LAND KEY : 190.

60

Site Location

&
ROOM

FORIF REQUIRED
ELEC.
DB

SKID
C2

EXTERNAL

PROVISION

GENERATOR

PILLAR
C2

INTAKE

FEEDER
MAIN
L4

L3
3 C2

D4 D1

L2

L1
C2

P
FUEL SKID AREA

D3

C2

1
OPEN TO SKY D2

WORK
Etisalat + IT
Cabinet
System
GYPSUM WALL
100mm DOMS
FACP 42U TGS

100mm WALL
WORK BLOCK
DB EP

OF
(Drive-thru Window)

LIMIT
ENTRY
Check out
Counter

Machine
Coffee
C2

C2
C2

A
WORK

EXIT
OF
LIMIT

R
K
I
1 2 3 4 5 6 6' 7 8 9 10 11 12 13 14

N
G
192.00m²

112.00
GENERAL NOTES :
DO NOT SCALE THIS DRAWING.
ALL DIMENSIONS ARE IN METERS AND LEVELS IN METERS UNLESS OTHERWISE NOTED.
8.70 8.60 8.60 8.60 8.60 4.48 4.12 8.60 8.60 8.60 8.60 8.60 8.60 8.70 ALL DRAWINGS SHALL BE READ IN CONJUNCTION WITH THE RELEVANT ARCHITECTURAL, CIVIL,
LANDSCAPE, STRUCTURAL, MECHANICAL, ELECTRICAL AND TELECOMMUNICATION, ENGINEERING
SERVICES DRAWINGS, TOGETHER WITH THE CONTRACT DOCUMENTS & PROJECT SPECIFICATIONS.

A'
10.00

REV. NO. DESCRIPTION Date

MASTER DEVELOPER

A A
5.25

5.25
B B
5.25

5.25
40.00

C C OWNER / TENANT

30.00
9.00

9.00
CONSULTANT :

D D
5.25

5.25
E E
PROJECT NAME :
5.25

5.25
EXCEL ASTRA ICAD FACILITY
F F

ZONE :

INDUSTRIAL CITY OF ABU DHABI


8.70 8.60 8.60 8.60 8.60 8.60 8.60 8.60 8.60 8.60 8.60 8.60 8.70

112.00
SECTOR NO : PLOT NO :

ICAD II 208ER7
1 2 3 4 5 6 7 8 9 10 11 12 13 14
PROJECT DESCRIPTION :

Pile Cap Layout PROPOSED BLOCK-A (WORKSHOP-1),BLOCK-B

1 SCALE: 1:200
GENERAL NOTES:-
(WORKSHOP-2),BLOCK-C(ADMIN BUILDING),BLOCK-D
(SECURITY ROOM),BLOCK-E(BLASTING SHED),
BLOCK-F(PAINTING SHED),BLOCK-G(SUBSTATION),BLOCK-H
(TELEPHONE ROOM), IN PLOT NO-208ER7,SECTOR NO-ICAD
1. Do not scale of drawings, use figured dimensions only II,ZONE-INDUSTRIAL CITY OF
2. All dimensions to be verified on site. ABU DHABI
3. All dimensions are in meter unless noted otherwise.
4. All levels are in meters unless noted otherwise.
5. This drawing must be read in conjunction with all relevant DRAWING TITLE :
project specifications, schedules and drawings.
6. Any discrepancy in or between the drawings, specifications
and schedules must be brought to the immediate attention BLOCK-A(WORKSHOP-1)
of the Architect/ Engineer prior to undertaking any works. PILE CAP LAYOUT
7. The contractor shall submit coordinated shop drawings for
approval (based on site dimensions) prior to commencement
of any site works or placing of any orders and
manufacture of any fittings, fixture and components shown. DRAWING NO : REVISION NO:
The contractor shall only work from coordinated and
916-CEG-01-S202 00
approved shop drawings.
8. Fcu = 40 N/mm²
Fy = 460 N/mm² SUBMISSION DATE : SCALE :
9. * PILES 50∅
28/05/2024 1:200
* Design pile load = 100 ton.
10. Foundation/piles shall be verified according to the final
steel reactions. PROJECT ID : DRAWING SIZE :
11. Pile design shall be submitted by the specialist contractor
B4N-2024-002119 A1
for approval.
12. Columns design shall be verified according to the final
steel reaction OFFICIAL USE ONLY :
13. The contractor shall be submit detailed steel structural
14. & decking slab drawing for adm approval
15. All reinforcement steel products to be used for
construction works should be from Abu Dhabi authorized OFFICIAL USE ONLY :
factories.

