O11B REV. DRAWING NO. T-3.098.

840_SHT-002

NOTES:

M-43

M-44
W 1. FOR ALL GENERAL NOTES REFER DRAWING T-3.098.840_SHT-001.

CL WP CL BEAM CL BEAM L BEAM


C CL BEAM 2. CONSTRUCTION CONTRACTOR TO FERRO SCAN / REBAR DETECTION PRIOR TO DRILL THE HOLES
IN EXISTING CONCRETE BEAM / COLUMN.
1800
425 150 1125 150 250 250 150 1300 150 250 250 150 740 150 250 250 150 460 150 250 1000
NEW HAND RAIL 3. CONSTRUCTION CONTRACTOR TO FABRICATE THE STRUCTURAL STEEL AFTER THE HOLES ARE
(3 EQUAL SPACING) (4 EQUAL SPACING) (2 EQUAL NEW HAND RAIL
NEW HAND RAIL AS PER DEP S28.008 POSITIONED IN EXISTING CONCRETE BEAM / COLUMN.
SPACING) AS PER DEP S28.008
AS PER DEP S28.008
4. CONSTRUCTION CONTRACTOR TO DRILL THE HOLES IN EXISTING CONCRETE WITH STARTING
FROM SMALLER DRILL BIT (8MM, 10MM, 12MM,18MM, 20MM & 22MM) FOR M20 BOLTS.

5. EMBEDMENT DEPTH SHALL BE PER MANUFACTURER RECOMMENDATION.

10 THK STIFF PL 6. METHOD STATEMENT FOR DRILLING FOR HILTI TO BE SUBMITTED PRIOR FOR SASREF APPROVAL.
(NEAR SIDE NODE 110
(TYP)

(TYP)
REFER FORCE

25
TOC/TOG TOC/TOG SUMMERY CHART
EL +12.000 EL +12.000

C254X76 C254X76 C254X76 C254X76


WP NODE 32
UB406X178X54
REFER FORCE
SUMMERY CHART
13
1 NODE 78 NODE 83
T-3.098.840_SHT-004 NODE 86 EXISTING CONCRETE
U
B2
1 1 3 REFER FORCE
TYP AT 3
REFER FORCE
COOLER PLATFORM
03 SUMMERY CHART SUMMERY CHART REFER FORCE
X T-3.098.840_SHT-003 T-3.098.840_SHT-003 LOCATION 4 SUMMERY CHART REF DWG T-1.764.138
13
O11B 3X T-3.098.840_SHT-003
25
2
T-3.098.840_SHT-003
NODE 46
REFER FORCE
EXISTING PIPE SUMMERY CHART SECTION B
(LOOKING EAST)
UB203X133X25 Straight beam shortage
T-3.098.840_SHT-001
EXISTING CONCRETE
COOLER PLATFORM
REF DWG T-1.764.138
Can we use UB254X146
WP
W
W
CL BEAM L STUB
C CL STUB
ELEVATION AT COL LINE M-43 COL COL

(LOOKING EAST)
25
830 350 620 1200 TYP
NEW HAND RAIL 25 THK GRATING
AS PER DEP S28.008 TOC/TOG
EL +12.000

W
L BEAM
C UC203X203X46 TOS EL +12.500
1800 TYP

425 150 875 150 200


10THK STIFF PL UC203X203X46 CONNECTION DETAILS REVISED
(2 EQUAL
(BOTH SIDE) 10THK STIFF PL TOC/TOG EL +12.000
SPACING) EXISTING CONCRETE
10 THK STIFF PL
COOLER PLATFORM
REF DWG T-1.764.138
UC203X203X46 6 C254X76
O11B
NEW HAND RAIL T-3.098.840_SHT-003
AS PER DEP S28.008 M16 HILTI HY-200
8 HAS-U-8.8 HDG
LEGEND:
EXISTING CONCRETE EMBEDMENT = 200MM MINIMUM
T-3.098.840_SHT-003
COOLER PLATFORM PROJECTION = 50MM
14 REF DWG T-1.764.138 (W/2 NUTS) EXISTING STEEL
TOC/TOG (FOR SPACING
EL +12.000 NODE 35
5 T-3.098.840_SHT-004 SEE SECTION B) NEW STEEL
REFER FORCE T-3.098.840_SHT-003
SUMMERY CHART
O11B
C254X76 SECTION C SECTION F REFERENCE DRAWINGS
1
(LOOKING NORTH) T-3.098.840_SHT-001 SCALE 1:10 T-3.098.840_SHT-001 T-3.095.845_SHT-001 MISC SUPPORT FOUNDATION LOCATION PLAN SECTOR 5 AREA 30 TANK FARM
T-3.098.840_SHT-003
(LOOKING NORTH)
T-3.095.845_SHT-002 MISC SUPPORT FOUNDATION PLAN SECTION & DETAIL SECT 5 AREA 30 TANK FARM

