Placing of concrete

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

LARSEN & TOUBRO LIMITED

INFRASTRUCTURE INDEPENDENT COMPANY


Ref: IM-08-B Rev 00
EHS RISK ASSESSMENT

Name of the Project : WDFC, Phase-II, EMP-16 Business Unit: RBU


Activity considered : Plain cement concreting (PCC) Date: 06-01-2017

Hazard / Environment Aspect

Probability
Risk / Residual

Severity
Rating

Rating
Sl. Existing Control Additional Control
Activity Source / Impact Risk / Action By
No Possible Measures Measures
Situation People at risk Level Impact
Outcome
/ Act
Site
1.Not exceeding
Loading of engineer
Overload Toppling of TM Workers / the Loading limit
1. concrete in 1 3 L /
ing while turning Helpers 2.Adequate
Miller P&M
supervision
Engineer
1.Collision with Site
1.Competentcy
object engineer
and Fitness of the
/
Moveme 2. Collision with driver 1.Separate walkway for
Traffic
nt of man 2. Driving within pedestrian and vehicle
Engineer
transit 3. Rash driving the speed limit movement
Transportation Workers / /
2. miller 3. PUC certificate 2 3 H 2.Bank’s men or helper L
of concrete 4.Fall of TM in Helpers SHE
(Forward and NOC of the while reversing
the pit Engineer
and vehicle 3.Use of Reverse horn
reverse) 5. Soil Collapse 4. Driver having while reversing
valid driving
license
Loose clothing P&M
Rotation Entanglement Workers / Providing guards on
must not be 2 3 M L Engineer
of drum Loose clothing helpers rotating parts
allowed on site
Placing and Contact Workers / Using PPE’s like Site
3. Irritation 1 3 L engineer
Finishing of with skin helpers gum boots ,rubber
concrete gloves, goggles, /
SHE
Engineer
1.Mosquito 1.Clearing the
Water breeding Workers / extra water Site
4. Curing 1 3 L L
logging helpers 2. sprinkling engineer
2. Slip-trip mosquito killer
1.Removing gunny Site
Gunny 1. NO smoking in site
bags immediately engineer
bag for premises
Workers / after curing /
covering Fire hazard 2 3 M 2.. Avoiding any hot work L
helpers 3. Adequate SHE
concrete near the gunny bags
supervision Engineer
surface

___________________
PM / CM / Section In-charge EHSO

You might also like