PIC-8192

Project Manager-ABC Engr. Ehab SRCM: Engr -Mohammad Tariq


Construction manager- Eng Heny
SRCE - Engr. Ivo Esong
ABC
Date - 21-03-2024
HSE Manager -ABC Eng Sameer A.R RCE Civil -Engr - Rafiq Ahmed Sayed-
Electrical Manager-ABC Eng John HSE Rep - Engr Tasleem Location-Pic-F-8192-

No OBSERVATION- Compliance- Before


After
Exhaust fan found non- Exhaust fan have
operational inside the been operational.
Toilets.
1.

Page 1 of 4 Rev. 0 [May - 2020] OHSMS Approved Document


2.23-F01 LEADERSHIP SAFETY INSPECTION & WALKTHROUGH

Leading edge
protection and The damaged ladder
damaged,bent ladder was immediately
fix for the parking removed and
garage but no replaced with new
2.
inspection was ones.
provided.

Rest shelter provided Rest shelter has been


at site was not organized and sign
properly maintained . board has been
posted.

3.

Smoking shelter provided Smoking shelter has been


at site not maintained organized.
properly

4.

Manhole found without Properly Barricade


barricade and signage , the man hole area.
inform to the Lead
Engineer about this
5. issue during the internal
walk down.

Mess hall was not Mess hall should be


properly maintained maintained

6.

Page 2 of 4 Rev. 0 [May - 2020] OHSMS Approved Document


2.23-F01 LEADERSHIP SAFETY INSPECTION & WALKTHROUGH

Scaffold was found Scaffold has been


without tag,inform to dismantled.
the area engineer , it
should be dismantled or
properly maintained inn
7. workplace.

Found waste material in All waste has been


street 32 , informed to removed
the area engineer and
Forman to remove the
waste material to
8. adverse impact on the
environment.

Soil was found Soil has been removed


unattended near the from the workplace.
street #32.
In from to the area
engineer immediate
remove and shift the
9.
temporarily yard area.

Found shuttering Immediate removed


material scattered near and stacked in
the gate area. designated yard area.
Inform to the area
10. engineer to remove this
shuttering immediate
from gate.

Worker was using Good Practice was Good Practice-


proper face shield , observed while
grinder with dead man management walk
switch and handle as down.
well.

11.

12.
13.
14.
15.
Page 3 of 4 Rev. 0 [May - 2020] OHSMS Approved Document
2.23-F01 LEADERSHIP SAFETY INSPECTION & WALKTHROUGH

16.
17.
18.
19.
20.
LOSS POTENTIAL: High Medium Low
ACTION LEVEL: Immediate 5 Days 14 Days

COMMENTS LOG: