AUTHORIZATION FORM

HIGH-RISK ACTIVITIES AFTER NORMAL WORKING HOURS

Location: Govt. Gate, Main Gate, Computer Gate, Sulfur Gate, Main Plant Area(South, East ,West,North), Flare
Area (South, East ,West,North)and Sulfur Fence Area (South, East ,West,North, UPS Building)

Start Date: _June 1- June 30, 2024 Time: 5:00 A.M Duration: 4:00 P.M – 10:00 P.M.

Initiator: _Ben-Hur Q. Salvatierra

DESCRIPTION OF THE JOB (Project, Activity)


REBAR WORK, COMPACTION, PAINTING, COATING & SURFACE PREPARATION, COMPACTION & BACKFILLING,
MANUAL AND MECHANICAL EXCAVATION, TRENCH BACKFILLING, CABLE LAYING, FENCE AND WARNING TAPE
INSTALLATION, GROUNDING WORK, CABLE TERMINATION, MEGGER TESTING, CONDUITING , CONDUIT BENDING ,
CONDUIT INSTALLATION, PANELS INSTALLATION , , PRECOMMISSIONING OF EQUIPMENT/ ENERGIZATION , FOC
CABLE PULLING, FOC SUBDUCT INSTALLATION, FOC SPLICING AND TERMINATION,LOADING/UNLOADING.
HIGH-RISK ACTIVITIES TO BE PERFORMED Yes No
Does the activity involve opening of equipment that have the potential to contain hazardous materials, √
and/or require isolating sources of energy?

Does the activity have the potential to develop sparks, flames or sufficient heat to cause ignition? √

Does the activity involve entry into process equipment or enclosures that has the potential to contain √
hazardous materials?
Does the activity require excavation around known or suspected underground lines, working at heights or √
crane lift?
Others [Please Specify]:

JUSTIFICATION POINTS FOR HIGH-RISK ACTIVITIES Yes No



Must the activity be performed after normal working hours?


Have the necessary risk assessments, plans, and procedures been thoroughly reviewed and approved?


Are the necessary resources available for conducting the activities?


Will adequate supervision and oversight be provided during the execution?


Will required controls be implemented during the execution?


Is there a detailed Emergency Response Plan in place to address any potential incident during the execution?

ADDITIONAL JUSTIFICATION AND BUSINESS NEED

I hereby authorize the execution of the above activities to be performed after normal working hours in accordance with Saudi
Aramco safety requirements and procedures.

Recommended by: Division Head Approved by: Department Head

Signature: ________________ Signature: _______________

Date: ____________________ Date: ___________________


Approved forms must be shared with area Loss Prevention office prior to commencing the activities.

Saudi Aramco: Company General Use


AUTHORIZATION FORM

HIGH-RISK ACTIVITIES AFTER NORMAL WORKING HOURS

Location: Govt. Gate, Main gate, Computer gate, Sulfur Gate, Main Plant Area(South, East ,West,North), Flare area
(South, East ,West,North)and Sulfur Fence Area (South, East ,West,North, UPS Building)

Start Date: _June 1- June 30, 2024______________ Time:_5:00 A.M Duration: 4:00 P.M – 10:00 P.M.

Initiator: _Ben-Hur Q. Salvatierra

DESCRIPTION OF THE JOB (Project, Activity)

Excavation and Backfilling (Manual & Mechanical excavation for duct bank, MV & LV cable, Manhole)

HIGH-RISK ACTIVITIES TO BE PERFORMED Yes No


Does the activity involve opening of equipment that have the potential to contain hazardous materials, √
and/or require isolating sources of energy?

Does the activity have the potential to develop sparks, flames or sufficient heat to cause ignition? √

Does the activity involve entry into process equipment or enclosures that has the potential to contain √
hazardous materials?
Does the activity require excavation around known or suspected underground lines, working at heights or √
crane lift?
Others [Please Specify]:

JUSTIFICATION POINTS FOR HIGH-RISK ACTIVITIES Yes No



Must the activity be performed after normal working hours?


Have the necessary risk assessments, plans, and procedures been thoroughly reviewed and approved?


Are the necessary resources available for conducting the activities?


Will adequate supervision and oversight be provided during the execution?


Will required controls be implemented during the execution?


