Professional Documents
Culture Documents
916-CEG-Excel Astra Structure Package WORKSHOP 1
916-CEG-Excel Astra Structure Package WORKSHOP 1
60
Site Location
&
ROOM
FORIF REQUIRED
ELEC.
DB
SKID
C2
EXTERNAL
PROVISION
GENERATOR
PILLAR
C2
INTAKE
FEEDER
MAIN
L4
L3
3 C2
D4 D1
L2
L1
C2
P
FUEL SKID AREA
D3
C2
1
OPEN TO SKY D2
WORK
Etisalat + IT
Cabinet
System
GYPSUM WALL
100mm DOMS
FACP 42U TGS
100mm WALL
WORK BLOCK
DB EP
OF
(Drive-thru Window)
LIMIT
ENTRY
Check out
Counter
Machine
Coffee
C2
C2
C2
A
WORK
EXIT
OF
LIMIT
R
K
I
N
G
192.00m²
GENERAL NOTES :
1 2 3 4 5 6 6' 7 8 9 10 11 12 13 14 DO NOT SCALE THIS DRAWING.
ALL DIMENSIONS ARE IN METERS AND LEVELS IN METERS UNLESS OTHERWISE NOTED.
ALL DRAWINGS SHALL BE READ IN CONJUNCTION WITH THE RELEVANT ARCHITECTURAL, CIVIL,
112.00 LANDSCAPE, STRUCTURAL, MECHANICAL, ELECTRICAL AND TELECOMMUNICATION, ENGINEERING
SERVICES DRAWINGS, TOGETHER WITH THE CONTRACT DOCUMENTS & PROJECT SPECIFICATIONS.
8.70 8.60 8.60 8.60 8.60 4.48 4.12 8.60 8.60 8.60 8.60 8.60 8.60 8.70
A'
MASTER DEVELOPER
10.00
5.25
B B
5.25
5.25
OWNER / TENANT
40.00
C C
CONSULTANT :
30.00
9.00
9.00
D D
5.25
5.25
PROJECT NAME :
E E
EXCEL ASTRA ICAD FACILITY
5.25
5.25
NC-2 NC-1 NC-1 NC-1 NC-1 NC-1 NC-1 NC-1 NC-1 NC-1 NC-1 NC-1 NC-1 NC-2
ZONE :
F F
INDUSTRIAL CITY OF ABU DHABI
SECTOR NO : PLOT NO :
8.70 8.60 8.60 8.60 8.60 8.60 8.60 8.60 8.60 8.60 8.60 8.60 8.70
ICAD II 208ER7
112.00
PROJECT DESCRIPTION :
1 SCALE: 1:200
(TELEPHONE ROOM), IN PLOT NO-208ER7,SECTOR NO-ICAD
II,ZONE-INDUSTRIAL CITY OF
ABU DHABI
DRAWING TITLE :
BLOCK-A(WORKSHOP-1)
NECK COLUMN LAYOUT
Neck Column Details
2 SCALE: 1:20
DRAWING NO : REVISION NO:
916-CEG-01-S100 00
FLOOR NC-1 NC-2 NC-3
SUBMISSION DATE : SCALE :
28/05/2024 1:200
B4N-2024-002119 A1
Foundation to
OFFICIAL USE ONLY :
Ground Floor
Site Location
&
ROOM
FORIF REQUIRED
ELEC.
DB
SKID
C2
EXTERNAL
PROVISION
GENERATOR
PILLAR
C2
INTAKE
FEEDER
MAIN
L4
L3
3 C2
D4 D1
L2
L1
C2
P
FUEL SKID AREA
D3
C2
1
OPEN TO SKY D2
WORK
Etisalat + IT
Cabinet
System
GYPSUM WALL
100mm DOMS
FACP 42U TGS
100mm WALL
WORK BLOCK
DB EP
OF
(Drive-thru Window)
LIMIT
ENTRY
Check out
Counter
Machine
Coffee
C2
C2
C2
A
WORK
EXIT
OF
LIMIT
R
K
I
N
G
192.00m²
GENERAL NOTES :
DO NOT SCALE THIS DRAWING.
ALL DIMENSIONS ARE IN METERS AND LEVELS IN METERS UNLESS OTHERWISE NOTED.
