Minutes of Meeting Shop Fabrication MHC MS & RFCC 24.10.2019
Minutes of Meeting Shop Fabrication MHC MS & RFCC 24.10.2019
TANK CLEANING
OF
FPSO FRONT PUFFIN,
WEST AFRICA EXPLORATION AND PRODUCTION COMPANY LIMITED
Attendees: Distribution
WAEP SESL SWDA All Attendees
1. Mathias Onosemuode (CM) 1. Izontimi Timi (PM) 1. Miracle (Project Engineer)
2. Stephen Ogundele (HSE Lead) 2. Ndenwa Victor (PE)
3. Kehinde Mustapha (Production Engineer) 3. Shehu Ringim (Trainee)
4. Oluwabusola Sipeolu (Trainee) 4. Clarence Ataha (Prod. Supt)
5. Tamunosini Daniel (Trainee)
6. Vikran Singu
Regrets
Nil
Agenda:
1. Work through of the FPSO accommodation and production facilities
2. Inspection of tank cleaning equipment and personnell
3. Progress review for tank cleaning operations
4. HSE review for tank cleaning operations
5. Status report on NORM
Reviewed and Approved By: Reviewed and Approved By: Reviewed and Approved By:
Page 1 of 2
WEEKLY SITE MEETING
AG, UG SHOP FABRICATION
FOR
MHC, MS-BLOCK AND RFCC,
DANGOTE REFINERY AND PETROCHEMICAL PROJECT
1.0 Objective:
To improve productivity, quality and material availability. Info
➢ Current Work Front to be updated to reflect recently issued MIVs CC-7 30/10/2019
➢ Any list of shortage materials to be sent to Mathias for a follow-up CC-7 30/10/2019
➢ 32 Tie-in spools to be check if fabricated and ready for installation. CC-7, DORC 30/10/2019
➢ Numbers of welders to be increase to 15 no. for shop fabrication, and 6 CC-7 A.S.A.P
no. for field fabrication