Continuous columns

Planted columns

Stop columns
LAND KEY : 190.60

Site Location

&
ROOM

FORIF REQUIRED
ELEC.
DB

SKID
C2

EXTERNAL

PROVISION

GENERATOR

PILLAR
C2

INTAKE

FEEDER
MAIN
L4

L3
3 C2

D4 D1

L2

L1
C2

P
FUEL SKID AREA

D3

C2

1
OPEN TO SKY D2

WORK
Etisalat + IT
Cabinet
System
GYPSUM WALL
100mm DOMS
FACP 42U TGS

100mm WALL
WORK BLOCK
DB EP

OF
(Drive-thru Window)

LIMIT
ENTRY
Check out
Counter

Machine
Coffee
C2

C2
C2

A
WORK

EXIT
OF
LIMIT

R
K
I
N
G
192.00m²

GENERAL NOTES :
DO NOT SCALE THIS DRAWING.
ALL DIMENSIONS ARE IN METERS AND LEVELS IN METERS UNLESS OTHERWISE NOTED.
ALL DRAWINGS SHALL BE READ IN CONJUNCTION WITH THE RELEVANT ARCHITECTURAL, CIVIL,
LANDSCAPE, STRUCTURAL, MECHANICAL, ELECTRICAL AND TELECOMMUNICATION, ENGINEERING
SERVICES DRAWINGS, TOGETHER WITH THE CONTRACT DOCUMENTS & PROJECT SPECIFICATIONS.

REV. NO. DESCRIPTION Date

MASTER DEVELOPER

SECTION S2
Scale 1:20

Sec.-S2
01-S210

OWNER / TENANT

CONSULTANT :

PROJECT NAME :

EXCEL ASTRA ICAD FACILITY

ZONE :

INDUSTRIAL CITY OF ABU DHABI

SECTOR NO : PLOT NO :

ICAD II 208ER7

PROJECT DESCRIPTION :

PROPOSED BLOCK-A (WORKSHOP-1),BLOCK-B


(WORKSHOP-2),BLOCK-C(ADMIN BUILDING),BLOCK-D
(SECURITY ROOM),BLOCK-E(BLASTING SHED),
SECTION S3 BLOCK-F(PAINTING SHED),BLOCK-G(SUBSTATION),BLOCK-H
Scale 1:20 (TELEPHONE ROOM), IN PLOT NO-208ER7,SECTOR NO-ICAD
II,ZONE-INDUSTRIAL CITY OF
SECTION S4
Scale 1:20 ABU DHABI

DRAWING TITLE :

BLOCK-A(WORKSHOP-1)
PILE CAP DETAILS

DRAWING NO : REVISION NO:

SECTION S3 916-CEG-01-S210 00
Scale 1:20

SUBMISSION DATE : SCALE :

28/05/2024 1:200

PROJECT ID : DRAWING SIZE :

B4N-2024-002119 A1
Sec.-S3
Sec.-S4
01-S212
01-S212 OFFICIAL USE ONLY :

OFFICIAL USE ONLY :

DETAIL FOR PILE CAP (PC4)


Scale 1:25
DETAIL FOR PILE CAP (PC3)
Scale 1:25
LAND KEY : 190.60

Site Location

1 2 3 4 5 6 6' 7 8 9 10 11 12 13 14
112.00

&
ROOM

FORIF REQUIRED
ELEC.
DB

SKID
C2

EXTERNAL

PROVISION

GENERATOR

PILLAR
C2

INTAKE

FEEDER
MAIN
L4

L3
3 C2

D4 D1

L2

L1
C2

P
FUEL SKID AREA

D3

C2

1
OPEN TO SKY D2

WORK
Etisalat + IT
Cabinet
System
GYPSUM WALL
100mm DOMS
FACP 42U TGS

100mm WALL
WORK BLOCK
DB EP

OF
(Drive-thru Window)

LIMIT
ENTRY
Check out
Counter

Machine
Coffee
C2

C2
C2

A
WORK

EXIT
OF
LIMIT

8.70 8.60 8.60 8.60 8.60 4.48 4.12 8.60 8.60 8.60 8.60 8.60 8.60 8.70

R
K
I
N
G
192.00m²

Sec.-S3
GENERAL NOTES :
02-S310

DO NOT SCALE THIS DRAWING.