Is there a detailed Emergency Response Plan in place to address any potential incident during the execution?

ADDITIONAL JUSTIFICATION AND BUSINESS NEED

I hereby authorize the execution of the above activities to be performed after normal working hours in accordance with Saudi
Aramco safety requirements and procedures.

Recommended by: Division Head Approved by: Department Head

Signature: ________________ Signature: _______________

Date: ____________________ Date: ___________________


Approved forms must be shared with area Loss Prevention office prior to commencing the activities.

Saudi Aramco: Company General Use


AUTHORIZATION FORM

HIGH-RISK ACTIVITIES AFTER NORMAL WORKING HOURS

Location: Govt. Gate, Main Gate, Computer Gate, Sulfur Gate, Main Plant Area(South, East ,West,North), Flare
Area (South, East ,West,North)and Sulfur Fence Area (South, East ,West,North, UPS Building)

Start Date: _June 1-June 30, 2024 Time:_5 A.M Duration: 4 P.M-10 P.M

Initiator: _Ben-Hur Q. Salvatierra

DESCRIPTION OF THE JOB (Project, Activity)

Hot Work (Concrete Pouring with Pump, Heavy Equipment Operation, Entry & using of Light and Heavy
Vehicle, Cutting, grinding , brazing )

HIGH-RISK ACTIVITIES TO BE PERFORMED Yes No


Does the activity involve opening of equipment that have the potential to contain hazardous materials,

and/or require isolating sources of energy?
Does the activity have the potential to develop sparks, flames or sufficient heat to cause ignition? √

Does the activity involve entry into process equipment or enclosures that has the potential to contain

hazardous materials?
Does the activity require excavation around known or suspected underground lines, working at heights or

crane lift?
Others [Please Specify]:

JUSTIFICATION POINTS FOR HIGH-RISK ACTIVITIES Yes No


Must the activity be performed after normal working hours? √

Have the necessary risk assessments, plans, and procedures been thoroughly reviewed and approved? √

Are the necessary resources available for conducting the activities? √

Will adequate supervision and oversight be provided during the execution? √

Will required controls be implemented during the execution? √


Is there a detailed Emergency Response Plan in place to address any potential incident during the

execution?
ADDITIONAL JUSTIFICATION AND BUSINESS NEED

I hereby authorize the execution of the above activities to be performed after normal working hours in accordance with Saudi
Aramco safety requirements and procedures.

Recommended by: Division Head Approved by: Department Head

Signature: ________________ Signature: _______________

Date: ____________________ Date: ___________________


Approved forms must be shared with area Loss Prevention office prior to commencing the activities.

Saudi Aramco: Company General Use


AUTHORIZATION FORM

HIGH-RISK ACTIVITIES AFTER NORMAL WORKING HOURS

Location: Govt. Gate, Main Gate, Computer Gate, Sulfur Gate, Main Plant Area (South, East ,West,North), Flare
Area (South, East ,West,North)and Sulfur Fence Area (South, East ,West,North, UPS Building)

Start Date: _June 1- June 30, 2024 Time: 5:00 A.M Duration: 4:00 P.M – 10:00 P.M.

Initiator: _Ben-Hur Q. Salvatierra

DESCRIPTION OF THE JOB (Project, Activity)

Lifting ( Loading , unloading , Shifting of Materials, Equipment , fence post, pipes , concertina , Electrical
Cable Drums, Camera poles, Lifting of Lighting Poles, Lifting of Precast Foundation, Transformers, Doors,
Panels, Space Frame, Shifting of Scaffolding Materials)

HIGH-RISK ACTIVITIES TO BE PERFORMED Yes No


Does the activity involve opening of equipment that have the potential to contain hazardous materials, √
and/or require isolating sources of energy?

Does the activity have the potential to develop sparks, flames or sufficient heat to cause ignition? √

Does the activity involve entry into process equipment or enclosures that has the potential to contain √
hazardous materials?
Does the activity require excavation around known or suspected underground lines, working at heights or √
crane lift?
Others [Please Specify]:

JUSTIFICATION POINTS FOR HIGH-RISK ACTIVITIES Yes No



Must the activity be performed after normal working hours?


Have the necessary risk assessments, plans, and procedures been thoroughly reviewed and approved?


Are the necessary resources available for conducting the activities?


