Q Flow 15000 m3/hr 4.

166666667 m3/s
V Velcity 10 m/s ( 1 for gravity , 2 for pressure 14 for odour)
D inner 0.72855 m 728.5503158 mm

Q=vX0.785 D sq

D = Rad (Q/VX0.785)

OD ID sch40 check chosen beam


6" pipe 60 60
V 1474.404 m/s

ID FOR P 450
Q 33 M3/H
A 0.158963 M2
V 207.5961 M/H 0.057665592 M/S
Acceptable
As per process calculation Extraction rate:

Lift Station 486 m3/hr


IHW 61.2 m3/hr
Balancing tank 1152 m3/hr
Total 1699.2

Q Flow 1699.2 m3/hr 0.472 m3/s


V Velcity 14 m/s ( average velocity : 0.8-1.2 for water by gravity
1.8-2.3 for water by pressure, 14-20 for odour)
D inner 0.207239 m 207.2393174 mm

Pipe size selcted is DN 250 UPVC

Balancing tank future 960 m3/hr


sludge holding tnak 308.7 m3/hr
screw filter press 12 m3/hr
Total 1280.7

Q Flow 1280.7 m3/hr 0.35575 m3/s


V Velcity 14 m/s ( average velocity : 0.8-1.2 for water by gravity
1.8-2.3 for water by pressure, 14-20 for odour)
D inner 0.179918 m 179.917583 mm

Pipe size selcted is DN 200 UPVC