A' TB2
10T3C
TB2
10T3C
TB2
10T3C
TB2
10T3C
TB2
10T3C
TB2
ALL DIMENSIONS ARE IN METERS AND LEVELS IN METERS UNLESS OTHERWISE NOTED.
ALL DRAWINGS SHALL BE READ IN CONJUNCTION WITH THE RELEVANT ARCHITECTURAL, CIVIL,
LANDSCAPE, STRUCTURAL, MECHANICAL, ELECTRICAL AND TELECOMMUNICATION, ENGINEERING
SERVICES DRAWINGS, TOGETHER WITH THE CONTRACT DOCUMENTS & PROJECT SPECIFICATIONS.
TB1

TB1
10t1B

15T4C 15T4C 15T4C 250mm THICK SLAB.


15T4C 15T4C
T12@200-B EW, T12@200-T EW.
10.00

THROUGHOUT

15t1B

15t1B

15t1B

15t1B

15t1B

10t1B
TB1

TB1
RAMP
25t4C 25t4C
10t2B

25t4C 25t4C 25t4C


Sec.-S1

10t1B
02-S310

A TB2 TB2 TB2 TB2 TB2 TB2 TB2 TB2


A

25t3C

25t3C
10T3C 10T3C 10T3C 10T3C 10T3C 10T3C 10T3C

25t3C
25t3C

25t3C
REV. NO. DESCRIPTION Date

10t1B

10t1B

10t1B

10t1B

10t4B

10t1B

10t1B

10t1B
5.25

5.25
MASTER DEVELOPER

TB1
TB1

10t1B

15T4C 15T4C 15T4C 15T4C 15T4C 15T4C 15T4C 15T4C 15T4C 15T4C 15T4C 15T5C
15t1B

15t1B

15t1B

15t1B

15t1B

15t1B

15t1B

15t1B

15t1B

15t1B

15t1B

15t1B

10t1B
B 64b1E
B
5.25

5.25
TB1
TB1

10t1B

15T4C 15T4C 15T4C 15T4C 15T4C 15T4C 15T4C 15T4C 15T4C 15T4C 15T4C 15T5C
40.00

15t1B

15t1B

15t1B

15t1B

15t1B

15t1B

15t1B

15t1B

15t1B

15t1B

15t1B

15t1B

10t1B
C C
TB1

250mm THICK SLAB.

TB1
T12@200-B EW, T12@200-T EW.
THROUGHOUT
10t1B

15T4C 15T4C 15T4C 15T4C 15T4C 15T4C 15T4C 15T4C 15T4C 15T4C 15T4C 15T5C

30.00
9.00

9.00
15t1B

15t1B

15t1B

15t1B

15t1B

15t1B

15t1B

15t1B

15t1B

15t1B

15t1B

15t1B

10t1B
RAMP

RAMP
OWNER / TENANT

TB1
TB1

10t1B

15T4C 15T4C 15T4C 15T4C 15T4C 15T4C 15T4C 15T4C 15T4C 15T4C 15T4C 15T5C
15t1B

15t1B

15t1B

15t1B

15t1B

15t1B

15t1B

15t1B

15t1B

15t1B

15t1B

15t1B

10t1B
D D
5.25

5.25
TB1
52b1E
CONSULTANT :
TB1

10t1B

15T4C 15T4C 15T4C 15T4C 15T4C 15T4C 15T4C 15T4C 15T4C 15T4C 15T4C 15T5C
15t1B

15t1B

15t1B

15t1B

15t1B

15t1B

15t1B

15t1B

15t1B

15t1B

15t1B

15t1B

10t1B
E E
TB1

TB1
164b1E 149b1E
5.25

5.25
10t1B

10t1B

10t1B

10t1B

10t1B

10t1B

10t1B

10t1B

10t1B

10t1B

10t1B

10t1B

10t1B

10t1B
Sec.-S2
10T3C 10T3C 10T3C 10T3C 10T3C 10T3C 10T3C 02-S310 10T3C 10T3C 10T3C 10T3C 10T3C

F TB2 TB2 TB2 TB2 TB2 TB2 TB2 TB2 TB2 TB2 TB2 TB2 TB2 F
RAMP PROJECT NAME :

