Professional Documents
Culture Documents
LK_FCD_Architectural_031224
LK_FCD_Architectural_031224
5
4
Legaspi St., Greenbelt, Makati City 2 3
1.57
PROPERTY LINE
PROPERTY LINE
SETBACK
0.67
J J
SETBACK
4.01
3.01
3.01
6.57
I I
3.50
5.53
5.53
ROOF DECK
368.53 m2 STAIRS-02
3.53
see details
FF-3
11
12
10
9
8
7
6
5
4
3
2
1
5.82
35R x 0.20
UP
34G x 0.25
ELEV +129.70
H FIRE EXIT
H
DISTRICT/CITY/MUNICIPALITY
1.30
D
14 FF-1
2.49
2.49
PRESSURIZATION
TO FIRE EXIT
14
15
13
16
17
18
19
20
21
22
G G
23
24
25
SAFETY AREA BOOSTER FOAM PUMP
26
27
28
29
30
31
D
FOAM TANK
OW
32
33
N
34
(SEE FIRE PROTECTION DETAILS)
35
4.60
4.60
F F
FATO LAND USE & ZONING
0.80
E E
36.97
0.80
1.20
36.36
D"
3.20
2.00
D' D'
2.41
LAND USE & ZONING
28.85
D
N
5.40
24.57
2.99
C C
3.30
3.30
ARCHITECTURAL
B B
TYPE: 32-storey Office & Residential Building
Location: Makati, Metro Manila
6.50
6.50
LOT AREA: 905.85SQM
NO. 165760: 932.16SQM
A A
SETBACK
PROPERTY LINE
STRUCTURAL
Line
0-1 S 38 22 W 1,961.32m
SETBACK
1-2 N 5 0 W 36.37m
0.86
PROPERTY LINE
0.57
2-3 N 84 44 E 4.32m 1 6
3-4 N 82 4 E 11.24m 8 7
1.25 1.50 5.35 10.30 5.35 1.50
4-5 N 79 25 E 8.32m 0.60 3.77 3.74 3.60 7.50 2.77 4.42 0.60
5-6 S 9 51 E 36.06m 26.99
6-7 S 81 22 W 9.95m
7-8 S 83 47 W 14.09m 1 2 3 4 6 7 8 ELECTRICAL
8-1 S 86 12 W 2.96m
SANITARY
PLUMBING
ELECTRONICS
2 VICINITY MAP
NOT TO SCALE SCALE BAR 1:100
A-000
*ALL DIMENSIONS ARE IN METER
*VERIFY DIMENSION & ELEVATION REFERENCE ON SITE 10 9 GEODETIC
8 7 6 ENGINEER
5 4 3 2 1 0
TIN NO.: LOCATION: LEGAZPI ST., GREENBELT, MAKATI CONSTRUCTION OTHER PROJECT WITHOUT APPROPRIATE CONSENT.
PROJECT REF NUMBER :
ISSUED AT: R.A. 9266
GSPublisherVersion 0.99.100.14
*VERIFY DIMENSION & ELEVATION REFERENCE ON SITE
*ALL DIMENSIONS ARE IN METER
DEVELOPER:
REAL ESTATE DEV'T CORP.
DATANG
ROOF DECK LEVEL +129.70
7.00
EXCLUSIVE CLUB +122.70 AREA TABULATION
4.00
32F +118.70 LOT AREA: 932.16SQM
4.00
+114.70
TOTAL GROSS FLOOR AREA: 21,720.30SQM
31F
BUILDING FOOTPRINT: 527.48SQM
TIN NO.:
PRC NO.:
DATE EXPIRY:
FAR USED: 23
4.00
30F +110.70
4.00
RESIDENTIAL
6-UNITS RESIDENTIAL = 30 TOTAL UNITS
ARCHITECT
29F +106.70
5-UNITS RESIDENTIAL = 25 TOTAL UNITS
4-UNITS RESIDENTIAL = 24 TOTAL UNITS
ISSUED ON:
PTR NO.:
ISSUED AT:
4.00
2F = 20 SLOTS
LOCATION:
PROJECT TITLE:
25F +92.50
3F-4F = 21 SLOTS
3.40
24F +89.10
LEGAZPI ST., GREENBELT, MAKATI
3.40
23F +85.70
3.40
32-STOREY
21F +78.90
3.40
20F +75.50
3.40
19F +72.10
3.40
18F +68.70
CLIENT:
3.40
16F +61.90
3.40
15F +58.50
GOVERNOR
3.40
14F +55.10
3.40
12F +51.70
3.40
4.00
8F +33.00
4.30
4.30
CONSTRUCTION
PERMIT
ADMIN APPROVAL
CLIENT APPROVAL
4F +15.80
R.A. 9266
OTHER PROJECT WITHOUT APPROPRIATE CONSENT.
THE REPETITION OF OR THE CONSTRUCTION OF ANY
DOCUMENT AND THEREFOR SHALL BE NOT BE USED IN
THE ARCHITECT MAINTAINS THE RIGHTS TO THIS
4.30
PAPER SIZE :
DRAWN BY :
OWNER SIGNATURE:
CHECKED BY:
1.20
B1 -6.60
4.30
-10.90
DATE:
REVISION:
B2
1 FRONT ELEVATION
SHEET NO.:
A-003
ARCHITECTURAL
GSPublisherVersion 0.99.100.14
SCALE BAR 1:100
*ALL DIMENSIONS ARE IN METER
*VERIFY DIMENSION & ELEVATION REFERENCE ON SITE 10 9 8 7 6 5 4 3 2 1 0
TIN NO.: LOCATION: LEGAZPI ST., GREENBELT, MAKATI CONSTRUCTION OTHER PROJECT WITHOUT APPROPRIATE CONSENT.
PROJECT REF NUMBER :
ISSUED AT: R.A. 9266
GSPublisherVersion 0.99.100.14
10M WIDE STREET LOT 30
N N
1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8
23.85 23.85
0.60 2.99 3.74 3.60 6.59 0.91 2.77 2.06 0.60 0.60 2.99 3.74 3.60 6.59 0.91 2.77 2.06 0.60
0.56 6.40 9.99 1.31 3.59 0.59 5.95 0.40 3.20 0.40 3.20 3.20 1.31 1.50 2.46 0.56
3.00 0.80 3.00 3.20
5 5
2 3 4 2 3
ELEV.-04
see details
4
RAMP UP & DOWN
1.57
1.57
PROPERTY LINE PROPERTY LINE
PROPERTY LINE
PROPERTY LINE
SETBACK SETBACK
3.54
0.67
FF-1
2.64
J J J J
SETBACK
SETBACK
ELEV 0.00 ELEV.-04 GALLARDO
5.47
D
see details
ENTRANCE
3.01
3.01
MRF ELEV +0.15
MALE
14
2.05
RETAINING WALL
4.90
1.04
1.04
LINE OF ARCADE FF-3
I I I I
D
13
8.53
FEMALE
10
RETAINING WALL
TOILET-01 TOILET
4.12
FF-4
0.15
CAR CAR CAR CAR CAR CAR TOILET-02
5.53
5.53
5.53
5.53
see details
5.99
LIFT LIFT LIFT LIFT LIFT LIFT
11
FEMALE
9
8.54 m2 12
8 STAIRS-02
5.93
3.63
13
14
7 see details
D 6
18G x 0.29
19R x 0.18
15
STEP UP 5
MALE2 2
16
1.40
D
17
11.73 m 3
0.15
18
H H H 13
H
2
D D
19
1
UP
DOWN
9 14 FIRE EXIT D
1.50
1.50
PRESSURIZATION PRESSURIZATION
TO FIRE EXIT
FF-1 TO FIRE EXIT
RETAINING WALL 12 PWD
2.49
2.49
2.49
2.49
1.99
10
12
1.20
PRESSURIZATION
TO FIRE EXIT
LOUNGE
1.54
G G G G
1.73
AREA
0.40
11
D
11
9
12 10 13
8
9
14
13 14
7
2.50
2.50
8
119.76 m2
14 15
6
STAIRS-01 STAIRS-01 7
18G x 0.26
19R x 0.18
2.07
5.60
5.60
20G x 0.26
21R x 0.18
2.58
ELEV.-03 ELEV.-03
15 16
5
see details 16
see details 6 17
4.60
4.60
4.60
17 18
5.00
5.00
COMMERCIAL UNIT 1.2
3
D D
19 20
F 14
F F F
1
2
ELEVATOR ELEVATOR
21
UP
DOWN
3 3
1
203.38 m2
FIRE EXIT
DOWN
UP
FF-1
1.47
2.50
2.50
FF-1 FF-1 14
E E E E
0.80
0.80
0.80
0.80
UTI. UTI.
PLUMBING PLUMBING
LPLG-8
2.20
D
36.97
36.97
1.27
CHASE CHASE
CONDUIT CHASE CONDUIT CHASE
1.20
1.20
6.41 m2 6.41 m2
to Residential PB
15 to Residential PB
36.36
36.36
D" D EE ROOM D" D EE ROOM
3.20
3.20
2 ELEV.-02
2 ELEV.-02
1.92
RECEPTION AREA D
(BUSDUCT CHASE
D
(BUSDUCT CHASE
2.00
2.00
MACHINE THRU-0UT UPPER FLOOR)
see details THRU-0UT UPPER FLOOR)
see details
2.00
2.00
ROOM LESS 104.64 m2
ELEVATOR 15 11.22 m2 15 11.22 m2
WF-2
D' PARKING
GRAND LOBBY D' D' PARKING
D'
4.00
4.00
ELEVATOR ELEVATOR
0.40
12.87 m2
MACHINE FF-2
ELEV.-01 14.73 m2 ELEV.-01
COMMERCIAL LEVEL
2.41
2.41
2.00
2.00
ROOM LESS MACHINE
see details see details
2.50
2.50
ELEVATOR ELEV +1.20 ROOM LESS
ELEVATOR
COMMON AREA
D LOW ZONE D 145.93 m2 LOW ZONE
5.00
5.40
5.00
5.40
0.40
7
6
5
4
3
2
1
7
6
5
4
3
2
1
ELEV -2.80
ELEVATOR ELEVATOR
1.50
16R x 0.19 16R x 0.19
UP
UP
15G x 0.26
D D D MACHINE
15G x 0.26
FF-2
2.99
2.99
2.50
2.50
STEP UP
2 1 1 ROOM LESS
8
ELEVATOR 8
WF-2
9 9
10 10
C C C C
11 11
2.65
5.64
5.64
12 12
13 13
VENTILA
14 14
LEGAZPI
15 15
16 TION FF-3 16
2.33
LIGHT
ENTRANCE LIGHT
3.24
DOWN DOWN
ELEV +0.35
3.30
3.30
3.30
3.30
WELL WELL
STAIRS-03 FIRE ESCAPE D GALVANIZED STEEL STAIRS-03 2
1.50
see details
STAIRS 8 TACTILE TILES
PWD GRATE ON TOP OF
VOCALO
see details
D
ELEV +0.20 RAMP 14
B DROP-OFF
10% SLOPE
B B VY
B
FF-1 COMMERCIAL UNIT 1.1
RAMP-01 215.13 m2
see details
4.49
4.49
FF-1
6.21
5.92
6.35
6.16
6.50
6.50
A A A A
SETBACK
SETBACK
PROPERTY LINE
PROPERTY LINE
SLOPE
RETAINING WALL
2.58
2.87
BUILDING DIRECTORY SIGN BOARD BUILDING DIRECTORY SIGN BOARD
1.64
8%
SETBACK SETBACK
0.60
0.60
0.86
1 RAMP UP 6 1 6
8 RAMP DOWN 7 8 7
0.61 24.48 0.64
FINISHES 0.60 3.77 3.74 3.60 7.50 2.77 4.42 0.60
0.60 3.77 3.74 3.60 7.50 2.77 4.42 0.60 26.99
26.99 FF1 BARE CEMENT EPOXY FLOORING
1 2 3 4 6 7 8 FF2
FF3
CERAMIC TILES
TEXTURED TILES
1 2 3 4 6 7 8
L E G A Z P I S TR E E T FF4 CERAMIC TILES (TOILET)
NEW LEVISTE TOWER
FF5 RUBBER FLOORING
NEW LEVISTE TOWER
2 LOWER GROUND FLOOR (LG)
1 GROUND FLOOR PLAN
SCALE @A1 (1:100)
WF1 SATIN FINISH
WF2 SEMI GLOSS FINISH
A-100 SCALE @A1 (1:100)
SCALE BAR 1:100
A-100 WF3 CERAMIC TILES
*ALL DIMENSIONS ARE IN METER
*VERIFY DIMENSION & ELEVATION REFERENCE ON SITE 10 9 8 7 6 5 4 3 2 1 0
TIN NO.: LOCATION: LEGAZPI ST., GREENBELT, MAKATI CONSTRUCTION OTHER PROJECT WITHOUT APPROPRIATE CONSENT.
