RISK ASSESSMENT
DOCUMENT NO - KJO-6403
REVISION NO - 00
DATE - 01 July 2008
Page 1 of 14
عمليات الخفجي المشتركة
الشركة الكويتية لنفط الخليج
KUWAIT GULF OIL COMPANY
AL-KHAFJI JOINT OPERATIONS
APPROVALS
The master of this document is stored on an electronic document server and is write protected. It can only be
changed by the Content Manager. Copies may be printed or downloaded to your desktop; however, any hard or
soft copy of this document (other than the Master) is considered to be an Uncontrolled document and used for
reference only.
PROPRIETARY INFORMATION: The information contained in this document is the property of KJO. Except as
specifically authorized in writing, the holder of this document shall keep all information contained herein
confidential, to be used within KJO only.
Page 2 of 14
عمليات الخفجي المشتركة
الشركة الكويتية لنفط الخليج
KUWAIT GULF OIL COMPANY
AL-KHAFJI JOINT OPERATIONS
TABLE OF CONTENTS
PAGE NO
1) PURPOSE 4
2) SCOPE 4
4) RESPONSIBILITY 5
6) RECORDS 11
7) ATTACHMENTS
Page 3 of 14
عمليات الخفجي المشتركة
الشركة الكويتية لنفط الخليج
KUWAIT GULF OIL COMPANY
AL-KHAFJI JOINT OPERATIONS
1. PURPOSE
The purpose of this procedure is to conduct risk assessments for all the activities, products and services
controlled and influenced by KJO in order to implement appropriate control measures to prevent accidents.
2. SCOPE
The scope includes:
Hazard - is the potential to cause harm, including ill health or injury, damage to property, facilities, products
or the environment; production losses or increased liabilities.
Risk -The frequency of occurrence (likelihood) of an undesired event, and the severity of the
consequences of that event.
Probability - is the description of how often an event will occur and is usually based on historical data and
statistics or sound engineering judgment.
Hazard Effect - is a description of how bad and how severe the event might be.
Risk Assessment - is a method of evaluating the risks associated with a particular job, activity or task in
order to identify the control and contingency measures that should be taken to manage the risks.
ALARP - As Low As Reasonably Practicable. Risks are said to be reduced to a level of ALARP, at a point
where the time, trouble, difficulty and cost of risk reduction measures have been assessed, with further
reduction measures considered to be unreasonable in regard to the additional risk reduction obtained.
Control Measures – suitable measures to mitigate the risks.
Page 4 of 14
عمليات الخفجي المشتركة
الشركة الكويتية لنفط الخليج
KUWAIT GULF OIL COMPANY
AL-KHAFJI JOINT OPERATIONS
4. RESPONSIBILITY
The Industrial Security and Safety Department (ISD) and the OH&S Coordinator are responsible for
identifying when this procedure shall be implemented. The EHSMR shall ensure that suitably experienced
personnel are appointed to carry out the identification of hazards and assessment of risks and to apply the
system for determining the significance rating. Assessment Teams shall, when required, carry out risk
assessments and will utilise the specialties of different personnel to ensure that the assessment process is
as objective as possible. Where deemed necessary, contracted OH&S specialists may join the assessment
team in order to input into assessments where additional assistance is required and the results are recorded
in a Risk Register.
5.1 INTRODUCTION
KJO activities have the potential to harm people and the environment, to cause damage or loss to
assets, to defer oil production, to cause financial loss, and to adversely impact the Company’s
reputation. Risk Assessment provides a structured approach to managing the hazards and potential
effects of KJO’s activities. Effective application of Risk Assessment involves four steps: Identify,
Assess, Control and Recover. These steps cover identification of the major hazards to people,
assets and the reputation, assessment of the related risks, as well as implementing measures to
control these risks and to recover in case these measures fail.
Risk assessments conducted for all the routine activities, existing facilities and operations
shall be used as a Generic Risk Assessment. The outcome of the General Risk Assessment
shall be used for future routine activities. On all routine activities, existing facilities and
operations, update these assessments at least every 3 years in order to assess changing
activities, products and services, and/or changes in laws and stakeholder requirements.
Page 5 of 14
عمليات الخفجي المشتركة
الشركة الكويتية لنفط الخليج
KUWAIT GULF OIL COMPANY
AL-KHAFJI JOINT OPERATIONS
Risk Assessment involves four steps: Identify, Assess, Control and Recover. Each step of the
assessment process should be completed before going onto the next step.
Page 6 of 14
عمليات الخفجي المشتركة
الشركة الكويتية لنفط الخليج
KUWAIT GULF OIL COMPANY
AL-KHAFJI JOINT OPERATIONS
Define the scope of the assessment and then divide it into appropriate assessment units.
Identify the safety hazards and consider the following in doing this:
Flammable and explosive substances.
Electricity
Chemicals and toxic substances.
Pressure systems.
Differences in height.
Confined spaces.
Slips, trips and falls.
Machinery with moving parts.
Extreme temperatures.
Objects under induced stress.
Transport and moving equipment.
Security.
