Take off sheet 14/06/2014
Tim.Dime. Qty unit Description Tim. Dime. Qty unit description
MA3/037 kichen door
Quartize plastering 1 2.83 H=2.83m
LHS side 0.9 w=0.9m
1 10.65 L=7.65+3=10.65m -2.547 m2
3.2 H=3.20m 29.863 m2 S.Total
34.08 m2 Deduction (living room front side
window ) 1 13.3 L=13.30m
1 1.9 L=1.90m 3.2 H=3.20
1 W=1m 42.56 m2
-1.9 m2 Deduction
Master bedroom
32.18 m2 S.Total bathroom window

1 10.65 RHS side 1 0.66 H=0.66m

3.2 L=7.65+3=10.65m 0.995 W =0.995

34.08 m2 H=3.20m -0.66 m2

Deduction Master bedroom door

1 0.66 H=0.66m 1 2.97 H=2.97

1 L=1m 1.3 W=1.45

-0.66 m2 -3.86 m2

33.42 m2 S.Total main french door

Rear side 1 3.25 L=3.25

1 13.3 L=13.30m 2.86 H=2.86m

3.2 H=3.20m -9.30 m2

42.56 m2 living room door

1 2.86 H=2.86m

3 1.9 L=1.50m 1.3 w= 1.30m

1.5 H=1.90m -3.72 m2

-8.55 m2 master bedroom Arc

kithen window 0.5 area =3.14*0.5476*/2=0.856m2

1 1.6 H= 1.60m 0.856

1 W=1m 0.4 m2

-1.6 m2
master bedroom

1 0.46 L=0.12*2+0.11*2=0.46m

2.85 H=2.85

1.311 m2

master bedroom triangle

2 3.7 L=3.70m

1.2 H=1.20m

0.5

4.44 m2

5.75 m2 S. Total.

