5S Audit Checksheet
5S Audit Checksheet
Level of
Criteria for deciding the Level
Judgement Mark %
Level-1 Not being Practiced at all. 0 0%
Level-2 Practiced but not thorough ( Partially Done) 5 20%
Level-3 Created Model Areas within the Zone 10 40%
Level-4 Horizontally Deployed within the Zone 15 60%
Level-5 Can be considered as a Role Model for other Zones 20 100%
5S Audit Check List
Co. Name:- Dawn Motors Pvt. Ltd Zone No. Zone Leader Dy. Leader Date of Audit
Max
Criteria for deciding the Level Marks
4-Jul 5-Jul 6-Jul 7-Jul 8-Jul 9-Jul 10-Jul 11-Jul 12-Jul 13-Jul 14-Jul 15-Jul 16-Jul 17-Jul 18-Jul 19-Jul
Marks Allocation
S.N.
1S Sorting Out
Nothing on Floor, Out Skirt of the factory , Roof ,Walls / Windows sill etc :No Cigarette
1 butts, scrap of paper,tools, parts, bins, chips, oil , etc are lying on the floor & scattered 20
around the factory premises.
Scrap Disposal System & Management : Scrap is disposed off at a regular interval (dust bins
2 overflowing) , Last Clearance Date , Next Due Date & person responsible is displayed & 20
Followed.
No mix up of two different kinds products/ No mix up of OK (Wanted), Rejected
3 20
( Unwanted) Parts/ Mix up of scrap in scrap yard/
No storage of unused/ excess parts like raw material, bought out parts, finished goods
4 20
etc/there is no misuse of components as supports,hammer
Disposal of drums,grinding sludge,paint sludge, spent ( used )oil / coolant , used consumables
5 20
like welding rods,cutting tools,etc
No storage of old machines , equipment's ,old Standards ( not in use) , old Drawings/ parts
6 ( obsolete), old documents( obsolete), old furniture( not in use),old racks inside the factory 20
premise.
Cupboards, almiras,racks drawers are visible and clean/Containers/pallets are clean and free
7 20
from damages.
No documents are pasted on walls,machines / Consumables like packing material , welding
8 20
wire/Adhesive tapes having company logos are used misused
9 There should be no leakges of air, water, oil , gas, sand , granules in any form 20
Rack height, Inventory pile and other stacking to be below 6ft Height: Nothing on the top of
10 20
the rack, under the table , under the machine, below the staircase, similar places etc.
TOTAL MARKS ACHIEVED FOR 1S 200
SCORE FOR 1S = Score / 200 * 100 (%)
S.N. 2S Systematic arrangement 0%
" There is a Place for every thing "Locations for storage of the parts, Documents, tools ,
1 20
equipment etc . are clearly defined & Identified.
"Every thing is in its place "No unidentified parts available. Every thing is available in its pre
2 20
decided location.
3 Parts do not touch each other in containers, trays, bins, trolleys etc. 20
4 Right component in right containers/pallets/ Bins/ Trolleys etc 20
5 Gangways are clearly marked/ no zig zag movement of man & material 20
6 Gangways are free of material, trolleys, bins 20
7 FIFO ( First In & First Out) System is in place. 20
Cleaning tools like Broom, Brush , Small Shovel , Tool for cleaning at Heights are kept
8 20
with proper identification
5S Audit Check List
Co. Name:- Dawn Motors Pvt. Ltd Zone No. Zone Leader Dy. Leader Date of Audit
Max
Criteria for deciding the Level Marks
4-Jul 5-Jul 6-Jul 7-Jul 8-Jul 9-Jul 10-Jul 11-Jul 12-Jul 13-Jul 14-Jul 15-Jul 16-Jul 17-Jul 18-Jul 19-Jul
1 Daily Sweeping and Mopping of the floor is carried out with pre-fixed time intervals 20
2 All toilets are cleaned / Mopped twice a shift 20
3 There is no dust and dirt on products / components / packing materials 20
4 All tools and shadow boards are clean 20
5 All Shelves/ stands /filing cabinets/ tables are clean 20
6 All pallets / trolleys / bins are free from dust 20
7 All material handling equipments are clean 20
8 Windows / pillars / beams are clean 20
9 There is no dust near equipments / machines 20
10 There is no swarf / water / oil underneath the equipment / machines 20
11 There is no dust on top of equipments / machines , shelves 20
12 All lightening facilities are clean ( Tubelight , bulbs ) 20
13 All pipelines ( Pneumatic , water , gas ) / and electrical lines are clean 20
14 There are no oil / coolant stains on sides of equipments / Machines 20
15 There are no fingerprints available on walls or equipment / machine surfaces 20
16 There is no dust / dirt / oil stains on jigs / fixtures / dies 20
17 All pressure gauges / level indicators are clean and visible 20
18 There is no dust on measuring instruments 20
19 There is no dust on display board / documents / files 20
5S Audit Check List
Co. Name:- Dawn Motors Pvt. Ltd Zone No. Zone Leader Dy. Leader Date of Audit
Max
Criteria for deciding the Level Marks
4-Jul 5-Jul 6-Jul 7-Jul 8-Jul 9-Jul 10-Jul 11-Jul 12-Jul 13-Jul 14-Jul 15-Jul 16-Jul 17-Jul 18-Jul 19-Jul
Rating Criteria
Level
of
Criteria for deciding the Level
Judgem
ent Mark %
Level-1 Not being Practiced at all. 0 0%
Level-2 Practiced but not thorough ( Partially Done) 5 25%
Level-3 Created Model Areas within the Zone 10 50%
Level-4 Horizontally Deployed within the Zone 15 75%
Level-5 Can be considered as a Role Model for other Zones 20 100%
5S Audit Check List
Zone Name : Auditor :
Audit Date Auditee :
Sr. Max
Checkpoint Actual Observation
No. Marks
1S Sorting Out
Nothing on Floor, Out Skirt of the factory , Roof ,Walls / Windows sill etc. No
1 Cigarette butts, scrap of paper,tools, parts, bins, chips, oil , etc are lying on the 20
floor & scattered around the factory premises.