Health Assessments
The second step in Risk Assessment process is to assess the OH&S risks of all activities, and
then to rank these risks. Once the hazards and effects have been identified, their
consequences and likelihood can be assessed and the risk is determined.
Page 7 of 14
عمليات الخفجي المشتركة
الشركة الكويتية لنفط الخليج
KUWAIT GULF OIL COMPANY
AL-KHAFJI JOINT OPERATIONS
KJO Risk Assessment Matrix standardises qualitative risk assessment within all Operating
areas. This Risk Assessment Matrix (shown below) shows risk as the product of likelihood and
consequence. It can be used to assess and evaluate KJO’s OH&S risks. The assessment of
likelihood is shown on the horizontal axis with assessment of consequence shown on
the vertical axis. Three categories of consequence are included: Impact on people, assets
and reputation. Plotting the intersection of both likelihood and consequence provides a
qualitative assessment of the risk.
Quantify the Risk arising from the hazards and estimate the risk rating. Decide whether existing
precautions are adequate or more should be done.
Table 1: Risk Assessment Matrix
CONSEQUENCES INCREASING LIKELIHOOD
1 2 3 4 5
Severity
Reputation
Page 8 of 14
عمليات الخفجي المشتركة
الشركة الكويتية لنفط الخليج
KUWAIT GULF OIL COMPANY
AL-KHAFJI JOINT OPERATIONS
Enhance appreciation of OH&S risk and achieving ALARP at all levels in KJO.
Assist in setting clear risk based strategic objectives.
Provide the basis for implementation of a risk based OH&S Management System.
Provide a consistency in evaluating risk across all KJO activities.
5.3.3 STEP 3: CONTROL MEASURES
The third step in Risk Assessment process is to control hazards and risks by preventative
measures (reducing the likelihood of hazards), mitigation measures (reducing the
consequence of hazards) and recovery measures (reducing the chain of consequences
arising from the first hazardous event). In all cases, risk reduction should be undertaken to
achieve a level that is “As Low As Reasonably Practicable” (ALARP).
Controls shall be developed and implemented control measures to reduce risks to a level
deemed ‘As Low As Reasonably Practicable’ (ALARP).
Controls should include preventative and mitigation measures involving active, passive and/or
operational systems. Examples of operational systems to be considered include:
Training programmes.
Monitoring programmes.
Operational procedures.
Management plans.
Emergency response plans.
Audit and inspection programmes.
Page 9 of 14
عمليات الخفجي المشتركة
الشركة الكويتية لنفط الخليج
KUWAIT GULF OIL COMPANY
AL-KHAFJI JOINT OPERATIONS
Page 10 of 14
عمليات الخفجي المشتركة
الشركة الكويتية لنفط الخليج
KUWAIT GULF OIL COMPANY
AL-KHAFJI JOINT OPERATIONS
If the controls fail to prevent or avoid the release of a hazard then some kind of counter
measures are required to limit the consequences of the hazardous event or effect. These
counter measures are aimed at mitigating the consequences of the hazard and aid in
reinstatement of the operation or activity. Recovery measures can reduce the likelihood that
the first hazardous event will develop into further consequences
To assist with a recovery, it is important that all personnel are fully briefed and drilled as to the
response measures planned, including evacuation and restoration procedures.
Effective recovery procedures also require testing and review. For instance, all procedures
for recovery from high risk and emergency scenarios shall be in place and subject to testing
and review. In addition, recovery procedures should be regularly updated in light of
incidents, following analysis of drills and testing, and kept in line with industry best practice.
Performance against all recovery procedures should be recorded and formally reviewed
periodically. Parties responsible for implementing recovery procedures shall be competent
and clearly understand their responsibilities.
6. RECORDS
Risk Assessments for all identified risks shall be documented in Risk Assessment Register and maintained
through each lifecycle phase, from development through to abandonment.
7. ATTACHMENTS
KJO – 6403-1: Hazard Identification Form
KJO – 6403-2: Risk Assessment Form
KJO – 6403-3: Risk Register Form
Page 11 of 14
KJO – 6403-1: Hazard Identification Form
Page 12 of 14
KJO – 6403-2: Risk Assessment Form
RISK ASSESSMENT
Department:
Team Leader:
Participants:
1.HAZARD IDENTIFICATION 2. RISK ASSESSMENT
Base Risk Residual Risk
Likelihood
Risk Ranking
Likelihood
Risk Ranking
Risk Category
Risk Category
Proposed
Severity
Severity
Significant Health Existing Control
Sl. Mitigating
Activity Sub-Activity and Safety Risk Measures
No Measures
Hazard
Page 13 of 14
KJO – 6403-3: Risk Register Form
RISK REGISTER
Department:
Team Leader:
Participants:
1.HAZARD IDENTIFICATION 2. RISK ASSESSMENT 3. ON SITE ACTION
Risk Category
Risk Category
Consequence
Consequence
Risk Ranking
Risk Ranking
Existing
Probability
Probability
Significant Mitigating Action Action Justification On-going Verified Third party
Control Status
Sl. Activit Sub- Health and measures By Date for closure comment by verification
Risk Measures
No y Activity Safety
Hazard
Page 14 of 14