PROJECT REF NUMBER :
ISSUED AT: R.A. 9266
GSPublisherVersion 0.98.99.14
N N
1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8
23.85 23.85
0.60 2.99 3.74 3.60 6.59 0.91 2.77 2.06 0.60 0.60 2.99 3.74 3.60 6.59 0.91 2.77 2.06 0.60
6.74 11.53 3.58 0.92 6.73 10.19 3.67 2.16
6.15 0.20 3.20 0.40 3.20 3.20 0.20 5.07 0.59 2.81 2.39 1.85 1.01 0.98 0.20 6.79 3.47 2.36
5 5
2 3
ELEV.-04
see details
4 2 3
ELEV.-04
see details
4
1.58
PROPERTY LINE PROPERTY LINE
0.60
PROPERTY LINE
PROPERTY LINE
SETBACK SETBACK
3.54
2.64
2.64
J J J J
SETBACK
SETBACK
0.60
1.96
FIRE WATER TANK MODULAR WATER TANK D
2.00
STP MALE
(DOMESTIC WATER TANK NO.2) 12 TOILET
FIRE
1.04
1.04
1.04
1.04
5.05
PUMP ROOM
I (SEE FP PLANS) I I I
5.42
TUBE DECK TOILET
1.88
6.68 m2
MEDIA FILTER TOILET-03
see details
7.93
CHLORINE
DOMESTIC CONTACT
WATER TANK CAR CAR CAR CAR CAR CAR
5.93
SLUDGE TANK
5.53
5.53
5.53
5.53
1.50
NO.1 FF-1 TANK
LIFT LIFT LIFT LIFT LIFT LIFT
D
16 PUMP
5.97
FINAL ROOM
H H H H
5.20
TREATED
WATER D
SERVICE
1.50
1.50
PRESSURIZATION PRESSURIZATION
TO FIRE EXIT TO FIRE EXIT TANK 16
PARKING
2.49
2.49
2.49
2.49
3.00 0.80 5.99 3.00 0.80 5.99
12
12
D
1.54
1.54
G 16
G G D G
16
11 11
13 13
10 10
14 14
9 9
15 15
6.34
6.34
8 8
16 16
STAIRS-01 7 STAIRS-01 7
5.60
5.60
21G x 0.26
21G x 0.26
22R x 0.17
22R x 0.20
2.58
2.58
ELEV.-03
17 17
see details
18 18
5 5
4.60
4.60
4.60
4.60
PIT
19 19
4 4
20 20
5.00
5.40
DRIVEWAY DRIVEWAY
3 3
(2.30m
F F F F
21 21
2 2
22 22
SLOPE 8%
SLOPE 8%
HEADROOM
1 1
UP 546.08 m2 UP 547.16 m2
DOWN DOWN
1.47
14 FF-1 14 FF-1
FF-1 FF-1
E 2.34 5.55 6.35 2.97
E E 5.55 6.35 5.20
E
0.80
0.80
0.80
0.80
PLUMBING
CHASE
UTI. PLUMBING
UTI. D
2.20
2.20
D
36.97
36.97
CHASE
CONDUIT CHASE CONDUIT CHASE
1.20
1.20
0.87
0.87
6.41 m2
15 to Residential PB 15 to Residential PB
36.36
36.36
D" D"
2.50
2.50
EE ROOM D EE ROOM
3.60
3.20
3.20
3.05
3.05
ELEV.-02 15
1.92
1.92
(BUSDUCT CHASE (BUSDUCT CHASE
D
2.00
2.00
THRU-0UT UPPER FLOOR)
see details THRU-0UT UPPER FLOOR)
2.00
2.00
5.01
5.01
15 11.22 m2 LOCATION 11.22 m2
OF ERI
D' PARKING
D' D' PARKING
D'
4.00
4.00
ELEVATOR ELEVATOR
2.51
2.51
0.40
7.85
7.85
ELEV.-01 ELEV +0.15 ELEV.-01 ELEV +0.15
2.41
2.41
2.00
2.41
2.50
16.51 m2
16.51 m2
ELEVATOR
0.80
0.80
D PIT
D
5.00
5.40
5.00
5.40
(2.30m
0.40
ELEV -6.60 ELEV -10.90
HEADROOM
1.50
1.50
3.13
CLEAR HEIGHT)
2.33
2.30
2.30
2.99
2.99
C C C C
0.80
0.80
2.65
2.65
2.50
2.50
1.64
1.64
LIGHT LIGHT
3.04
3.30
3.30
3.30
3.30
WELL WELL
9.83
9.83
2.50 0.68
2.50 0.68
12.39
11.99
B B B B
2.50
2.50
2.50
2.50
6.64
6.64
9.40
4.49
4.49
4.49
4.49
2.50
2.50
2.50
2.50
2.50
2.50
6.76
A A A A
SETBACK
SETBACK
PROPERTY LINE
PROPERTY LINE
2.16
2.16
2-DECK PARKING
2.58
2.58
2.87
2.87
SETBACK SETBACK
0.60
0.60
0.60
PROPERTY LINE PROPERTY LINE
0.57
1 6 1 6
8 7 8 7
0.61 0.67 5.00 5.00 7.10 5.00 1.71 0.64 0.61 0.67 5.00 5.00 7.10 5.00 1.71 0.64
0.60 3.77 3.74 3.60 7.50 2.77 4.42 0.60 FINISHES 0.60 3.77 3.74 3.60 7.50 2.77 4.42 0.60
26.99 26.99
FF1 BARE CEMENT EPOXY FLOORING
1 2 3 4 6 7 8 FF2
FF3
CERAMIC TILES
TEXTURED TILES
1 2 3 4 6 7 8
FF4 CERAMIC TILES (TOILET)
NEW LEVISTE TOWER NEW LEVISTE TOWER
FF5 RUBBER FLOORING
1 BASEMENT 1 FLOOR PLAN
SCALE @A1 (1:100) WF1 SATIN FINISH
2 BASEMENT 2 FLOOR PLAN
SCALE @A1 (1:100)
A-101 A-101
WF2 SEMI GLOSS FINISH
SCALE BAR 1:100
WF3 CERAMIC TILES
*ALL DIMENSIONS ARE IN METER
*VERIFY DIMENSION & ELEVATION REFERENCE ON SITE 10 9 8 7 6 5 4 3 2 1 0
TIN NO.: LOCATION: LEGAZPI ST., GREENBELT, MAKATI CONSTRUCTION OTHER PROJECT WITHOUT APPROPRIATE CONSENT.
PROJECT REF NUMBER :
ISSUED AT: R.A. 9266
GSPublisherVersion 0.98.99.14
N N
1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8
23.85 23.85
0.60 2.99 3.74 3.60 6.59 0.91 2.77 2.06 0.60 0.60 2.99 3.74 3.60 6.59 0.91 2.77 2.06 0.60
6.76 10.19 5.89 6.76 10.19 5.89
3.20 0.40 3.20 3.00 3.20 0.40 3.20 3.00 1.31 4.59
5 5
4 4
S
2 3 ELEV.-04
see details 2 3 ELEV.-04
see details
1.57
1.57
PROPERTY LINE PROPERTY LINE
W W
PROPERTY LINE
PROPERTY LINE
SETBACK 1 1 SETBACK PERFORATED SHEET
0.67
0.67
J J J J
SETBACK
SETBACK
GENSET ROOM
3.01
3.01
3.01
3.01
3.01
3.01
71.88 m2 EDP
GENSET PARALLELING TRANSFORMER
MDP
SWITCHGEAR LVSG ROOM
4.85
5.00
5.00
37.59 m2
I I I I
G1 G2
GENSET
12
12
CAR CAR CAR CAR CAR CAR
1.14
1.14
2x1000kVA
5.53
5.53
5.53
5.53
5.53
5.53
(TENTATIVE RATING)
LIFT LIFT LIFT D 13
14
11
10
STAIRS-02
LIFT LIFT LIFT 13
14
11
10
STAIRS-02
9 9
16 15
16
8 see details
15
16
8 see details
7 7
4.83
4.83
21G x 0.26
21G x 0.26
22R x 0.20
22R x 0.20
2.59
2.59
17 17
6 6
18 18
5 5
19 19
4 4
20 20
3 3
H H H H
21 21
2 2
22 22
1 1
D D
1.10
1.10
1.50
1.50
PRESSURIZATION PRESSURIZATION
TO FIRE EXIT
14 FF-1 TO FIRE EXIT
14 FF-1
2.49
2.49
2.49
2.49
3.00 0.80 5.99 3.00 0.80 5.99
12
12
PRESSURIZATION PRESSURIZATION
1.40
1.40
D TO FIRE EXIT TO FIRE EXIT
1.54
1.54
G 11
13
16 G G 11
13
G
10 10
7.09
14 14
9 9
15 15
6.34
6.34
8 8
16 16
STAIRS-01 7 STAIRS-01 7
5.60
21G x 0.26
21G x 0.26
22R x 0.20
22R x 0.20
2.58
2.58
ELEV.-03 ELEV.-03
17 17
4.60
4.60
4.60
HIGH ZONE HIGH ZONE
19 19
4 4
20 20
5.00
5.00
5.00
5.00
DRIVEWAY DRIVEWAY
3 3
F F F F
21 21
2 2
ELEVATOR ELEVATOR
22 22
SLOPE 8%
SLOPE 8%
1 1
UP UP
DOWN DOWN
FIRE EXIT D FF-1 ELEV +0.15 FIRE EXIT D FF-1 ELEV +0.15
1.47
1.47
FF-1 14 FF-1 14
E 2.01 5.88 6.35
E E 2.34 4.05 1.50 6.35
E
0.80
0.80
0.80
0.80
PLUMBING
UTI. PLUMBING
UTI.
2.21
2.20
D D
36.97
36.97
CHASE CHASE
CONDUIT CHASE CONDUIT CHASE
1.20
1.20
6.41 m2 6.41 m2
15 to Residential PB
15 to Residential PB
36.36
36.36
D" D"
2.50
2.50
EE ROOM EE ROOM
3.20
3.60
3.20
0.15
0.15
ELEV.-02 ELEV.-02
SLOPE 8%
SLOPE 8%
(BUSDUCT CHASE
D D
2.00
2.00
see details (BUSDUCT CHASE see details
4.00
4.00
THRU-0UT UPPER FLOOR)
5.01
5.01
THRU-0UT UPPER FLOOR)
15 11.22 m2 15 11.22 m2
6.15
D' PARKING
D' D' PARKING
D'
4.00
4.00
4.00
4.00
ELEVATOR ELEVATOR
2.51
2.51
7.85
7.85
ELEV.-01 ELEV +0.15 ELEV.-01 ELEV +0.15
2.41
2.41
see details see details 16.51 m2
0.80
0.80
D LOW ZONE D LOW ZONE
5.00
5.40
5.00
5.00
5.40
0.40
0.41
ELEV +7.20 ELEV +11.50
3.85
3.85
ELEVATOR ELEVATOR
2.33
2.33
2.32
64.01 m2
2.99
2.99
2.45
C C C C
0.80
0.80
2.50
2.50
2.50
1.64
1.64
LIGHT LIGHT
3.24
3.24
.
3.30
3.30
3.30
3.30
WELL WELL
9.83
9.83
B B B B
2.50
2.50
2.50
2.50
2.50
12.59
12.58
6.64
6.64
2.50
2.50
2.50
2.50
2.50
6.76
6.76
6.50
6.50
6.50
6.50
A A A A
SETBACK
SETBACK
PROPERTY LINE
PROPERTY LINE
2-DECK PARKING 2-DECK PARKING
2.76
LOW CARBON STEEL PERFORATED METAL MESH LOW CARBON STEEL PERFORATED METAL MESH
SETBACK SETBACK
0.86
0.86
(VARIES BASED ON SUPPLIERS DETAILS) (VARIES BASED ON SUPPLIERS DETAILS)
0.57
1 6 1 6
8 7 8 7
1.90 5.00 5.00 7.10 5.00 2.99 1.26 5.00 5.00 7.10 5.00
0.60 3.77 3.74 3.60 7.50 2.77 4.42 0.60 FINISHES 0.60 3.77 3.74 3.60 7.50 2.77 4.42 0.60
26.99 26.99
FF1 BARE CEMENT EPOXY FLOORING
1 2 3 4 6 7 8 FF2
FF3
CERAMIC TILES
TEXTURED TILES
1 2 3 4 6 7 8
FF4 CERAMIC TILES (TOILET)
NEW LEVISTE TOWER NEW LEVISTE TOWER
FF5 RUBBER FLOORING
1 PODIUM PARKING (2F)
SCALE @A1 (1:100) WF1 SATIN FINISH
2 PODIUM PARKING (3F-4F)
SCALE @A1 (1:100)
A-102 A-102
WF2 SEMI GLOSS FINISH
SCALE BAR 1:100
WF3 CERAMIC TILES
*ALL DIMENSIONS ARE IN METER
*VERIFY DIMENSION & ELEVATION REFERENCE ON SITE 10 9 8 7 6 5 4 3 2 1 0
TIN NO.: LOCATION: LEGAZPI ST., GREENBELT, MAKATI CONSTRUCTION OTHER PROJECT WITHOUT APPROPRIATE CONSENT.
