UT THICKNESS SURVEY RECORD - PIPING

Hot spots(TML) Technique


0
P & ID NO. DEEP-036-02 Pr. (bar) 102.04 Temperature C 38
THIS INSP. DATE 9-Sep-20
LINE No. 6-PG-13-D DESIGN Corro Allow. DCA 1.59 Pipe Spec. ASTM A106 GR.B
SERVICE: PROCESS GAS Joint Efficiency 1 Allowable Stress (Ksi) 20 LAST INSP. DATE 4-Sep-20
0
Period From Last Insp.(YRS) 0.01 Pr. (bar) - Temperature C - SERVICE START DATE Jun-19
OPER
Period From Service Start.(YRS) 1.26 OD of Pipe (mm) 168.3 Min 9.40 Max 13.00 TEST LOCATION BOSSTER COMPRESSOR
UTM Procedure Ref. NO TSSA/SOP/NDT/UTT/13 From Line Line To TEST REPORT NO UTM/09-20/13
LINE
D-101
Corrosion Remaining as per Remaining as per Remaining as per
MRT MRT
Present Rate CA MDWT/MAT MDWT/MST
Feature Line Last MRT as per as per
Feature Present Measurement Thickness (mm) Nominal WT Min. MDWT MAT MST Corr. Corr. Corr.
Meas. nominal Min.WT as per CA MDWT/M MDWT/M Life Life Life
Type WT STCR LTCR Allow. Allow. Allow.
Point No dai AT ST (RL) (RL) (RL)
(RCA) (RCA) (RCA)
T B N E S W mm mm mm mm mm mm mm mm mm mm/yr mm/yr mm Years mm Years mm Years
R1 REDUCER 6 10.20 10.30 9.40 - 9.80 - 10.97 9.40 9.40 8.01 6.05 3.30 6.05 2.80 6.05 0.00 1.25 1.39 1.11 3.35 2.69 3.35 2.69
E1 ELBOW 6 12.10 11.50 - 12.40 - 10.60 10.97 10.70 10.60 8.01 6.05 3.30 6.05 2.80 6.05 7.30 0.29 2.59 0.35 4.55 0.62 4.55 0.62
P1 PIPE 6 10.10 10.70 - 11.00 - 11.30 10.97 10.20 10.10 8.01 6.05 3.30 6.05 2.80 6.05 7.30 0.69 2.09 0.29 4.05 0.56 4.05 0.56
P2 PIPE 6 10.90 11.10 - 10.70 - 10.40 10.97 10.60 10.40 8.01 6.05 3.30 6.05 2.80 6.05 14.60 0.45 2.39 0.16 4.35 0.30 4.35 0.30
P3 PIPE 6 10.30 10.80 - 11.30 - 11.20 10.97 10.30 10.30 8.01 6.05 3.30 6.05 2.80 6.05 0.00 0.53 2.29 4.30 4.25 7.98 4.25 7.98
E2 ELBOW 6 12.10 11.50 - 12.40 - 10.70 10.97 10.70 10.70 8.01 6.05 3.30 6.05 2.80 6.05 0.00 0.21 2.69 12.53 4.65 20.00 4.65 20.00
P4 PIPE 6 - - 11.40 10.50 10.70 10.10 10.97 10.10 10.10 8.01 6.05 3.30 6.05 2.80 6.05 0.00 0.69 2.09 3.02 4.05 5.86 4.05 5.86
P5 PIPE 6 - - 10.80 11.10 10.60 10.90 10.97 10.60 10.60 8.01 6.05 3.30 6.05 2.80 6.05 0.00 0.29 2.59 8.81 4.55 15.47 4.55 15.47
P6 PIPE 6 - - 10.70 11.00 10.80 11.70 10.97 10.70 10.70 8.01 6.05 3.30 6.05 2.80 6.05 0.00 0.21 2.69 12.53 4.65 20.00 4.65 20.00
E3 ELBOW 6 11.70 10.50 11.30 - 11.50 - 10.97 10.50 10.50 8.01 6.05 3.30 6.05 2.80 6.05 0.00 0.37 2.49 6.67 4.45 11.91 4.45 11.91
P7 PIPE 6 10.90 10.40 10.90 - 10.80 - 10.97 10.40 10.40 8.01 6.05 3.30 6.05 2.80 6.05 0.00 0.45 2.39 5.28 4.35 9.60 4.35 9.60
P8 PIPE 6 10.50 10.40 10.90 - 11.00 - 10.97 10.40 10.40 8.01 6.05 3.30 6.05 2.80 6.05 0.00 0.45 2.39 5.28 4.35 9.60 4.35 9.60
P9 PIPE 6 10.60 10.40 10.40 - 10.50 - 10.97 10.40 10.40 8.01 6.05 3.30 6.05 2.80 6.05 0.00 0.45 2.39 5.28 4.35 9.60 4.35 9.60
P10 PIPE 6 11.20 10.90 10.60 - 11.10 - 10.97 10.80 10.60 8.01 6.05 3.30 6.05 2.80 6.05 14.60 0.29 2.59 0.18 4.55 0.31 4.55 0.31
P11 PIPE 6 10.20 10.10 11.00 - 10.20 - 10.97 10.10 10.10 8.01 6.05 3.30 6.05 2.80 6.05 0.00 0.69 2.09 3.02 4.05 5.86 4.05 5.86
P12 PIPE 6 11.00 11.70 11.10 - 10.80 - 10.97 10.80 10.80 8.01 6.05 3.30 6.05 2.80 6.05 0.00 0.14 2.79 20.00 4.75 20.00 4.75 20.00
P13 PIPE 6 11.40 10.60 11.10 - 9.70 - 10.97 9.70 9.70 8.01 6.05 3.30 6.05 2.80 6.05 0.00 1.01 1.69 1.67 3.65 3.62 3.65 3.62
E4 ELBOW 6 12.60 12.40 13.00 - 10.50 - 10.97 10.60 10.50 8.01 6.05 3.30 6.05 2.80 6.05 7.30 0.37 2.49 0.34 4.45 0.61 4.45 0.61
P14 PIPE 6 11.00 10.50 - 11.70 - 11.00 10.97 10.50 10.50 8.01 6.05 3.30 6.05 2.80 6.05 0.00 0.37 2.49 6.67 4.45 11.91 4.45 11.91
P15 PIPE 6 10.60 11.00 - 11.10 - 11.00 10.97 10.70 10.60 8.01 6.05 3.30 6.05 2.80 6.05 7.30 0.29 2.59 0.35 4.55 0.62 4.55 0.62
P16 PIPE 6 10.60 10.60 - 10.10 - 11.10 10.97 10.10 10.10 8.01 6.05 3.30 6.05 2.80 6.05 0.00 0.69 2.09 3.02 4.05 5.86 4.05 5.86
E5 ELBOW 6 10.60 10.50 - 11.50 - 11.40 10.97 10.50 10.50 8.01 6.05 3.30 6.05 2.80 6.05 0.00 0.37 2.49 6.67 4.45 11.91 4.45 11.91
P17 PIPE 6 - - 11.20 10.40 10.10 10.80 10.97 10.10 10.10 8.01 6.05 3.30 6.05 2.80 6.05 0.00 0.69 2.09 3.02 4.05 5.86 4.05 5.86
P18 PIPE 6 - - 10.80 10.80 10.90 11.20 10.97 10.80 10.80 8.01 6.05 3.30 6.05 2.80 6.05 0.00 0.14 2.79 20.00 4.75 20.00 4.75 20.00
P19 PIPE 6 - - 10.60 10.30 10.80 10.60 10.97 10.30 10.30 8.01 6.05 3.30 6.05 2.80 6.05 0.00 0.53 2.29 4.30 4.25 7.98 4.25 7.98
P20 PIPE 6 - - 10.90 11.00 10.40 11.10 10.97 10.40 10.40 8.01 6.05 3.30 6.05 2.80 6.05 0.00 0.45 2.39 5.28 4.35 9.60 4.35 9.60
E6 ELBOW 6 10.50 10.20 12.00 - 10.50 - 10.97 10.20 10.20 8.01 6.05 3.30 6.05 2.80 6.05 0.00 0.61 2.19 3.58 4.15 6.78 4.15 6.78
P21 PIPE 6 10.90 11.50 11.40 - 11.10 - 10.97 10.90 10.90 8.01 6.05 3.30 6.05 2.80 6.05 0.00 0.06 2.89 20.00 4.85 20.00 4.85 20.00
P22 PIPE 6 11.30 10.60 11.50 - 11.00 - 10.97 10.70 10.60 8.01 6.05 3.30 6.05 2.80 6.05 7.30 0.29 2.59 0.35 4.55 0.62 4.55 0.62
R2 REDUCER 6 12.80 12.60 12.50 - 12.30 - 10.97 12.30 12.30 8.01 6.05 3.30 6.05 2.80 6.05 0.00 0.00 4.29 20.00 6.25 20.00 6.25 20.00

VISUAL INSPECTION:

Contract No 4600009908 Probe T/R 5 Mhz, 10mm D201 (77852013) Insulation NO


Contct Name NDT SERVICE'S FOR ONSHOIRE TERMINAL & OFFSHORE Refernace Code API 570 Surface Condition PAINTED
Make & Model Of Machine MODSONIC UTG MACHINE Couplant Grease Calibration Block CS 2.5 - 12.5 mm Step Gauge
Tested By
TUV SUD SOUTH ASIA PVT LTD.
Name : S.SUNIL KUMAR

Signature :