Will adequate supervision and oversight be provided during the execution?


Will required controls be implemented during the execution?


Is there a detailed Emergency Response Plan in place to address any potential incident during the execution?

ADDITIONAL JUSTIFICATION AND BUSINESS NEED

I hereby authorize the execution of the above activities to be performed after normal working hours in accordance with Saudi
Aramco safety requirements and procedures.

Recommended by: Division Head Approved by: Department Head

Signature: ________________ Signature: _______________

Date: ____________________ Date: ___________________


Approved forms must be shared with area Loss Prevention office prior to commencing the activities.

Saudi Aramco: Company General Use


AUTHORIZATION FORM

HIGH-RISK ACTIVITIES AFTER NORMAL WORKING HOURS

Location: Govt. Gate, Main Gate, Computer Gate, Sulfur Gate, Main Plant Area(South, East ,West,North), Flare
Area (South, East ,West,North)and Sulfur Fence Area (South, East ,West,North, UPS Building)

Start Date: _June 1- June 30, 2024 Time: 5:00 A.M Duration: 4:00 P.M – 10:00 P.M.

Initiator: _Ben-Hur Q. Salvatierra

DESCRIPTION OF THE JOB (Project, Activity)

Scaffolding ( Erection, Altering , Dismantling), Using of Man lift for Space Frame Installation, Erection of
Precast Panel, Spreading gravel on the Roof, Installation of HVAC, Fire Fighting Systems, Lights , Gypsum
board, Acoustic Ceiling, Concreting & Grouting (above 1.8 m )

HIGH-RISK ACTIVITIES TO BE PERFORMED Yes No


Does the activity involve opening of equipment that have the potential to contain hazardous materials, √
and/or require isolating sources of energy?

Does the activity have the potential to develop sparks, flames or sufficient heat to cause ignition? √

Does the activity involve entry into process equipment or enclosures that has the potential to contain √
hazardous materials?
Does the activity require excavation around known or suspected underground lines, working at heights or √
crane lift?
Others [Please Specify]:

JUSTIFICATION POINTS FOR HIGH-RISK ACTIVITIES Yes No



Must the activity be performed after normal working hours?


Have the necessary risk assessments, plans, and procedures been thoroughly reviewed and approved?


Are the necessary resources available for conducting the activities?


Will adequate supervision and oversight be provided during the execution?


Will required controls be implemented during the execution?


Is there a detailed Emergency Response Plan in place to address any potential incident during the execution?

ADDITIONAL JUSTIFICATION AND BUSINESS NEED

I hereby authorize the execution of the above activities to be performed after normal working hours in accordance with Saudi
Aramco safety requirements and procedures.

Recommended by: Division Head Approved by: Department Head

Signature: ________________ Signature: _______________

Date: ____________________ Date: ___________________


Approved forms must be shared with area Loss Prevention office prior to commencing the activities.

Saudi Aramco: Company General Use


#

01-JUNE-2024 TO 30-JUNE-2024
4-Weeks Construction Look Ahead for Package-05 TANAJIB GAS PLANT
Stations Works
Work Station/s # Dicipline Activity Description Timing PERMIT TYPE

Heavy Equipment Operation, Entry & using of Light and Heavy Vehicle, Cutting, grinding , brazing
, Loading , unloading , Shifting of Materials, Equipment , Electrical Cable Drums, Camera poles,
1 MECHANICAL Lifting of Lighting Poles, Lifting of Precast Foundation, Transformers, Doors, Panels, Space Frame, 16:00 - 22:00 INTERNAL PERMIT
Shifting of Scaffolding Materials)Installation of HVAC, Fire Fighting Systems, Cutting, Grinding ,
Brazing.

GOVERNMENT
2 ELECTRICAL CABLE LAYING, FENCE AND WARNING TAPE INSTALLATION, GROUNDING WORK, CABLE 16:00 - 22:00 INTERNAL PERMIT
SECURITY GATE TERMINATION, MEGGER TESTING, CONDUITING , CONDUIT BENDING , CONDUIT INSTALLATION,
PANELS INSTALLATION , , PRECOMMISSIONING OF EQUIPMENT/ ENERGIZATION , FOC CABLE
PULLING, FOC SUBDUCT INSTALLATION, FOC SPLICING AND TERMINATION

Scaffolding ( Erection, Altering , Dismantling), Using of Man lift for Space Frame Installation,
Erection of Precast Panel, Spreading gravel on the Roof, Installation of HVAC, Fire Fighting
3
CIVIL Systems, Lights , Gypsum board, Acoustic Ceiling, Concreting & Grouting (above 1.8 m ) Manual & 16:00 - 22:00 INTERNAL PERMIT
Mechanical excavation for duct bank, MV & LV cable in Manhole, Concrete Pouring with Pump,
concrete Pouring .