PROJECT REF NUMBER :
ISSUED AT: R.A. 9266
GSPublisherVersion 0.98.99.14
N N
1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8
23.85 23.85
0.60 2.99 3.74 3.60 6.59 0.91 2.77 2.06 0.60 0.60 2.99 3.74 3.60 6.59 0.91 2.77 2.06 0.60
6.76 10.19 5.89 0.56 22.85
6.56 5.98 5.71 4.59
5 5
2 3 ELEV.-04
see details
4 2 3 4
1.57
PROPERTY LINE PROPERTY LINE
PROPERTY LINE
PROPERTY LINE
SETBACK SETBACK
3.54
0.67
0.67
EC ROOM D
2.64
EC ROOM
J J J J
SETBACK
SETBACK
(TELECOM)
(SECURITY OFFICE 10 MALE MALE
2.70
2.70
3.01
3.01
/ CCTV) D toilet
D toilet
D 12 12
1.04
1.04
10 TOILET-04 TOILET-04
I I I I
see details see details
D D
2.31
2.31
PWD PWD
12 12
ADMIN
toilet toilet
8.53
8.53
WF-2
WF-2
OFFICES
12
12
MACHINE MACHINE MACHINE
1.14
84.45 m2
5.53
5.53
5.53
5.53
ROOM ROOM ROOM 11 11
FF-2
13 13
10 10
14
9 STAIRS-02 14
9 STAIRS-02
see details see details
15 15
ELEV +20.10 16
8
16
8
7 7
4.83
4.83
21G x 0.26
21G x 0.26
22R x 0.20
22R x 0.20
2.59
D
17 17
6 6
18 18
5 5
2
19 19
4 4
20 20
3 3
H D D
H H H
21 21
2 2
22 22
1 1
15 15 FIRE EXIT
DOWN
UP
FIRE EXIT
DOWN
UP
D D
1.10
1.50
1.50
PRESSURIZATION PRESSURIZATION
TO FIRE EXIT
14 FF-1 TO FIRE EXIT D 14 FF-1
2.49
2.49
2.49
2.49
WF-2
2
12
12
PRESSURIZATION PRESSURIZATION
OFFICE LEVEL
1.40
1.40
HALLWAY TO FIRE EXIT TO FIRE EXIT
1.54
1.54
G 11
149.17 m2
FF-2
G G 11
533.50 m2 G
D
13 13
10 10
14 14
9 9
FF-2 4
15 15
8 8
16 16
STAIRS-01 7 STAIRS-01 7
5.59
5.59
21G x 0.26
21G x 0.26
22R x 0.20
22R x 0.20
2.58
2.58
ELEV.-03 ELEV.-03
WF-2
17 17
see details 6
see details 6
4.60
4.60
5 5
4.60
4.60
ELEV +24.40
HIGH ZONE HIGH ZONE
19 19
D
4 4
20 20
5.00
5.00
5.00
5.00
3 3
F F F F
21 21
2
1
22
2 ELEVATOR
2
1
22
ELEVATOR
UP UP
DOWN DOWN
1.47
14 14
0.80
FF-1 FF-1
E E E E
0.80
0.80
PLUMBING
UTI. PLUMBING
UTI. D LOBBY
2.21
2.21
D
36.97
0.80
36.97
CHASE CHASE
LOBBY
WF-2
1.20
CONDUIT CHASE CONDUIT CHASE
1.20
6.41 m2 2
15 to Residential PB
15 66.40 m to Residential PB
36.36
6.41 m2
36.36
D" D"
43.80 m 2
FF-2
WF-2
EE ROOM EEPP6FROOM
3.20
3.60
3.20
3.60
FF-2 LP6F
0.15
0.15
ELEV.-02 ELEV.-02
(BUSDUCT CHASE (BUSDUCT CHASE
2.00
D D
2.00
WF-2
D' PARKING
D' D' PARKING
D'
4.00
4.00
4.00
4.00
ELEVATOR ELEVATOR
ELEV.-01 ELEV.-01 D
2.41
2.41
5.40
5.00
5.00
5.40
5.00
5.00
0.40
ELEVATOR D ELEVATOR
OFFICE LEVEL
WF-2
D 2
2.99
2.99
2
388.94 m2
C FF-1
C C WATER FALLS
C
CHASE
3.24
3.24
D
3.30
3.30
3.30
3.30
WELL WELL
16
B B B B
12.99
12.59
WATER FALLS DEPTH &
EQUIPMENT ROOM
D 42.27 m2
2 ELEV +24.40
4.49
4.49
ELEV +24.40
6.76
6.50
6.50
FF-1
7.33
A A A A
SETBACK
SETBACK
PROPERTY LINE
PROPERTY LINE
2.58
2.87
SETBACK SETBACK
0.86
0.86
0.57
1 6 1 6
8 7 8 7
0.64 25.65 0.71
0.60 3.77 3.74 3.60 7.50 2.77 4.42 0.60 FINISHES 0.60 3.77 3.74 3.60 7.50 2.77 4.42 0.60
26.99 26.99
FF1 BARE CEMENT EPOXY FLOORING
1 2 3 4 6 7 8 FF2
FF3
CERAMIC TILES
TEXTURED TILES
1 2 3 4 6 7 8
FF4 CERAMIC TILES (TOILET)
NEW LEVISTE TOWER NEW LEVISTE TOWER
FF5 RUBBER FLOORING
1 OFFICE LEVEL w/ MR (5F)
SCALE @A1 (1:100) WF1 SATIN FINISH
2 OFFICE LEVEL (6F)
SCALE @A1 (1:100)
A-103 A-103
WF2 SEMI GLOSS FINISH
SCALE BAR 1:100
WF3 CERAMIC TILES
*ALL DIMENSIONS ARE IN METER
*VERIFY DIMENSION & ELEVATION REFERENCE ON SITE 10 9 8 7 6 5 4 3 2 1 0
TIN NO.: LOCATION: LEGAZPI ST., GREENBELT, MAKATI CONSTRUCTION OTHER PROJECT WITHOUT APPROPRIATE CONSENT.
PROJECT REF NUMBER :
ISSUED AT: R.A. 9266
GSPublisherVersion 0.98.99.14
N N
1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8
23.85 23.85
0.60 2.99 3.74 3.60 6.59 0.91 2.77 2.06 0.60 0.60 2.99 3.74 3.60 6.59 0.91 2.77 2.06 0.60
6.76 6.00 10.09 10.36 4.50 8.43
5 5
2 3 4 2 3 4
1.57
1.57
PROPERTY LINE PROPERTY LINE
PROPERTY LINE
PROPERTY LINE
SETBACK SETBACK
3.54
3.54
0.67
2.64
2.64
J J J J
SETBACK
SETBACK
DOMESTIC
3.71
MALE MALE
PREPARATION AREA toilet toilet
D WATER TANK D
12 NO.3 12
1.04
1.04
1.04
1.04
5.00
5.00
FROZEN
COOKING AREA
COOKING AREA
TOILET-04 TOILET-04
GOODS
I I I I
5.88
D D
PWD PWD
FREEZER KITCHEN 12 12
RESTAURANT
8.53
toilet toilet
&
AREA KITCHEN AREA ELECTRICAL
FROZEN
51.18 m2 D 2 PUMP ROOM METER CENTER ENGINEERING
GOODS 93.67 m2 RAINWATER 104.53 m2
4.50
OFFICE
11
12
5 HIGH&LOW-ZONE
1.10
TANK
1.14
WASHING ZONE 77.42 m2
5.53
5.53
5.53
5.53
FF-1 (SEE EE PLANS) 63.54 m2
PREPARATION AREA
FF-2 13
11
45.27 m2
12
10
WATER FF-2
10
STAIRS-02 STAIRS-02
13
14
9
9
ELEV +28.70
14
see details see details
15
8
15
DRY
16
7
2.56
7
4.83
2.59
VENTILATED
21G x 0.26
22R x 0.20
STAFF
16
20G x 0.26
21R x 0.18
17
6
HIGH&LOW-ZONE
6
TOILET GOODS
D
17
DRY GOODS
18
5
ROOM 5 18
1.00
19
4
6.22
4
15
19
WASHING ZONE
20
3
3
H H H H
20
21
2
2 21
22
1
1
UP
DOWN
DRY GOODS D D D
1.10
1.50
1.50
PRESSURIZATION PRESSURIZATION
TO FIRE EXIT
SERVICE AREA 3 14 FF-1 TO FIRE EXIT
14 FF-1
2.49
2.49
2.49
2.49
D D
10 15
12
12
PRESSURIZATION PRESSURIZATION
1.40
TO FIRE EXIT TO FIRE EXIT
1.54
1.54
G 11
13
TOILET
G G 11
13
D D
G
10 10
9
14
D 9
14
15 15
STAFF
15 15
5 D
8 8
ROOM
16 16
STAIRS-01 7 STAIRS-01 7
5.59
5.59
2.58
2.58
21G x 0.26
21G x 0.26
22R x 0.20
22R x 0.20
ELEV.-03 ELEV.-03
17 17
see details 6
18
see details
see details 6
18
16 see details
4.60
4.60
4.60
4.60
5 5
5.00
5.00
5.00
20 20
3 3
F F F F
21 21
2 2
1.47
14 14
0.80
0.80
FF-1 FF-1
E E E FF-2 E
ELEV +37.30
UTI. UTI. D
2.01
2.01
PLUMBING PLUMBING
D
36.97
36.97
0.80
0.80
CHASE CHASE
1.20
1.20
CONDUIT CHASE CONDUIT CHASE
6.41 m2 6.41 m2 15
15 RESTAURANT
to Residential PB to Residential PB
36.36
36.36
D" 1 EE ROOM D" EE ROOM
3.60
3.20
3.60
3.20
D (BUSDUCT CHASE
ELEV.-02 D (BUSDUCT CHASE
ELEV.-02
2.00
2.00
MALE
187.64 m2
3 D THRU-0UT UPPER FLOOR)
see details
16 D THRU-0UT UPPER FLOOR)
see details
15
3.02
11.22 m2 15 11.22 m2
FF-2
D' HD D
13 ELEV +28.70
GROUNDING BAR
ON EVERY EE-ROOM
D' D' D'
2.41
2.41
ELEV +28.70 LINE OF POOL DEPTH
TOILET-08
7.39
TOILET
1.65
D D
21.03 m2
LOW ZONE LOW ZONE
OUTDOOR
5.00
5.40
5.00
5.00
5.40
D ELEVATOR SWIMMING POOL DEPTH & ELEVATOR
HD 13 DINING EQUIPMENT ROOM
2.99
2.99
2.73
269.13 m2
FEMALE (SEE MEFP DETAILS)
FF-3 376.39 m2
C WATER FALLS
C C FF-1 WATER FALLS
C
TABLE CHASE CHASE ACCU - 1/9
17.19
3.24
3.24
LIGHT ELEV +37.30 LIGHT
3.30
3.30
3.30
3.30
WELL WELL
ACCU - 2/9
B WATER B B WATER B
FALLS FALLS
9.80
4.49
4.49
4.49
4.49
6.76
A A A A
SETBACK
SETBACK
PROPERTY LINE
PROPERTY LINE
2.58
2.58
2.87
2.87
ROLL UP DOOR SETBACK SETBACK
0.86
0.86
(VARIES BASED ON SUPPLIERS DETAILS)
PROPERTY LINE PROPERTY LINE
0.57
0.57
1 6 1 6
8 7 FRES AIR LOUVER GRILLS
850X 500 8 7
9.71 3.11 3.14 9.69 0.70 12.82 12.83
0.60 3.77 3.74 3.60 7.50 2.77 4.42 0.60 FINISHES 0.60 3.77 3.74 3.60 7.50 2.77 4.42 0.60
26.99 26.99
FF1 BARE CEMENT EPOXY FLOORING
1 2 3 4 6 7 8 FF2
FF3
CERAMIC TILES
TEXTURED TILES
1 2 3 4 6 7 8
FF4 CERAMIC TILES (TOILET)
NEW LEVISTE TOWER NEW LEVISTE TOWER
FF5 RUBBER FLOORING
1 TYP. RESTAURANT LEVEL (7F-8F)
SCALE @A1 (1:100) WF1 SATIN FINISH
2 ENGINEERING LEVEL (9F)
SCALE @A1 (1:100)
A-104 A-104
WF2 SEMI GLOSS FINISH
SCALE BAR 1:100
WF3 CERAMIC TILES
*ALL DIMENSIONS ARE IN METER
*VERIFY DIMENSION & ELEVATION REFERENCE ON SITE 10 9 8 7 6 5 4 3 2 1 0
TIN NO.: LOCATION: LEGAZPI ST., GREENBELT, MAKATI CONSTRUCTION OTHER PROJECT WITHOUT APPROPRIATE CONSENT.
PROJECT REF NUMBER :
ISSUED AT: R.A. 9266
GSPublisherVersion 0.98.99.14
N N
1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8
23.85 23.85
0.60 2.99 3.74 3.60 6.59 0.91 2.77 2.06 0.60 0.60 2.99 3.74 3.60 6.59 0.91 2.77 2.06 0.60
10.36 7.50 3.99 1.00 0.44 0.56 0.85 4.75 12.26 4.99 0.44
1.60 1.19 1.20 2.37 2.39
5 5
2 3 4 2 3 4
1.57
1.57
PROPERTY LINE PROPERTY LINE
PROPERTY LINE
PROPERTY LINE
SETBACK PROVISION FOR ROLL-UP DOOR SETBACK
0.67
0.67
11
13
12
10
1.40
J J J J
SETBACK
SETBACK
D
SHO.
STAIRS-04 13 STAIRS-04
2.51
3.01
3.01
3.01
3.01
9 see details see details
1.02
14
8
15
7
4.85
15G x 0.26
16R x 0.19
16
6
DOWN
5
I I I I
4
SHOWER
LOCKER
1.05 1.10
3
2 SHO.
TOILET-06
see details
8.53
ACCESS D
UP
SHO.
2
9.83
9.83
TO GYM
11
12
D
5.53
5.53
5.53
5.53
TOILET-07
1.91
PWD D MULTI-PURPOSE MULTI-PURPOSE see details PWD
13 11
13
GYM AREA
13
10 10
91.31 m2 81.22 m2 STAIRS-02
TOILET STAIRS-02
3.68
12 14
9 9
13 15
8 see details 8 see details
18.11 m2 172.21 m2 ELEV +45.30 ENTRANCE
14 16
D FF-2 FF-2 7 7
20G x 0.26
21R x 0.19
15 17
15G x 0.26
16R x 0.19
6 6
TOILET TOILET
/ EXIT
1.76
1.76
16 18
13 D
5 5
DOWN 19
4 4
13
20
3 3
H H H H
21
2 2
DOWN
1 1
UP UP
1.20
1.20
1.50
1.50
PRESSURIZATION PRESSURIZATION
TO FIRE EXIT
14 FF-1 TO FIRE EXIT
14 FF-1
2.49
2.49
2.49
2.49
ALUMINUM FRAMING ALUMINUM FRAMING
MOVABLE SLIDING FOLDING MOVABLE SLIDING FOLDING
DRINKING AREA FF-5
12
12
PRESSURIZATION PRESSURIZATION
1.40
1.40
PARTITION WALL PARTITION WALL
TO FIRE EXIT TO FIRE EXIT
1.54
1.54
G 11
13
G G 11
13
G
10 10
14 14
9 9
15 15
8 8
16 16
STAIRS-01 7 STAIRS-01 7
5.59
5.60
2.58
2.58
21G x 0.26
21G x 0.26
22R x 0.18
22R x 0.18
ELEV.-03 ELEV.-03
17 17
see details 6
see details 6
4.60
4.60
4.60
5 5
5.00
5.00
5.00
5.00
20 20
3 3
F F F F
21 21
2 2
1.47
14
0.80
0.80
FF-1 FF-1
E E E E
UTI. UTI.
