Professional Documents
Culture Documents
1721024441JI5l146oM468Vc76
1721024441JI5l146oM468Vc76
ITEM DESCRIPTION
A KOMPONEN
1 Kabel Control NYYHY 7x1,5 mm
2 Kabel Control NYYHY 8x2,5 mm
3 Kabel Control NYYHY 2x4 mm
4 Kabel Control LIYCY 3x2,5 mm
5 Kabel Control M2XQY 7x1,5 mm
6 Kabel Control M2XQY 2x4 mm
7 Kabel Control M2XQY 3x2,5 mm
B LAIN-LAIN
1 Packing
2 Delivery
3 Asuransi
4 Engineering Design
5 Documentation
6 Factory Activities
7 Site Activities
8 Raw Material
9 Man Power Produksi
10 Overhead
C EXIM
1 Biaya Pengiriman (Freight)
2 Bea Masuk (PIB)
3 Sewa Storage/Gudang di port
D KEUANGAN
1 Operasional Umum
2 Interest
3 Pph
4 Resiko
5 SKBDN
6 Premi
E SALES
1 Entertaint
Nilai PO (exclude tax)
Realisasi pembayaran
Profit berdasarkan nilai Estimasi
Profit berdasarkan nilai Plan PM
Profit berdasarkan nilai Ongoing
Profit berdasarkan realisasi pembayaran
Discount Managemen
Kesimpulan :
Mitigasi :
Pembayaran Vendor : Open
Laporan Pajak : Open
NO DOC : BK-PM-BP-001
No. WO
No. PO
Tanggal PO
Nama Proyek
Nama Client
Nilai PO
Sales
Packing
FAT
SAT
Term of Payment
Syarat Penagihan
Delivery Time
Delivery Point
Penalty
Cancelation Fee
Waranty
Project Manager :
Suprapto Rahmin
TYPE BRAND QTY
- - 1 lot
- - 1 lot
- - 1 lot
- - 1 lot
- - 1 lot
- - 1 lot
- - 1 lot
- - 1 lot
- - 1 lot
- - 1 lot
- - 1 lot
- - 1 lot
- - 1 lot
- - 1 lot
- - 1 lot
- - 1 lot
- - 1 lot
- - 1 lot
- - 1 lot
- - 1 lot
Rp 20,362,600
Rp - 0%
Rp 3,287,130 16.14%
Rp 3,287,130 16.14%
Rp 20,362,600 100.00%
Rp - 0.00%
Rp - 0.00%
NO DOC : BK-PM-BP-001
: 240050109 (wajib di isi PM)
: 24-PH-BCP-B-249-AA-R0 (PO MENYUSUL, (wajib di isi PM)
SUDAH TERKONFIRMASI BY EMAIL)
: 08 JULI 2024
: ADD COST KABEL KONTROL (wajib di isi PM)
: PT. MULTIKARYA ASIA PASIFIK RAYA (wajib di isi PM)
: Rp 20,362,600
: ALAN ALATAS
: STANDAR (wajib di isi PM)
: N/A (wajib di isi PM)
: N/A (wajib di isi PM)
: BEFORE DELIVERY 100% (wajib di isi PM)
: STANDAR
: ASAP (wajib di isi PM)
: SITE (wajib di isi PM)
: YES (wajib di isi PM)
: YES (wajib di isi PM)
: 12 MONTH AFTER TESCOMM OR 18 (wajib di isi PM)
MONTH AFTER MOS
Suprapto Rahmin
ESTIMASI
Faktor
STATUS STOCK Unit Price Total Price Unit Price
Management
Rp - Rp - 1.00 Rp -
Rp - Rp - 1.00 Rp -
Rp - Rp - 1.00 Rp -
Rp - Rp - 1.00 Rp -
TOTAL : Rp 17,075,470 TOTAL :
Subcon Project
DESCRIPTION ESTIMASI
Subcon A Rp -
Subcon B Rp -
Subcon C Rp -
Subcon D Rp -
Total Rp -
Rp - 1.00 Rp - Rp -
Rp - 1.00 Rp - Rp -
Rp - 1.00 Rp - Rp -
Rp - 1.00 Rp - Rp -
Rp 17,075,470 TOTAL : Rp 17,075,470 TOTAL :
Unit Price Total Price Unit Price Total Price Unit Price
Rp - TOTAL : Rp - TOTAL :
SCOUNT MANAGEMENT
Remarks
Total Price
Rp -