EXISTING CONCRETE
10 THK STIFF PL
(NEAR SIDE
SECTION D T-3.098.840_SHT-001 MISC SUPPORT STEEL AND PLATFORM PLAN UNIT 3000
COOLER PLATFORM (TYP) (LOOKING NORTH) T-3.098.840_SHT-001 T-3.098.840_SHT-003 MISC SUPPORT STEEL AND PLATFORM CONNECTION DETAILS UNIT 3000
REF DWG T-1.764.138

SECTION A
(LOOKING SOUTH) T-3.098.840_SHT-001 BEAM END FORCES SUMMARY

W
M-44

CL BEAM L STUB
C CL STUB
COL COL

NEW HAND RAIL 1180 620


275 275 AS PER DEP S28.008 275 275

TOS EL +12.500 TOS EL +12.500


TYP
O11B 01APR24 RVA AMS RE-ISSUED FOR CONSTRUCTION AS PER SPP-23/014 (EARLY TIE-INS)
TYP
O11A 14NOV23 RVA AMS ISSUED FOR CONSTRUCTION AS PER SPP-23/014 (EARLY TIE-INS)
10THK STIFF PL 10THK STIFF PL
TOC/TOG UC203X203X46 UC203X203X46 TOC/TOG O 19OCT23 RVA AMS ISSUED FOR APPROVAL AS PER SPP-23/014 (EARLY TIE-INS)
(BOTH SIDE) (BOTH SIDE)
EL +12.000 EL +12.000
REV. DATE BY APPR. DESCRIPTION
MANDATORY REQUIREMENT & RECOMMENDATION WHEN REVISIONS ARE MADE TO THIS DRAWING THE LETTER OF ISSUE
SHALL BE INDICATED IN A TRIANGLE NEAR THE PART(S) CONCERNED
6 UC203X203X46 a) DUE TO VARIATIONS IN CONDITIONS IN LOCAL BASE MATERIALS, ON SITE Drawn by RVA Date 27-09-2023 This document is confidential. The copyright therein
T-3.098.840_SHT-003 O11B TESTING IS REQUIRED TO DETERMINE PERFORMANCE AND SAFETY. is vested in the SAUDI ARAMCO SHELL REFINERY
Checked by Scale COMPANY AL-JUBAIL. Recipients must obtain the
AMS written authority of the said company before wholly
8 b) MINIMUM BASE MATERIAL STRENGTH SHALL BE 25N/MM2 PER MANUFACTURER
REQUIREMENT. Approved by AG
1:25 or partly duplicating the contents or disclosing
same to others - All rights reserved.
T-3.098.840_SHT-003 EXISTING CONCRETE
COOLER PLATFORM TITLE/LOCATION
c) ANCHOR EMBEDMENT SHOWN IS MINIMUM AND TO BE CONFIRMED
EXISTING CONCRETE 14 REF DWG T-1.764.138
BY VENDOR.
MISC SUPPORT STEEL AND PLATFORM
COOLER PLATFORM 5 T-3.098.840_SHT-003 ELEVATION AND SECTIONS
REF DWG T-1.764.138 d) BOLTS SHOWN ON EACH POST INSTALLED LOCATION ARE MINIMUM UNO.
T-3.098.840_SHT-003 HYDROCRACKER REACTION UNIT 3000
O11B e) ANCHOR PULL OUT TEST SHALL BE PERFORMED AFTER INSTALLATION WORKS.
ELEVATION - MPS-3000-006 SECTION E
F) CONTRACTOR SHALL ARRANGE WORKERS TO OBTAIN TRAINING AND / OR
(LOOKING WEST) (LOOKING NORTH) T-3.098.840_SHT-001 CERTIFICATION FROM HILTI PRIOR ENGAGING IN FIELD WORK. Discipline DRG. No. Rev.

C T-3.098.840_SHT-002 O11B
Form/File : F000A10.DWG