2.01
2.00
PLUMBING PLUMBING
D
36.97
36.97
0.80
0.80
CHASE CHASE
1.20
1.20
CONDUIT CHASE CONDUIT CHASE
6.41 m2 6.41 m2
15 to Residential PB to Residential PB
36.36
36.36
D" EE ROOM D" EE ROOM
3.60
3.20
3.60
3.20
ELEV.-02 ELEV.-02
1.60
2.00
TOILET-05 FEMALE D THRU-0UT UPPER FLOOR)
see details THRU-0UT UPPER FLOOR)
see details
see details FF-2 15 11.22 m2 11.22 m2
3.80
SHO. TOILET
D 10.84 m2
13
2.41
2.41
1.00 1.10
D LOW ZONE D
5.00
5.00
5.40
5.00
5.00
5.40
SHALLOW POOL
62.68 m2 ELEV -0.30 SEATING AREA ELEV -0.30 ELEVATOR
2.99
2.99
2.81 0.80
ELEV -0.10
3.24
LIGHT LIGHT
10.44
3.30
3.30
3.30
3.30
ELEV -0.70 WELL WELL
SEATING AREA
SEATING AREA
REST AREA
2.99
DRY AREA
B WATER FF-2 B B WATER B
FALLS FALLS
10.00
DOWN
2.84
FF-4 FF-4
BARRIER BARRIER
6.50
6.50
6.50
6.50
ELEV -0.10 ELEV -0.10
OVERFLOW OVERFLOW
POOL LADDER
FF-4
A A A A
SETBACK
SETBACK
PROPERTY LINE
PROPERTY LINE
DEEP POOL
2.96
2.96
66.37 m2
POOL GUTTER POOL GUTTER ELEV -1.60 POOL GUTTER POOL GUTTER
0.86
0.86
(VARIES BASED ON SUPPLIERS DETAILS)
PROPERTY LINE PROPERTY LINE
0.57
0.57
1 6 1 6
8 22.52 7 8 7
0.64 5.19 0.80 6.83 9.70 3.13 0.70
0.60 3.77 3.74 3.60 7.50 2.77 4.42 0.60 FINISHES 0.60 3.77 3.74 3.60 7.50 2.77 4.42 0.60
26.99 26.99
FF1 BARE CEMENT EPOXY FLOORING
1 2 3 4 6 7 8 FF2
FF3
CERAMIC TILES
TEXTURED TILES
1 2 3 4 6 7 8
FF4 CERAMIC TILES (TOILET)
NEW LEVISTE TOWER NEW LEVISTE TOWER
FF5 RUBBER FLOORING
1 AMENTIES (10F)
SCALE @A1 (1:100) WF1 SATIN FINISH
2 MEZZANINE LEVEL (10MF)
SCALE @A1 (1:100)
A-105 A-105
WF2 SEMI GLOSS FINISH
SCALE BAR 1:100
WF3 CERAMIC TILES
*ALL DIMENSIONS ARE IN METER
*VERIFY DIMENSION & ELEVATION REFERENCE ON SITE 10 9 8 7 6 5 4 3 2 1 0
TIN NO.: LOCATION: LEGAZPI ST., GREENBELT, MAKATI CONSTRUCTION OTHER PROJECT WITHOUT APPROPRIATE CONSENT.
PROJECT REF NUMBER :
ISSUED AT: R.A. 9266
GSPublisherVersion 0.98.99.14
N N
1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8
23.85 23.85
0.60 2.99 3.74 3.60 6.59 0.91 2.77 2.06 0.60 0.60 2.99 3.74 3.60 6.59 0.91 2.77 2.06 0.60
5.22 3.95 4.01 4.50 5.16 0.44 0.56 5.22 3.95 4.01 4.50 5.16
5 5
2 3 4 2 3 4
1.57
1.57
PROPERTY LINE PROPERTY LINE
FRAMING WITHOUT GLASS FRAMING WITHOUT GLASS
PROPERTY LINE
PROPERTY LINE
SETBACK SETBACK
0.67
0.67
BALCONY BALCONY BALCONY BALCONY BALCONY BALCONY
J J J J
SETBACK
SETBACK
7.03 m2 7.02 m2 8.04 m2 7.03 m2 7.02 m2 8.04 m2
D D D D D D
3.01
3.01
3.01
3.01
3.48
3.53
3 3 3 3 3 3
MASTER MASTER
4.93
5.08
BEDROOM BEDROOM
D MASTER D MASTER
I 21.48 m2
7 D BEDROOM I I 21.48 m2
7 D BEDROOM I
23.02 m2 23.11 m2
T&B 7 T&B 7
1.40
1.60
3.57 m2 3.57 m2
LIVING LIVING LIVING LIVING
9.83
9.83
BEDROOM WIC BEDROOM WIC
11
11
15.39 m2 10.82 m2 15.39 m2 10.92 m2
5.53
5.53
5.53
5.53
PROVISION PROVISION
D 10
STAIRS-02 D 10
STAIRS-02
3.61
12 12
FOR 9
FOR 9
3.46
7 T&B 7 T&B
13 13
OUTDOOR 14
8
see details OUTDOOR 14
8
see details
7 7
UNIT UNIT
15 15
18G x 0.26
18G x 0.26
19R x 0.18
19R x 0.18
T&B T&B
6 6
BEDROOM 1 BEDROOM 1
16 16
5 5
UNIT C
3.59 m2
UNIT D UNIT C
3.59 m2
UNIT D
17 17
4 4
12.87 m2
FF-2 12.87 m2
FF-2
18 18
D D
3 3
H H H H
19 19
100.78 m2 100.78 m2
2 2
7 110.58 m2 DOWN
UP
1
7 110.58 m2 DOWN
UP
1
1.50
PRESSURIZATION PRESSURIZATION
T&B T&B
TO FIRE EXIT
LIVING 14 FF-1 TO FIRE EXIT
LIVING 14 FF-1
2.49
2.49
2.49
2.49
3.90 m2 3.90 m2
10
10
PRESSURIZATION PRESSURIZATION
1.40
1.40
TO FIRE EXIT TO FIRE EXIT
1.50
1.50
UNIT E UNIT E
G 11 58.04 m2
G G 11 58.04 m2
G
9 9
12 12
8 8
STAIRS-01 STAIRS-01
14 14
5.59
5.60
2.63
2.63
6 6
66.15 m2 35.50 m2 65.45 m2 ELEV.-03 66.15 m2 35.50 m2 65.28 m2 ELEV.-03
18G x 0.29
18G x 0.29
19R x 0.18
19R x 0.18
see details see details
15 15
5 5
see details see details
4.60
4.60
4.60
4.60
16 16
5.00
5.00
5.00
5.00
3 3
18 18
F F F F
2 2
ELEVATOR ELEVATOR
19 19
1 1
UP UP
DOWN DOWN
1.47
6 6 6 6 6 6
0.80
0.80
FF-1 FF-1
E E E E
1.48
1.48
PLUMBING PLUMBING
CHASE CHASE
36.97
36.97
0.80
0.80
D D
1.20
1.20
CONDUIT CHASE CONDUIT CHASE
14 H A L L W A Y to Residential PB
14 H A L L W A Y to Residential PB
36.36
36.36
ELEV +48.30 ELEV +65.30
D" MFP 75.28 m2
EE ROOM D" MFP 75.28 m2
D EE ROOM
3.60
3.20
3.60
3.20
ELEV.-02 15 ELEV.-02
2.77
(BUSDUCT CHASE (BUSDUCT CHASE
2.00
2.00
see details see details
D THRU-0UT UPPER FLOOR) THRU-0UT UPPER FLOOR)
T&B 15 11.22 m2 LOCATION 11.22 m2
T&B T&B OF ERI (17F)
D' D' D' D'
3.01 m2
3.00 m2 T&B 3.00 m2 T&B T&B
D 4.57 m2 KITCHEN D D D 4.91 m2 4.91 m2 D
6 6 6 6 6
9.79
D
2.41
2.41
MACHINE
D D
7 ROOM LESS
KITCHEN 7 7 KITCHEN ELEVATOR
KITCHEN
D LOW ZONE D LOW ZONE
5.00
5.00
5.40
5.00
5.00
5.40
5.55
UNIT F
5.50
2.99
ROOM LESS
18.06 m2
D FF-2 45.41 m2 18.06 m2
D ELEVATOR
7 7
DINING UNIT A UNIT B
C C C C
19.20
3.24
3.24
LIGHT LIGHT
T&B SEWING T&B T&B T&B T&B
2.50
2.50
3.30
3.30
3.30
3.30
FOR WELL FOR WELL
T&B DINING T&B
2.90
OUTDOOR
3.68 m2
6.57 m2 LIVING ROOM
3.44 m2 4.42 m2 OUTDOOR
3.68 m2
3.44 m2 4.42 m2
UNIT 32.68 m2 UNIT
12.04 m2
D D
B T&B
D
7
D
7 7 MASTER
B B T&B T&B
7 MASTER
B
3.91 m2
T&B BEDROOM 4.87 m2 4.87 m2
T&B BEDROOM
D BEDROOM 2.51 m2 23.19 m2 2.51 m2 23.19 m2
14.81 m2
UNIT B LIVING D D LIVING
7
4.75
75.84 m2 81.54 m2
LIVING 119.32 m2
7 7
BEDROOM 2 BEDROOM 2 BEDROOM 2
62.54 m2
FF-2 BEDROOM 1
6.90
6.90
6.76
6.76
18.06 m2 18.06 m2
MASTER BEDROOM 1 MASTER
6.50
6.50
6.50
6.50
6.50
14.48 m2
D D 13.76 m2
BEDROOM 13.76 m2
BEDROOM
25.07 m2
7 LIVING 25.07 m2
7
A A A A
SETBACK
SETBACK
PROPERTY LINE
PROPERTY LINE
D D D D D D D
3 3 3 3 3 3 3
2.01
SETBACK SETBACK
0.86
0.86
0.86
FRAMING WITHOUT GLASS FRAMING WITHOUT GLASS FRAMING WITHOUT GLASS FRAMING WITHOUT GLASS
PROPERTY LINE PROPERTY LINE
0.57
0.57
1 6 1 6
8 7 8 7
0.64 3.90 3.01 2.96 4.01 4.51 3.02 4.25 0.70 0.64 3.90 3.51 3.65 3.65 3.68 3.02 4.25 0.70
0.60 3.77 3.74 3.60 7.50 2.77 4.42 0.60 FINISHES 0.60 3.77 3.74 3.60 7.50 2.77 4.42 0.60
26.99 26.99
FF1 BARE CEMENT EPOXY FLOORING
1 2 3 4 6 7 8 FF2
FF3
CERAMIC TILES
TEXTURED TILES
1 2 3 4 6 7 8
FF4 CERAMIC TILES (TOILET)
NEW LEVISTE TOWER NEW LEVISTE TOWER
FF5 RUBBER FLOORING
1 6-UNITS RES. FLOOR PLAN (11F-16F)
SCALE @A1 (1:100) WF1 SATIN FINISH
1 5-UNITS RES. FLOOR PLAN (17-21F)
SCALE @A1 (1:100)
A-106 A-106
WF2 SEMI GLOSS FINISH
SCALE BAR 1:100
WF3 CERAMIC TILES
*ALL DIMENSIONS ARE IN METER
*VERIFY DIMENSION & ELEVATION REFERENCE ON SITE 10 9 8 7 6 5 4 3 2 1 0
TIN NO.: LOCATION: LEGAZPI ST., GREENBELT, MAKATI CONSTRUCTION OTHER PROJECT WITHOUT APPROPRIATE CONSENT.