#REF! m2 G. Total

Prepared by:_ HAILE MARIYAM S. Checked by______________


IMPACT INTERNATIONAL ENGINEERS PLC

ኢምፓክት ኢንተርናሽናል ኢንጅ ነር ስ ኃ.የተ.የግ .ማ

BAHIRDAR REALESTATE PROJECT OFFICE

Take off sheet 14/06/2014

Tim. Dime. Qty unit Description Tim. Dime. Qty unit description

MA3/054 Master bedroom


L=5.40*2+3.30*2=17.40
Gypsum plastering 1 17.4 m

1 28.67 L=7.80+2.57+3.50+3.25+4.30+7.25=28.6 3 H=3m

3 H=3m 52.2 m2

86.01 m2 Deduction
Deduction door

living room main door 1 0.9 L=0.90m


L=3m H=2.20m
1 3 2.2

2.8 H=2.80m -1.98 m2

-8.4 m2 Deduction
living room mini door 1 1.5 L=1.50m

1 1.3 L=1.30m 2.8 H=3m

2.8 H=2.80m -4.2 m2

-3.64 m2 master bedroom Arc

living room windows 0.5 area =3.14*0.5476*/2=0.856m2

1 1 L=1m 0.856

1.9 H=1.90m -0.4 m2

-1.9 m2

ditoo 45.592 m2 S.Total

1 1.46 L=1.46m

1.9 H=1.90m 227.768 m2 G.Total

-2.774 m2

MA3/067

69.30 m2 S.Total Gypsum board ceiling

common bath room

modern kitchen 1 2.38 L=2.38m

1 12.2 L=3.30*2+2.80*2=12.20m 1.42 W=1.42m


3 H=3m 3.3796 m2

36.6 m2 Master bath room


deduction 1 2.37 L=2.37m

Doors 2.1 W=2.10m

1 2.8 H=2.80m 4.977 m2

0.9 w=0.90 bedroom 01

-2.52 m2 1 3.47 L=3.47m


openings 3.25 W=3.25m

1 2.2 H=2.20m 11.2775 m2

0.9 w=0.90m bedroom 02

-1.98 m2 1 3.25 L=3.25m


windows 3.23 W=3.23m

1 1.9 H=1.90m 10.4975 m2

1 w=1m Lobby

-1.9 m2 1 3 L=3m

30.20 m2 S.Total 1.2 W=1.20m

Bedroom 01 3.6 m2
L=3.40+2.08+3.30+2.61+1.45=1
1 12.84 2.84m ditto

3 H=3m 1 1.77 L=1.77m


38.52 m2 1.5 W=1.50m

Deduction 2.655 m2

windows master bedroom

1 1.5 L=1.50m 1 2.8 L=2.80m

1.9 H=1.90m 0.58 W=0.58m

-2.85 m2 1.624 m2

Doors ditto

1 0.9 L=0.90m 1 4.1 L=4.1m

2.2 H=2.20m 4.3 W=4.30m

-1.98 m2 17.63 m2

ktchen

33.69 m2 S.Total 1 3.28 L=3.28m

Bed room 02 1.9 W=1.90m

1 12.01 L=3.25+2.94+2.12+2.94+0.76=12.01m 6.232 m2

3 H=3m Dining room

36.03 m2 1 4.55 L=4.55m

deduction 3.28 W=3.28m

windows 14.924 m2

1 1.5 L=1.50m living room

1.9 H=1.90m 1 6.73 L=6.73m

-2.85 m2 3.77 W=3.77m

Doors 25.3721 m2

1 0.9 L=0.90m Deduction

2.2 H=2.20m 1 1.77 L=1.77m

-1.98 m2 0.2 W=0.20m

-0.354 m2

31.20 m2 S.Total

lobby 101.8147 m2 TOTAL

1 9.11 L=3.58+3.50+1.23+0.80=9.11m

3 H=3m summary

27.33 m2 Gypsum plastering


deduction LMA4/053+054
SQ=218.57115m2
door MA3/054 = 227.768m2

3 2.2 H=2.2m quartize plastering

0.9 L=0.90m MA3/037 =125.8153m2

-5.94 m2 MA3/058=133.6398m2
homemade gypsum
Openings board

1 1.2 L=1.20m MA3/067 = 101.815m2

3 W=3m

-3.6 m2

17.79 m2 S.Total

Prepared by:_ HAILE MARIYAM S. Checked by______________


ኢምፓክት ኢንተርናሽናል ኢንጅነርስ ኃ/የተ/የግ/ማህበር
IMPACT INTERNATIONAL ENGINEERS PLC
BAHIRDAR REALESTATE PROJECT

Tel 011-5-51 10 61,058-2-26 49 01/02. Fax 011-5-51 10 36. e-mail iie@ethion

STEEL BAR REINFOR


NO. LOCATION PLOT CODE UNIT
6.00 8.00 10.00
1 Roof floor slab kg 382.16 100.06
2 Wastage 10% 38.22 10.01
S.Total available available

Prepared by:- haile m. sewagegn checked by :-

ኢምፓክት ኢንተርናሽናል ኢንጅነርስ ኃ/የተ/የግ/ማህበር


IMPACT INTERNATIONAL ENGINEERS PLC
BAHIRDAR REALESTATE PROJECT

Tel 011-5-51 10 61,058-2-26 49 01/02. Fax 011-5-51 10 36. e-mail iie@ethion

STEEL BAR REINFOR


NO. LOCATION PLOT CODE UNIT
6.00 8.00 10.00
Roof floor slab
kg
1 beam 0 175.38 0.00
2 Wastage 10% 17.54 0.00
S.Total avialable -

ኢምፓክት ኢንተርናሽናል ኢንጅነርስ ኃ/የተ/የግ/ማህበር


IMPACT INTERNATIONAL ENGINEERS PLC
BAHIRDAR REALESTATE PROJECT

Tel 011-5-51 10 61,058-2-26 49 01/02. Fax 011-5-51 10 36. e-mail iie@ethion


STEEL BAR REINFOR
NO. LOCATION PLOT CODE UNIT
6.00 8.00 10.00
Roof floor slab
kg
1 Staircase 68.67
2 Wastage 10% 6.87 0.00
S.Total available -

Prepared by:- haile m. sewagegn checked by :-

ኢምፓክት ኢንተርናሽናል ኢንጅነርስ ኃ/የተ/የግ/ማህበር


IMPACT INTERNATIONAL ENGINEERS PLC
BAHIRDAR REALESTATE PROJECT

Tel 011-5-51 10 61,058-2-26 49 01/02. Fax 011-5-51 10 36. e-mail iie@ethion

STEEL BAR REINFOR


NO. LOCATION PLOT CODE UNIT
6.00 8.00 10.00
Distrbution or
mager reinfor. In kg
1 first floor slab 101.00
2 Wastage 10% 10.10 0.00
S.Total available 0.00

Prepared by:- haile m. sewagegn checked by :-

ኢምፓክት ኢንተርናሽናል ኢንጅነርስ ኃ/የተ/የግ/ማህበር


IMPACT INTERNATIONAL ENGINEERS PLC
BAHIRDAR REALESTATE PROJECT

Tel 011-5-51 10 61,058-2-26 49 01/02. Fax 011-5-51 10 36. e-mail iie@ethion

STEEL BAR REINFOR


NO. LOCATION PLOT CODE UNIT
6.00 8.00 10.00
1 Hidden beam kg 32.85
2 Wastage 10% 3.29 0.00
S.Total available 0.00
Prepared by:- haile m. sewagegn checked by :-

STEEL BAR REINFOR


NO. LOCATION PLOT CODE UNIT
6.00 8.00 10.00
1 summary kg available available

S.Total - -

********** 10% wastage included for slabs and columns

********** 30% wastage included for roof slab beams for Diam. 16 bars

********** diam. 20 rebar is considerd as full berag


ኃ/የተ/የግ/ማህበር
ENGINEERS PLC
ROJECT

10 36. e-mail iie@ethionet.et

STEEL BAR REINFORCEMENT


12.00 14.00 16.00 20.00
298.67
29.87 0.00 0.00 0.00
328.54 - - -

G.Total 328.54 Kg

approved by:-

ኃ/የተ/የግ/ማህበር
ENGINEERS PLC
ROJECT

10 36. e-mail iie@ethionet.et

STEEL BAR REINFORCEMENT


12.00 14.00 16.00 20.00

10.68 616.39 484.85 CONSIDERED AS FULL BERGA


0.00 1.07 184.92 48.49
- 11.75 801.31 533.34
32.613227513
G.Total 1,346.40 Kg 8
6
ኃ/የተ/የግ/ማህበር 4
ENGINEERS PLC 18
ROJECT