ALL DRAWINGS SHALL BE READ IN CONJUNCTION WITH THE RELEVANT ARCHITECTURAL, CIVIL,
LANDSCAPE, STRUCTURAL, MECHANICAL, ELECTRICAL AND TELECOMMUNICATION, ENGINEERING
SERVICES DRAWINGS, TOGETHER WITH THE CONTRACT DOCUMENTS & PROJECT SPECIFICATIONS.
112.00
8.70 8.60 8.60 8.60 8.60 4.48 4.12 8.60 8.60 8.60 8.60 8.60 8.60 8.70
A'
10.00
OWNER / TENANT
A A
CONSULTANT :
5.25
5.25
B B
5.25
5.25
40.00
C C PROJECT NAME :
30.00
9.00
9.00
ZONE :
5.25
ICAD II 208ER7
E E PROJECT DESCRIPTION :
5.25
(WORKSHOP-2),BLOCK-C(ADMIN BUILDING),BLOCK-D
(SECURITY ROOM),BLOCK-E(BLASTING SHED),
BLOCK-F(PAINTING SHED),BLOCK-G(SUBSTATION),BLOCK-H
F F (TELEPHONE ROOM), IN PLOT NO-208ER7,SECTOR NO-ICAD
II,ZONE-INDUSTRIAL CITY OF
ABU DHABI
8.70 8.60 8.60 8.60 8.60 8.60 8.60 8.60 8.60 8.60 8.60 8.60 8.70
DRAWING TITLE :
112.00
BLOCK-A(WORKSHOP-1)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 STEEL COLUMN LAYOUT
916-CEG-01-S101
REVISION NO:
00
28/05/2024 1:200
B4N-2024-002119 A1
Site Location
&
ROOM
FORIF REQUIRED
ELEC.
DB
SKID
C2
EXTERNAL
PROVISION
GENERATOR
PILLAR
C2
INTAKE
FEEDER
MAIN
L4
1 2 3 4 5 6 6' 7 8 9 10 11 12 13 14
L3
3 C2
D4 D1
L2
L1
C2
P
FUEL SKID AREA
D3
C2
1
OPEN TO SKY D2
WORK
Etisalat + IT
Cabinet
System
GYPSUM WALL
100mm DOMS
FACP 42U TGS
100mm WALL
WORK BLOCK
DB EP
OF
(Drive-thru Window)
LIMIT
ENTRY
Check out
Counter
Machine
Coffee
C2
C2
C2
A
WORK
EXIT
OF
LIMIT
R
K
I
N
G
112.00
192.00m²
GENERAL NOTES :
8.70 8.60 8.60 8.60 8.60 4.48 4.12 8.60 8.60 8.60 8.60 8.60 8.60 8.70 DO NOT SCALE THIS DRAWING.
ALL DIMENSIONS ARE IN METERS AND LEVELS IN METERS UNLESS OTHERWISE NOTED.
ALL DRAWINGS SHALL BE READ IN CONJUNCTION WITH THE RELEVANT ARCHITECTURAL, CIVIL,
LANDSCAPE, STRUCTURAL, MECHANICAL, ELECTRICAL AND TELECOMMUNICATION, ENGINEERING
SERVICES DRAWINGS, TOGETHER WITH THE CONTRACT DOCUMENTS & PROJECT SPECIFICATIONS.
A' C1 C1 C1 C1 C1 C1 C1
10.00
C1
C1
C1
REV. NO. DESCRIPTION Date
MASTER DEVELOPER
A C1 C1 C1 C1 C1 C1 C1 A
5.25
5.25
B B
5.25
5.25
40.00
C C
OWNER / TENANT
30.00
9.00
9.00
CONSULTANT :
D D
5.25
5.25
E E
5.25
5.25
PROJECT NAME :
ZONE :
8.70 8.60 8.60 8.60 8.60 8.60 8.60 8.60 8.60 8.60 8.60 8.60 8.70
INDUSTRIAL CITY OF ABU DHABI
112.00
SECTOR NO : PLOT NO :
1 2 3 4 5 6 7 8 9 10 11 12 13 14 ICAD II 208ER7
1 SCALE: 1:200
PROPOSED BLOCK-A (WORKSHOP-1),BLOCK-B
(WORKSHOP-2),BLOCK-C(ADMIN BUILDING),BLOCK-D
(SECURITY ROOM),BLOCK-E(BLASTING SHED),
BLOCK-F(PAINTING SHED),BLOCK-G(SUBSTATION),BLOCK-H
(TELEPHONE ROOM), IN PLOT NO-208ER7,SECTOR NO-ICAD
II,ZONE-INDUSTRIAL CITY OF
ABU DHABI
DRAWING TITLE :
BLOCK-A(WORKSHOP-1)
CONCRETE COLUMN LAYOUT
B4N-2024-002119 A1
Site Location
&
ROOM
FORIF REQUIRED
ELEC.