PROJECT REF NUMBER :
ISSUED AT: R.A. 9266
GSPublisherVersion 0.98.99.14
N N
1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8
23.85 23.85
0.60 2.99 3.74 3.60 6.59 0.91 2.77 2.06 0.60 2.99 3.74 3.60 6.59 0.91 2.77 2.06
0.56 4.72 8.46 4.50 5.16 0.44 7.92 4.13 4.13 5.82 0.85 0.44
5 5
2 3 4 2 3 4
1.57
1.57
PROPERTY LINE PROPERTY LINE
PROPERTY LINE
PROPERTY LINE
SETBACK SETBACK
3.54
0.67
0.67
2.64
BALCONY BALCONY
J J J J
SETBACK
SETBACK
6.27 m2 11.04 m2
D D
3.01
3.01
3.48
3 3
MASTER KITCHEN
4.88
1.04
1.04
5.00
5.08
BEDROOM D
26.34 m2
MASTER
I 18.99 m2
7
D BEDROOM I I I
LIVING BEDROOM 1 23.01 m2
BALCONY MASTER'S
T&B 23.49 m2 D LIVING 7
1.60
3.57 m2
7
57.15 m2 BEDROOM BEDROOM 1 BEDROOM 2
9.83
29.49 m2 27.05 m2 27.06 m2
WIC
11
11
T&B
10.82 m2 D DR
T&B
W
5.53
5.53
5.53
5.53
6.02 m2 7
PROVISION
12
10
D
10
3.66
12 13
FOR 9
3.46
9
13 14
see details 12 see details
8 8
OUTDOOR
UNIT D T&B T&B T&B
14 15
7 7
8.12 m2
4.82
4.82
UNIT BEDROOM 1 D 5.56 m2 5.57 m2
15 16
18G x 0.26
19R x 0.18
20G x 0.26
21R x 0.19
6 6
16 21.50 m2 17
5
WIC
5
10.99 m2 7 T&B 179.51 m2 17
18
4
18
19
4
3 3
H H H H
6.04 m2
FF-2
19 20
UNIT C
2 2
DOWN 21
1 1
UP
D
UP
DOWN
1.20
1.50
1.50
PRESSURIZATION 102.38 m2 PRESSURIZATION
D D D
TO FIRE EXIT D FF-1 TO FIRE EXIT 3 FF-1
BEDROOM 2 14
UNIT A 14
2.49
2.49
2.49
2.49
FF-2 7 9 9 9
T&B 23.90 m2
10
12
3.54 m2 PRESSURIZATION
715.33 m2 PRESSURIZATION
1.40
1.40
TO FIRE EXIT TO FIRE EXIT
1.50
1.58
G 11
DINING G G 11
G
KITCHEN/
9
13
12 10
14
8 9
H A L L W A Y
DINING
13 15
7 8
STAIRS-01 D STAIRS-01
14 16
5.59
5.59
7
2.63
2.55
6
21G x 0.25
ELEV.-03 ELEV.-03
22R x 0.18
18G x 0.29
19R x 0.18
17
see details 56.87 m2 see details
15
6
5
7 see details see details
18
4.60
4.60
4.60
4.60
5
16
HIGH ZONE
4 19
17 4
5.00
5.00
5.00
5.00
3
20
18 3
F F F F
21
2 2
ELEVATOR
19 22
1 1
26.14 m2
KITCHEN
UP UP
D
DOWN DOWN
1.47
14.78 m2 14
0.80
0.80
FF-1 FF-1 245.11 m2
E 6 T&B
3.17 m2
6
E E E
PLUMBING PLUMBING
CHASE CHASE
36.97
36.97
0.80
0.80
1.27
D D
2.80
1.20
1.20
CONDUIT CHASE
0.87
3.00
14 H A L L W A Y to Residential PB
36.36
36.36
ELEV +82.30 6
D" MFP 56.38 m2
D D" UTILITY ROOM FF-2 DINING AREA
3.40
EE ROOM
3.52
3.20
3.20
15 (BUSDUCT CHASE
2.12
(BUSDUCT CHASE
2.25
2.00
2.00
ELEV +102.70
THRU-0UT UPPER FLOOR)
THRU-0UT UPPER FLOOR)
D
0.06
D 11.22 m2
T&B 15
D' 3.00 m2 D
6
T&B
4.88 m2
T&B
4.85 m2
D
6
D' D' PROVISION
FOR
OUTDOOR
15
D'
WIC UNIT
2.41
2.41
D 6.93 m2 T&B
7 D
KITCHEN KITCHEN 7
6.40
LIVING AREA
7.00
D 10.49 m2 13.04 m2
D
5.40
5.40
5.27
5.60
7.70
5.55
BEDROOM 3
BEDROOM 1 18.77 m2
PIANO AREA D
2.99
2.99
REST ROOM
18.21 m2
D D 2 31.55 m2
7 7
C UNIT B
C C D D D
C
UNIT A DINING DINING T&B
199.06 m2 4.29 m2 3 3 9
PROVISION 15.92 m2 LIGHT LIGHT
3.04
2.69
159.32 m2 D
2.50
3.30
3.30
3.30
3.30
FOR T&B WELL WELL
OUTDOOR FF-2 3
3.75 m2
FF-2 D
2.00
UNIT
GARDEN 9
T&B
3.09 m2 199.50 m2
B T&B
T&B
D MASTER
B B B
LIVING 3.32 m2
T&B 3.62 m2 7 BEDROOM
3.37 m2
43.87 m2
9.65
D LIVING
34.74 m2
BEDROOM 2 68.43 m 2
44.50 m2
D 7
4.49
4.49
15.46 m2
D
7
5.47
7
6.76
6.90
6.76
MASTER
6.50
6.50
BEDROOM FF-3
25.26 m2 D BEDROOM 2 D
A 3 3
A A A
SETBACK
SETBACK
11.84 m2
PROPERTY LINE
PROPERTY LINE
BEDROOM 1 D
14.87 m2 3 FF-2
2.58
15.21 m2 15.66 m2 7.31 m2
0.88
2.87
BALCONY BALCONY BALCONY
1.01
SETBACK SETBACK
0.86
0.72
1 6 1 6
8 7 1.28 8 4.94 8.53 7
0.64 3.93 3.34 3.79 3.87 3.45 2.94 4.33 0.70 0.64 14.75 3.81 7.79
0.60 3.77 3.74 3.60 7.50 2.77 4.42 0.60 FINISHES 3.77 3.74 3.60 7.50 2.77 4.42
26.99 26.99
FF1 BARE CEMENT EPOXY FLOORING
1 2 3 4 6 7 8 FF2
FF3
CERAMIC TILES
TEXTURED TILES
1 2 3 4 6 7 8
FF4 CERAMIC TILES (TOILET)
NEW LEVISTE TOWER NEW LEVISTE TOWER
FF5 RUBBER FLOORING
2 4-UNITS RES. FLOOR PLAN (22F-27F)
SCALE @A1 (1:100) WF1 SATIN FINISH
1 1-UNIT RES. FLOOR PLAN (28F-32F)
SCALE @A1 (1:100)
A-107 A-107
WF2 SEMI GLOSS FINISH
SCALE BAR 1:100
WF3 CERAMIC TILES
*ALL DIMENSIONS ARE IN METER
*VERIFY DIMENSION & ELEVATION REFERENCE ON SITE 10 9 8 7 6 5 4 3 2 1 0
TIN NO.: LOCATION: LEGAZPI ST., GREENBELT, MAKATI CONSTRUCTION OTHER PROJECT WITHOUT APPROPRIATE CONSENT.
PROJECT REF NUMBER :
ISSUED AT: R.A. 9266
GSPublisherVersion 0.98.99.14
N N
1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8
23.85 23.85
0.60 2.99 3.74 3.60 6.59 0.91 2.77 2.06 0.60 0.60 2.99 3.74 3.60 6.59 0.91 2.77 2.06 0.60
6.76 13.86 2.21 0.45 5.83 3.50 14.36
5 5
2 3 4 2 3 4
1.57
1.57
PROPERTY LINE
PROPERTY LINE
SETBACK
3.54
0.67
2.64
J J J J
SETBACK
PAVEMENT
3.68
4.01
3.01
3.01
3.01
GRASS
6.57
GRASS
PAVEMENT
1.04
1.04
I I I I
1.83
PROVISION FOR
OUTDOOR UNIT
3.50
11
GRASS
1.10
5.53
5.53
5.53
5.53
ROOF DECK
6.82
12
10
13
STAIRS-02 368.53 m2 STAIRS-02
3.53
9
14
15
8 see details see details
7
2.56
16
20G x 0.26
21R x 0.18
6
D FF-3
11
12
10
9
8
7
6
5
4
3
2
1
17
5
5.82
18
4
14 19 35R x 0.20
UP
3 34G x 0.25
ELEV +129.70
H H H H
20
2
21
D DOWN
UP
1
1.30
D D
1.17
PRESSURIZATION 11
FAN LOCATION
14 FF-1 14 FF-1
2.49
2.49
2.49
2.49
FF-3 PRESSURIZATION
1.40
TO FIRE EXIT
14
15
13
16
17
18
19
20
21
22
G G G G
23
24
25
SAFETY AREA BOOSTER FOAM PUMP
26
D
27
28
29
30
31
DO
11 FOAM TANK
D
32
W
33
N
34
(SEE FIRE PROTECTION DETAILS)
35
4 ELEV.-03
see details
4.60
4.60
4.60
4.60
HIGH ZONE
5.00
5.00
LINE OF ROOF SLAB ABOVE
F ELEVATOR F F F
EXCLUSIVE CLUB
26.14 m2
D
FATO
D
0.80
0.80
11
E 311.17 m2 4
E E E
23.13
36.97
36.97
0.80
0.80
1.20
1.20
CONDUIT CHASE
to Residential PB
36.36
36.36
D" D FF-2
D
EE ROOM D"
3.55
3.20
3.20
11 15
(BUSDUCT CHASE
2.00
2.00
ELEV +122.70
THRU-0UT UPPER FLOOR)
LOCATION 11.22 m2
GRASS
OF ERI
D' D' D' D'
H
D WASHING ZONE
2.41
2.41
28.85
11
FF-3 KITCHEN
D
D 5 27.31 m2
D
5.40
5.40
ISLAND
COOKING AREA
5.25
COUNTER
24.57
2.99
2.99
D
PREPARATION AREA
11 TOILET
3.00 m2
C D
C C C
12 LIGHT
2.97
3.30
3.30
3.30
3.30
WELL
PAVEMENT
B B B B
0.36
GRASS
4.49
4.49
GRASS
6.83
6.46
6.50
6.50
A A A A
SETBACK
PROPERTY LINE
PAVEMENT PAVEMENT
2.58
2.87
0.57
SETBACK
0.90
0.86
PROPERTY LINE
0.57
1 6 1 6
1.91
8 7 8 7
3.73 3.74 16.14 2.05 0.70 1.25 1.50 5.35 10.30 5.35 1.50
0.60 3.77 3.74 3.60 7.50 2.77 4.42 0.60 FINISHES 0.60 3.77 3.74 3.60 7.50 2.77 4.42 0.60
26.99 26.99
FF1 BARE CEMENT EPOXY FLOORING
1 2 3 4 6 7 8 FF2
FF3
CERAMIC TILES
TEXTURED TILES
1 2 3 4 6 7 8
FF4 CERAMIC TILES (TOILET)
NEW LEVISTE TOWER NEW LEVISTE TOWER
FF5 RUBBER FLOORING
1 VIP CLUB
SCALE @A1 (1:100) WF1 SATIN FINISH
2 ROOF DECK
SCALE @A1 (1:100)
A-108 A-108
WF2 SEMI GLOSS FINISH
SCALE BAR 1:100
WF3 CERAMIC TILES
*ALL DIMENSIONS ARE IN METER
*VERIFY DIMENSION & ELEVATION REFERENCE ON SITE 10 9 8 7 6 5 4 3 2 1 0
TIN NO.: LOCATION: LEGAZPI ST., GREENBELT, MAKATI CONSTRUCTION OTHER PROJECT WITHOUT APPROPRIATE CONSENT.
PROJECT REF NUMBER :
ISSUED AT: R.A. 9266
GSPublisherVersion 0.96.100.10
*VERIFY DIMENSION & ELEVATION REFERENCE ON SITE
*ALL DIMENSIONS ARE IN METER
DEVELOPER:
REAL ESTATE DEV'T CORP.
DATANG
PRC NO.:
DATE EXPIRY:
7.00
7.00
ARCHITECT
4.00
ISSUED ON:
PTR NO.:
ISSUED AT:
4.00
31F +114.70 31F +114.70
4.00
4.00
30F +110.70 30F +110.70
4.00
4.00
29F +106.70 29F +106.70
LOCATION:
PROJECT TITLE:
4.00
4.00
TYP. 1 UNIT RESIDENTIAL +102.70 TYP. 1 UNIT RESIDENTIAL +102.70
(28F-32F) (28F-32F)
3.40
3.40
LEGAZPI ST., GREENBELT, MAKATI
3.40
26F +95.90 26F +95.90
3.40
3.40
32-STOREY
3.40
24F +89.10 24F +89.10
3.40
3.40
23F +85.70 23F +85.70
3.40
3.40
TYP. 4 UNITS RESIDENTIAL +82.30 TYP. 4 UNITS RESIDENTIAL +82.30
(22F-27F) (22F-27F)
3.40
3.40
21F +78.90 21F +78.90
3.40
3.40
FIRE RATED LOW-E GLASS
20F +75.50 20F +75.50
0.60x3.00mm
(SEE SUPPLIER'S DETAILS)
CLIENT:
3.40
3.40
19F +72.10 19F +72.10
3.40
3.40
3.40
3.40
3.40
3.40
3.40
3.40
4.00
MEZZ. LEVEL GYM (10MF) +44.30 MEZZ. LEVEL GYM (10MF) +44.30
3.00
3.00
4.00
4.00
4.30
8F +33.00 8F +33.00
4.30
4.30
4.30
4.30
4.30
CONSTRUCTION
PERMIT
ADMIN APPROVAL
CLIENT APPROVAL
4.30
4F +15.80 4F +15.80
4.30
4.30
4.30
4.30
6.00
1.20
1.20
4.00
2.80
2.80
3.80
B1 -6.60 B1 -6.60
PROJECT REF NUMBER :
PAPER SIZE :
DRAWN BY :
OWNER SIGNATURE:
CHECKED BY:
4.30
4.30
B2 -10.90 B2 -10.90
ELEVATIONS ELEVATIONS
REVISION:
SHEET NO.:
A 200
ARCHITECTURAL
GSPublisherVersion 0.96.100.10
*VERIFY DIMENSION & ELEVATION REFERENCE ON SITE
*ALL DIMENSIONS ARE IN METER
DEVELOPER:
REAL ESTATE DEV'T CORP.
DATANG
PRC NO.:
DATE EXPIRY:
7.00
7.00
ARCHITECT
4.00
ISSUED ON:
PTR NO.:
ISSUED AT:
4.00
31F +114.70 31F +114.70
4.00
4.00
30F +110.70 30F +110.70
4.00
4.00
29F +106.70 29F +106.70
LOCATION:
PROJECT TITLE:
4.00
4.00
TYP. 1 UNIT RESIDENTIAL +102.70 TYP. 1 UNIT RESIDENTIAL +102.70
(28F-32F) (28F-32F)
3.40
3.40
LEGAZPI ST., GREENBELT, MAKATI
3.40
26F +95.90 26F +95.90
3.40
3.40
32-STOREY
3.40
24F +89.10 24F +89.10
3.40
3.40
23F +85.70 23F +85.70
3.40
3.40
TYP. 4 UNITS RESIDENTIAL +82.30 TYP. 4 UNITS RESIDENTIAL +82.30
(22F-27F) (22F-27F)
3.40
3.40
21F +78.90 21F +78.90
3.40
3.40
20F +75.50 20F +75.50
CLIENT:
3.40
3.40
19F +72.10 19F +72.10
3.40
3.40
18F +68.70 18F +68.70
JOSE ANTONIO LEVISTE
3.40
3.40
3.40
3.40
3.40
3.40
3.40
3.40
4.00
MEZZ. LEVEL GYM (10MF) +44.30 MEZZ. LEVEL GYM (10MF) +44.30
3.00
3.00
4.00
4.00
4.30
8F +33.00 8F +33.00
4.30
4.30
4.30
4.30
4.30
CONSTRUCTION
PERMIT
ADMIN APPROVAL
CLIENT APPROVAL
4.30
4F +15.80 4F +15.80
4.30
4.30
4.30
4.30
6.00
1.20
1.20
4.00
2.80
2.80
3.80
B1 -6.60 B1 -6.60
PROJECT REF NUMBER :
PAPER SIZE :
DRAWN BY :
OWNER SIGNATURE:
CHECKED BY:
4.30
4.30
B2 -10.90 B2 -10.90
ELEVATIONS ELEVATIONS
REVISION:
SHEET NO.:
A 201
ARCHITECTURAL
*VERIFY DIMENSION & ELEVATION REFERENCE ON SITE
*ALL DIMENSIONS ARE IN METER
DEVELOPER:
REAL ESTATE DEV'T CORP.