Heavy Equipment Operation, Entry & using of Light and Heavy Vehicle, Cutting, grinding , brazing
, Loading , unloading , Shifting of Materials, Equipment , Electrical Cable Drums, Camera poles,
1 MECHANICAL Lifting of Lighting Poles, Lifting of Precast Foundation, Transformers, Doors, Panels, Space Frame, 16:00 - 22:00 INTERNAL PERMIT
Shifting of Scaffolding Materials)Installation of HVAC, Fire Fighting Systems, Cutting, Grinding ,
Brazing.

2 ELECTRICAL CABLE LAYING, FENCE AND WARNING TAPE INSTALLATION, GROUNDING WORK, CABLE 16:00 - 22:00 INTERNAL PERMIT
MAIN GATE TERMINATION, MEGGER TESTING, CONDUITING , CONDUIT BENDING , CONDUIT INSTALLATION,
PANELS INSTALLATION , , PRECOMMISSIONING OF EQUIPMENT/ ENERGIZATION , FOC CABLE
PULLING, FOC SUBDUCT INSTALLATION, FOC SPLICING AND TERMINATION

Scaffolding ( Erection, Altering , Dismantling), Using of Man lift for Space Frame Installation,
Erection of Precast Panel, Spreading gravel on the Roof, Installation of HVAC, Fire Fighting
3
CIVIL Systems, Lights , Gypsum board, Acoustic Ceiling, Concreting & Grouting (above 1.8 m ) Manual & 16:00 - 22:00 INTERNAL PERMIT
Mechanical excavation for duct bank, MV & LV cable, Manhole Concrete Pouring with Pump,
Concrete Pouring

Heavy Equipment Operation, Entry & using of Light and Heavy Vehicle, Cutting, grinding , brazing
, Loading , unloading , Shifting of Materials, Equipment , Electrical Cable Drums, Camera poles,
1 MECHANICAL Lifting of Lighting Poles, Lifting of Precast Foundation, Transformers, Doors, Panels, Space Frame, 16:00 - 22:00 INTERNAL PERMIT
Shifting of Scaffolding Materials)Installation of HVAC, Fire Fighting Systems, Cutting, Grinding ,
Brazing.

COMPUTER GATE 2 ELECTRICAL CABLE LAYING, FENCE AND WARNING TAPE INSTALLATION, GROUNDING WORK, CABLE 16:00 - 22:00 INTERNAL PERMIT
TERMINATION, MEGGER TESTING, CONDUITING , CONDUIT BENDING , CONDUIT INSTALLATION,
PANELS INSTALLATION , , PRECOMMISSIONING OF EQUIPMENT/ ENERGIZATION , FOC CABLE
PULLING, FOC SUBDUCT INSTALLATION, FOC SPLICING AND TERMINATION

Scaffolding ( Erection, Altering , Dismantling), Using of Man lift for Space Frame Installation,
Erection of Precast Panel, Spreading gravel on the Roof, Installation of HVAC, Fire Fighting
3 CIVIL Systems, Lights , Gypsum board, Acoustic Ceiling, Concreting & Grouting (above 1.8 m ) Manual & 16:00 - 22:00 INTERNAL PERMIT
Mechanical excavation for duct bank, MV & LV cable, Manhole Concrete Pouring with Pump,
Concrete Pouring.