10 36. e-mail iie@ethionet.et


STEEL BAR REINFORCEMENT
12.00 14.00 16.00 20.00

121.87
0.00 24.37 0.00 0.00
- 146.24 - -

G.Total 146.24 Kg
approved by:-

ኃ/የተ/የግ/ማህበር
ENGINEERS PLC
ROJECT

10 36. e-mail iie@ethionet.et

STEEL BAR REINFORCEMENT


12.00 14.00 16.00 20.00

0.00 0.00 0.00 0.00


0.00 0.00 0.00 0.00

G.Total - Kg
approved by:-

ኃ/የተ/የግ/ማህበር
ENGINEERS PLC
ROJECT

10 36. e-mail iie@ethionet.et

STEEL BAR REINFORCEMENT


12.00 14.00 16.00 20.00
56.89
0.00 0.00 5.69 0.00
0.00 0.00 62.58 0.00
G.Total 62.58 Kg
approved by:-

STEEL BAR REINFORCEMENT


12.00 14.00 16.00 20.00
328.54 157.99 863.89 533.34

328.54 157.99 863.89 533.34


ኢምፓክት ኢንተርናሽናል ኢንጅነርስ ኃ/የተ/የግ/ማህበር
IMPACT INTERNATIONAL ENGINEERS PLC
BAHIRDAR REALESTATE PROJECT

Tel 011-5-51 10 61,058-2-26 49 01/02. Fax 011-5-51 10 36. e-mail iie@ethion

STEEL BAR REINFOR


NO. LOCATION PLOT CODE UNIT
6.00 8.00 10.00
ground floor
kg
1 Elevation col. 75.84
2 Wastage 10% 7.58
S.Total 83.42 0.00

Prepared by:- haile m. sewagegn checked by :-


ኃ/የተ/የግ/ማህበር
ENGINEERS PLC
ROJECT

10 36. e-mail iie@ethionet.et

STEEL BAR REINFORCEMENT


12.00 14.00 16.00 20.00

320.63
32.06
0.00 352.69 0.00 0.00

G.Total 436.11 Kg

approved by:-
ኢምፓክት ኢንተርናሽናል ኢንጅነርስ ኃ/የተ/የግ/ማህበር
IMPACT INTERNATIONAL ENGINEERS PLC
BAHIRDAR REALESTATE PROJECT

Tel 011-5-51 10 61,058-2-26 49 01/02. Fax 011-5-51 10 36. e-mail iie@ethio

STEEL BAR REINF


NO. LOCATION PLOT CODE UNIT
6.00 8.00
First floor Elevation
kg
1 col. 75.84
2 Wastage 10% 7.58
S.Total 83.42

Prepared by:- haile m. sewagegn checked by :-


ናሽናል ኢንጅነርስ ኃ/የተ/የግ/ማህበር
NATIONAL ENGINEERS PLC
LESTATE PROJECT

Fax 011-5-51 10 36. e-mail iie@ethionet.et

STEEL BAR REINFORCEMENT


10.00 12.00 14.00 16.00 20.00

320.63
32.06
0.00 0.00 352.69 0.00 0.00

G.Total 436.11 Kg
approved by:-
ኢምፓክት ኢንተርናሽናል ኢንጅነርስ ኃ/የተ/የግ/ማህበር
IMPACT INTERNATIONAL ENGINEERS PLC
BAHIRDAR REALESTATE PROJECT

Tel 011-5-51 10 61,058-2-26 49 01/02. Fax 011-5-51 10 36. e-mail iie@ethion

STEEL BAR REINFOR


NO. LOCATION PLOT CODE UNIT
6.00 8.00 10.00
1 first floor beam kg 205.20
2 Wastage 10% 20.52 0.00
S.Total 225.72 -

Prepared by:- haile m. sewagegn checked by :-


ኃ/የተ/የግ/ማህበር
ENGINEERS PLC
ROJECT

10 36. e-mail iie@ethionet.et

STEEL BAR REINFORCEMENT


12.00 14.00 16.00 20.00
82.05 81.56 451.94 347.35
8.21 8.16 45.19 34.74
90.26 89.71 497.14 382.09

G.Total 1,284.91 Kg

approved by:-
ኢምፓክት ኢንተርናሽናል ኢንጅነርስ ኃ/የተ/የግ/ማህበር
IMPACT INTERNATIONAL ENGINEERS PLC
BAHIRDAR REALESTATE PROJECT

Tel 011-5-51 10 61,058-2-26 49 01/02. Fax 011-5-51 10 36. e-mail iie@ethionet.e

STEEL BAR REINFORCEME


NO. LOCATION PLOT CODE UNIT
6.00 8.00 10.00
1 first floor slab kg 582.31 209.76
2 Wastage 10% 58.23 20.98
S.Total 640.55 230.73