DATANG
2 3 4 5 6 7
PRC NO.:
DATE EXPIRY:
7.00
7.00
ARCHITECT
4.00
ISSUED ON:
PTR NO.:
ISSUED AT:
4.00
31F +114.70 31F +114.70
4.00
4.00
30F +110.70 30F +110.70
4.00
4.00
29F +106.70 29F +106.70
LOCATION:
PROJECT TITLE:
4.00
4.00
TYP. 1 UNIT RESIDENTIAL +102.70 TYP. 1 UNIT RESIDENTIAL +102.70
(28F-32F) (28F-32F)
3.40
3.40
LEGAZPI ST., GREENBELT, MAKATI
3.40
26F +95.90 26F +95.90
3.40
3.40
32-STOREY
3.40
24F +89.10 24F +89.10
3.40
3.40
23F +85.70 23F +85.70
3.40
3.40
TYP. 4 UNITS RESIDENTIAL +82.30 TYP. 4 UNITS RESIDENTIAL +82.30
(22F-27F) (22F-27F)
3.40
3.40
21F +78.90 21F +78.90
3.40
3.40
20F +75.50 20F +75.50
CLIENT:
3.40
3.40
19F +72.10 19F +72.10
3.40
3.40
18F +68.70 18F +68.70
JOSE ANTONIO LEVISTE
3.40
3.40
3.40
3.40
3.40
3.40
3.40
3.40
4.00
MEZZ. LEVEL GYM (10MF) +44.30 MEZZ. LEVEL GYM (10MF) +44.30
3.00
3.00
4.00
4.00
4.30
8F +33.00 8F +33.00
4.30
4.30
4.30
4.30
4.30
CONSTRUCTION
PERMIT
ADMIN APPROVAL
CLIENT APPROVAL
4.30
4F +15.80 4F +15.80
4.30
4.30
4.30
4.30
6.00
1.20
1.20
4.00
2.80
2.80
3.80
B1 -6.60 B1 -6.60
PROJECT REF NUMBER :
PAPER SIZE :
DRAWN BY :
OWNER SIGNATURE:
CHECKED BY:
4.30
4.30
B2 -10.90 B2 -10.90
SECTIONS SECTIONS
REVISION:
SHEET NO.:
A 202
ARCHITECTURAL
N N
1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8
23.85 23.85
0.60 2.99 3.74 3.60 6.59 0.91 2.77 2.06 0.60 0.60 2.99 3.74 3.60 6.59 0.91 2.77 2.06 0.60
0.56 6.40 9.99 1.31 3.59 0.59 5.95 0.40 3.20 0.40 3.20 3.20 1.31 1.50 2.46 0.56
3.00 0.80 3.00 3.20
5 5
2 3 4 2 3 4
1.57
1.57
3.54
0.67
2.64
J J J J
5.47
CF-1
3.01
3.01
2.05
4.90
1.04
1.04
I I I I
8.53
CF-2
4.12
0.15
5.53
5.53
5.53
5.53
CF-2
5.93
3.63
CF-2
16G x 0.29
19R x 0.18
1.40
18G
17R
0.15
H H H H
1.50
1.50
2.49
2.49
2.49
2.49
1.99
1.20
1.54
G G G G
1.73
0.40
2.50
2.50
x 0.29
x 0.17
CF-3
x 0.26
x 0.18
2.07
5.60
5.60
20G x 0.26
22R x 0.18
0.17
2.58
16G
17R
18G
19R
21G
21R
4.60
4.60
4.60
4.60
5.00
5.00
F F F CF-1 F
1.79
1.47
2.50
2.50
E E E E
0.80
0.80
0.80
0.80
2.20
36.97
36.97
1.27
1.20
1.20
36.36
36.36
D" GRAND LOBBY D"
3.20
3.20
CF-3
1.92
2.00
2.00
2.00
2.00
CF-3
D' D' D' D'
4.00
4.00
CH=4.70M
0.40
COMMERCIAL LEVEL
2.41
2.41
2.00
2.00
2.50
2.50
CF-3
D D
5.00
5.40
5.00
5.40
0.40
CH=2.70M
1.50
16R x 0.19 16R x 0.19
15G x 0.26 15G x 0.26
2.99
2.99
2.50
2.50
C C C C
2.65
5.64
5.64
2.33
LIGHT LIGHT
3.24
3.30
3.30
3.30
3.30
WELL WELL
1.50
CF-1
B B B B
CH=5.90M CF-1
4.49
4.49
6.21
5.92
6.35
6.16
6.50
6.50
A A A A
2.58
2.87
1.64
0.60
0.60
0.86
0.57
1 6 1 6
8 7 8 7
0.61 24.48 0.64
0.60 3.77 3.74 3.60 7.50 2.77 4.42 0.60
0.60 3.77 3.74 3.60 7.50 2.77 4.42 0.60 26.99
26.99
FINISHES
1 2 3 4 6 7 8 1 2 3 4 6 7 8
CF1 GLOSSY CEMENT FINISH
CF2 PVC CEILING PANEL (TOILET) REFLECTED CEILING PLAN
REFLECTED CEILING PLAN CF3 CEILING PANELS
2 LOWER GROUND FLOOR (LG)
1 GROUND FLOOR PLAN
SCALE @A1 (1:100)
CF5
CF6
WOOD DESIGN CEILING PANELS
ACOUSTIC PANELS (RESIDENTIAL) A-300 SCALE @A1 (1:100)
SCALE BAR 1:100
A-300
*ALL DIMENSIONS ARE IN METER
*VERIFY DIMENSION & ELEVATION REFERENCE ON SITE 10 9 8 7 6 5 4 3 2 1 0
TIN NO.: LOCATION: LEGAZPI ST., GREENBELT, MAKATI CONSTRUCTION OTHER PROJECT WITHOUT APPROPRIATE CONSENT.
PROJECT REF NUMBER :
ISSUED AT: R.A. 9266
GSPublisherVersion 0.98.99.14
N N
1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8
23.85 23.85
0.60 2.99 3.74 3.60 6.59 0.91 2.77 2.06 0.60 0.60 2.99 3.74 3.60 6.59 0.91 2.77 2.06 0.60
6.74 11.53 3.58 0.92 6.73 10.19 3.67 2.16
6.15 0.20 3.20 0.40 3.20 3.20 0.20 5.07 0.59 2.81 2.39 1.85 1.01 0.98 0.20 6.79 3.47 2.36
5 5
2 3 4 2 3 4
1.58
0.60
3.54
2.64
2.64
J J J J
0.60
1.96
2.00
1.04
1.04
1.04
1.04
5.05
I I I I
5.42
CF-2
1.88
7.93
5.93
5.53
5.53
5.53
5.53
1.50
5.97
H H H H
5.20
1.50
1.50
2.49
2.49
2.49
2.49
1.54
1.54
G G G G
5.60
5.60
21G x 0.26
21G x 0.26
22R x 0.17
0.20
22R x 0.20
2.58
2.58
ELEVATOR
4.60
4.60
4.60
4.60
PIT
5.00
5.40
(2.30m
F HEADROOM
CLEAR HEIGHT)
F F F
1.47
1.47
E E E E
0.80
0.80
0.80
0.80
2.20
2.20
36.97
36.97
1.20
1.20
0.87
0.87
36.36
36.36
D" D"
3.60
3.20
3.20
PARKING LEVEL PARKING LEVEL
1.92
1.92
2.00
2.00
2.00
2.00
DRIVEWAY DRIVEWAY
D' D' D' D'
4.00
4.00
CF-1 CF-1
0.40
2.41
2.41
2.00
2.41
ELEVATOR
D PIT
D
5.00
5.40
5.00
5.40
(2.30m
0.40
HEADROOM
1.50
1.50
CH=3.00M CLEAR HEIGHT) CH=3.00M
2.99
2.99
C C C C
2.65
2.65
LIGHT LIGHT
3.04
3.30
3.30
3.30
3.30
WELL WELL
2.50 0.68
2.50 0.68
12.39
11.99
B B B B
9.40
4.49
4.49
4.49
4.49
2.50
2.50
6.76
A A A A
2.16
2.16
2.58
2.58
2.87
2.87
0.60
0.60
0.60
0.57
1 6 1 6
8 7 8 7
0.61 0.67 5.00 5.00 7.10 5.00 1.71 0.64 0.61 0.67 5.00 5.00 7.10 5.00 1.71 0.64
0.60 3.77 3.74 3.60 7.50 2.77 4.42 0.60 0.60 3.77 3.74 3.60 7.50 2.77 4.42 0.60
26.99 26.99
FINISHES
1 2 3 4 6 7 8 1 2 3 4 6 7 8
CF1 GLOSSY CEMENT FINISH
REFLECTED CEILING PLAN CF2 PVC CEILING PANEL (TOILET) REFLECTED CEILING PLAN
TIN NO.: LOCATION: LEGAZPI ST., GREENBELT, MAKATI CONSTRUCTION OTHER PROJECT WITHOUT APPROPRIATE CONSENT.
PROJECT REF NUMBER :
ISSUED AT: R.A. 9266
GSPublisherVersion 0.98.99.14
N N
1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8
23.85 23.85
0.60 2.99 3.74 3.60 6.59 0.91 2.77 2.06 0.60 0.60 2.99 3.74 3.60 6.59 0.91 2.77 2.06 0.60
6.76 10.19 5.89 6.76 10.19 5.89
3.20 0.40 3.20 3.00 3.20 0.40 3.20 3.00 1.31 4.59
5 5
2 3 4 2 3 4
1.57
1.57
0.67
0.67
J J J J
3.01
3.01
3.01
3.01
3.01
3.01
4.85
5.00
5.00
I I I I
1.14
1.14
5.53
5.53
5.53
5.53
5.53
5.53
4.83
4.83
21G x 0.26
21G x 0.26
0.20
22R x 0.20
22R x 0.29
17R x 0.18
2.59
2.59
16G
H H H H
1.10
1.10
1.50
1.50
2.49
2.49
2.49
2.49
1.40
1.40
1.54
1.54
G G G G
7.09
x 0.29
x 0.17
5.60
x 0.26
21G x 0.26
x 0.20
22R x 0.20
2.58
2.58
21G16G
22R17R
4.60
4.60
4.60
4.60
5.00
5.00
5.00
5.00
F F F F
1.47
1.47
E E E E
0.80
0.80
0.80
0.80
2.21
2.20
36.97
36.97
1.20
1.20
PARKING LEVEL PARKING LEVEL
36.36
36.36
D" D"
3.20
3.60
3.20
0.15
0.15
DRIVEWAY DRIVEWAY
2.00
2.00
CF-1 CF-1
6.15
D' D' D' D'
4.00
4.00
4.00
4.00
CH=3.20M CH=3.20M
2.41
2.41
D D
5.00
5.40
5.00
5.00
5.40
0.40
0.41
2.32
2.99
2.99
2.45
C C C C
2.50
LIGHT LIGHT
3.24
3.24
.
3.30
3.30
3.30
3.30
WELL WELL
B B B B
2.50
12.59
12.58
2.50
6.76
6.76
6.50
6.50
6.50
6.50
A A A A
2.76
0.86
0.86
0.57
0.57
1 6 1 6
8 7 8 7
1.90 5.00 5.00 7.10 5.00 2.99 1.26 5.00 5.00 7.10 5.00
0.60 3.77 3.74 3.60 7.50 2.77 4.42 0.60 0.60 3.77 3.74 3.60 7.50 2.77 4.42 0.60
26.99 26.99
FINISHES
1 2 3 4 6 7 8 1 2 3 4 6 7 8
CF1 GLOSSY CEMENT FINISH
REFLECTED CEILING PLAN CF2 PVC CEILING PANEL (TOILET) REFLECTED CEILING PLAN
TIN NO.: LOCATION: LEGAZPI ST., GREENBELT, MAKATI CONSTRUCTION OTHER PROJECT WITHOUT APPROPRIATE CONSENT.