Date : 9-Sep-20
Point no Nominal Thk MRT 17-Mar-20 25-Jun-20 9-Jul-20 16-Jul-20 23-Jul-20 30-Jul-20 05-Aug-20 12-Aug-20 19-Aug-20 27-Aug-20 04-Sep-20 09-Sep-20 14.00
R1 10.97 8.01 9.40 9.40 9.40 9.40 9.40 9.40 9.40 9.40 9.40 9.40 9.40 9.40
12.00
E1 10.97 8.01 10.80 10.70 10.70 10.70 10.70 10.70 10.70 10.70 10.70 10.70 10.60 10.60
P1 10.97 8.01 10.30 10.20 10.20 10.20 10.20 10.20 10.20 10.20 10.10 10.10 10.10 10.10 10.00
P2 10.97 8.01 10.60 10.60 10.60 10.60 10.60 10.60 10.60 10.60 10.50 10.50 10.40 10.40 8.00
P3 10.97 8.01 10.30 10.30 10.30 10.30 10.30 10.30 10.30 10.30 10.30 10.30 10.30 10.30 6.00
E2 10.97 8.01 10.00 10.70 10.70 10.70 10.70 10.70 10.70 10.70 10.70 10.70 10.70 10.70 4.00
P4 10.97 8.01 10.20 10.10 10.10 10.10 10.10 10.10 10.10 10.10 10.10 10.10 10.10 10.10
2.00
P5 10.97 8.01 10.70 10.60 10.60 10.60 10.60 10.60 10.60 10.60 10.60 10.60 10.60 10.60
P6 10.97 8.01 10.80 10.70 10.70 10.70 10.70 10.70 10.70 10.70 10.70 10.70 10.70 10.70 0.00
E3 10.97 8.01 10.60 10.50 10.50 10.50 10.50 10.50 10.50 10.50 10.50 10.50 10.50 10.50 R1 E1 P1 P2 P3 E2 P4 P5 P6 E3 P7 P8 P9 P10 P11 P12 P13 E4 P14 P15 P16 E5 P17 P18 P19 P20 E6 P21 P22 R2
P7 10.97 8.01 10.40 10.40 10.40 10.40 10.40 10.40 10.40 10.40 10.40 10.40 10.40 10.40
P8 10.97 8.01 10.50 10.40 10.40 10.40 10.40 10.40 10.40 10.40 10.40 10.40 10.40 10.40 Nominal Thk MRT 17-Mar-20 25-Jun-20 9-Jul-20 16-Jul-20 23-Jul-20
P9 10.97 8.01 10.40 10.40 10.40 10.40 10.40 10.40 10.40 10.40 10.40 10.40 10.40 10.40 30-Jul-20 05-Aug-20 12-Aug-20 19-Aug-20 27-Aug-20 04-Sep-20 09-Sep-20
P10 10.97 8.01 10.80 10.80 10.80 10.80 10.80 10.80 10.80 10.80 10.70 10.70 10.60 10.60
P11 10.97 8.01 10.10 10.10 10.10 10.10 10.10 10.10 10.10 10.10 10.10 10.10 10.10 10.10
P12 10.97 8.01 10.90 10.80 10.80 10.80 10.80 10.80 10.80 10.80 10.80 10.80 10.80 10.80
P13 10.97 8.01 9.70 9.70 9.70 9.70 9.70 9.70 9.70 9.70 9.70 9.70 9.70 9.70
E4 10.97 8.01 10.70 10.60 10.60 10.60 10.60 10.60 10.60 10.60 10.60 10.60 10.50 10.50
P14 10.97 8.01 10.60 10.50 10.50 10.50 10.50 10.50 10.50 10.50 10.50 10.50 10.50 10.50
P15 10.97 8.01 10.70 10.70 10.70 10.70 10.70 10.70 10.70 10.70 10.60 10.60 10.60 10.60
P16 10.97 8.01 10.20 10.10 10.10 10.10 10.10 10.10 10.10 10.10 10.10 10.10 10.10 10.10
E5 10.97 8.01 10.50 10.50 10.50 10.50 10.50 10.50 10.50 10.50 10.50 10.50 10.50 10.50
P17 10.97 8.01 10.10 10.10 10.10 10.10 10.10 10.10 10.10 10.10 10.10 10.10 10.10 10.10
P18 10.97 8.01 10.80 10.80 10.80 10.80 10.80 10.80 10.80 10.80 10.80 10.80 10.80 10.80
P19 10.97 8.01 10.30 10.30 10.30 10.30 10.30 10.30 10.30 10.30 10.30 10.30 10.30 10.30
P20 10.97 8.01 10.40 10.40 10.40 10.40 10.40 10.40 10.40 10.40 10.40 10.40 10.40 10.40
E6 10.97 8.01 10.20 10.20 10.20 10.20 10.20 10.20 10.20 10.20 10.20 10.20 10.20 10.20
P21 10.97 8.01 10.90 10.90 10.90 10.90 10.90 10.90 10.90 10.90 10.90 10.90 10.90 10.90
P22 10.97 8.01 10.70 10.70 10.70 10.70 10.70 10.70 10.70 10.70 10.70 10.70 10.60 10.60
R2 10.97 8.01 12.30 12.30 12.30 12.30 12.30 12.30 12.30 12.30 12.30 12.30 12.30 12.30
UT THICKNESS SURVEY RECORD - PIPING
Hot spots(TML) Technique
P & ID NO. DEEP-036-02 Pr. (bar) 51.02 Temperature 0C 38
THIS INSP. DATE 9-Sep-20
LINE No. PG-2-38-B DESIGN Corro Allow. DCA 1.59 Pipe Spec. ASTM A106 GR.B
SERVICE: PROCESS GAS Joint Efficiency 1 Allowable Stress (Ksi) 20 LAST INSP. DATE 4-Sep-20
Period From Last Insp.(YRS) 0.01
OPER
Pr. (bar) - Temperature 0C - SERVICE START DATE Jun-19
Period From Service Start.(YRS) 1.26 OD of Pipe (mm) 60.32 Min 4.40 Max 6.50 TEST LOCATION BOSSTER COMPRESSOR
UTM Procedure Ref. NO TSSA/SOP/NDT/UTT/13 From Line Line To TEST REPORT NO UTM/09-20/38
LINE
PG-6-01-B PG-6-01-B
Remaining as
Corrosion Remaining as per Remaining as per
MRT MRT per
Present Rate CA MDWT/MAT
Line Last MRT as per as per MDWT/MST
Feature Meas. Feature Present Measurement Thickness (mm) Nominal WT Min. MDWT MAT MST
nominal Min.WT as per CA MDWT/M MDWT/M Corr. Corr. Corr.
Point No Type WT Life Life Life
dai AT ST STCR LTCR Allow. Allow. Allow.
(RL) (RL) (RL)
(RCA) (RCA) (RCA)
T B N E S W mm mm mm mm mm mm mm mm mm mm/yr mm/yr mm Years mm Years mm Years
P1 PIPE 2 5.80 5.30 5.40 - 5.50 - 5.54 5.40 5.30 3.26 1.10 2.50 2.50 1.80 1.80 7.30 0.19 2.04 0.28 2.80 0.38 3.50 0.48
E1 ELBOW 2 5.20 5.10 - 4.80 - 4.40 5.54 4.40 4.40 3.26 1.10 2.50 2.50 1.80 1.80 0.00 0.91 1.14 1.26 1.90 2.10 2.60 2.87
P2 PIPE 2 5.90 5.20 - 5.70 - 5.60 5.54 5.30 5.20 3.26 1.10 2.50 2.50 1.80 1.80 7.30 0.27 1.94 0.27 2.70 0.37 3.40 0.47
P3 PIPE 2 5.50 5.80 - 5.70 - 5.80 5.54 5.60 5.50 3.26 1.10 2.50 2.50 1.80 1.80 0.00 0.03 2.24 20.00 3.00 20.00 3.70 20.00
E2 ELBOW 2 5.30 5.20 6.50 - 4.70 - 5.54 4.70 4.70 3.26 1.10 2.50 2.50 1.80 1.80 0.00 0.67 1.44 2.16 2.20 3.29 2.90 4.34
P4 PIPE 2 5.30 5.90 5.60 - 5.80 - 5.54 5.40 5.30 3.26 1.10 2.50 2.50 1.80 1.80 7.30 0.19 2.04 0.28 2.80 0.38 3.50 0.48

VISUAL INSPECTION:

Contract No 4600009908 Probe T/R 5 Mhz, 10mm D201 (77852013) Insulation NO


NDT SERVICE'S FOR ONSHOIRE TERMINAL &
Contct Name
Name Refernace Code
Refernace Code API 570 Surface Condition
Condition PAINTED
OFFSHORE TERMINAL AT RAVVA
Make & Model Of Machine
Machine MODSONIC UTG MACHINE Couplant
Couplant Grease Calibration Block
Calibration Block CS 2.5 - 12.5 mm Step Gauge
Tested By
TUV SUD SOUTH ASIA PVT LTD.
Name : S.SUNIL KUMAR

Signature :

Date : 9-Sep-20
Point no Nominal Thk MRT 18-Oct-19 6-Feb-20 27-Feb-20 17-Mar-20 25-Jun-20 9-Jul-20 16-Jul-20 23-Jul-20 30-Jul-20 05-Aug-20 12-Aug-20 19-Aug-20 27-Aug-20 04-Sep-20 09-Sep-20
P1 5.54 3.26 5.80 5.50 5.50 5.50 5.40 5.40 5.40 5.50 5.40 5.40 5.40 5.40 5.30 5.30 5.30
E1 5.54 3.26 4.62 4.41 4.40 4.40 4.40 4.40 4.40 4.40 4.40 4.40 4.40 4.40 4.40 4.40 4.40
P2 5.54 3.26 5.79 5.28 5.30 5.30 5.30 5.30 5.30 5.30 5.30 5.30 5.30 5.30 5.20 5.20 5.20
P3 5.54 3.26 5.80 5.50 5.60 5.60 5.60 5.60 5.60 5.60 5.60 5.60 5.60 5.60 5.50 5.50 5.50
E2 5.54 3.26 4.85 4.69 4.70 4.70 4.70 4.70 4.70 4.70 4.70 4.70 4.70 4.70 4.70 4.70 4.70
P4 5.54 3.26 5.75 5.48 5.40 5.40 5.40 5.40 5.40 5.40 5.40 5.40 5.40 5.40 5.30 5.30 5.30

PG-2-38-B Trending Sheet


8.00
6.00
Thk in mm

4.00
2.00
0.00
P1 E1 P2 P3 E2 P4

Thk Locations

Nominal Thk MRT 18-Oct-19 6-Feb-20 27-Feb-20


17-Mar-20 25-Jun-20 9-Jul-20 16-Jul-20 23-Jul-20
30-Jul-20 05-Aug-20 12-Aug-20 19-Aug-20 27-Aug-20
04-Sep-20 09-Sep-20
UT THICKNESS SURVEY RECORD - PIPING
Hot spots(TML) Technique
P & ID NO. DEEP-036-02 Pr. (bar) 51.02 Temperature 0C 38
THIS INSP. DATE 9-Sep-20
LINE No. PG-6-14-B DESIGN Corro Allow. DCA 1.59 Pipe Spec. ASTM A106 GR.B
SERVICE: PROCESS GAS Joint Efficiency 1 Allowable Stress (Ksi) 20 LAST INSP. DATE 4-Sep-20
Period From Last Insp.(YRS) 0.01
OPER
Pr. (bar) - Temperature 0C - SERVICE START DATE Jun-19
Period From Service Start.(YRS) 1.26 OD of Pipe (mm) 168.3 Min 10.20 Max 12.10 TEST LOCATION BOSSTER COMPRESSOR
UTM Procedure Ref. NO TSSA/SOP/NDT/UTT/13 From Line Line To TEST REPORT NO UTM/09-20/14
LINE
PG-6-01-B PG-6-01-B

Corrosion Remaining as per Remaining as per Remaining as per


MRT MRT
Present Rate CA MDWT/MAT MDWT/MST
Line Last MRT as per as per
Feature Meas. Feature Present Measurement Thickness (mm) Nominal WT Min. MDWT MAT MST
nominal Min.WT as per CA MDWT/M MDWT/M Corr. Corr. Corr.
Point No Type WT Life Life Life
dai AT ST STCR LTCR Allow. Allow. Allow.
(RL) (RL) (RL)
(RCA) (RCA) (RCA)
T B N E S W mm mm mm mm mm mm mm mm mm mm/yr mm/yr mm Years mm Years mm Years
P1 PIPE 6 - - 10.40 11.00 10.20 11.20 7.11 10.20 10.20 4.63 3.07 3.30 3.30 2.80 3.07 0.00 0.00 5.57 20.00 6.90 20.00 7.13 20.00
E1 ELBOW 6 10.90 12.10 - 11.30 - 11.80 7.11 10.90 10.90 4.63 3.07 3.30 3.30 2.80 3.07 0.00 0.00 6.27 20.00 7.60 20.00 7.83 20.00
P2 PIPE 6 11.00 11.70 - 10.60 - 10.70 7.11 10.60 10.60 4.63 3.07 3.30 3.30 2.80 3.07 0.00 0.00 5.97 20.00 7.30 20.00 7.53 20.00
P3 PIPE 6 10.40 11.10 - 10.40 - 10.70 7.11 10.40 10.40 4.63 3.07 3.30 3.30 2.80 3.07 0.00 0.00 5.77 20.00 7.10 20.00 7.33 20.00
P4 PIPE 6 11.20 11.30 - 11.50 - 11.70 7.11 11.20 11.20 4.63 3.07 3.30 3.30 2.80 3.07 0.00 0.00 6.57 20.00 7.90 20.00 8.13 20.00
P5 PIPE 6 11.10 10.80 - 10.80 - 11.00 7.11 10.80 10.80 4.63 3.07 3.30 3.30 2.80 3.07 0.00 0.00 6.17 20.00 7.50 20.00 7.73 20.00
P6 PIPE 6 10.50 11.10 - 10.60 - 10.40 7.11 10.40 10.40 4.63 3.07 3.30 3.30 2.80 3.07 0.00 0.00 5.77 20.00 7.10 20.00 7.33 20.00
P7 PIPE 6 11.00 10.50 - 10.70 - 10.30 7.11 10.30 10.30 4.63 3.07 3.30 3.30 2.80 3.07 0.00 0.00 5.67 20.00 7.00 20.00 7.23 20.00
E2 ELBOW 6 10.50 11.70 - 11.60 - 11.90 7.11 10.50 10.50 4.63 3.07 3.30 3.30 2.80 3.07 0.00 0.00 5.87 20.00 7.20 20.00 7.43 20.00
P8 PIPE 6 - - 10.50 10.60 11.30 10.70 7.11 10.50 10.50 4.63 3.07 3.30 3.30 2.80 3.07 0.00 0.00 5.87 20.00 7.20 20.00 7.43 20.00

VISUAL INSPECTION:

Contract No 4600009908 Probe T/R 5 Mhz, 10mm D201 (77852013) Insulation NO+A26:AA29
NDT SERVICE'S FOR ONSHOIRE TERMINAL &
Contct Name
Name Refernace Code
Refernace Code API 570 Surface Condition
Condition PAINTED
OFFSHORE TERMINAL AT RAVVA
Make & Model Of Machine
Machine MODSONIC UTG MACHINE Couplant
Couplant Grease Calibration Block
Calibration Block CS 2.5 - 12.5 mm Step Gauge
Tested By
TUV SUD SOUTH ASIA PVT LTD.
Name : S.SUNIL KUMAR

Signature :

Date : 9-Sep-20
Point no Nominal Thk MRT 18-Oct-19 6-Feb-20 27-Feb-20 17-Mar-20 25-Jun-20 9-Jul-20 16-Jul-20 23-Jul-20 30-Jul-20 05-Aug-20 12-Aug-20 19-Aug-20 27-Aug-20 04-Sep-20 09-Sep-20
P1 7.11 4.63 10.64 10.37 10.30 10.20 10.20 10.20 10.20 10.20 10.20 10.20 10.20 10.20 10.20 10.20 10.20
E1 7.11 4.63 11.14 10.97 10.90 10.90 10.90 10.90 10.90 10.90 10.90 10.90 10.90 10.90 10.90 10.90 10.90
P2 7.11 4.63 10.89 10.87 10.70 10.70 10.60 10.60 10.60 10.60 10.60 10.60 10.60 10.60 10.60 10.60 10.60
P3 7.11 4.63 10.51 10.41 10.40 10.40 10.40 10.40 10.40 10.40 10.40 10.40 10.40 10.40 10.40 10.40 10.40
P4 7.11 4.63 11.52 11.35 11.30 11.20 11.20 11.20 11.20 11.20 11.20 11.20 11.20 11.20 11.20 11.20 11.20
P5 7.11 4.63 10.77 10.84 10.80 10.80 10.80 10.80 10.80 10.80 10.80 10.80 10.80 10.80 10.80 10.80 10.80
P6 7.11 4.63 10.45 10.45 10.40 10.40 10.40 10.40 10.40 10.40 10.40 10.40 10.40 10.40 10.40 10.40 10.40
P7 7.11 4.63 10.73 10.53 10.50 10.40 10.30 10.30 10.30 10.30 10.30 10.30 10.30 10.30 10.30 10.30 10.30
E2 7.11 4.63 10.68 10.5 10.50 10.50 10.50 10.50 10.50 10.50 10.50 10.50 10.50 10.50 10.50 10.50 10.50
P8 7.11 4.63 10.78 10.64 10.60 10.60 10.50 10.50 10.50 10.50 10.50 10.50 10.50 10.50 10.50 10.50 10.50

PG-6-14-B Trending Sheet


Thk in mm 15.00
10.00
5.00
0.00
P1 E1 P2 P3 P4 P5 P6 P7 E2 P8

Thk Locations
UT THICKNESS SURVEY RECORD - PIPING
Hot spots(TML) Technique
P & ID NO. DEEP-036-02 Pr. (bar) 51.02 Temperature 0C 38
THIS INSP. DATE 9-Sep-20
LINE No. PG-6-01-B DESIGN Corro Allow. DCA 1.59 Pipe Spec. ASTM A106 GR.B
SERVICE: PROCESS GAS Joint Efficiency 1 Allowable Stress (Ksi) 20 LAST INSP. DATE 4-Sep-20
Period From Last Insp.(YRS) 0.01
OPER
Pr. (bar) - Temperature 0C - SERVICE START DATE Jun-19
Period From Service Start.(YRS) 1.26 OD of Pipe (mm) 168.3 Min 9.80 Max 15.30 TEST LOCATION BOSSTER COMPRESSOR
UTM Procedure Ref. NO TSSA/SOP/NDT/UTT/13 From Line Line To TEST REPORT NO UTM/09-20/01
LINE
S-101
Corrosion Remaining as per Remaining as per Remaining as per
MRT MRT
Present Rate CA MDWT/MAT MDWT/MST
Line Nominal Last MRT as per as per
Feature Meas. Feature Present Measurement Thickness (mm) Min. MDWT MAT MST Corr. Corr. Corr.
nominal WT Min.WT as per CA MDWT/M MDWT/M Life Life Life
Point No Type WT STCR LTCR Allow. Allow. Allow.
dai AT ST (RL) (RL) (RL)
(RCA) (RCA) (RCA)
T B N E S W mm mm mm mm mm mm mm mm mm mm/yr mm/yr mm Years mm Years mm Years
P1 PIPE 6 - - 10.40 10.80 10.30 10.60 7.11 10.40 10.30 4.63 3.07 3.30 3.30 2.80 3.07 7.30 0.00 5.67 20.00 7.00 20.00 7.23 20.00
P2 PIPE 6 - - 10.40 10.20 11.00 10.30 7.11 10.20 10.20 4.63 3.07 3.30 3.30 2.80 3.07 0.00 0.00 5.57 20.00 6.90 20.00 7.13 20.00
E1 ELBOW 6 12.30 10.00 - 12.00 - 11.60 7.11 10.10 10.00 4.63 3.07 3.30 3.30 2.80 3.07 7.30 0.00 5.37 20.00 6.70 20.00 6.93 20.00
P3 PIPE 6 11.50 11.20 - 11.20 - 11.30 7.11 11.20 11.20 4.63 3.07 3.30 3.30 2.80 3.07 0.00 0.00 6.57 20.00 7.90 20.00 8.13 20.00
T1 TEE 6 - 12.20 - 11.30 - 11.40 7.11 11.30 11.30 4.63 3.07 3.30 3.30 2.80 3.07 0.00 0.00 6.67 20.00 8.00 20.00 8.23 20.00
P4 PIPE 6 11.00 10.50 - 11.40 - 11.60 7.11 10.50 10.50 4.63 3.07 3.30 3.30 2.80 3.07 0.00 0.00 5.87 20.00 7.20 20.00 7.43 20.00
P5 PIPE 6 10.60 10.50 - 10.70 - 11.70 7.11 10.50 10.50 4.63 3.07 3.30 3.30 2.80 3.07 0.00 0.00 5.87 20.00 7.20 20.00 7.43 20.00
P6 PIPE 6 10.40 10.40 - 11.10 - 11.00 7.11 10.40 10.40 4.63 3.07 3.30 3.30 2.80 3.07 0.00 0.00 5.77 20.00 7.10 20.00 7.33 20.00
P7 PIPE 6 10.20 10.50 - 10.70 - 10.60 7.11 10.20 10.20 4.63 3.07 3.30 3.30 2.80 3.07 0.00 0.00 5.57 20.00 6.90 20.00 7.13 20.00
P8 PIPE 6 10.30 10.60 - 10.40 - 10.20 7.11 10.20 10.20 4.63 3.07 3.30 3.30 2.80 3.07 0.00 0.00 5.57 20.00 6.90 20.00 7.13 20.00
P9 PIPE 6 10.70 11.50 - 10.90 - 11.10 7.11 10.70 10.70 4.63 3.07 3.30 3.30 2.80 3.07 0.00 0.00 6.07 20.00 7.40 20.00 7.63 20.00
T2 TEE 6 - 12.40 - 13.10 - 11.50 7.11 11.50 11.50 4.63 3.07 3.30 3.30 2.80 3.07 0.00 0.00 6.87 20.00 8.20 20.00 8.43 20.00
P10 PIPE 6 10.90 11.00 - 10.70 - 10.90 7.11 10.70 10.70 4.63 3.07 3.30 3.30 2.80 3.07 0.00 0.00 6.07 20.00 7.40 20.00 7.63 20.00
P11 PIPE 6 11.10 10.20 - 10.30 - 10.40 7.11 10.30 10.20 4.63 3.07 3.30 3.30 2.80 3.07 7.30 0.00 5.57 20.00 6.90 20.00 7.13 20.00
P12 PIPE 6 10.30 11.00 - 10.60 - 11.10 7.11 10.30 10.30 4.63 3.07 3.30 3.30 2.80 3.07 0.00 0.00 5.67 20.00 7.00 20.00 7.23 20.00
P13 PIPE 6 11.10 10.70 - 11.00 - 10.60 7.11 10.60 10.60 4.63 3.07 3.30 3.30 2.80 3.07 0.00 0.00 5.97 20.00 7.30 20.00 7.53 20.00
P14 PIPE 6 10.50 10.60 - 10.40 - 10.20 7.11 10.20 10.20 4.63 3.07 3.30 3.30 2.80 3.07 0.00 0.00 5.57 20.00 6.90 20.00 7.13 20.00
P15 PIPE 6 10.50 10.50 - 11.00 - 10.80 7.11 10.50 10.50 4.63 3.07 3.30 3.30 2.80 3.07 0.00 0.00 5.87 20.00 7.20 20.00 7.43 20.00
T3 TEE 6 - 10.00 - 10.20 - 9.80 7.11 9.80 9.80 4.63 3.07 3.30 3.30 2.80 3.07 0.00 0.00 5.17 20.00 6.50 20.00 6.73 20.00
P16 PIPE 6 11.10 10.70 - 10.00 - 10.40 7.11 10.10 10.00 4.63 3.07 3.30 3.30 2.80 3.07 7.30 0.00 5.37 20.00 6.70 20.00 6.93 20.00
P17 PIPE 6 11.00 11.00 - 10.40 - 10.80 7.11 10.40 10.40 4.63 3.07 3.30 3.30 2.80 3.07 0.00 0.00 5.77 20.00 7.10 20.00 7.33 20.00
T4 TEE 6 - 12.80 - 13.20 - 13.10 7.11 12.80 12.80 4.63 3.07 3.30 3.30 2.80 3.07 0.00 0.00 8.17 20.00 9.50 20.00 9.73 20.00
P18 PIPE 6 10.60 10.50 - 10.40 - 10.70 7.11 10.40 10.40 4.63 3.07 3.30 3.30 2.80 3.07 0.00 0.00 5.77 20.00 7.10 20.00 7.33 20.00
E2 ELBOW 6 11.30 10.80 - 11.70 - 11.50 7.11 10.80 10.80 4.63 3.07 3.30 3.30 2.80 3.07 0.00 0.00 6.17 20.00 7.50 20.00 7.73 20.00
P19 PIPE 6 - - 10.90 9.80 10.40 11.30 7.11 9.80 9.80 4.63 3.07 3.30 3.30 2.80 3.07 0.00 0.00 5.17 20.00 6.50 20.00 6.73 20.00
P20 PIPE 6 - - 10.70 10.80 10.20 10.90 7.11 10.20 10.20 4.63 3.07 3.30 3.30 2.80 3.07 0.00 0.00 5.57 20.00 6.90 20.00 7.13 20.00
E3 ELBOW 6 10.20 11.50 12.00 - 11.50 - 7.11 10.20 10.20 4.63 3.07 3.30 3.30 2.80 3.07 0.00 0.00 5.57 20.00 6.90 20.00 7.13 20.00
P21 PIPE 6 10.40 11.10 10.70 - 10.60 - 7.11 10.40 10.40 4.63 3.07 3.30 3.30 2.80 3.07 0.00 0.00 5.77 20.00 7.10 20.00 7.33 20.00
P22 PIPE 6 10.30 10.90 10.40 - 11.20 - 7.11 10.30 10.30 4.63 3.07 3.30 3.30 2.80 3.07 0.00 0.00 5.67 20.00 7.00 20.00 7.23 20.00
P23 PIPE 6 10.00 10.80 11.20 - 10.40 - 7.11 10.00 10.00 4.63 3.07 3.30 3.30 2.80 3.07 0.00 0.00 5.37 20.00 6.70 20.00 6.93 20.00
R1 REDUCER 6 14.80 15.30 15.20 - 15.30 - 7.11 14.80 14.80 4.63 3.07 3.30 3.30 2.80 3.07 0.00 0.00 10.17 20.00 11.50 20.00 11.73 20.00

