TYPICAL CROSS SECTION

NOTES:-
1. NO DIMENSIONS SHALL BE MEASURED, ONLY WRITTEN DIMENSIONS ARE TO BE
TAKEN AS CORRECT.
2. DIMENSIONS, LEVELS AND COORDINATES SHALL BE CHECKED ON SITE PRIOR TO
EXECUTION OF THE WORKS. ANY DISCREPANCIES MUST BE BROUGHT TO THE
NOTICE OF THE DESIGNER PRIOR TO EXECUTION OF THE WORKS.

℄ ℄
300
BOOSTER JET FAN AS PER DESIGN BOOSTER JET FAN AS PER DESIGN
REQUIREMENT (VARIABLE DISPLAY & JET FAN REQUIREMENT (VARIABLE DISPLAY & JET FAN
WILL BE AT DIFFERENT PLACES IN TUNNEL) WILL BE AT DIFFERENT PLACES IN TUNNEL)
TUNNEL VENTILATION SYSTEM CLEARANCE TUNNEL VENTILATION SYSTEM CLEARANCE
2120

2120
R5

R5
VARIABLE DISPLAY VARIABLE DISPLAY VARIABLE DISPLAY VARIABLE DISPLAY
00

00
0

0
FINAL LINING (AS PER DESIGN) FINAL LINING (AS PER DESIGN)
7500 7500
GEOTEXTILE FELT 500GR/M2 GEOTEXTILE FELT 500GR/M2
WATERPROOFING PVC MEMBRANC WATERPROOFING PVC MEMBRANC

THEORETICAL EXCAVATION LINE THEORETICAL EXCAVATION LINE

300 300 SIDE WALK CLEARANCE PROFILE 10000 SIDE WALK CLEARANCE PROFILE
5500

5500
R7196 R7196
FINAL LINING REINFORCED CAST FINAL LINING REINFORCED CAST
500 3500 3500 500 1000 CONCRETE (RCC) C30/37 500 3500 3500 500 1000 CONCRETE (RCC) C30/37
HARD CLEARANCE

CLEARANCE

FOOTPATH
HARD
FOOTPATH
1050

1050
CABLE MEP DUCTS/CHANNEL FIRE KILL BOX (EVERY -60m) CABLE MEP DUCTS/CHANNEL FIRE KILL BOX (EVERY -60m)
Slope 2.0% Slope 2.0% Slope 2.0% Slope 2.0%
LEAN CONCRETE FIRE MAIN Ø150 LEAN CONCRETE FIRE MAIN Ø150
ROCK MASS LONGITUDINAL DRAIN PERFORATED ROCK MASS LONGITUDINAL DRAIN PERFORATED
600

600

SURFACE WATER DRAIN SURFACE WATER DRAIN


PVC PIPE Ø 250 WITH GEOTEXTILE PVC PIPE Ø 250 WITH GEOTEXTILE
CONCRETE PIPE Ø250 CONCRETE PIPE Ø250

TYPICAL CROSS SECTION FOR TUNNEL


(SCALE 1:65)

TYPICAL CROSS SECTION FOR TUNNEL


(SCALE 1:65)

CLIENT: CONCESSIONAIRE : INDEPENDENT ENGINEER : DESIGN CONSULTANT : PROJECT TITLE : TITLE : DATE : DRAWN : REVISION :
17.05.2024 SP
TYPICAL CROSS SECTION R0
M/s CENTRO DE ESTUDIOS DE CONSTRUCTION OF 4-LANING WITH PAVED SHOULDER OF BIJNI TO MANDI
MATERIALES Y CONTROL DE OBRA, SECTION FROM EXISTING KM 202.815 TO KM 208.000 OF NH-20 (NEW NH154) DESIGNED : CHECKED :
SA (CEMOSA) IN JV M/s G-ENG (DESIGN LENGTH 5.357 KM) INCLUDING CONSTRUCTION OF TWIN TUBE NS APV
NATIONAL HIGHWAYS AUTHORITY ADVISORY SERVICES PVT. LTD. IN DRAWING NUMBER : SHEET :
GAWAR MANDI HIGHWAYS FBC INFRATECH PRIVATE TUNNEL FOR A LENGTH OF 3.500 KM OF PATHANKOT-MANDI UNDER NH(O)
OF INDIA ASSOCIATION WITH M/s INTROSOFT LIMITED FORMAT (SIZE):-
PRIVATE LIMITED R0 MAY - 2024 SP NS APV SM FOR APPROVAL IN HIMACHAL PRADESH ON HYBRID ANNUITY MODE BASIS (PACKAGE-VB) APPROVED : SCALE :
G 5&6, Sector-10, Dwarka, New Delhi, SOLUTIONS. G-31-SHNM-1780, BEGUMPUR, NARSINGHPUR, FBC/D1194/TNL/DWG/TCS/01 A3 (420X297)
Delhi 110075 DSS - 378, Sector 16-17, Hisar - 125005 GURUGRAM HARYANA-122004 SM AS SHOWN
(Haryana) REV. DATE DRAWN DESIGNED CHECKED APPROVED DESCRIPTION OF REVISION