Prepare haile m. sewagegn checked by :-


ነርስ ኃ/የተ/የግ/ማህበር
AL ENGINEERS PLC
E PROJECT

51 10 36. e-mail iie@ethionet.et

STEEL BAR REINFORCEMENT


12.00 14.00 16.00 20.00
352.72 78.04
35.27 7.80 0.00 0.00
387.99 85.85 - -

G.Total 1,345.12 kg
approved by:-
ኢምፓክት ኢንተርናሽናል ኢንጅነርስ ኃ/የተ/የግ/ማህበር
IMPACT INTERNATIONAL ENGINEERS PLC
BAHIRDAR REALESTATE PROJECT

Tel 011-5-51 10 61,058-2-26 49 01/02. Fax 011-5-51 10 36. e-mail iie@ethionet.e

STEEL BAR REINFORCEME


NO. LOCATION PLOT CODE UNIT
6.00 8.00 10.00
1 staircase kg 87.18
2 Wastage 10% 8.72 0.00
S.Total 95.89 -

Prepare haile m. sewagegn checked by :-


ነርስ ኃ/የተ/የግ/ማህበር
AL ENGINEERS PLC
E PROJECT

51 10 36. e-mail iie@ethionet.et

STEEL BAR REINFORCEMENT


12.00 14.00 16.00 20.00
74.67 152.33
7.47 15.23 0.00 0.00
82.13 167.57 - -

G.Total 345.60 Kg
approved by:-
ኢምፓክት ኢንተርናሽናል ኢንጅነርስ ኃ/የተ/የግ/ማህበር
IMPACT INTERNATIONAL ENGINEERS PLC
BAHIRDAR REALESTATE PROJECT

Tel 011-5-51 10 61,058-2-26 49 01/02. Fax 011-5-51 10 36. e-mail iie@ethionet.e

STEEL BAR REINFORCEME


NO. LOCATION PLOT CODE UNIT
6.00 8.00 10.00
variation due to
additon or
kg
modifcation infirst
1 floor slab 38.38
2 Wastage 10% 3.84 0.00
S.Total 42.22 -

Prepare haile m. sewagegn checked by :-


ነርስ ኃ/የተ/የግ/ማህበር
AL ENGINEERS PLC
E PROJECT

51 10 36. e-mail iie@ethionet.et

STEEL BAR REINFORCEMENT


12.00 14.00 16.00 20.00

29.00 56.89
0.00 2.90 5.69 0.00
- 31.90 62.58 -

G.Total 136.69 Kg
approved by:-
ኢምፓክት ኢንተርናሽናል ኢንጅነርስ ኃ/የተ/የግ/ማህበር
IMPACT INTERNATIONAL ENGINEERS PLC
BAHIRDAR REALESTATE PROJECT

Tel 011-5-51 10 61,058-2-26 49 01/02. Fax 011-5-51 10 36. e-mail iie@ethionet.e

STEEL BAR REINFORCEME


NO. LOCATION PLOT CODE UNIT
6.00 8.00 10.00
Distrbution or
mager reinfor. In kg
1 first floor slab 101.00
2 Wastage 10% 10.10 0.00
S.Total 111.10 0.00

Prepare haile m. sewagegn checked by :-


ነርስ ኃ/የተ/የግ/ማህበር
AL ENGINEERS PLC
E PROJECT

51 10 36. e-mail iie@ethionet.et

STEEL BAR REINFORCEMENT


12.00 14.00 16.00 20.00

0.00 0.00 0.00 0.00


0.00 0.00 0.00 0.00

G.Total 111.10 Kg
approved by:-
ኢምፓክት ኢንተርናሽናል ኢንጅነርስ ኃ/የተ/የግ/ማህበር
IMPACT INTERNATIONAL ENGINEERS PLC
BAHIRDAR REALESTATE PROJECT

Tel 011-5-51 10 61,058-2-26 49 01/02. Fax 011-5-51 10 36. e-mail iie@ethio

STEEL BAR REINF


NO. LOCATION PLOT CODE UNIT
6.00 8.00
Roof floor slab
kg
7 beam 0 175.38
2 Wastage 10% 17.54
S.Total 192.92

Prepared by:-__ haile m. sewagegn checked by :-

ኢምፓክት ኢንተርናሽናል ኢንጅነርስ ኃ/የተ/የግ/ማህበር


IMPACT INTERNATIONAL ENGINEERS PLC
BAHIRDAR REALESTATE PROJECT

Tel 011-5-51 10 61,058-2-26 49 01/02. Fax 011-5-51 10 36. e-mail iie@ethio

STEEL BAR REINF


NO. LOCATION PLOT CODE UNIT
6.00 8.00
Roof floor slab
kg
7 beam 0 175.38
2 Wastage 10% 17.54
S.Total 192.92