VISUAL INSPECTION:

Contract No 4600009908 Probe T/R 5 Mhz, 10mm D201 (77852013) Insulation NO


Contct Name NDT SERVICE'S FOR ONSHOIRE TERMINAL & Refernace Code API 570 Surface Condition PAINTED
Make & Model Of Machine MODSONIC UTG MACHINE Couplant Grease Calibration Block CS 2.5 - 12.5 mm Step Gauge
Tested By
TUV SUD SOUTH ASIA PVT LTD.
Name : S.SUNIL KUMAR

Signature :

Date : 9-Sep-20
Point no Nominal Thk MRT 18-Oct-19 6-Feb-20 27-Feb-20 17-Mar-20 25-Jun-20 9-Jul-20 16-Jul-20 23-Jul-20 30-Ju-20 05-Aug-20 12-Aug-20 19-Aug-20 27-Aug-20 04-Sep-20 09-Sep-20
P1 7.11 4.63 10.62 10.60 10.50 10.50 10.40 10.40 10.40 10.40 10.40 10.40 10.30 10.30 10.30 10.30 10.30 PG-6-01-B Trending Sheet
P2 7.11 4.63 10.80 10.38 10.30 10.20 10.20 10.20 10.20 10.20 10.20 10.20 10.20 10.20 10.20 10.20 10.20 20.00

Thk in mm
E1 7.11 4.63 10.80 10.30 10.20 10.10 10.10 10.10 10.10 10.10 10.10 10.10 10.00 10.00 10.00 10.00 10.00 10.00
P3 7.11 4.63 11.21 11.29 11.20 11.20 11.20 11.20 11.20 11.20 11.20 11.20 11.20 11.20 11.20 11.20 11.20 0.00
T1 7.11 4.63 11.91 11.40 11.40 11.40 11.30 11.30 11.30 11.30 11.30 11.30 11.30 11.30 11.30 11.30 11.30 P1 E1 T1 P5 P7 P9 P10 P12 P14 T3 P17 P18 P19 E3 P22 R1
P4 7.11 4.63 10.85 10.52 10.50 10.50 10.50 10.50 10.50 10.50 10.50 10.50 10.50 10.50 10.50 10.50 10.50 Thk Locations
P5 7.11 4.63 10.69 10.60 10.70 10.60 10.50 10.50 10.50 10.50 10.50 10.50 10.50 10.50 10.50 10.50 10.50
P6 7.11 4.63 10.56 10.41 10.40 10.40 10.40 10.40 10.40 10.40 10.40 10.40 10.40 10.40 10.40 10.40 10.40 Nominal Thk MRT 18-Oct-19 6-Feb-20
P7 7.11 4.63 10.23 10.21 10.20 10.20 10.20 10.20 10.20 10.20 10.20 10.20 10.20 10.20 10.20 10.20 10.20 27-Feb-20 17-Mar-20 25-Jun-20 9-Jul-20
P8 7.11 4.63 10.46 10.38 10.20 10.20 10.20 10.20 10.20 10.20 10.20 10.20 10.20 10.20 10.20 10.20 10.20
16-Jul-20 23-Jul-20 30-Ju-20 05-Aug-20
P9 7.11 4.63 10.65 10.68 10.70 10.70 10.70 10.70 10.70 10.70 10.70 10.70 10.70 10.70 10.70 10.70 10.70
12-Aug-20 19-Aug-20 27-Aug-20 04-Sep-20
T2 7.11 4.63 11.63 11.60 11.60 11.60 11.50 11.50 11.50 11.50 11.50 11.50 11.50 11.50 11.50 11.50 11.50
P10 7.11 4.63 10.97 10.94 10.70 10.70 10.70 10.70 10.70 10.70 10.70 10.70 10.70 10.70 10.70 10.70 10.70 09-Sep-20
P11 7.11 4.63 10.46 10.36 10.30 10.30 10.30 10.30 10.30 10.30 10.30 10.30 10.20 10.20 10.20 10.20 10.20
P12 7.11 4.63 10.92 10.72 10.30 10.30 10.30 10.30 10.30 10.30 10.30 10.30 10.30 10.30 10.30 10.30 10.30
P13 7.11 4.63 10.56 10.63 10.60 10.60 10.60 10.60 10.60 10.60 10.60 10.60 10.60 10.60 10.60 10.60 10.60
P14 7.11 4.63 10.17 10.20 10.20 10.20 10.20 10.20 10.20 10.20 10.20 10.20 10.20 10.20 10.20 10.20 10.20
P15 7.11 4.63 10.75 10.62 10.60 10.50 10.50 10.50 10.50 10.50 10.50 10.50 10.50 10.50 10.50 10.50 10.50
T3 7.11 4.63 9.88 9.88 9.80 9.80 9.80 9.80 9.80 9.80 9.80 9.80 9.80 9.80 9.80 9.80 9.80
P16 7.11 4.63 10.69 10.04 10.00 10.10 10.10 10.10 10.10 10.10 10.10 10.10 10.00 10.00 10.00 10.00 10.00
P17 7.11 4.63 10.48 10.43 10.40 10.40 10.40 10.40 10.40 10.40 10.40 10.40 10.40 10.40 10.40 10.40 10.40
T4 7.11 4.63 13.75 13.08 13.00 12.90 12.80 12.80 12.80 12.80 12.80 12.80 12.80 12.80 12.80 12.80 12.80
P18 7.11 4.63 10.58 10.41 10.40 10.40 10.40 10.40 10.40 10.40 10.40 10.40 10.40 10.40 10.40 10.40 10.40
E2 7.11 4.63 10.83 10.88 10.90 10.90 10.80 10.80 10.80 10.80 10.80 10.80 10.80 10.80 10.80 10.80 10.80
P19 7.11 4.63 10.49 9.81 9.80 9.80 9.80 9.80 9.80 9.80 9.80 9.80 9.80 9.80 9.80 9.80 9.80
P20 7.11 4.63 10.22 10.20 10.20 10.20 10.20 10.20 10.20 10.20 10.20 10.20 10.20 10.20 10.20 10.20 10.20
E3 7.11 4.63 10.43 10.30 10.30 10.20 10.20 10.20 10.20 10.20 10.20 10.20 10.20 10.20 10.20 10.20 10.20
P21 7.11 4.63 10.40 10.40 10.40 10.40 10.40 10.40 10.40 10.40 10.40 10.40 10.40 10.40 10.40 10.40 10.40
P22 7.11 4.63 10.73 10.41 10.40 10.30 10.30 10.30 10.30 10.30 10.30 10.30 10.30 10.30 10.30 10.30 10.30
P23 7.11 4.63 10.02 10.02 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00
R1 7.11 4.63 15.32 14.90 14.90 14.90 14.80 14.80 14.80 14.80 14.80 14.80 14.80 14.80 14.80 14.80 14.80
UT THICKNESS SURVEY RECORD - EQUIPMENT
Hot spots(TML) Technique
Equip. ID BOOSTER COMRESSOR Pr. (bar) - Temperature 0C 93 P & ID NO.
DESIGN
Equip.Name S-101-SUCTION SCRUBBER Corro Allow. DCA - Shell Spec. THIS INSP. DATE 9/Sep/20
OUTER DIA LENGTH Head Spec.
Period From Last Insp.(YRS) - DIMENSIONS LAST INSP. DATE -
Nozzle-1 Min 26.79 Max 26.86
(mm) - -
Period From Service Start.(YRS) 24.5 Nozzle-2 Min 8.03 Max 8.06 SERVICE START DATE Mar/96
UTM Procedure Ref. NO TSSA/SOP/NDT/UTT/13 TEST LOCATION TRAINS Nozzle-3 Min 12.10 Max 12.16 TEST REPORT NO UTM/9-20/13
Loss of Thick Corrosion Rate Remaining Anomaly Remark
Actual WT
Nomina Last Present MDW
Present Measurement Thickness (mm) or 1st Min. MAT MRT W-C B-C
Feature Meas. Nominal DIA l WT Min.WT Min.WT T Corr. Allow. Life
Feature Type WT (Long (Short STCR LTCR
Point No (INCH) (RCA) (RL)
Term) Term)
mm mm mm mm (C)
T B N E S W mm mm mm mm mm mm/yr mm/yr mm Years
(W) (A) (B)
N-1 Nozzle 10" 26.86 26.85 26.86 - 26.79 - 28.57 - - 26.79 - - 23.41 - - - 0.07 3.38 20.00
N-2 Nozzle 4" 8.06 8.03 8.06 - 8.05 - 8.56 - - 8.03 - - 5.90 - - - 0.07 2.13 20.00
N-3 Nozzle 8" 12.15 12.16 12.15 - 12.10 - 12.70 - - 12.10 - - 9.52 - - - 0.07 2.58 20.00
S-1 Shell 36" - - 17.10 17.00 17.00 17.40 15.88 - - 17.00 - - 12.31 - - - 0.07 4.70 20.00
S-2 Shell 36" - - 17.00 17.00 16.40 16.40 15.88 - - 16.40 - - 12.31 - - - 0.07 4.10 20.00
S-3 Shell 36" - - 18.40 17.40 18.30 16.40 15.88 - - 16.40 - - 12.31 - - - 0.07 4.10 20.00
D-1 Dish 36" - - 19.90 19.00 18.40 19.00 19.05 - - 18.40 - - 15.08 - - - 0.07 3.32 20.00

Remarks: AS PER THE EQUIPMENT SPECIFICATION NOMINAL THICKNESS NOT AVAILABLE, BASED ON UT SURVEY MENTIONED NOMINAL THICKNESS SCHEDULE WHICH IS CLOSE TO THE MAXIMUM READING.