5 There should be no leakges of air, water, oil , gas, sand , granules in any form 20
2S Systematic arrangement
" There is a Place for every thing "Locations for storage of the parts, Documents,
1 20
tools , equipment etc . are clearly defined & Identified.
"Every thing is in its place "No unidentified parts available. Every thing is
2 20
available in its pre decided location.
Cleaning tools like Broom, Brush , Small Shovel , Tool for cleaning are
4 20
placed properly.
Visual for fans, tube lights, electrical cabinets, direction of rotation of motors and
7 20
other equipment ,Control Boxes/Safe and Unsafe Zones etc.
5S Zones are marked, Roles and Responsibilities are defined, Zone assessment
8 20
takes place/Notice Board is Updated and Maintained
3S Shine
Daily Sweeping and Mopping of the floor is carried out with pre-fixed time
1 20
intervals
% in 1S
% in 2S
% in 3S
% Overall
Rating Criteria
Level of Judgement Criteria for deciding the Level Mark %
Level-1 Not being Practiced at all. 0 0
Level-2 Practiced but not thorough ( Partially Done) 5 25
Level-3 Created Model Areas within the Zone 10 50
Level-4 Horizontally Deployed within the Zone 15 75
Level-5 Can be considered as a Role Model for other Zones 20 100
No storage of old equipment's ,old documents ( not in use) , old Drawings/ parts,
3 20
old furniture ( not in use), old racks etc.
Cupboards, almiras, racks drawers are visible and clean / Containers, pallets &
4 20
crates are clean and free from damages.
2S Systematic arrangement
" There is a Place for every thing "Locations for storage of the parts, Documents,
1 20
tools , equipment etc . are clearly defined & Identified.
"Every thing is in its place "No unidentified parts available every thing is available
2 20
in its pre decided location.
5 Fans, tube lightes & other electrical equipment, wires are in safe condition. 20
3S Shine
1 Daily Sweeping of the floor is carried out with pre-fixed time intervals. 20
There is no dust and dirt on products, components, packing materials crates, bin
2 20
etc.
3 There is no dust on equipments machines etc. 20
4S Standardize
1 Is 5S Zone structure displayed in zone with with zone leader role & responsibility. 20
5S Sustain
1 Lights are switched off after use. 20
% Overall (Result)
Rating Criteria
Level of Judgement Criteria for deciding the Level Mark %
Level-0 VERY POOR 0 0
Level-1 POOR 5 25
Level-2 GOOD 10 50
Level-3 VERY GOOD 15 75
Level-4 EXCELLENT 20 100
2S Systematic arrangement
The zone has a designated place for everything, such as tools,
jigs, fixtures, rework, rejected materials, etc.
1 20
जोन में हर चीज के लिए जगह निर्धारित हो जैसे टू ल, जिग, फिक्सचर, रिवर्क , रिजेक्ट मटेरियल
इत्यादि
Fans, tube lights & other electrical equipment, wires are in safe
5 condition. 20
पंखे, ट्यूबलाइट और अन्य बिजली उपकरण, तार सुरक्षित स्थिति में हो।
3S Shine
Daily Sweeping of the floor is carried out with pre-fixed time
1 intervals. 20
सुनिश्चित करे की फर्श की सफाई समय से की जाती है।
4S Standardize
Is 5S Zone structure displayed in zone with with zone leader role
& responsibility.
1 20
क्या 5S ज़ोन संरचना को ज़ोन लीडर की भूमिका और जिम्मेदारी के साथ ज़ोन में प्रदर्शित किया
गया है।
5S Sustain
% Overall (Result)
Rating Criteria
Level of Judgement Criteria for deciding the Level Mark %
Level-0 POOR 0 0
Level-1 FAIR 5 25
Level-2 SATISFACTORY 10 50
Level-3 GOOD 15 75
Level-4 EXCELLENT 20 100
Sr. Max
Checkpoint Marks
Actual Observation
No.