8.70 8.60 8.60 8.60 8.60 8.60 8.60 8.60 8.60 8.60 8.60 8.60 8.70 EXCEL ASTRA ICAD FACILITY
112.00

ZONE :
1 2 3 4 5 6 7 8 9 10 11 12 13 14 INDUSTRIAL CITY OF ABU DHABI

Ground Floor Slab SECTOR NO : PLOT NO :

1 SCALE: 1:200
ICAD II

PROJECT DESCRIPTION :
208ER7

PROPOSED BLOCK-A (WORKSHOP-1),BLOCK-B


(WORKSHOP-2),BLOCK-C(ADMIN BUILDING),BLOCK-D
GENERAL NOTES:- (SECURITY ROOM),BLOCK-E(BLASTING SHED),
TIE BEAMS SCHEDULE 1. Do not scale of drawings, use figured dimensions only BLOCK-F(PAINTING SHED),BLOCK-G(SUBSTATION),BLOCK-H
2. All dimensions to be verified on site. (TELEPHONE ROOM), IN PLOT NO-208ER7,SECTOR NO-ICAD
Bottom Top Rft. Links II,ZONE-INDUSTRIAL CITY OF
3. All dimensions are in meter unless noted otherwise.
4. All levels are in meters unless noted otherwise. ABU DHABI
5. This drawing must be read in conjunction with all relevant
project specifications, schedules and drawings. DRAWING TITLE :
6. Any discrepancy in or between the drawings, specifications
and schedules must be brought to the immediate attention
of the Architect/ Engineer prior to undertaking any works. BLOCK-A(WORKSHOP-1)
7. The contractor shall submit coordinated shop drawings for IMPORTANT STEEL NOTES:-
approval (based on site dimensions) prior to commencement
* All steel member sizes shown are indicative only, steel GROUND FLOOR SLAB
specialist sub-contractor shall ensure design adequacy for
of any site works or placing of any orders and
intended loading for strength and serviceability criteria.
manufacture of any fittings, fixture and components shown.
* Connection to RC beam/slab/columns/walls shall be subject
The contractor shall only work from coordinated and DRAWING NO : REVISION NO:
to engineer approval.
approved shop drawings.
REINFORCING BARS ARE CALLED UP THIS: * Specialist sub contractor to submit detailed
8. Fcu = 40 N/mm² 916-CEG-01-S300 00
calculation/drawings to obtain authority approval.
Fy = 460 N/mm²
* Contractor shall be fully responsible for the design
9. * PILES 50∅ SUBMISSION DATE : SCALE :
fabrication, erection, installation connection design &
* Design pile load = 100 ton.
adequacy of all RC member supporting the steel elements.
10. Foundation/piles shall be verified according to the final 28/05/2024 1:200
* All structural steel member which are not encased with
steel reactions.
concrete shall be coated with fire proof coating as
11. Pile design shall be submitted by the specialist contractor PROJECT ID : DRAWING SIZE :
specified in compliance with civil defense requirements.
for approval.
* Actual reaction of steel structure on RC member shall be A1
12. Columns design shall be verified according to the final B4N-2024-002119
provided by steel contractor for consultant approval prior
steel reaction
to commencement of work.
13. The contractor shall be submit detailed steel structural OFFICIAL USE ONLY :
* For all main connections, bolts shall be of grade 8.8 in
14. & decking slab drawing for adm approval
clearance holes. holding down bolts, nuts and washers shall
15. All reinforcement steel products to be used for
be of grade 4.6 .
SCHEDULE OF EXTRA REINFORCEMENT construction works should be from Abu Dhabi authorized
* All steel products to be used for construction works
factories. OFFICIAL USE ONLY :
should be from Abu Dhabi authorized factories.
Continuous columns

