Construction manager- Eng Heny
SRCE - Engr. Ivo Esong
ABC
Date - 07-02-2024
HSE Manager -ABC Eng Sameer A.R RCE Civil -Engr - Rafiq Ahmed Sayed-
Electrical Manager-ABC Eng John HSE Rep - Engr Tasleem Location-PIc-8192

No: OBSERVATION(S) Compliance- ACTION BY

Telehandler carrying the loose All telehandler operators have been


materials at unsafe position,Advise trained and instructed not to raise
the operator to always tie-off the the boom to its maximum height
loose materials and always down
the fork while shifting the
materials.

1. |

Scaffolding fixed with the green tag


and worker performing the activity The worker was immediately removed
at unsafe and incomplete working from the scaffold and thereafter
platform,Immediately called provided with training. A red tag was
attention to the CTR team to placed on the scaffold.
remove the green tag and asked
scaffolding team to complete the
scaffolding and scaffolding
inspector need to be inspected
2.

Page 1 of 5 Rev. 0 [May - 2020] OHSMS Approved Document


2.23-F01 LEADERSHIP SAFETY INSPECTION & WALKTHROUGH

Flagman assigned with the Training has been given to the


telehandler without specific flagman.
training for the flagman,Advise the
site engineer prior to assign the
flagman with equipment must
be trained from safety department
and specific sticker need to be
3. provided for the
training.

Working is performing the activity Given the proper work at height


without complete protection of training and educate the
leading edges,Immediately called subcontractor about the work at
attention to the site engineer to height work.
stop the activity and
provide the complete protection
for the leading edges
and also provide the refresher
training to the worker.
4.

Unsafe access provided by using Access planks are being installed at


the single planks to the the required locations,but sometimes
villa entrance also ,Advise the Site Area needs to be compacted when
engineer to make the construction or soil work is being
proper access for the entrance of carried out then access needs to be
villas and no materials removed.
5.
need to be stored at the entrance.

Wheel loader observed with the The leak in the wheel loader has been
hydraulic leakage working at fixed.
site,Advise the operator to asked
the maintenance team to check
and fix the leakage issue
6.

Page 2 of 5 Rev. 0 [May - 2020] OHSMS Approved Document


2.23-F01 LEADERSHIP SAFETY INSPECTION & WALKTHROUGH

Protruding Rebars fix for the Rebar caps have been


support of farm work exposing the
hazard,Advise the site engineer to installed.
fix the Rebars cap.

7.

Scaffolding observed at site without The Red tag has been installed on
inspection tag,Discuss the issue the scaffold.
with CTR Site engineer all the
scaffolding need to be fixed with
the inspection tag
8.

Contractor worker directly inserted The damaged cable has been


the wire to the socket and also confiscated and then placed in a
using the substandard specific location.
socket,Immediately called attention
to the CTR SM to confiscate the
substandard power socket and also
asked competent electrician to fix
the plug.
9.

Worker is operating the roller


compactor but hear and
The roller compactor has been
hand protection is not available
with the worker,roller standby in specific place until
compactor is producing more noise its rotating parts are fixed with
and vibration,Worker need to be mechanical personnel.
provided with required
ppe's and also regular breaks need
10.
to be provided because worker is
continuously exposing to the Hand
arm vibration hazard.Plate
compactor using by contractor with
exposed rotating
parts which may lead to the
entanglement while using the
rotating parts needs to be covered.

Page 3 of 5 Rev. 0 [May - 2020] OHSMS Approved Document


2.23-F01 LEADERSHIP SAFETY INSPECTION & WALKTHROUGH

Using power socket with missing Confiscated the cable and power
grounding wire and spliced socket and placed at one location.
cable,Competent electrician need
to make the inspection of
connection and spliced cables need
to be Fixed properly.

11.

Contractor worker is using the Work has been halted until an A-type
unsafe working platform ladder is used. Work will not proceed
by using the A-type ladder and until the A type ladder provision.
planks ,Advise the Site engineer to
dismantle the platform and provide
the safe working platform.

12.

Page 4 of 5 Rev. 0 [May - 2020] OHSMS Approved Document


2.23-F01 LEADERSHIP SAFETY INSPECTION & WALKTHROUGH

Water accumulation observed near Rectified it.


to the drinking water
station exposing to the health
hazard and also observed
area without proper
cleaning,Advise the CTR SM to
assign the cleaner to make the
cleaning on daily basis.all
the electrical cables need to be
protected against the
water and accidental damage.

13.

14.
15.
16.
17.
18.
19.
20.
LOSS POTENTIAL: High Medium Low
ACTION LEVEL: Immediate 5 Days 14 Days

COMMENTS LOG:
Closeout
No. Corrective Action Action By Date

Page 5 of 5 Rev. 0 [May - 2020] OHSMS Approved Document