Rev. No. 00 TOWER CRANE ERECTION Date: 01-04-19 TC-1 Page 13 of 19 8.0 SAFETY Proper TOOL BOX talk will be given to the personnel involved in the tower crane erection regarding the precautions to be taken and PPE’s to be used. Safety Equipment: The following safety equipment should be available during the activity. Safety Shoes, Helmet, Gloves, Safety Rope, Ladder Platforms etc. 9.0 ATTACHEMENTS
Risk Assessment Check Sheet for Tower Crane Erection Location and Section of Tower Crane
a.
MAIN CONTRACTOR : AL SERH AL KHABEER CONSTRUCTION CO. LLC