Heavy Equipment Operation, Entry & using of Light and Heavy Vehicle, Cutting, grinding , brazing
, Loading , unloading , Shifting of Materials, Equipment , Electrical Cable Drums, Camera poles,
1 MECHANICAL Lifting of Lighting Poles, Lifting of Precast Foundation, Transformers, Doors, Panels, Space Frame, 16:00 - 22:00 INTERNAL PERMIT
Shifting of Scaffolding Materials)Installation of HVAC, Fire Fighting Systems, Cutting, Grinding ,
Brazing. Fence post , Concertina, V support , Vinyl Coted Wire Mesh,

MAIN PLANT AREA


(WEST , EAST, SOUTH,
NORTH, UPS CABLE LAYING, FENCE AND WARNING TAPE INSTALLATION, GROUNDING WORK, CABLE
BUILDING) TERMINATION, MEGGER TESTING, CONDUITING , CONDUIT BENDING , CONDUIT INSTALLATION,
2 ELECTRICAL 16:00 - 22:00 INTERNAL PERMIT
PANELS INSTALLATION , , PRECOMMISSIONING OF EQUIPMENT/ ENERGIZATION , FOC CABLE
PULLING, FOC SUBDUCT INSTALLATION, FOC SPLICING AND TERMINATION

Scaffolding ( Erection, Altering , Dismantling), , Concreting & Grouting (above 1.8 m ) Manual &
3 CIVIL Mechanical excavation for duct bank, MV & LV cable, Manhole Concrete Pouring with Pump, 16:00 - 22:00 INTERNAL PERMIT
Concrete Pouring.

Heavy Equipment Operation, Entry & using of Light and Heavy Vehicle, Cutting, grinding , brazing
, Loading , unloading , Shifting of Materials, Equipment , Electrical Cable Drums, Camera poles,
1 MECHANICAL Lifting of Lighting Poles, Lifting of Precast Foundation, Transformers, Doors, Panels, Space Frame, 16:00 - 22:00 INTERNAL PERMIT
Shifting of Scaffolding Materials), Cutting, Grinding , Brazing. Fence post , Concertina, V support ,
Vinyl Coted Wire Mesh,

FLARE AREA (WEST ,


CABLE LAYING, FENCE AND WARNING TAPE INSTALLATION, GROUNDING WORK, CABLE
EAST, SOUTH, TERMINATION, MEGGER TESTING, CONDUITING , CONDUIT BENDING , CONDUIT INSTALLATION,
2 ELECTRICAL 16:00 - 22:00 INTERNAL PERMIT
NORTH,UPS BUILDING) PANELS INSTALLATION , , PRECOMMISSIONING OF EQUIPMENT/ ENERGIZATION , FOC CABLE
PULLING, FOC SUBDUCT INSTALLATION, FOC SPLICING AND TERMINATION

Scaffolding ( Erection, Altering , Dismantling), , Concreting & Grouting (above 1.8 m ) Manual &
3 CIVIL Mechanical excavation for duct bank, MV & LV cable, Manhole Concrete Pouring with Pump, 16:00 - 22:00 INTERNAL PERMIT
Concrete Pouring.

# Saudi Aramco: Company General Use


#

Heavy Equipment Operation, Entry & using of Light and Heavy Vehicle, Cutting, grinding , brazing
, Loading , unloading , Shifting of Materials, Equipment , Electrical Cable Drums, Camera poles,
1 MECHANICAL Lifting of Lighting Poles, Lifting of Precast Foundation, Transformers, Doors, Panels, Space Frame, 16:00 - 22:00 INTERNAL PERMIT
Shifting of Scaffolding Materials), Cutting, Grinding , Brazing. Fence post , Concertina, V support ,
Vinyl Coted Wire Mesh,

CABLE LAYING, FENCE AND WARNING TAPE INSTALLATION, GROUNDING WORK, CABLE
SULFUR FENCE (WEST , TERMINATION, MEGGER TESTING, CONDUITING , CONDUIT BENDING , CONDUIT INSTALLATION,
2 ELECTRICAL 16:00 - 22:00 INTERNAL PERMIT
EAST, SOUTH, PANELS INSTALLATION , , PRECOMMISSIONING OF EQUIPMENT/ ENERGIZATION , FOC CABLE
NORTH,UPS BUILDING) PULLING, FOC SUBDUCT INSTALLATION, FOC SPLICING AND TERMINATION

Scaffolding ( Erection, Altering , Dismantling), , Concreting & Grouting (above 1.8 m ) Manual &
3 CIVIL Mechanical excavation for duct bank, MV & LV cable, Manhole Concrete Pouring with Pump, 16:00 - 22:00 INTERNAL PERMIT
Concrete Pouring.