Contract No 4600009908 Probe T/R 5 Mhz, 10mm D799 (1117914) Insulation NO

NDT SERVICE'S FOR ONSHOIRE TERMINAL & OFFSHORE


Contct Name Refernace Code API 510 Surface Condition PAINTED
TERMINAL AT RAVVA

Make & Model Of Machine OLYMPUS 38DL PLUS Couplant Grease Calibration Block CS 2.5 - 12.5 mm Step Gauge
Tested By
TUV SUD SOUTH ASIA PVT LTD.
Name : S.SUNIL KUMAR

Signature :

Date : 9/Sep/20
S-101-Scrubber

Point no Nominai Dia.Inch Nominal Thk 20-Jan-20 6-Feb-20 26-Feb-20 17-Mar-20 25-Jun-20 9-Jul-20 16-Jul-20 23-Jul-20 30-Jul-20 5-Aug-20 12-Aug-20 19-Aug-20 27-Aug-20 4-Sep-20 9-Sep-20
N-01 10 28.57 27.00 27.00 27.00 26.90 26.85 26.85 26.84 26.84 26.84 26.83 26.83 26.81 26.80 26.80 26.79
N-02 4 8.56 8.20 8.20 8.20 8.10 8.05 8.05 8.05 8.05 8.05 8.04 8.04 8.03 8.03 8.03 8.03
N-03 8 12.70 12.35 12.30 12.29 12.20 12.15 12.15 12.14 12.14 12.14 12.13 12.12 12.11 12.10 12.10 12.10

S-101 Scrubber

30.00 28.57
27.00 27.00 27.00 26.90 26.85 26.85 26.84 26.84 26.84 26.83 26.83 26.81 26.80 26.80 26.79
25.00

20.00

15.00 12.70 12.35 12.30 12.29 12.20 12.15 12.15 12.14 12.14 12.14 12.13 12.12 12.11 12.10 12.10 12.10

10.00 8.56 8.20 8.20 8.20 8.10 8.05 8.05 8.05 8.05 8.05 8.04 8.04 8.03 8.03 8.03 8.03

5.00

0.00
Nominal Thk 20-Jan-20 6-Feb-20 26-Feb-20 17-Mar-20 25-Jun-20 9-Jul-20 16-Jul-20 23-Jul-20 30-Jul-20 5-Aug-20 12-Aug-20 19-Aug-20 27-Aug-20 4-Sep-20 9-Sep-20
N-01 10 N-02 4 N-03 8
S-101-Scrubber
UT THICKNESS SURVEY RECORD - EQUIPMENT
Hot spots(TML) Technique
Equip. ID BOOSTER COMRESSOR Pr. (bar) - Temperature 0C 93 P & ID NO.
DESIGN
Equip.Name S-102-INTER STAGE SCRUBBER Corro Allow. DCA - Shell Spec. THIS INSP. DATE 9/Sep/20
OUTER DIA LENGTH Head Spec.
Period From Last Insp.(YRS) - DIMENSIONS LAST INSP. DATE -
Nozzle-1 Min 9.88 Max 9.95
(mm) - -
Period From Service Start.(YRS) 24.5 Nozzle-2 Min 7.58 Max 7.66 SERVICE START DATE Mar/96
UTM Procedure Ref. NO TSSA/SOP/NDT/UTT/13 TEST LOCATION TRAINS TEST REPORT NO UTM/9-20/13
Loss of Thick Corrosion Rate Remaining Anomaly Remark
Actual WT
Nomina Last Present MDW
Nominal Present Measurement Thickness (mm) or 1st Min. MAT MRT W-C B-C
Feature Meas. l WT Min.WT Min.WT T Corr. Allow.
Feature Type DIA WT (Long (Short STCR LTCR Life (RL)
Point No (RCA)
(INCH) Term) Term)
mm mm mm mm (C)
T B N E S W mm mm mm mm mm mm/yr mm/yr mm Years
(W) (A) (B)
N-1 Nozzle 6" 9.92 9.95 - 9.88 - 9.92 10.97 - - 9.88 - - 8.01 - - - 0.04 1.87 20.00
N-2 Nozzle 4" 7.65 7.66 7.58 - 7.64 - 8.56 - - 7.58 - - 5.90 - - - 0.04 1.68 20.00
S-1 SHELL 30" - - 13.82 14.12 13.63 14.06 15.88 - - 13.63 - - 12.31 - - - 0.04 1.33 20.00
S-2 SHELL 30" - - 13.75 13.03 13.10 13.69 15.88 - - 13.03 - - 12.31 - - - 0.04 0.72 20.00
S-3 SHELL 30" - - 13.63 14.06 14.56 14.53 15.88 - - 13.63 - - 12.31 - - - 0.04 1.33 20.00
D-1 DISH 30" - - 17.43 17.03 17.02 16.36 15.88 - - 16.36 - - 12.31 - - - 0.04 4.06 20.00

Remarks: AS PER THE EQUIPMENT SPECIFICATION NOMINAL THICKNESS NOT AVAILABLE, BASED ON UT SURVEY MENTIONED NOMINAL THICKNESS SCHEDULE WHICH IS CLOSE TO THE MAXIMUM READING.

Contract No 4600009908 Probe T/R 5 Mhz, 10mm D799 (1117914) Insulation NO

NDT SERVICE'S FOR ONSHOIRE TERMINAL & OFFSHORE


Contct Name Refernace Code API 510 Surface Condition PAINTED
TERMINAL AT RAVVA

Make & Model Of Machine OLYMPUS 38DL PLUS Couplant Grease Calibration Block CS 2.5 - 12.5 mm Step Gauge
Tested By
TUV SUD SOUTH ASIA PVT LTD.
Name : S.SUNIL KUMAR

Signature :

Date : 9/Sep/20
S-102-Scrubber

Point no Nominai Dia.Inch Nominal Thk 20-Jan-20 6-Feb-20 26-Feb-20 17-Mar-20 25-Jun-20 9-Jul-20 16-Jul-20 23-Jul-20 30-Jul-20 5-Aug-20 12-Aug-20 19-Aug-20 27-Aug-20 4-Sep-20 9-Sep-20
N-01 6 10.97 10.00 10.01 10.00 10.00 9.95 9.95 9.94 9.94 9.94 9.93 9.93 9.92 9.91 9.90 9.88
N-02 4 8.56 7.78 7.78 7.78 7.70 7.65 7.65 7.64 7.64 7.64 7.63 7.61 7.61 7.60 7.60 7.58

S-102 Inter stage scrubber


12.00

10.00

8.00

6.00

4.00

2.00

0.00
8.56 7.78 7.78 7.78 7.70 7.65 7.65 7.64 7.64 7.64 7.63 7.61 7.61 7.60 7.60 7.58
10.97 10.00 10.01 10.00 10.00 9.95 9.95 9.94 9.94 9.94 9.93 9.93 9.92 9.91 9.90 9.88
Nominal Thk 20-Jan-20 6-Feb-20 26-Feb-20 17-Mar-20 25-Jun-20 9-Jul-20 16-Jul-20 23-Jul-20 30-Jul-20 5-Aug-20 12-Aug-20 19-Aug-20 27-Aug-20 4-Sep-20 9-Sep-20
S-102-Scrubber

N-01 6 N-02 4
UT THICKNESS SURVEY RECORD - EQUIPMENT
Hot spots(TML) Technique
Equip. ID BOOSTER COMRESSOR Pr. (bar) - Temperature 0C 93 P & ID NO.
DESIGN
Equip.Name D-101-DISCHARGE SCRUBBER Corro Allow. DCA - Shell Spec. THIS INSP. DATE 9/Sep/20
OUTER DIA LENGTH Head Spec.
Period From Last Insp.(YRS) - DIMENSIONS LAST INSP. DATE -
Nozzle-1 Min 7.00 Max 7.06
(mm) - -
Period From Service Start.(YRS) 24.5 Nozzle-2 Min 10.05 Max 10.12 SERVICE START DATE Mar/96
UTM Procedure Ref. NO TSSA/SOP/NDT/UTT/13 TEST LOCATION TRAINS TEST REPORT NO UTM/9-20/13
Loss of Thick Corrosion Rate Remaining Anomaly Remark
Actual WT
Nomina Last Present MDW
Present Measurement Thickness (mm) or 1st Min. MAT MRT W-C B-C
Feature Meas. Point Nominal DIA l WT Min.WT Min.WT T Corr. Allow. Life
Feature Type WT (Long (Short STCR LTCR
No (INCH) (RCA) (RL)
Term) Term)
mm mm mm mm (C)
T B N E S W mm mm mm mm mm mm/yr mm/yr mm Years
(W) (A) (B)
N-1 Nozzle 3 7.02 7.06 7.06 - 7.00 - 7.62 - - 7.00 - - 5.08 - - - 0.03 1.92 20.00
N-2 Nozzle 4 10.05 10.06 10.10 - 10.12 - 11.12 - - 10.05 - - 8.14 - - - 0.00 1.91 20.00
D-1 ( TOP) Dish 24 - - 26.80 26.80 26.80 26.80 24.61 - - 26.80 - - 19.94 - - - 0.00 6.86 20.00
D-2 ( TOP) Dish 24 - - 26.40 26.80 26.40 26.50 24.61 - - 26.40 - - 19.94 - - - 0.00 6.46 20.00
D-3 ( TOP) Dish 24 - - 27.80 27.40 27.80 27.60 24.61 - - 27.40 - - 19.94 - - - 0.00 7.46 20.00
S-1 Shell 24 - - 23.70 23.80 23.80 23.40 24.61 - - 23.40 - - 19.94 - - - 0.00 3.46 20.00
S-2 Shell 24 - - 23.40 23.40 23.40 23.40 24.61 - - 23.40 - - 19.94 - - - 0.00 3.46 20.00
S-3 Shell 24 - - 23.40 23.40 23.80 23.40 24.61 - - 23.40 - - 19.94 - - - 0.00 3.46 20.00
D-4 ( BOTTOM) Dish 24 - - 27.80 26.80 27.40 27.40 24.61 - - 26.80 - - 19.94 - - - 0.00 6.86 20.00

Remarks: AS PER THE EQUIPMENT SPECIFICATION NOMINAL THICKNESS NOT AVAILABLE, BASED ON UT SURVEY MENTIONED NOMINAL THICKNESS SCHEDULE WHICH IS CLOSE TO THE MAXIMUM READING.

