Trimmer Bar of Paddle Pipe prior to restoration of CW3 at Outlet Flowmeter RL. +4.735 as per highlighted in the WIR-S- 16-Apr-24 3pm drawing. 9956
Inspection of Formworks Installation &
CPR of CW3 at Outlet Flowmeter RL. +4.735 as per highlighted in the WIR-S- 8pm drawing. 9957
Survey Lay-out Inspection Prior for
Rebar Foundation at PERIMETER FENCE , STA.493m-516m , AGL351- RL.4.460m-4.860m as per highlighted EPC-WIR- 09:00AM in the drawing. S-9960
Rebar Inspection for Foundations at
PERIMETER FENCE , STA.493m- AGL351- 10:00AM 516m , RL.4.460m-4.860m as per EPC-WIR- Onwards highlighted in the drawing. S-9961
FW and CPR Inspection for Foundation
at PERIMETER FENCE , STA.493m- AGL351- 02:00PM 516m , RL.4.460m-4.860m as per EPC-WIR- Onwards highlighted in the drawing. S-9962 WIR-AR- 10:00AM Torque Test at Generato Room 1360 Inspection of Survey Lay-out for CB1,CB2,CBR1,CBR2 & CBJ1 along GL: 1-3/A-F, RL: 10.310 at Workshop and Spareparts Storeroom as per highlighted in the drawing. 3pm 9897 Inspection of Steel Reinforcement for B1,CB2,CBR1,CBR2 & CBJ1 along WIR-S- GL: 1-3/A-F, RL: 10.310 at Workshop 9898 and Spareparts Storeroom as per highlighted in the drawing. 8pm Inspection of Formworks and Concrete Pouring Request for B1,CB2,CBR1,CBR2 & CBJ1 along WIR-S- GL: 1-3/A-F, RL: 10.310 at Workshop 9899 and Spareparts Storeroom as per highlighted in the drawing. 11pm WIR-S- Inspection of Survey Lay-out for FC1 9946 along GL: 3/A, RL: 3.010 at Hazardous Waste Storage as per highlighted in the 1pm drawing.
Inspection of Steel Reinforcement for
FC1 along GL: 3/C, RL: 3.010 at Hazardous Waste Storage as per WIR-S- 6pm highlighted in the drawing. 9947
Inspection of Formworks and Concrete
Pouring Request for FC1 along GL: 3/C, RL: 3.010 at Hazardous Waste Storage as per highlighted in the WIR-S- 10PM drawing. 9948 Date Time Activity WIR Remarks
Inspection of Rebar Installation for
Trimmer Bar of Paddle Pipe prior to restoration of CW3 at Outlet Flowmeter RL. +4.735 as per highlighted in the WIR-S- 16-Apr-24 3pm drawing. 9956
Inspection of Formworks Installation &
CPR of CW3 at Outlet Flowmeter RL. +4.735 as per highlighted in the WIR-S- 8pm drawing. 9957
Survey Lay-out Inspection Prior for
Rebar Foundation at PERIMETER FENCE , STA.493m-516m , AGL351- RL.4.460m-4.860m as per highlighted EPC-WIR- 09:00AM in the drawing. S-9960
Rebar Inspection for Foundations at
PERIMETER FENCE , STA.493m- AGL351- 10:00AM 516m , RL.4.460m-4.860m as per EPC-WIR- Onwards highlighted in the drawing. S-9961
FW and CPR Inspection for Foundation
at PERIMETER FENCE , STA.493m- AGL351- 02:00PM 516m , RL.4.460m-4.860m as per EPC-WIR- Onwards highlighted in the drawing. S-9962 WIR-AR- 10:00AM Torque Test at Generato Room 1360 Inspection of Survey Lay-out for CB1,CB2,CBR1,CBR2 & CBJ1 along GL: 1-3/A-F, RL: 10.310 at Workshop and Spareparts Storeroom as per highlighted in the drawing. 3pm 9897 Inspection of Steel Reinforcement for B1,CB2,CBR1,CBR2 & CBJ1 along WIR-S- GL: 1-3/A-F, RL: 10.310 at Workshop 9898 and Spareparts Storeroom as per highlighted in the drawing. 8pm Inspection of Formworks and Concrete Pouring Request for B1,CB2,CBR1,CBR2 & CBJ1 along WIR-S- GL: 1-3/A-F, RL: 10.310 at Workshop 9899 and Spareparts Storeroom as per highlighted in the drawing. 11pm WIR-S- Inspection of Survey Lay-out for FC1 9946 along GL: 3/A, RL: 3.010 at Hazardous Waste Storage as per highlighted in the 1pm drawing.
Inspection of Steel Reinforcement for
FC1 along GL: 3/C, RL: 3.010 at Hazardous Waste Storage as per WIR-S- 6pm highlighted in the drawing. 9947
Inspection of Formworks and Concrete
Pouring Request for FC1 along GL: 3/C, RL: 3.010 at Hazardous Waste Storage as per highlighted in the WIR-S- 10PM drawing. 9948