DB
SKID
C2
EXTERNAL
PROVISION
GENERATOR
PILLAR
C2
INTAKE
FEEDER
MAIN
L4
L3
3 C2
D4 D1
L2
L1
C2
P
FUEL SKID AREA
D3
C2
1
OPEN TO SKY D2
WORK
Etisalat + IT
Cabinet
System
GYPSUM WALL
100mm DOMS
FACP 42U TGS
100mm WALL
WORK BLOCK
DB EP
OF
(Drive-thru Window)
LIMIT
ENTRY
Check out
Counter
Machine
Coffee
C2
C2
C2
A
WORK
EXIT
OF
LIMIT
R
K
I
N
G
192.00m²
GENERAL NOTES :
DO NOT SCALE THIS DRAWING.
ALL DIMENSIONS ARE IN METERS AND LEVELS IN METERS UNLESS OTHERWISE NOTED.
ALL DRAWINGS SHALL BE READ IN CONJUNCTION WITH THE RELEVANT ARCHITECTURAL, CIVIL,
LANDSCAPE, STRUCTURAL, MECHANICAL, ELECTRICAL AND TELECOMMUNICATION, ENGINEERING
SERVICES DRAWINGS, TOGETHER WITH THE CONTRACT DOCUMENTS & PROJECT SPECIFICATIONS.
1 2 3 4 5 6 6' 7 8 9 10 11 12 13 14
112.00
8.70 8.60 8.60 8.60 8.60 4.48 4.12 8.60 8.60 8.60 8.60 8.60 8.60 8.70
REV. NO. DESCRIPTION Date
MASTER DEVELOPER
A'
P1 P1 P1 P1 P1 P1 P1
10.00
P1 P1 P1 P1 P1 P1 P1
P5 P4 P4 P4 P4 P4 P2 P2 P2 P2 P2 P2 P2 P2
A P1 A
P2 P2 P2 P2 P2 P2 P2 OWNER / TENANT
P5 P5 P4 P4 P4 P4 P4 P4 P4 P4 P4 P4 P2
5.25
5.25
P1 P1 P1 P1 P1 P1 P1 P1 P1 P1 P1 P1 P1
B P1 B
CONSULTANT :
5.25
5.25
40.00
P1 P1 P1 P1 P1 P1 P1 P1 P1 P1 P1 P1 P1
C P1 C
30.00
P1 P1 P1 P1 P1 P1 P1 P1 P1 P1 P1 P1 P1
9.00
9.00
P1
PROJECT NAME :
P1 P1 P1 P1 P1 P1 P1 P1 P1 P1 P1 P1 P1
D P1 D EXCEL ASTRA ICAD FACILITY
5.25
5.25
ZONE :
5.25
P3 P3 P3 P3 P3 P3 P3 P3 P3 P3 P3 P3 P3 P3
P3 P3 P3 P3 P3 P3 P3 P3 P3 P3 P3 P3 P3 P3 ICAD II 208ER7
P3 P3 P3 P3 P3 P3 P3 P3 P3 P3 P3 P3 P3 P3 P3 P3 P3 P3 P3 P3 P3 P3 P3 P3 P3 P3 P3 P3
F F
PROJECT DESCRIPTION :
Pile Layout
1 SCALE: 1:200
BLOCK-A(WORKSHOP-1)
PILE LAYOUT
916-CEG-01-S200 00
28/05/2024 1:200
B4N-2024-002119 A1
NOTE :
ADDITIONAL LOAD DUE TO THE ALLOWABLE PILE ECCENTRICITY (REFER TO SPECIFICATION) AND HORIZONTAL FORCE AT TOP
OF PILE EQUAL MINIMUM 5% OF PILE CAPACITY, UNLESS OTHERWISE NOTED IN THE SCHEDULE , SHOULD BE CONSIDERED.