Contract No 4600009908 Probe T/R 5 Mhz, 10mm D799 (1117914) Insulation NO

NDT SERVICE'S FOR ONSHOIRE TERMINAL & OFFSHORE


Contct Name Refernace Code API 510 Surface Condition PAINTED
TERMINAL AT RAVVA

Make & Model Of Machine OLYMPUS 38DL PLUS Couplant Grease Calibration Block CS 2.5 - 12.5 mm Step Gauge
Tested By
TUV SUD SOUTH ASIA PVT LTD.
Name : S.SUNIL KUMAR

Signature :

Date : 9/Sep/20

0
D-101-Scrubber

Point no Nominai Dia.Inch Nominal Thk 20-Jan-20 6-Feb-20 26-Feb-20 17-Mar-20 25-Jun-20 9-Jul-20 16-Jul-20 23-Jul-20 30-Jul-20 5-Aug-20 12-Aug-20 19-Aug-20 27-Aug-20 4-Sep-20 9-Sep-20
N-01 3 7.62 7.15 7.15 7.15 7.10 7.05 7.05 7.04 7.04 7.04 7.03 7.03 7.02 7.01 7.01 7.00
N-02 4 11.12 10.17 10.17 10.16 10.15 10.10 10.10 10.09 10.09 10.09 10.08 10.08 10.07 10.06 10.06 10.05

D-101- Scrubber
12.00 11.12
10.17 10.17 10.16 10.15 10.10 10.10 10.09 10.09 10.09 10.08 10.08 10.07 10.06 10.06 10.05
10.00
7.62 7.15 7.15 7.15 7.10 7.05 7.05 7.04 7.04 7.04 7.03 7.03 7.02 7.01 7.01 7.00
8.00
6.00
4.00
2.00
0.00

3 4
UT THICKNESS SURVEY RECORD - EQUIPMENT
Hot spots(TML) Technique
Equip. ID BOOSTER COMRESSOR Pr. (bar) - Temperature 0C 93 P & ID NO.
DESIGN
Equip.Name VB-101-SUCTION VOLUME BOTTLE Corro Allow. DCA - Shell Spec. THIS INSP. DATE 9/Sep/20
OUTER DIA LENGTH Head Spec.
Period From Last Insp.(YRS) 0.0 DIMENSIONS LAST INSP. DATE -
Nozzle-1 Min 11.90 Max 11.98
(mm) - -
Period From Service Start.(YRS) 24.5 Nozzle-2 Min 33.20 Max 33.26 SERVICE START DATE Mar/96
UTM Procedure Ref. NO TSSA/SOP/NDT/UTT/13 TEST LOCATION TRAINS Nozzle-3 Min 33.71 Max 33.75 TEST REPORT NO UTM/9-20/13
Loss of Thick Corrosion Rate Remaining Anomaly Remark
Actual WT
Nomina Last Present MDW
Nominal Present Measurement Thickness (mm) or 1st Min. MAT MRT W-C B-C
Feature Meas. l WT Min.WT Min.WT T Corr. Allow. Life
Feature Type DIA WT (Long (Short STCR LTCR
Point No (RCA) (RL)
(INCH) Term) Term)
mm mm mm mm (C)
T B N E S W mm mm mm mm mm mm/yr mm/yr mm Years
(W) (A) (B)
N-1 Nozzle 8 11.96 11.98 11.95 - 11.90 12.75 - - 11.90 - - 9.57 - - - 0.03 2.33 20.00
N-2 Nozzle 10 33.23 33.26 - 33.25 - 33.20 35.00 - - 33.20 - - 29.04 - - - 0.03 4.17 20.00
N-3 Nozzle 10 33.75 33.71 - 33.73 - 33.75 35.00 - - 33.71 - - 29.04 - - - 0.03 4.68 20.00
D-1 ( TOP) Dish 24" 17.51 17.42 16.48 - 17.03 - 17.47 - - 16.48 - - 13.70 - - - 0.03 2.78 20.00
D-2 ( TOP) Dish 24" 17.48 17.34 17.25 - 17.43 - 17.47 - - 17.25 - - 13.70 - - - 0.03 3.55 20.00
D-3 ( TOP) Dish 24" 18.15 18.02 17.42 - 17.23 - 17.47 - - 17.23 - - 13.70 - - - 0.03 3.53 20.00
S-1 Shell 24" 17.46 17.23 17.43 - 17.06 - 17.47 - - 17.06 - - 13.70 - - - 0.03 3.36 20.00
S-2 Shell 24" 18.44 17.23 17.06 - 17.06 - 17.47 - - 17.06 - - 13.70 - - - 0.03 3.36 20.00
S-3 Shell 24" 18.23 17.06 17.44 - 17.40 - 17.47 - - 17.06 - - 13.70 - - - 0.03 3.36 20.00
D-4 ( BOTTOM) Dish 24" 17.42 17.44 17.49 - 17.44 - 17.47 - - 17.42 - - 13.70 - - - 0.03 3.72 20.00
D-5 ( BOTTOM) Dish 24" 16.49 16.48 17.06 - 17.06 - 17.47 - - 16.48 - - 13.70 - - - 0.03 2.78 20.00
D-6 ( BOTTOM) Dish 24" 16.48 16.42 17.28 - 16.43 - 17.47 - - 16.42 - - 13.70 - - - 0.03 2.72 20.00

Remarks: AS PER THE EQUIPMENT SPECIFICATION NOMINAL THICKNESS NOT AVAILABLE, BASED ON UT SURVEY MENTIONED NOMINAL THICKNESS SCHEDULE WHICH IS CLOSE TO THE MAXIMUM READING.

Contract No 4600009908 Probe T/R 5 Mhz, 10mm D799 (1117914) Insulation NO

NDT SERVICE'S FOR ONSHOIRE TERMINAL & OFFSHORE


Contct Name Refernace Code API 510 Surface Condition PAINTED
TERMINAL AT RAVVA

Make & Model Of Machine OLYMPUS 38DL PLUS Couplant Grease Calibration Block CS 2.5 - 12.5 mm Step Gauge
Tested By
TUV SUD SOUTH ASIA PVT LTD.
Name : S.SUNIL KUMAR

Signature :

Date : 9/Sep/20 9/Sep/20


VB-101- 1 st stage suction Volume Bottle

Point no Nominai Dia.Inch Nominal Thk 20-Jan-20 6-Feb-20 26-Feb-20 17-Mar-20 25-Jun-20 9-Jul-20 16-Jul-20 23-Jul-20 30-Jul-20 5-Aug-20 12-Aug-20 19-Aug-20 27-Aug-20 4-Sep-20 9-Sep-20
N-01 8 12.75 12.00 12.00 12.00 12.00 11.96 11.96 11.95 11.95 11.95 11.94 11.92 11.92 11.91 11.91 11.90
N-02 10 35.00 33.40 33.33 33.32 33.30 33.25 33.25 33.24 33.24 33.24 33.23 33.22 33.22 33.22 33.22 33.20
N-03 10 35.00 33.89 33.89 33.89 33.80 33.75 33.75 33.74 33.74 33.74 33.73 33.73 33.73 33.73 33.73 33.71

VB-101 1st stage suction volume bottle


40.00
35.00
30.00
25.00
20.00
15.00
10.00
5.00
0.00

N-01 8 N-02 10 N-03 10


UT THICKNESS SURVEY RECORD - EQUIPMENT
Hot spots(TML) Technique
Equip. ID BOOSTER COMRESSOR Pr. (bar) - Temperature 0C 93 P & ID NO.
DESIGN
Equip.Name VB-102-DISCHARGE VOLUME BOTTLE Corro Allow. DCA - Shell Spec. THIS INSP. DATE 9/Sep/20
OUTER DIA LENGTH Head Spec.
Period From Last Insp.(YRS) 0.0 DIMENSIONS LAST INSP. DATE -
Nozzle-1 Min 33.99 Max 34.02
(mm) - -
Period From Service Start.(YRS) 24.5 Nozzle-2 Min 34.10 Max 34.15 SERVICE START DATE Mar/96
UTM Procedure Ref. NO TSSA/SOP/NDT/UTT/13 TEST LOCATION TRAINS Nozzle-3 Min 17.00 Max 18.00 TEST REPORT NO UTM/9-20/13
Loss of Thick Corrosion Rate Remaining Anomaly Remark
Actual WT
Nomina Last Present MDW
Present Measurement Thickness (mm) or 1st Min. MAT MRT W-C B-C
Feature Meas. Nominal DIA l WT Min.WT Min.WT T Corr. Allow. Life
Feature Type WT (Long (Short STCR LTCR
Point No (INCH) (RCA) (RL)
Term) Term)
mm mm mm mm (C)
T B N E S W mm mm mm mm mm mm/yr mm/yr mm Years
(W) (A) (B)
N-1 Nozzle 8 34.00 33.99 34.02 - 34.02 - 35.00 - - 33.99 - - 29.04 - - 0.04 4.96 20.00
N-2 Nozzle 10 - - 34.15 34.14 34.12 34.10 35.00 - - 34.10 - - 29.04 - - - 0.04 5.07 20.00
N-3 Nozzle 10 - - 11.85 11.80 11.87 11.85 12.75 - - 11.80 - - 9.57 - - - 0.04 2.23 20.00
D-1 ( TOP) Dish 24 16.40 16.40 16.40 - 16.00 - 17.47 - - 16.00 - - 13.70 - - - 0.04 2.30 20.00
D-2 ( TOP) Dish 24 17.00 17.90 17.20 - 16.40 - 17.47 - - 16.40 - - 13.70 - - - 0.04 2.70 20.00
D-3 ( TOP) Dish 24 17.40 17.20 17.40 - 18.00 - 17.47 - - 17.40 - - 13.70 - - - 0.04 3.70 20.00
S-1 Shell 24 18.20 18.00 16.40 - 18.40 - 17.47 - - 16.40 - - 13.70 - - - 0.04 2.70 20.00
S-2 Shell 24 18.20 19.20 18.80 - 18.20 - 17.47 - - 18.20 - - 13.70 - - - 0.04 4.50 20.00
S-3 Shell 24 18.00 18.40 18.90 - 19.20 - 17.47 - - 18.90 - - 13.70 - - - 0.04 5.20 20.00
S-4 Shell 24 17.40 17.40 17.00 - 18.00 - 17.47 - - 17.00 - - 13.70 - - - 0.04 3.30 20.00

Remarks: AS PER THE EQUIPMENT SPECIFICATION NOMINAL THICKNESS NOT AVAILABLE, BASED ON UT SURVEY MENTIONED NOMINAL THICKNESS SCHEDULE WHICH IS CLOSE TO THE MAXIMUM READING.

