PROJECT:G+4+11 TYPICAL Agreement No.

FLOOR

METHOD STATEMENT FOR Ref. No. MS-0001


Rev. No. 00
TOWER CRANE ERECTION Date: 01-04-19
TC-1 Page 13 of 19
8.0 SAFETY
Proper TOOL BOX talk will be given to the personnel involved in the
tower crane erection regarding the precautions to be taken and
PPE’s to be used.
Safety Equipment: The following safety equipment should be
available during the activity.
Safety Shoes, Helmet, Gloves, Safety Rope, Ladder Platforms etc.
9.0 ATTACHEMENTS

Risk Assessment
Check Sheet for Tower Crane Erection
Location and Section of Tower Crane

a.

MAIN CONTRACTOR : AL SERH AL KHABEER CONSTRUCTION CO. LLC