faLARSEN & TOUBRO LIMITED

INFRASTRUCTURE INDEPENDENT COMPANY


Ref: IM-08-B Rev 00
EHS RISK ASSESSMENT

Name of the Project : WDFC, Phase-II, EMP-16 Business Unit: RBU


Activity considered : Shuttering of beam /Column /Slab Date: 07-01-2017

Hazard / Environment Aspect

Probability
Risk / Residual

Severity
Rating

Rating
Sl. Additional Control
Activity Source / Existing Control Measures Impact Risk / Action By
No Possible People at Measures
Situation / Level Impact
Outcome risk
Act
Material Worker/ Site
1.maintaining good
handling Improper Slip –trip helper Engineer
1. housekeeping 1 4 L L
(loading / Access and fall
2. proper material stacking
unloading)
1. Emergency lighting Site
arrangements must be Engineer
Poor Worker/ provided. /
Slip –trip helper
illuminatio 2. Proper supervision must 1 4 L . L P&M
and fall
n be ensured that workers do
not work in poor
illumination.
Workers 1. All sharp edges must be Site Engg
Sharp Wear & tear checked /
/ 1 3 L
edges 2. PPe’s like gloves and safety L Safety engg.
helpers boots must be used.
1. Manual handling must be
WRULD’s Workers reduced.
Manual 2. Weight must be lifted Site Engg.
/ / 1 3 L L
handling closer to the body.
Back pain helpers 3.Training must be given to /
workmen Safety Engg
Site
Transportat Workers 1.Not exceeding the Loading engineer
Uneven Toppling of
2. ion of / limit 1 3 L L /
ramp/road vehicle
material helpers 2.Adequate supervision P&M
Engineer
1.Collision Site
with object engineer
/
2. Collision
1.Competentcy and Fitness of Traffic
with man 1.Separate walkway for
the driver Engineer
Rash 3. Rash pedestrian and vehicle
2. Driving within the speed /
driving driving movement
Workers limit SHE
/ 2 3 H 2.Bank’s men or helper L
4.Fall of TM / Helpers 3. PUC certificate and NOC of Engineer
over while reversing
in the pit the vehicle
speeding 3.Use of Reverse horn
5. Soil 4. Driver having valid driving
while reversing
Collapse license

1. Manual handling must be


WRULD’s Workers reduced.
Making of
Manual 2. Weight must be lifted Site engg.
3 shuttering / / 1 3 L L
handling closer to the body.
board Back pain helpers /
3.Training must be imparted
to workmen Safety engg
1.Contact 1. Using job specific PPE’s like
with sharp gloves, safety shoes, helmets, Site engg.
edges nose masks. /
Using 2.Electric Workers 2. Regular inspection of 1. Using RCCB/ ELCB for P&M
Power shock Power/ hand tools. power tools.
/ 2 3 M L /
/ hand 3.inhalation 3. Avoiding using wires which 2. Training for workers for
tools of dust helpers have cut. using power tools Safety engg
3.exposure 4. providing good
to noise and illumination
vibration
Use of Workers 1. Using job specific PPE’s like
Exposure to
bonding nose mask, hand gloves, 2 3 L L
chemicals / Site engg.
and safety shoes.
shuttering helpers 2.Good ventilation /
oils Safety engg
1.Fall of 1. Training to workmen
Installation Fixing of Workers 2. Load must be lifted closer Site engg
material
4 of formwork CT prop / to the body 1 3 L L
board jacks 2.Material 3. Ct prop jacks must be fixed
handling helpers
using tripod stands
1. Loose material must not be Site engg
left on the edge of the
1.Fall of
formwork
material
2. Load must be lifted closer
Worker to the body
Lifting and 1.PTW must be issued
2.Fall from S 3. Use of full body harness
Fixing and before starting of work
height while working at height 1 3 H L
alignment / 2. Work at height must be
3.Material 4. Lifelines must be to hook
of boards helpers given
handling the safety harness.
material 5. Scaffolds must be erected
as per drawing
6. Regular inspection of
scaffolds must be done

_______________________ __________________
PM / CM / Section In-charge EHSO