Contract No 4600009908 Probe T/R 5 Mhz, 10mm D799 (1117914) Insulation NO

NDT SERVICE'S FOR ONSHOIRE TERMINAL & OFFSHORE


Contct Name Refernace Code API 510 Surface Condition PAINTED
TERMINAL AT RAVVA

Make & Model Of Machine OLYMPUS 38DL PLUS Couplant Grease Calibration Block CS 2.5 - 12.5 mm Step Gauge
Tested By
TUV SUD SOUTH ASIA PVT LTD.
Name : S.SUNIL KUMAR

Signature :

Date : 9/Sep/20 9/Sep/20


VB-102- 1 st stage Discharge Volume Bottle

Point no Nominai Dia.Inch Nominal Thk 20-Jan-20 6-Feb-20 26-Feb-20 17-Mar-20 25-Jun-20 9-Jul-20 16-Jul-20 23-Jul-20 30-Jul-20 5-Aug-20 12-Aug-20 19-Aug-20 27-Aug-20 4-Sep-20 9-Sep-20
N-01 8 35.00 34.15 34.15 34.15 34.10 34.04 34.02 34.02 34.02 34.01 34.01 34.01 34.00 34.00 33.99 33.99
N-02 10 35.00 34.30 34.30 34.30 34.20 34.16 34.15 34.14 34.14 34.13 34.13 34.13 34.11 34.11 34.1 34.1
N-03 10 12.75 11.93 11.93 11.92 11.90 11.85 11.85 11.85 11.85 11.84 11.84 11.84 11.82 11.82 11.82 11.8

VB-102-1ST STAGE DISCHARGE VOLUME BOTTLE


40.00
35.00
30.00
25.00
20.00
15.00
10.00
5.00
0.00
Nominal Thk 20-Jan-20 6-Feb-20 26-Feb-20 17-Mar-20 25-Jun-20 9-Jul-20 16-Jul-20 23-Jul-20 30-Jul-20 5-Aug-20 12-Aug-20 19-Aug-20 27-Aug-20 4-Sep-20 9-Sep-20

N-01 8 35.00 N-02 10 N-03 10


UT THICKNESS SURVEY RECORD - EQUIPMENT
Hot spots(TML) Technique
Equip. ID BOOSTER COMRESSOR Pr. (bar) - Temperature 0C 93 P & ID NO.
DESIGN
Equip.Name VB-103-SUCTION VOLUME BOTTLE Corro Allow. DCA - Shell Spec. THIS INSP. DATE 9/Sep/20
OUTER DIA LENGTH Head Spec.
Period From Last Insp.(YRS) - DIMENSIONS LAST INSP. DATE -
Nozzle-1 Min 5.68 Max 5.77
(mm) - -
Period From Service Start.(YRS) 24.5 Nozzle-2 Min 16.00 Max 16.30 SERVICE START DATE Mar/96
UTM Procedure Ref. NO TSSA/SOP/NDT/UTT/13 TEST LOCATION TRAINS TEST REPORT NO UTM/9-20/13
Loss of Thick Corrosion Rate Remaining Anomaly Remark
Actual WT
Nomina Last Present MDW
Nominal Present Measurement Thickness (mm) or 1st Min. MAT MRT W-C B-C
Feature Meas. l WT Min.WT Min.WT T Corr. Allow. Life
Feature Type DIA WT (Long (Short STCR LTCR
Point No (RCA) (RL)
(INCH) Term) Term)
mm mm mm mm (C)
T B N E S W mm mm mm mm mm mm/yr mm/yr mm Years
(W) (A) (B)
N-1 Nozzle 4 5.72 5.68 5.76 - 5.77 - 6.02 - - 5.68 - - 3.68 - - - 0.01 2.00 20.00
N-2 Nozzle 6 - - 10.33 10.31 10.37 10.36 10.97 - - 10.31 - - 8.01 - - - 0.01 2.30 20.00
D-1 (TOP) Dish 18 16.40 16.40 - 16.20 - 16.00 19.05 - - 16.00 - - 15.08 - - - 0.01 0.92 20.00
D-1 (TOP) Dish 18 17.00 17.30 - 17.30 - 17.20 19.05 - - 17.20 - - 15.08 - - - 0.01 2.12 20.00
D-1 (TOP) Dish 18 17.20 18.40 - 17.20 - 17.00 19.05 - - 17.00 - - 15.08 - - - 0.01 1.92 20.00
S-1 Shell 18 16.40 15.90 - 16.80 - 17.00 19.05 - - 16.80 - - 15.08 - - - 0.01 1.72 20.00
S-2 Shell 18 16.20 16.40 - 16.20 - 16.00 19.05 - - 16.00 - - 15.08 - - - 0.01 0.92 20.00
D-4 ( BOTTOM) Dish 18 17.40 17.40 - 17.40 - 17.40 19.05 - - 17.40 - - 15.08 - - - 0.01 2.32 20.00
D-5 ( BOTTOM) Dish 18 16.30 17.20 - 16.50 - 16.40 19.05 - - 16.40 - - 15.08 - - - 0.01 1.32 20.00
D-6 ( BOTTOM) Dish 18 16.4 16.40 - 16.30 - 16.00 19.05 - - 16.00 - - 15.08 - - - 0.01 0.92 20.00

Remarks: AS PER THE EQUIPMENT SPECIFICATION NOMINAL THICKNESS NOT AVAILABLE, BASED ON UT SURVEY MENTIONED NOMINAL THICKNESS SCHEDULE WHICH IS CLOSE TO THE MAXIMUM READING.

Contract No 4600009908 Probe T/R 5 Mhz, 10mm D799 (1117914) Insulation NO

NDT SERVICE'S FOR ONSHOIRE TERMINAL & OFFSHORE


Contct Name Refernace Code API 510 Surface Condition PAINTED
TERMINAL AT RAVVA

Make & Model Of Machine OLYMPUS 38DL PLUS Couplant Grease Calibration Block CS 2.5 - 12.5 mm Step Gauge
Tested By
TUV SUD SOUTH ASIA PVT LTD.
Name : S.SUNIL KUMAR

Signature :

Date : 9/Sep/20
VB-103- 2 nd stage suction Volume Bottle

Point no Nominai Dia.Inch Nominal Thk 20-Jan-20 6-Feb-20 26-Feb-20 17-Mar-20 25-Jun-20 9-Jul-20 16-Jul-20 23-Jul-20 30-Jul-20 5-Aug-20 12-Aug-20 19-Aug-20 27-Aug-20 4-Sep-20 9-Sep-20
N-01 4 6.02 5.90 5.82 5.82 5.80 5.76 5.76 5.75 5.75 5.74 5.72 5.72 5.71 5.70 5.68 5.68
N-02 6 10.97 10.40 10.40 10.40 10.40 10.35 10.35 10.35 10.35 10.34 10.33 10.33 10.32 10.32 10.31 10.31

VB-103 Suction volume bottle


12

10

0
Nominal Thk 20-Jan-20 6-Feb-20 26-Feb-20 17-Mar-20 25-Jun-20 9-Jul-20 16-Jul-20 23-Jul-20 30-Jul-20 5-Aug-20 12-Aug-20 19-Aug-20 27-Aug-20 4-Sep-20 9-Sep-20

N-01 4 N-02 6
UT THICKNESS SURVEY RECORD - EQUIPMENT
Hot spots(TML) Technique
Equip. ID BOOSTER COMRESSOR Pr. (bar) - Temperature 0C 93 P & ID NO.
DESIGN
Equip.Name VB-104-2nd DISCHARGE VOLUME BOTTLE Corro Allow. DCA - Shell Spec. THIS INSP. DATE 9/Sep/20
OUTER DIA LENGTH Head Spec.
Period From Last Insp.(YRS) - DIMENSIONS LAST INSP. DATE -
Nozzle-1 Min 35.65 Max 35.85
(mm) - -
Period From Service Start.(YRS) 24.5 Nozzle-2 Min 7.19 Max 7.29 SERVICE START DATE Mar/96
UTM Procedure Ref. NO TSSA/SOP/NDT/UTT/13 TEST LOCATION TRAINS TEST REPORT NO UTM/9-20/13
Loss of Thick Corrosion Rate Remaining Anomaly Remark
Actual WT
Nomina Last Present MDW
Nominal Present Measurement Thickness (mm) or 1st Min. MAT MRT W-C B-C
Feature Meas. Point l WT Min.WT Min.WT T Corr. Allow. Life
Feature Type DIA WT (Long (Short STCR LTCR
No (RCA) (RL)
(INCH) Term) Term)
mm mm mm mm (C)
T B N E S W mm mm mm mm mm mm/yr mm/yr mm Years
(W) (A) (B)
N-1 Nozzle 6 - - 35.80 35.85 35.65 35.84 35.00 - - 35.65 - - 29.04 - - 0.00 6.62 20.00
N-2 Nozzle 3 7.28 7.29 - 7.26 - 7.19 7.62 - - 7.19 - - 5.08 - - - 0.00 2.11 20.00
D-1 ( TOP) Dish 20 21.30 22.10 22.00 - 22.10 - 20.62 - - 21.30 - - 16.45 - - - 0.00 4.85 20.00
D-1 ( TOP) Dish 20 21.40 21.40 21.40 - 22.20 - 20.62 - - 21.40 - - 16.45 - - - 0.00 4.95 20.00
D-1 ( TOP) Dish 20 22.40 22.40 22.20 - 22.20 - 20.62 - - 22.20 - - 16.45 - - - 0.00 5.75 20.00
S-1 Shell 20 20.40 20.20 20.00 - 20.20 - 20.62 - - 20.00 - - 16.45 - - - 0.00 3.55 20.00
S-2 Shell 20 20.00 20.10 20.40 - 20.00 - 20.62 - - 20.00 - - 16.45 - - - 0.00 3.55 20.00
D-4 ( BOTTOM) Dish 20 22.20 22.40 21.40 - 21.40 - 20.62 - - 21.40 - - 16.45 - - - 0.00 4.95 20.00
D-5 ( BOTTOM) Dish 20 21.40 22.20 21.40 - 21.40 - 20.62 - - 21.40 - - 16.45 - - - 0.00 4.95 20.00
D-6 ( BOTTOM) Dish 20 21.40 21.40 22.00 - 20.02 - 20.62 - - 20.02 - - 16.45 - - - 0.00 3.57 20.00

Remarks: AS PER THE EQUIPMENT SPECIFICATION NOMINAL THICKNESS NOT AVAILABLE, BASED ON UT SURVEY MENTIONED NOMINAL THICKNESS SCHEDULE WHICH IS CLOSE TO THE MAXIMUM READING.