Prepared by:-__ haile m. sewagegn checked by :-


ናሽናል ኢንጅነርስ ኃ/የተ/የግ/ማህበር
NATIONAL ENGINEERS PLC
LESTATE PROJECT

ax 011-5-51 10 36. e-mail iie@ethionet.et

STEEL BAR REINFORCEMENT


10.00 12.00 14.00 16.00 20.00

0.00 0.00 10.68 616.39 353.0277


0.00 0.00 1.07 61.64 35.30
- - 11.75 678.03 388.33

G.Total 1,271.03 Kg
approved by:-

ናሽናል ኢንጅነርስ ኃ/የተ/የግ/ማህበር


NATIONAL ENGINEERS PLC
LESTATE PROJECT

ax 011-5-51 10 36. e-mail iie@ethionet.et

STEEL BAR REINFORCEMENT


10.00 12.00 14.00 16.00 20.00

0.00 0.00 10.68 616.39 353.0277


0.00 0.00 1.07 61.64 35.30
- - 11.75 678.03 388.33

approved by:-
ኢምፓክት ኢንተርናሽናል ኢንጅነርስ ኃ/የተ/የግ/ማህበር
IMPACT INTERNATIONAL ENGINEERS PLC
BAHIRDAR REALESTATE PROJECT

Tel 011-5-51 10 61,058-2-26 49 01/02. Fax 011-5-51 10 36. e-mail iie@eth

STEEL BAR RE
NO. LOCATION PLOT CODE UNIT
6.00 8.00
Roof floor slab
kg
1 Staircase 68.67
2 Wastage 10% 6.87
S.Total 75.54

Prepared by:-_____ haile m. sewagegn checked by :-


ናል ኢንጅነርስ ኃ/የተ/የግ/ማህበር
ATIONAL ENGINEERS PLC
ESTATE PROJECT

x 011-5-51 10 36. e-mail iie@ethionet.et

STEEL BAR REINFORCEMENT


10.00 12.00 14.00 16.00 20.00

121.87
0.00 0.00 24.37 0.00 0.00
- - 146.24 - -

G.Total 221.78 Kg
approved by:-
ኢምፓክት ኢንተርናሽናል ኢንጅነርስ ኃ/የተ/የግ/ማህበር
IMPACT INTERNATIONAL ENGINEERS PLC
BAHIRDAR REALESTATE PROJECT

Tel 011-5-51 10 61,058-2-26 49 01/02. Fax 011-5-51 10 36. e-mail iie@ethionet.e

STEEL BAR REINFORCEME


NO. LOCATION PLOT CODE UNIT
6.00 8.00 10.00
Distrbution or
mager reinfor. In kg
1 first floor slab 101.00
2 Wastage 10% 10.10 0.00
S.Total 111.10 0.00

Prepare haile m. sewagegn checked by :-


ነርስ ኃ/የተ/የግ/ማህበር
AL ENGINEERS PLC
E PROJECT

51 10 36. e-mail iie@ethionet.et

STEEL BAR REINFORCEMENT


12.00 14.00 16.00 20.00

0.00 0.00 0.00 0.00


0.00 0.00 0.00 0.00

G.Total 111.10 Kg
approved by:-
ኢምፓክት ኢንተርናሽናል ኢንጅነርስ ኃ/የተ/የግ/ማህበር
IMPACT INTERNATIONAL ENGINEERS PLC
BAHIRDAR REALESTATE PROJECT

Tel 011-5-51 10 61,058-2-26 49 01/02. Fax 011-5-51 10 36. e-mail iie@ethion

STEEL BAR REINFOR


NO. LOCATION PLOT CODE UNIT
6.00 8.00 10.00
1 Roof floor slab kg 382.16 100.06
2 Wastage 10% 38.22 10.01
S.Total 420.38 110.06

Prepared by: haile m. sewagegn checked by :-


ኃ/የተ/የግ/ማህበር
ENGINEERS PLC
ROJECT

10 36. e-mail iie@ethionet.et

STEEL BAR REINFORCEMENT


12.00 14.00 16.00 20.00
503.00
50.30 0.00 0.00 0.00
553.30 - - -

G.Total 1,083.74 Kg

approved by:-
Impact International Engineers Plc
Bahir Dar Realestate Project

PROJECT:-ROW HOUSE
CLIENT:-DIFFERENT INDI.
CONSULTANT:- ….................. LAKE/033 IP-1
CONTRACTOR:-…..................... GROUND FLOOR ELEVATION COLUMN
SUPERSTRUCTURE
Total Length of Bar
Total
Length No. of No. of
S. No Location Ø number
of bar member bars Dia.8 Dia.10 Dia.12 Dia.14 Dia.16 Dia.20 Dia.24
of bars

C-1 14 3.900 3 8 24.00 93.60


8 1.200 3 20 60.00 72.00
-
C-3 14 3.900 2 10 20.00 78.00
8 1.200 2 20 40.00 48.00
-
C-4 14 3.900 1 12 12.00 46.80
8 1.500 1 20 20.00 30.00
-
C-4 14 3.900 3 4 12.00 46.80
8 0.700 3 20 60.00 42.00