PROJECT REF NUMBER :
ISSUED AT: R.A. 9266
GSPublisherVersion 0.98.99.14
1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8
23.85 23.85
0.60 2.99 3.74 3.60 6.59 0.91 2.77 2.06 0.60 0.60 2.99 3.74 3.60 6.59 0.91 2.77 2.06 0.60
6.76 10.19 5.89 0.56 22.85
6.56 5.98 5.71 4.59
5 5
2 3 4 2 3 4
1.57
3.54
0.67
0.67
2.64
J J J J
2.70
2.70
3.01
3.01
CF-2 CF-2
1.04
1.04
I I I I
CF-2 CF-2
2.31
2.31
CF-1
8.53
8.53
1.14
5.53
5.53
5.53
5.53
4.83
4.83
21G x 0.26
21G x 0.26
22R x 0.20
22R x 0.20
2.59
H H H H
1.10
1.50
1.50
2.49
2.49
2.49
2.49
1.40
1.40
1.54
1.54
CF-3
G CH=3.20M
G G G
OFFICE LEVEL
5.59
5.59
21G x 0.26
21G x 0.26
22R x 0.20
22R x 0.20
2.58
2.58
4.60
4.60
4.60
4.60
CF-1
5.00
5.00
5.00
5.00
F F F F
CH=4.00M
1.47
1.47
0.80
E E E E
0.80
0.80
2.21
2.21
36.97
0.80
36.97
LOBBY
1.20
1.20
36.36
36.36
D" D"
43.80 m2
3.20
3.60
3.20
3.60
LP6F PP6F
0.15
0.15
2.00
2.00
4.00
4.00
2.41
CF-3 CF-3
2.41
CH=3.20M CH=3.20M
D D
5.40
5.00
5.00
5.40
5.00
5.00
0.40
2.99
2.99
3.24
3.24
3.30
3.30
3.30
3.30
WELL WELL
CH=4.00M
B B B B
12.99
12.59
4.49
4.49
6.76
6.50
6.50
7.33
A A A A
2.58
2.87
0.86
0.86
0.57
1 6 1 6
8 7 8 7
0.64 25.65 0.71
0.60 3.77 3.74 3.60 7.50 2.77 4.42 0.60 0.60 3.77 3.74 3.60 7.50 2.77 4.42 0.60
26.99 26.99
FINISHES
1 2 3 4 6 7 8 1 2 3 4 6 7 8
CF1 GLOSSY CEMENT FINISH
REFLECTED CEILING PLAN CF2 PVC CEILING PANEL (TOILET) REFLECTED CEILING PLAN
TIN NO.: LOCATION: LEGAZPI ST., GREENBELT, MAKATI CONSTRUCTION OTHER PROJECT WITHOUT APPROPRIATE CONSENT.
PROJECT REF NUMBER :
ISSUED AT: R.A. 9266
GSPublisherVersion 0.98.99.14
N N
1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8
23.85 23.85
0.60 2.99 3.74 3.60 6.59 0.91 2.77 2.06 0.60 0.60 2.99 3.74 3.60 6.59 0.91 2.77 2.06 0.60
6.76 6.00 10.09 10.36 4.50 8.43
5 5
2 3 4 2 3 4
1.57
1.57
3.54
3.54
0.67
2.64
2.64
J J J J
3.71
CF-2 CF-2
1.04
1.04
1.04
1.04
5.00
5.00
I I I I
5.88
CF-2 CF-2
RESTAURANT 2
8.53
CF-4 CF-4 CF-3 ENGINEERING
4.50
OFFICE
1.10
1.14
5.53
5.53
5.53
5.53
CH=3.20M CF-1 CF-1 CF-2
2.65
2.56
4.83
2.59
21G x 0.26
22R x 0.20
20G x 0.26
21R x 0.18
1.00
6.22
H H H H
1.10
1.50
1.50
2.49
2.49
2.49
2.49
1.40
1.54
1.54
G G G G
ENGINEERING LEVEL
5.59
5.59
2.58
2.58
21G x 0.26
21G x 0.26
22R x 0.20
22R x 0.20
4.60
4.60
4.60
4.60
CF-1
5.00
5.00
5.00
F F F CH=3.70M
F
1.47
1.47
0.80
0.80
E E E E
2.01
2.01
36.97
36.97
0.80
0.80
1.20
1.20
36.36
36.36
D" RESTAURANT 1 D"
3.60
3.20
3.60
3.20
CF-3
2.00
2.00
3.02
CF-2 CF-1
CH=3.20M
D' GROUNDING BAR
ON EVERY EE-ROOM
D' D' D'
2.41
2.41
OUTDOOR DINING
7.39
1.65
CF-2 CF-3
D D
5.00
5.40
5.00
5.00
5.40
CH=3.20M
2.99
2.99
2.73
CF-2
CH=1.00M
C WATER FALLS
C C WATER FALLS
C
CHASE CHASE ACCU - 1/9
17.19
3.24
3.24
LIGHT LIGHT
3.30
3.30
3.30
3.30
WELL WELL
ACCU - 2/9
B B B B
9.80
4.49
4.49
4.49
4.49
6.76
A A A CH=2.00M
A
2.58
2.58
2.87
2.87
0.86
0.86
0.57
0.57
1 6 1 6
8 7 8 7
9.71 3.11 3.14 9.69 0.70 12.82 12.83
0.60 3.77 3.74 3.60 7.50 2.77 4.42 0.60 0.60 3.77 3.74 3.60 7.50 2.77 4.42 0.60
26.99 26.99
FINISHES
1 2 3 4 6 7 8 1 2 3 4 6 7 8
CF1 GLOSSY CEMENT FINISH
REFLECTED CEILING PLAN CF2 PVC CEILING PANEL (TOILET) REFLECTED CEILING PLAN
TIN NO.: LOCATION: LEGAZPI ST., GREENBELT, MAKATI CONSTRUCTION OTHER PROJECT WITHOUT APPROPRIATE CONSENT.
PROJECT REF NUMBER :
ISSUED AT: R.A. 9266
GSPublisherVersion 0.98.99.14
N N
1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8
23.85 23.85
0.60 2.99 3.74 3.60 6.59 0.91 2.77 2.06 0.60 0.60 2.99 3.74 3.60 6.59 0.91 2.77 2.06 0.60
10.36 7.50 3.99 1.00 0.44 0.56 0.85 4.75 12.26 4.99 0.44
1.60 1.19 1.20 2.37 2.39
5 5
2 3 4 2 3 4
1.57
1.57
PROVISION FOR ROLL-UP DOOR
0.67
0.67
1.40
J J J J
2.51
3.01
3.01
3.01
3.01
1.02
CF-2
4.85
15G x 0.26
16R x 0.19
I I I I
1.05 1.10
CF-2
8.53
CF-2
9.83
9.83
GYM LEVEL
5.53
5.53
5.53
5.53
CF-3
1.91
CF-2 CF-2
CF-3
3.68
CH=2.70M
CH=3.30M
20G x 0.26
21R x 0.19
15G x 0.26
16R x 0.19
1.76
1.76
CF-2 CF-2
H H H H
1.20
1.20
1.50
1.50
2.49
2.49
2.49
2.49
1.40
1.40
1.54
1.54
G G G G
5.59
5.60
2.58
2.58
21G x 0.26
21G x 0.26
22R x 0.18
0.20
22R x 0.18
4.60
4.60
4.60
4.60
5.00
5.00
5.00
5.00
F F F F
1.47
1.47
0.80
0.80
E E E E
2.01
2.00
36.97
36.97
0.80
0.80
1.20
1.20
36.36
36.36
D" D"
3.60
3.20
3.60
3.20
CF-2
1.60
2.00
2.00
3.80
2.41
1.00 1.10
D D
5.00
5.00
5.40
5.00
5.00
5.40
AMENITIES
2.99
2.99
2.81 0.80
CF-5
C WATER FALLS
C C CH=5.00M WATER FALLS
C
CHASE CHASE
3.24
LIGHT LIGHT
10.44
3.30
3.30
3.30
3.30
WELL WELL
2.99
B B B B
10.00
2.84
6.50
6.50
6.50
6.50
A A A A
2.96
2.96
0.86
0.86
0.86
0.57
0.57
1 6 1 6
8 22.52 7 8 7
0.64 5.19 0.80 6.83 9.70 3.13 0.70
0.60 3.77 3.74 3.60 7.50 2.77 4.42 0.60 0.60 3.77 3.74 3.60 7.50 2.77 4.42 0.60
26.99 26.99
FINISHES
1 2 3 4 6 7 8 1 2 3 4 6 7 8
CF1 GLOSSY CEMENT FINISH
REFLECTED CEILING PLAN CF2 PVC CEILING PANEL (TOILET) REFLECTED CEILING PLAN
1 AMENTIES (10F)
SCALE @A1 (1:100)
CF3
CF5
CEILING PANELS
WOOD DESIGN CEILING PANELS
2 MEZZANINE LEVEL (10MF)
SCALE @A1 (1:100)
A-305 CF6 ACOUSTIC PANELS (RESIDENTIAL) A-305
SCALE BAR 1:100
*ALL DIMENSIONS ARE IN METER
*VERIFY DIMENSION & ELEVATION REFERENCE ON SITE 10 9 8 7 6 5 4 3 2 1 0
TIN NO.: LOCATION: LEGAZPI ST., GREENBELT, MAKATI CONSTRUCTION OTHER PROJECT WITHOUT APPROPRIATE CONSENT.
PROJECT REF NUMBER :
ISSUED AT: R.A. 9266
GSPublisherVersion 0.98.99.14
N N
1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8
23.85 23.85
0.60 2.99 3.74 3.60 6.59 0.91 2.77 2.06 0.60 0.60 2.99 3.74 3.60 6.59 0.91 2.77 2.06 0.60
5.22 3.95 4.01 4.50 5.16 0.44 0.56 5.22 3.95 4.01 4.50 5.16
5 5
2 3 4 2 3 4
1.57
1.57
0.67
0.67
J CF-5 CF-5 CF-5 J J CF-5 CF-5 CF-5 J
3.01
3.01
3.01
3.01
3.48
3.53
4.93
5.08
I I I I
1.40
1.60
CF-2 CF-2
9.83
9.83
5.53
5.53
5.53
5.53
3.61
3.46
CF-2 CF-2
18G x 0.26
18G x 0.26
19R x 0.18
19R x 0.18
CF-2 CF-2
UNIT C UNIT D UNIT C UNIT D
H CF-6 CF-6 H H CF-6 CF-6 H
1.50
1.50
2.49
2.49
2.49
2.49
CF-2 CF-2
1.40
1.40
1.50
1.50
UNIT E UNIT E
G CF-6
G G CF-6
G
5.59
5.60
2.63
2.63
x 0.26
x 0.18
x 0.29
18G x 0.29
x 0.18
19R x 0.18
21G
22R
4.60
4.60
4.60
4.60
18G
19R
5.00
5.00
5.00
5.00
F F F F
1.47
1.47
0.80
0.80
E E E E
1.48
1.48
36.97
36.97
0.80
0.80
1.20
1.20
H A L L W A Y H A L L W A Y
36.36
36.36
D" CF-3 D" CF-3
3.60
3.20
3.60
3.20
2.77
2.00
2.00
CF-2 CF-2 CF-2
CF-2 CF-2 CF-2
D' D' D' D'
9.79
2.41
2.41
D D
5.00
5.00
5.40
5.00
5.00
5.40
5.55
UNIT F
5.50
CF-6
2.99
2.99
UNIT A UNIT B
C C C C
19.20
3.24
3.24
CF-2 CF-2 CF-2 CF-2
2.50
2.50
3.30
3.30
3.30
3.30
CF-2 CF-2
2.90
CF-2
CF-6
6.90
6.90
6.76
6.76
6.50
6.50
6.50
6.50
6.50
A A A A
CF-5 CF-5 CF-5 CF-5
2.01
0.86
0.86
0.57
0.57
1 6 1 6
8 7 8 7
0.64 3.90 3.01 2.96 4.01 4.51 3.02 4.25 0.70 0.64 3.90 3.51 3.65 3.65 3.68 3.02 4.25 0.70
0.60 3.77 3.74 3.60 7.50 2.77 4.42 0.60 0.60 3.77 3.74 3.60 7.50 2.77 4.42 0.60
26.99 26.99
FINISHES
1 2 3 4 6 7 8 1 2 3 4 6 7 8
CF1 GLOSSY CEMENT FINISH
REFLECTED CEILING PLAN CF2 PVC CEILING PANEL (TOILET) REFLECTED CEILING PLAN
TIN NO.: LOCATION: LEGAZPI ST., GREENBELT, MAKATI CONSTRUCTION OTHER PROJECT WITHOUT APPROPRIATE CONSENT.
PROJECT REF NUMBER :
ISSUED AT: R.A. 9266
GSPublisherVersion 0.98.99.14
N N
1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8
23.85 23.85
0.60 2.99 3.74 3.60 6.59 0.91 2.77 2.06 0.60 2.99 3.74 3.60 6.59 0.91 2.77 2.06
0.56 4.72 8.46 4.50 5.16 0.44 7.92 4.13 4.13 5.82 0.85 0.44
5 5
2 3 4 2 3 4
1.57
1.57
3.54
0.67
0.67
2.64
J CF-5 CF-5 J J J
3.01
3.01
3.48
4.88
1.04
1.04
5.00
CF-6 CF-6 CF-6 CF-4
5.08
I I I I
1.60
CF-2
9.83
5.53
5.53
5.53
5.53
CF-2
3.66
3.46
4.82
4.82
CF-2
18G x 0.26
19R x 0.18
20G x 0.26
21R x 0.19
CF-2 CF-6
H UNIT C H H H
1.20
1.50
1.50
CF-6
2.49
2.49
2.49
2.49
CF-2
1.40
1.40
1.50
1.58
G G G G
H A L L W A Y
5.59
5.59
2.63
2.55
21G x 0.25
22R x 0.18
18G x 0.29
19R x 0.18
4.60
4.60
4.60
4.60
5.00
5.00
5.00
5.00
F F F F
1.47
1.47
0.80
0.80
E CF-2 E E E
36.97
36.97
0.80
0.80
1.27
2.80
1.20
1.20
0.87
3.00
H A L L W A Y UNIT A
36.36
36.36
D" CF-3 D"
3.40
3.52
CF-6 CF-3
3.20
3.20
2.12
2.25
2.00
2.00
0.06
CF-2
D' CF-2 CF-2
D' D' D'
CF-2
2.41
2.41
6.40
7.00
D D
5.40
5.40
CF-6
5.27
5.60
7.70
5.55
2.99
2.99
C UNIT B
C C C
UNIT A CF-2
CF-6
3.04
2.69
CF-6 CF-6
2.50
3.30
3.30
3.30
3.30
CF-2
2.00
CF-2
B CF-2 B B B
CF-2 CF-2
9.65
OUTDOOR AREA
4.49
4.49
CF-5
5.47
6.76
6.90
6.76
CF-6
6.50
6.50
A A A A
CF-5 CF-5 CF-5
2.58
0.88
2.87
1.01
0.86
0.57
0.72
1 6 1 6
8 7 1.28 8 4.94 8.53 7
0.64 3.93 3.34 3.79 3.87 3.45 2.94 4.33 0.70 0.64 14.75 3.81 7.79
0.60 3.77 3.74 3.60 7.50 2.77 4.42 0.60 3.77 3.74 3.60 7.50 2.77 4.42
26.99 26.99
FINISHES
1 2 3 4 6 7 8 1 2 3 4 6 7 8
CF1 GLOSSY CEMENT FINISH
REFLECTED CEILING PLAN CF2 PVC CEILING PANEL (TOILET) REFLECTED CEILING PLAN
TIN NO.: LOCATION: LEGAZPI ST., GREENBELT, MAKATI CONSTRUCTION OTHER PROJECT WITHOUT APPROPRIATE CONSENT.