Planted columns

Stop columns
LAND KEY : 190.60

Site Location

&
ROOM

FORIF REQUIRED
ELEC.
DB

SKID
C2

EXTERNAL

PROVISION

GENERATOR

PILLAR
C2

INTAKE

FEEDER
MAIN
L4

L3
3 C2

D4 D1

L2

L1
C2

P
FUEL SKID AREA

D3

C2

1
OPEN TO SKY D2

WORK
Etisalat + IT
Cabinet
System
GYPSUM WALL
100mm DOMS
FACP 42U TGS

100mm WALL
WORK BLOCK
DB EP

OF
(Drive-thru Window)

LIMIT
ENTRY
Check out
Counter

Machine
Coffee
C2

C2
C2

A
WORK

EXIT
OF
LIMIT

R
K
I
N
G
192.00m²

GENERAL NOTES :
DO NOT SCALE THIS DRAWING.
ALL DIMENSIONS ARE IN METERS AND LEVELS IN METERS UNLESS OTHERWISE NOTED.
ALL DRAWINGS SHALL BE READ IN CONJUNCTION WITH THE RELEVANT ARCHITECTURAL, CIVIL,
LANDSCAPE, STRUCTURAL, MECHANICAL, ELECTRICAL AND TELECOMMUNICATION, ENGINEERING
SERVICES DRAWINGS, TOGETHER WITH THE CONTRACT DOCUMENTS & PROJECT SPECIFICATIONS.

REV. NO. DESCRIPTION Date


1 2 3 4 5 6 6' 7 8 9 10 11 12 13 14 MASTER DEVELOPER

112.00

8.70 8.60 8.60 8.60 8.60 4.48 4.12 8.60 8.60 8.60 8.60 8.60 8.60 8.70
EAVE HT.
+5.13m

A'
SLOPE

SLOPE
10.00

OWNER / TENANT

EAVE HT.
+12.90m
TOP HT.

ROOF DECK
+6.40m

T.O.S
+3.50m
A A
EAVE HT.
+12.90m

CONSULTANT :

ROOF PANEL
5.25

5.25
B B
SLOPE

SLOPE

SLOPE

SLOPE

SLOPE

SLOPE

SLOPE

SLOPE

SLOPE

SLOPE

SLOPE

SLOPE

SLOPE
5.25

5.25
ROOF PANEL
40.00

C C PROJECT NAME :

+14.66m
TOP HT.
EXCEL ASTRA ICAD FACILITY

30.00
9.00

9.00
ZONE :
ROOF PANEL

INDUSTRIAL CITY OF ABU DHABI


D D
SECTOR NO : PLOT NO :
5.25

5.25
SLOPE

SLOPE

SLOPE

SLOPE

SLOPE

SLOPE

SLOPE

SLOPE

SLOPE

SLOPE

SLOPE ROOF PANEL

SLOPE

SLOPE
ICAD II 208ER7

E E PROJECT DESCRIPTION :

PROPOSED BLOCK-A (WORKSHOP-1),BLOCK-B


5.25

5.25
(WORKSHOP-2),BLOCK-C(ADMIN BUILDING),BLOCK-D
(SECURITY ROOM),BLOCK-E(BLASTING SHED),
BLOCK-F(PAINTING SHED),BLOCK-G(SUBSTATION),BLOCK-H
F F (TELEPHONE ROOM), IN PLOT NO-208ER7,SECTOR NO-ICAD
EAVE HT.
+12.90m

II,ZONE-INDUSTRIAL CITY OF
ABU DHABI

8.70 8.60 8.60 8.60 8.60 8.60 8.60 8.60 8.60 8.60 8.60 8.60 8.70
DRAWING TITLE :
112.00

BLOCK-A(WORKSHOP-1)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 TOP ROOF SLAB LAYOUT

Top Roof Slab Layout


1 SCALE: 1:200
DRAWING NO :

916-CEG-01-S301
REVISION NO:

00

SUBMISSION DATE : SCALE :

28/05/2024 1:200

PROJECT ID : DRAWING SIZE :

B4N-2024-002119 A1

OFFICIAL USE ONLY :