Total Length in mt. 192.00 - - 265.20 - - -


Unit Weight in kg/m 0.395 0.617 0.888 1.209 1.579 2.467 3.552
Total Weight in kg 75.84 0.00 0.00 320.63 0.00 0.00 0.00
Previous page sum in kg 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Total Sum in kg 75.84 0.00 0.00 320.63 0.00 0.00 0.00

Impact International Engineers Plc


Bahir Dar Realestate Project

PROJECT:-ROW HOUSE
CLIENT:-DIFFERENT INDI.
CONSULTANT:- ….................. LAKE/033 IP-1
CONTRACTOR:-…..................... FIRST FLOOR ELEVATION COLUMN
SUPERSTRUCTURE
Total Length of Bar
Total
Length No. of No. of
S. No Location Ø number
of bar member bars
of bars
Total
Length No. of No. of
S. No Location Ø number
of bar member bars Dia.8 Dia.10 Dia.12 Dia.14 Dia.16 Dia.20 Dia.24
of bars

C-1 14 3.900 3 8 24.00 93.60


8 1.200 3 20 60.00 72.00
-
C-3 14 3.900 2 10 20.00 78.00
8 1.200 2 20 40.00 48.00
-
C-4 14 3.900 1 12 12.00 46.80
8 1.500 1 20 20.00 30.00
-
C-4 14 3.900 3 4 12.00 46.80
8 0.700 3 20 60.00 42.00

Total Length in mt. 192.00 - - 265.20 - - -


Unit Weight in kg/m 0.395 0.617 0.888 1.209 1.579 2.467 3.552
Total Weight in kg 75.84 0.00 0.00 320.63 0.00 0.00 0.00
Previous page sum in kg 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Total Sum in kg 75.84 0.00 0.00 320.63 0.00 0.00 0.00
Impact International Engineers Plc
Bahir Dar Realestate Project

PROJECT:-ROW HOUSE
CLIENT:-DIFFERENT INDI.
CONSULTANT:- ….................. LAKE/033 IP-1
CONTRACTOR:-…..................... FIRST FLOOR SLAB R.BAR TAKE OFF
SUPERSTRUCTURE
Total Length of Bar
Total
Length No. of No. of
S. No Location Ø number
of bar member bars Dia.8 Dia.10 Dia.12 Dia.14 Dia.16 Dia.20 Dia.24
of bars

8 1.860 1 9 9.00 16.74


8 7.400 1 13 13.00 96.20
12 2.195 1 13 13.00 28.53
12 2.195 1 49 49.00 107.55
8 8.250 2 17 34.00 280.50
12 2.195 2 34 68.00 149.26
10 3.333 1 29 29.00 96.66
10 2.600 1 29 29.00 75.40
8 1.650 1 6 6.00 9.90
8 3.600 1 4 4.00 14.40
14 3.150 1 11 11.00 34.65
14 2.300 1 13 13.00 29.90
8 9.500 1 28 28.00 266.00
8 6.165 1 35 35.00 215.78
8 10.700 1 19 19.00 203.30
10 2.600 1 28 28.00 72.80
12 3.995 1 28 28.00 111.86
8 9.050 1 10 10.00 90.50
8 5.800 1 5 5.00 29.00
8 4.000 1 39 39.00 156.00
8 3.300 1 11 11.00 36.30
8 2.050 1 8 8.00 16.40
10 1.761 1 11 11.00 19.37
10 2.295 1 33 33.00 75.74
8 1.2 1 36 36.00 43

Total Length in mt. 1,474.22 339.96 397.21 64.55 - - -


Unit Weight in kg/m 0.395 0.617 0.888 1.209 1.579 2.467 3.552
Total Weight in kg 582.31 209.76 352.72 78.04 0.00 0.00 0.00
Previous page sum in kg 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Total Sum in kg 582.31 209.76 352.72 78.04 0.00 0.00 0.00
Impact International Engineers Plc
Bahir Dar Realestate Project

PROJECT:-ROW HOUSE
CLIENT:-DIFFERENT INDI.
CONSULTANT:- ….................. LAKE/033 IP-1
CONTRACTOR:-…..................... FIRST FLOOR BEAM TAKE OFF
SUPERSTRUCTURE
Total Length of Bar
Total
Length No. of No. of
S. No Location Ø number
of bar member bars Dia.8 Dia.10 Dia.12 Dia.14 Dia.16 Dia.20 Dia.24
of bars

Axis A 16 9.075 1 3 3.00 27.22


16 5.473 1 3 3.00 16.42
16 6.675 1 3 3.00 20.03
16 8.575 1 3 3.00 25.72
14 2.425 1 1 1.00 2.43
14 3.333 1 1 1.00 3.33
14 2.600 1 1 1.00 2.60
14 2.000 1 1 1.00 2.00
8 1.300 1 92 92.00 119.60
Axis B`
16 8.000 1 3 3.00 24.00
16 9.475 1 3 3.00 28.42
14 2.283 1 2 2.00 4.57
14 2.767 1 2 2.00 5.53
14 2.000 1 2 2.00 4.00
12 8.000 1 4 4.00 32.00
8 1.300 1 59 59.00 76.70