Contract No 4600009908 Probe T/R 5 Mhz, 10mm D799 (1117914) Insulation NO

NDT SERVICE'S FOR ONSHOIRE TERMINAL & OFFSHORE


Contct Name Refernace Code API 510 Surface Condition PAINTED
TERMINAL AT RAVVA

Make & Model Of Machine OLYMPUS 38DL PLUS Couplant Grease Calibration Block CS 2.5 - 12.5 mm Step Gauge
Tested By
TUV SUD SOUTH ASIA PVT LTD.
Name : S.SUNIL KUMAR

Signature :

Date : 9/Sep/20
VB-104- 2 nd stage Discharge Volume Bottle

Point no Nominai Dia. Nominal Thk 20-Jan-20 6-Feb-20 26-Feb-20 17-Mar-20 25-Jun-20 9-Jul-20 16-Jul-20 23-Jul-20 30-Jul-20 5-Aug-20 12-Aug-20 19-Aug-20 27-Aug-20 4-Sep-20 9-Sep-20
N-01 6 35.00 36.00 35.94 35.94 35.90 35.84 35.82 35.82 35.81 35.81 35.80 35.79 35.77 35.77 35.77 35.65
N-02 3 7.62 7.35 7.35 7.30 7.30 7.26 7.26 7.26 7.25 7.25 7.24 7.24 7.22 7.20 7.20 7.19

VB-104 2nd DISCHARGE VOLUME BOTTLE


40.00 35.00 36.00 35.94 35.94 35.90 35.84 35.82 35.82 35.81 35.81 35.80 35.79 35.77 35.77 35.77 35.65
35.00
30.00
25.00
20.00
15.00
10.00 7.62 7.35 7.35 7.30 7.30 7.26 7.26 7.26 7.25 7.25 7.24 7.24 7.22 7.20 7.20 7.19
5.00
0.00

N-01 6 N-02 3
UT THICKNESS SURVEY RECORD - EQUIPMENT
Hot spots(TML) Technique
Equip. ID BOOSTER COMRESSOR Pr. (bar) - Temperature 0C 93 P & ID NO.
DESIGN
Equip.Name VB-105 2nd STAGE SUCTION E VOLUME BOTTLE Corro Allow. DCA - Shell Spec. THIS INSP. DATE 9/Sep/20
OUTER DIA LENGTH Head Spec.
Period From Last Insp.(YRS) - DIMENSIONS LAST INSP. DATE -
Nozzle-1 Min 7.40 Max 7.48
(mm) - -
Period From Service Start.(YRS) 24.5 Nozzle-2 Min 30.30 Max 30.37 SERVICE START DATE Mar/96
UTM Procedure Ref. NO TSSA/SOP/NDT/UTT/13 TEST LOCATION TRAINS TEST REPORT NO UTM/9-20/13
Loss of Thick Corrosion Rate Remaining Anomaly Remark
Nomina Last Actual WT or Present MDW
Nominal Present Measurement Thickness (mm) MAT MRT W-C B-C
Feature Meas. Point l WT Min.WT 1st Min. WT Min.WT T Corr. Allow. Life
Feature Type DIA (Long (Short STCR LTCR
No (RCA) (RL)
(INCH) Term) Term)
mm mm mm mm (C)
T B N E S W mm mm mm mm mm mm/yr mm/yr mm Years
(W) (A) (B)
N-1 Nozzle 3 7.45 7.48 - 7.40 - 7.44 7.62 - - 7.40 - - 5.08 - - 0.01 2.32 20.00
N-2 Nozzle 4 - - 30.34 30.34 30.30 30.37 32.00 - - 30.30 - - 26.41 - - - 0.00 3.89 20.00
D-1 ( TOP) Dish 16 23.00 23.00 23.40 - 23.40 - 26.19 - - 23.40 - - 21.33 - - - 0.00 2.07 20.00
D-2 ( TOP) Dish 16 24.40 23.40 23.20 - 23.20 - 26.19 - - 23.20 - - 21.33 - - - 0.00 1.87 20.00
D-3 ( TOP) Dish 16 23.40 23.60 23.80 - 23.40 - 26.19 - - 23.40 - - 21.33 - - - 0.00 2.07 20.00
S-1 Shell 16 23.80 24.40 24.40 - 24.40 - 26.19 - - 24.40 - - 21.33 - - - 0.00 3.07 20.00
S-2 Shell 16 23.40 24.60 23.40 - 24.60 - 26.19 - - 23.40 - - 21.33 - - - 0.00 2.07 20.00
D-4 ( BOTTOM) Dish 16 24.60 24.20 23.80 - 24.80 - 26.19 - - 23.80 - - 21.33 - - - 0.00 2.47 20.00
D-5 ( BOTTOM) Dish 16 23.60 23.20 23.00 - 23.20 - 26.19 - - 23.00 - - 21.33 - - - 0.00 1.67 20.00
D-6 ( BOTTOM) Dish 16 23.80 23.00 23.40 23.00 - 26.19 - - 23.00 - - 21.33 - - - 0.00 1.67 20.00

Remarks: AS PER THE EQUIPMENT SPECIFICATION NOMINAL THICKNESS NOT AVAILABLE, BASED ON UT SURVEY MENTIONED NOMINAL THICKNESS SCHEDULE WHICH IS CLOSE TO THE MAXIMUM READING.

Contract No 4600009908 Probe T/R 5 Mhz, 10mm D799 (1117914) Insulation NO

NDT SERVICE'S FOR ONSHOIRE TERMINAL & OFFSHORE TERMINAL


Contct Name Refernace Code API 510 Surface Condition PAINTED
AT RAVVA

Make & Model Of Machine OLYMPUS 38DL PLUS Couplant Grease Calibration Block CS 2.5 - 12.5 mm Step Gauge
TUV SUD SOUTH ASIA PVT LTD.
Name : S.SUNIL KUMAR

Signature :

Date : 9/Sep/20 9/Sep/20


VB-105- 2 nd stage suction e Volume Bottle

Point no Nominai Dia. Nominal Thk 20-Jan-20 6-Feb-20 26-Feb-20 17-Mar-20 25-Jun-20 9-Jul-20 16-Jul-20 23-Jul-20 30-Jul-20 5-Aug-20 12-Aug-20 19-Aug-20 27-Aug-20 4-Sep-20 9-Sep-20
N-01 3 7.62 7.58 7.58 7.56 7.50 7.46 7.46 7.45 7.44 7.44 7.43 7.43 7.42 7.42 7.40 7.40
N-02 4 32.00 30.41 30.41 30.40 30.40 30.35 30.35 30.34 30.34 30.34 30.33 30.31 30.30 30.30 30.30 30.30

VB-105 2nd stage suction e volume bottle


35.00 32.00 30.41 30.41 30.40 30.40 30.35 30.35 30.34 30.34 30.34 30.33 30.31 30.30 30.30 30.30 30.30
30.00
25.00
20.00
15.00
10.00 7.62 7.58 7.58 7.56 7.50 7.46 7.46 7.45 7.44 7.44 7.43 7.43 7.42 7.42 7.40 7.40
5.00
0.00

N-01 3 N-02 4
UT THICKNESS SURVEY RECORD - EQUIPMENT
Hot spots(TML) Technique
Equip. ID BOOSTER COMRESSOR Pr. (bar) - Temperature 0C 93 P & ID NO.
DESIGN
Equip.Name VB-106-2nd STAGE DISCHARGE VOLUME BOTTLE Corro Allow. DCA - Shell Spec. THIS INSP. DATE 9/Sep/20
OUTER DIA LENGTH Head Spec.
Period From Last Insp.(YRS) - DIMENSIONS LAST INSP. DATE -
Nozzle-1 Min 13.01 Max 13.08
(mm) - -
Period From Service Start.(YRS) 24.5 Nozzle-2 Min 12.78 Max 12.87 SERVICE START DATE Mar/96
UTM Procedure Ref. NO TSSA/SOP/NDT/UTT/13 TEST LOCATION TRAINS TEST REPORT NO UTM/9-20/13
Loss of Thick Corrosion Rate Remaining Anomaly Remark
Nomina Last Actual WT or Present MDW
Nominal Present Measurement Thickness (mm) MAT MRT W-C B-C
Feature Meas. Point l WT Min.WT 1st Min. WT Min.WT T Corr. Allow. Life
Feature Type DIA (Long (Short STCR LTCR
No (RCA) (RL)
(INCH) Term) Term)
mm mm mm mm (C)
T B N E S W mm mm mm mm mm mm/yr mm/yr mm Years
(W) (A) (B)
N-1 Nozzle 4 - - 13.07 13.08 13.01 13.06 13.49 - - 13.01 - - 10.21 - - 0.02 2.80 20.00
N-2 Nozzle 4 12.87 12.78 - 12.86 - 12.83 13.49 - - 12.78 - - 10.21 - - - 0.02 2.57 20.00
D-1 ( TOP) Dish 20 24.40 24.40 24.01 - 24.30 - 26.19 - - 24.01 - - 21.33 - - - 0.02 2.68 20.00
D-1 ( TOP) Dish 20 24.60 24.80 24.60 - 24.80 - 26.19 - - 24.60 - - 21.33 - - - 0.02 3.27 20.00
D-1 ( TOP) Dish 20 24.80 25.80 25.80 - 25.40 - 26.19 - - 24.80 - - 21.33 - - - 0.02 3.47 20.00
S-1 Shell 20 28.60 30.09 29.40 - 30.04 - 26.19 - - 28.60 - - 21.33 - - - 0.02 7.27 20.00
S-2 Shell 20 29.80 29.40 28.80 - 30.08 - 26.19 - - 28.80 - - 21.33 - - - 0.02 7.47 20.00
D-4 ( BOTTOM) Dish 20 25.80 26.40 25.80 - 25.60 - 26.19 - - 25.60 - - 21.33 - - - 0.02 4.27 20.00
D-5 ( BOTTOM) Dish 20 25.40 26.60 24.80 - 25.80 - 26.19 - - 24.80 - - 21.33 - - - 0.02 3.47 20.00
D-6 ( BOTTOM) Dish 20 24.80 25.60 24.80 - 24.80 - 26.19 - - 24.80 - - 21.33 - - - 0.02 3.47 20.00

Remarks: AS PER THE EQUIPMENT SPECIFICATION NOMINAL THICKNESS NOT AVAILABLE, BASED ON UT SURVEY MENTIONED NOMINAL THICKNESS SCHEDULE WHICH IS CLOSE TO THE MAXIMUM READING.

Contract No 4600009908 Probe T/R 5 Mhz, 10mm D799 (1117914) Insulation NO

NDT SERVICE'S FOR ONSHOIRE TERMINAL & OFFSHORE TERMINAL


Contct Name Refernace Code API 510 Surface Condition PAINTED
AT RAVVA

Make & Model Of Machine OLYMPUS 38DL PLUS Couplant Grease Calibration Block CS 2.5 - 12.5 mm Step Gauge
TUV SUD SOUTH ASIA PVT LTD.
Name : S.SUNIL KUMAR

Signature :

Date : 9/Sep/20 9/Sep/20


VB-106- 2 nd stage Discharge Volume Bottle

Point no Nominai Dia Nominal Thk 20-Jan-20 6-Feb-20 26-Feb-20 17-Mar-20 25-Jun-20 16-Jul-20 9-Jul-20 16-Jul-20 23-Jul-20 30-Jul-20 5-Aug-20 12-Aug-20 19-Aug-20 27-Aug-20 4-Sep-20 9-Sep-20
N-01 4 13.49 13.10 13.10 13.10 13.10 13.08 13.08 13.08 13.07 13.06 13.06 13.05 13.05 13.03 13.03 13.02 13.01
N-02 4 13.49 12.93 12.93 12.93 12.90 12.87 12.85 12.85 12.84 12.83 12.83 12.82 12.82 12.81 12.80 12.79 12.78

VB-106 2nd Stage Discharge Volume bottle


13.6 13.49
13.49
13.4
13.10 13.10 13.10 13.10 13.08 13.08 13.08 13.07 13.06 13.06 13.05 13.05 13.03 13.03 13.02 13.01
13.2 12.93 12.93 12.93 12.90 12.87 12.85 12.85 12.84
13 12.83 12.83 12.82 12.82 12.81 12.80 12.79 12.78
12.8
12.6
12.4
Nominal Thk

6-Feb-20

4-Sep-20

9-Sep-20
17-Mar-20

25-Jun-20

16-Jul-20

23-Jul-20
26-Feb-20

5-Aug-20

12-Aug-20

19-Aug-20

27-Aug-20
16-Jul-20
20-Jan-20

9-Jul-20

30-Jul-20
VB-106- 2 nd stage Discharge Volume Bottle

N-01 4 N-02 4