PROJECT REF NUMBER :
ISSUED AT: R.A. 9266
GSPublisherVersion 0.98.99.14
N N
1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8
23.85 23.85
0.60 2.99 3.74 3.60 6.59 0.91 2.77 2.06 0.60 0.60 2.99 3.74 3.60 6.59 0.91 2.77 2.06 0.60
6.76 13.86 2.21 0.45 5.83 3.50 14.36
5 5
2 3 4 2 3 4
1.57
1.57
PROPERTY LINE
PROPERTY LINE
SETBACK
3.54
0.67
2.64
J J J J
SETBACK
3.68
4.01
3.01
3.01
3.01
6.57
1.04
1.04
I I I I
1.83
3.50
1.10
5.53
5.53
5.53
5.53
ROOF DECK
6.82
368.53 m2 STAIRS-02
3.53
see details
2.56
20G x 0.26
21R x 0.18
FF-3
11
12
10
9
8
7
6
5
4
3
2
1
5.82
35R x 0.20
UP
34G x 0.25
ELEV +129.70
H H H FIRE EXIT
H
1.30
D
1.17
14 FF-1
2.49
2.49
2.49
2.49
PRESSURIZATION
1.40
TO FIRE EXIT
14
15
13
16
17
18
19
20
21
22
G G G G
23
24
25
SAFETY AREA BOOSTER FOAM PUMP
26
27
28
29
30
31
DO
FOAM TANK
32
W
H A L L W A Y
33
N
34
(SEE FIRE PROTECTION DETAILS)
35
4.60
4.60
4.60
4.60
5.00
5.00
F F F F
EXCLUSIVE CLUB
FATO
0.80
0.80
E CF-6 E E E
23.13
36.97
36.97
0.80
0.80
1.20
1.20
36.36
36.36
D" CF-3 D"
3.55
3.20
3.20
2.00
2.00
D' D' D' D'
H
2.41
2.41
28.85
D CF-4 D
5.40
5.40
5.25
24.57
2.99
2.99
CF-2
C C C C
LIGHT
2.97
3.30
3.30
3.30
3.30
WELL
B B B B
0.36
4.49
4.49
6.83
6.46
6.50
6.50
A A A A
SETBACK
PROPERTY LINE
2.58
2.87
0.57
SETBACK
0.90
0.86
PROPERTY LINE
0.57
1 6 1 6
1.91
8 7 8 7
3.73 3.74 16.14 2.05 0.70 1.25 1.50 5.35 10.30 5.35 1.50
0.60 3.77 3.74 3.60 7.50 2.77 4.42 0.60 0.60 3.77 3.74 3.60 7.50 2.77 4.42 0.60
26.99 26.99
FINISHES
1 2 3 4 6 7 8 1 2 3 4 6 7 8
CF1 GLOSSY CEMENT FINISH
REFLECTED CEILING PLAN CF2 PVC CEILING PANEL (TOILET) REFLECTED CEILING PLAN
1 VIP CLUB
SCALE @A1 (1:100)
CF3
CF5
CEILING PANELS
WOOD DESIGN CEILING PANELS
2 ROOF DECK
SCALE @A1 (1:100)
A-308 CF6 ACOUSTIC PANELS (RESIDENTIAL) A-308
SCALE BAR 1:100
*ALL DIMENSIONS ARE IN METER
*VERIFY DIMENSION & ELEVATION REFERENCE ON SITE 10 9 8 7 6 5 4 3 2 1 0
TIN NO.: LOCATION: LEGAZPI ST., GREENBELT, MAKATI CONSTRUCTION OTHER PROJECT WITHOUT APPROPRIATE CONSENT.
PROJECT REF NUMBER :
ISSUED AT: R.A. 9266
GSPublisherVersion 0.98.99.14
LEGEND:
FLOOR
FF- 1 EPOXY PAINT CEMENT FLOORING
WALL
WF- 1 SATIN FINISH WALL
CEILING
CF- 1 SLAB SOFFIT
1.80mW x 2.50mH - 12.00mm THK. INSULATED GLASS 1.80mW x 2.10mH - 12.00mm THK. INSULATED GLASS 1.60mW x 2.10mH - 12.00mm THK. INSULATED GLASS 1.80mW x 2.10mH - 12.00mm THK. INSULATED GLASS CF-5 WOOD DESIGN CEILING PANELS
DOOR SUPPORTED WITH CORRESPONDING DOOR ON 40.00mm THK. ALUMINUM FRAMING - DOOR SUPPORTED WITH CORRESPONDING DOOR ON 40.00mm THK. ALUMINUM FRAMING -
BLOW-UP DETAILS ACCESSORIES CONNECTED TO CURTAIN GLASS DOUBLE SWING GLASS DOOR ACCESSORIES CONNECTED TO CURTAIN GLASS SLIDING GLASS DOOR
WALL GROUND
WL MOUNTED LIGHT GL LIGHTS
FLOOR MOUNTED PINLIGHT
FL LIGHT (ONE-PIECE)
PINLIGHT PINLIGHT
(TWO-PIECE) (THREE-PIECE)
WALL MOUNTED
CENTER LIGHT WL LIGHT
ROOFING
RF- 1 LONG SPAN PRE-PAINTED GI ROOF
RF-2
ROOF SLAB, WITH MEMBRANE
WATERPROOFING
SYMBOLS
FFL FFL FFL FFL FFL FFL
CODE DESCRIPTION: CODE DESCRIPTION: CODE DESCRIPTION: CODE DESCRIPTION: CODE DESCRIPTION: CODE DESCRIPTION:
FF-0 FLOOR FINISH 4" THK.CHB WALL
1.50mW x 2.10mH - 44.4mm THK. GALVANIZED PANEL 1.00mW x 2.10mH - 44.4mm THK. GALVANIZED PANEL 0.80mW x 2.10mH - 44.4mm THK. GALVANIZED PANEL 0.70mW x 2.10mH - 44.4mm THK. GALVANIZED PANEL 1.50mW x 2.10mH - 44.4mm THK. GALVANIZED PANEL 0.70mW x 2.10mH - 44.4mm THK. GALVANIZED PANEL
W/ HONEYCOMB INSULATION ON GALVANIZED W/ HONEYCOMB INSULATION ON GALVANIZED W/ HONEYCOMB INSULATION ON GALVANIZED W/ HONEYCOMB INSULATION ON GALVANIZED W/ HONEYCOMB INSULATION ON GALVANIZED W/ HONEYCOMB INSULATION ON GALVANIZED WF-0 WALL FINISH 6" THK.CHB WALL
SINGLE RABBET JAMB, 1 HR. FIRE DOUBLE SWING SINGLE RABBET JAMB, 1 HR. FIRE SINGLE SWING SINGLE RABBET JAMB, 1 HR. FIRE SINGLE SWING SINGLE RABBET JAMB, 1 HR. FIRE SINGLE SWING SINGLE RABBET JAMB, 1 HR. FIRE SINGLE SWING SINGLE RABBET JAMB, 1 HR. FIRE SINGLE SWING
D5 DOOR
D6 DOOR
D7 DOOR
D8 DOOR
D9 DOOR
D10 DOOR CF-0 CEILING FINISH 8" THK.CHB WALL
LOCATION: RESTAURANT KITCHEN LOCATION: RESIDENTIAL LOCATION: RESIDENTIAL ROOM DOOR LOCATION: RESIDENTIAL TOILET LOCATION: 1-UNIT RESIDENTIAL LOCATION: NORMAL DOOR CH=0 CEILING HEIGHT RETAINING WALL
QUANTITY: 6 QUANTITY: 79 QUANTITY: 232 QUANTITY: 241 QUANTITY: 25 QUANTITY: 9
D W
DOOR MARK WINDOW MARK
AB B R E V IATI O N S
FFL FINISHED FLOOR LEVEL
FL FLOOR LEVEL
2.70mW x 4.00mH - 12.00mm THK. INSULATED GLASS 2.00mW x 2.40mH & 1.80mW x 2.40mH - 12.00mm THK. 0.80mW x 2.10mH - 44.4mm THK. GALVANIZED PANEL 0.90mW x 2.10mH - 44.4mm THK. DOOR, GALVANIZED 0.90mW x 2.10mH - 44.4mm THK. DOOR, GALVANIZED 2.50mW x 2.10mH - 44.4mm THK. DOOR, GALVANIZED
DOOR ON 40.00mm THK. ALUMINUM FRAMING - INSULATED GLASS DOOR ON 40.00mm THK. W/ HONEYCOMB INSULATION ON GALVANIZED PANEL WL HONEYCOMB INSULATION ON PANEL WL HONEYCOMB INSULATION ON PANEL WL HONEYCOMB INSULATION ON
PIVOT GLASS DOOR ALUMINUM FRAMING - SLIDING GLASS DOOR WITH SINGLE RABBET JAMB, 1 HR. FIRE SINGLE SWING GALVANIZED SINGLE RABBET JAMB W/ PANIC GALVANIZED SINGLE RABBET JAMB - 1 HR. FIRE GALVANIZED SINGLE RABBET JAMB - 1 HR. FIRE
D11 D12 TRANSOM (2 LEAVES, 1 SLIDING)
D13 DOOR
D14 DEVICE, UL FIRE RATED STEEL DOOR - 4 HR. FIRE
RATING D15 RATING
D16 RATING SINGLE SWING METAL DOOR
LOCATION: VIP CLUB LOCATION: TOILET LOCATION: TOILET / SHOWER LOCATION: FIRE EXIT STAIRS LOCATION: UTILITY ROOM LOCATION: EQUIPMENT ROOM DOORS
QUANTITY: 6 QUANTITY: 13 QUANTITY: 25 QUANTITY: 72 QUANTITY: 75 QUANTITY: 9
BLOW-UP DETAILS
TIN NO.: LOCATION: LEGAZPI ST., GREENBELT, MAKATI CONSTRUCTION OTHER PROJECT WITHOUT APPROPRIATE CONSENT.
PROJECT REF NUMBER :
ISSUED AT: R.A. 9266
GSPublisherVersion 0.98.99.14
BLOW-UP DETAILS BLOW-UP DETAILS BLOW-UP DETAILS
DATANG
DRAWN BY : ARCHITECTURAL
AUTHORIZATION FROM THE ARCHITECT AND ITS
ARCHITECT 32-STOREY GOVERNOR SIGNATORY ARCHITECT EITHER THE OBJECT FOR
ADMIN APPROVAL WHICH IT IS MADE IS EXECUTED OR NOT. CHECKED BY:
TIN NO.: LOCATION: LEGAZPI ST., GREENBELT, MAKATI CONSTRUCTION OTHER PROJECT WITHOUT APPROPRIATE CONSENT.
PROJECT REF NUMBER :
ISSUED AT: R.A. 9266
11
12
13
14
16
17
18
19
15
19
18
17
16
15
14
13
12
11
DOWN
DOWN
10
10
UP
UP
S-01 S-02
1
2
4
9
8
7
6
3
5
7
5
8
9
6
4
19
18
17
16
15
14
13
12
11
DOWN
S-06
10
UP
7
5
9
6
8
4
20
21
13
14
15
16
17
18
19
11TH-27TH FLOOR BASEMENT LEVEL
FIRE EXIT
DOWN
PRESSURIZATION
TO FIRE EXIT
BLOW-UP DETAILS BLOW-UP DETAILS
FF-1
STAIRS '01' STAIRS '02'
12
1 2 S-07
A-402 SCALE @A1 (1:50) A-402 SCALE @A1 (1:50) 20G x 0.26
UP
21R x 0.18
11
10
9
8
7
6
5
4
3
2
1
11
15
14
13
12
10
SETBACK
FIRE ESCAPE
9
16 8
STAIRS
S-04
S-03 17 7
22G x 0.26
23R x 0.17
18
PRESSURIZATION
6
TO FIRE EXIT
19 5
20 4
21 3
VENTILATION VENTILATION 22 2
23
DOWN
UP
ACCESS
TO GYM
LOWER GROUND
2ND TO 8TH FLOOR ROOF DECK
BLOW-UP DETAILS BLOW-UP DETAILS
A-402
5 STAIRS '01'
SCALE @A1 (1:50)
6
A-402
STAIRS '02'
SCALE @A1 (1:50)
3
A-402
STAIRS '03'
SCALE @A1 (1:50)
4
A-402
STAIRS '04'
SCALE @A1 (1:50)
DATANG
DRAWN BY : ARCHITECTURAL
AUTHORIZATION FROM THE ARCHITECT AND ITS
ARCHITECT 32-STOREY GOVERNOR SIGNATORY ARCHITECT EITHER THE OBJECT FOR
ADMIN APPROVAL WHICH IT IS MADE IS EXECUTED OR NOT. CHECKED BY:
TIN NO.: LOCATION: LEGAZPI ST., GREENBELT, MAKATI CONSTRUCTION OTHER PROJECT WITHOUT APPROPRIATE CONSENT.
PROJECT REF NUMBER :
ISSUED AT: R.A. 9266