axis B
14 5.875 1 3 3.00 17.63
14 5.175 1 3 3.00 15.52
8 1.300 1 32 32.00 41.60

axis 1&2 20 7.550 2 4 8.00 60.40


20 8.450 2 4 8.00 67.60
16 3.200 2 2 4.00 12.80
16 3.200 2 2 4.00 12.80
12 7.550 2 4 8.00 60.40
8 1.600 2 49 98.00 156.80

axis 4 16 6.200 1 4 4.00 24.80


16 6.900 1 3 3.00 20.70
14 2.450 1 2 2.00 4.90
14 2.450 1 2 2.00 4.90
8 1.300 1 41 41.00 53.30

axis 3 16 8.175 1 4 4.00 32.70


16 8.875 1 3 3.00 26.63
16 4.425 1 2 2.00 8.85
16 2.450 1 2 2.00 4.90
8 1.300 1 55 55.00 71.50

Total Length in mt. 519.50 - 92.40 67.41 285.99 128.00 -


Unit Weight in kg/m 0.395 0.617 0.888 1.210 1.580 2.467 3.552
Total Weight in kg 205.20 0.00 82.05 81.56 451.94 315.78 0.00
Previous page sum in kg 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Total Sum in kg 205.20 0.00 82.05 81.56 451.94 315.78 0.00
Impact International Engineers Plc
Bahir Dar Realestate Project

PROJECT:-ROW HOUSE
CLIENT:-DIFFERENT INDI.
CONSULTANT:- ….................. LAKE/033 IP-1
CONTRACTOR:-…..................... SLAB AND STAIRCASE COLUMN R. BAR TAKEOFF variation
SUPERSTRUCTURE
Total Length of Bar
Total
Length No. of No. of
S. No Location Ø number
of bar member bars Dia.8 Dia.10 Dia.12 Dia.14 Dia.16 Dia.20 Dia.24
of bars

Elevation
column 14 3.9 1 4 4.00 15.60
8 0.70 1 20 20.00 14.00
first floor slab 8 7.560 1 11 11.00 83.16
hidden beam 16 3.450 1 6 6.00 20.70

Total Length in mt. 97.16 - - 15.60 20.70 - -


Unit Weight in kg/m 0.395 0.617 0.888 1.209 1.579 2.467 3.552
Total Weight in kg 38.38 0.00 0.00 18.86 32.69 0.00 0.00
Previous page sum in kg 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Total Sum in kg 38.38 0.00 0.00 18.86 32.69 0.00 0.00
PROJECT:-ROW HOUSE
CLIENT:-DIFFERENT INDI.
CONSULTANT:- ….................. LAKE/033 IP-1
CONTRACTOR:-…..................... STAIRCASE R. BAR TAKEOFF
SUPERSTRUCTURE
Total Length of Bar
Total
Length No. of No. of
S. No Location Ø number
of bar member bars Dia.8 Dia.10 Dia.12 Dia.14 Dia.16 Dia.20 Dia.24
of bars

staire case 14 7.6 1 9 9.00 126.00


8 0.90 9 19 171.00 153.90
12 4.300 1 9 9.00 38.70
8 1.200 1 49 49.00 58.80
staircase Beam 16 1.300 1 5 5.00 6.50
8 1.000 1 8 8.00 8.00

Total Length in mt. 220.70 - 38.70 126.00 6.50 - -


Unit Weight in kg/m 0.395 0.617 0.888 1.209 1.579 2.467 3.552
Total Weight in kg 87.18 0.00 34.37 152.33 10.26 0.00 0.00
Previous page sum in kg 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Total Sum in kg 87.18 0.00 34.37 152.33 10.26 0.00 0.00
PROJECT:-ROW HOUSE
CLIENT:-DIFFERENT INDI.
CONSULTANT:- ….................. LAKE/033 IP-1
CONTRACTOR:-…..................... SLAB TOP (MAGER) R. BAR TAKEOFF
SUPERSTRUCTURE
Total Length of Bar
Total
Length No. of No. of
S. No Location Ø number
of bar member bars Dia.8 Dia.10 Dia.12 Dia.14 Dia.16 Dia.20 Dia.24
of bars

8 7.5 1 3 3.00 22.56


8 4.3 1 7 7.00 30.10
8 6.0 1 5 5.00 30.00
8 3.0 1 6 6.00 18.00
8 3.2 1 4 4.00 12.80
8 5.5 1 4.0 4.00 22.00
8 4.3 1 6 6.00 25.80
8 7.5 1 7 7.00 52.50
8 2.6 1 7 7.00 18.20
8 3.0 1 6 6.00 18.00

Total Length in mt. 249.96 - - - - - -


Unit Weight in kg/m 0.395 0.617 0.888 1.209 1.579 2.467 3.552
Total Weight in kg 98.73 0.00 0.00 0.00 0.00 0.00 0.00
Previous page sum in kg 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Total Sum in kg 98.73 0.00 0.00 0.00 0.00 0.00 0.00
PROJECT:-ROW HOUSE
CLIENT:-DIFFERENT INDI.
CONSULTANT:- ….................. LAKE/033 IP-1
CONTRACTOR:-…..................... ROOF BEAM TAKEOFF
SUPERSTRUCTURE
Total Length of Bar
Total
Length No. of No. of
S. No Location Ø number
of bar member bars Dia.8 Dia.10 Dia.12 Dia.14 Dia.16 Dia.20 Dia.24
of bars

axis A 16 5.473 1 4 4.00 21.89


16 9.075 1 4 4.00 36.30
16 8.575 1 3 3.00 25.72
16 6.675 1 3 3.00 20.03
16 3.333 1 2 2.00 6.67
16 2.600 1 2 2.00 5.20
14 2.000 1 2 2.00 4.00
14 2.425 1 2 2.00 4.85
8 1.200 1 92 92.00 110.40

axis B`
16 8.000 1 4 4.00 32.00
16 9.475 1 3 3.00 28.42
8 1.200 1 53 53.00 63.60

axis B
16 5.175 1 4 4.00 20.70
16 5.875 1 3 3.00 17.63
8 1.200 1 35 35.00 42.00

axis 3
16 8.175 1 5 5.00 40.88
16 8.875 1 4 4.00 35.50
16 2.450 1 2 2.00 4.90
16 4.425 1 2 2.00 8.85
8 1.200 1 55 55.00 66.00
axis 4
16 6.200 1 5 5.00 31.00
16 6.400 1 4 4.00 25.60
16 2.450 2 2 4.00 9.80
8 1.200 1 41 41.00 49.20
axis 1 and 2 20 8.450 2 4 8.00 67.60
20 7.550 2 5 10.00 75.50
16 2.450 2 2 4.00 9.80
16 2.450 2 2 4.00 9.80
8 1.300 1 50 50.00 65.00

Total Length in mt. 396.20 - - 8.85 390.68 143.10 -


Unit Weight in kg/m 0.395 0.617 0.888 1.209 1.579 2.467 3.552
Total Weight in kg 156.50 0.00 0.00 10.70 616.89 0.00 0.00
Previous page sum in kg 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Total Sum in kg 156.50 0.00 0.00 10.70 616.89 0.00 0.00
PROJECT:-ROW HOUSE
CLIENT:-DIFFERENT INDI.
CONSULTANT:- ….................. LAKE/033 IP-1
CONTRACTOR:-…..................... ROOF SLAB TAKEOFF
SUPERSTRUCTURE
Total Length of Bar
Total
Length No. of No. of
S. No Location Ø number
of bar member bars Dia.8 Dia.10 Dia.12 Dia.14 Dia.16 Dia.20 Dia.24
of bars

8 1.860 1 9 9.00 16.74


8 7.400 1 12 12.00 88.80
12 2.195 1 9 9.00 19.76
12 2.195 1 49 49.33 108.29
12 2.195 1 21 21.00 46.10
12 2.295 1 21 21.00 48.20
8 10.700 1 21 21.00 224.70
8 5.315 1 24 24.00 127.56
8 9.500 1 31 31.00 294.50
8 7.450 1 15 15.00 111.75
12 2.300 1 24 24.00 55.20
12 2.195 1 28 28.00 61.46
10 3.333 1 21 21.00 69.99
10 2.600 1 28 28.00 72.80
12 2.195 1 14 14.00 30.73
12 2.195 1 10 10.00 21.95
12 2.461 1 39 39.00 95.98
8 5.850 1 8 8.00 46.80
8 5.150 1 11 11.00 56.65
12 2.295 1 34 34.33 78.80
10 1.761 1 11 11.00 19.37

Total Length in mt. 967.50 162.16 566.45 - - - -


Unit Weight in kg/m 0.395 0.617 0.888 1.209 1.579 2.467 3.552
Total Weight in kg 382.16 100.06 503.00 0.00 0.00 0.00 0.00
Previous page sum in kg 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Total Sum in kg 382.16 100.06 503.00 0.00 0.00 0.00 0.00
PROJECT:-ROW HOUSE
CLIENT:-DIFFERENT INDI.
CONSULTANT:- ….................. LAKE/033 IP-1
CONTRACTOR:-…..................... TERRACE STAIRCASE TAKEOFF
SUPERSTRUCTURE
Total Length of Bar
Total
Length No. of No. of
S. No Location Ø number
of bar member bars Dia.8 Dia.10 Dia.12 Dia.14 Dia.16 Dia.20 Dia.24
of bars

8 1.200 1 7 7.00 8.4


8 1.000 1 25 25.00 25.0
8 0.900 12 7 84.00 75.6
8 0.900 4 9 36.00 32.4
14 2.000 1 9 9.00 18.00
14 9.200 1 9 9.00 82.80
8 1.000 2 7 14.00 14.00
8 1.000 1 9 9.00 9.00
8 1.350 1 7 7.00 9.45

Total Length in mt. 173.85 - - 100.80 - - -


Unit Weight in kg/m 0.395 0.617 0.888 1.209 1.579 2.467 3.552
Total Weight in kg 68.67 0.00 0.00 121.87 0.00 0.00 0.00
Previous page sum in kg 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Total Sum in kg 68.67 0.00 0.00 121.87 0.00 0.00 0.00