REPORT ON
GEOTECHNICAL INVESTIGATION
WORK NAME
CONSULTANCY SERVICES FOR PREPARATION OF DETAILED PROJECT REPORT FOR
CONSTRUCTION OF EXISTING ROAD/ GREEN FIELD ALIGNMENT FOR 2 LANE 2 LANE WITH
PAVED SHOULDER/ FOUR LANE CONFIGURATION ROAD FROM ASHIRVAD BANQUET TO FIRING
RANGE (BARIATU) INCLUDING REPLACEMENT OF CULVERTS AND BRIDGES, CONSTRUCTION OF
NEW CULVERTS AND BRIDGES, COMPLETE LAND ACQUISITION PLAN INCLUDING OWNERSHIP
DETAILS ALL COMPLETE AS PER LATEST GUIDELINES, RESETTLEMENT AND REHABILITATION
PLAN AND FOREST DIVERSION PROPOSAL ETC AS REQUIRED, IN THE STATE OF JHARKHAND.
TENTATIVE LENGTH -2.52KM
LOCATION
BRIDGE AT 300 M
CLIENT NAME
ROAD CONSTRUCTION DEPARMENTFIELD SURVEY DIVISION, ADVANCE PLANNING,
ROAD CONSTRUCTION DEPARTMENT RANCHI.
GOVERNMENT OF JHARKHAND
SUBMITED TO
MARS PLANNING & ENGINEERING SERVICES PVT. LTD.
287/C YASH PADM BESIDE HILL TOP MOTORS ASHOK NAGAR, RANCHI 834002, JHARKHAND,
INDIA. JHARKHAND@MARSCONSULTANCY.COM
DEC-,2023
INVESTIGATION DONE BY
OM SAI CONSULTANTS
(AN ISO 9001:2015 & ISO/IEC 17025: 2017 CERTIFIED, NABL ACCREDITED LAB)
Of f i c e- B a n k o f I n d i a C ol o n y, N e a r J a i Sh r e e G a s G o d o w n , S o u t h D / S S, P .O . - B . V . C o l l e g e R a j a B a z a ar ,
P a t na - 8 0 0 0 1 4 , M ob + 9 1 947 2 9 0 9 2 8 7 . I GS T N o: - 1 0 B ZI P P 5 8 5 8 H 2Z 4, P A N N o:- B Z I P P 58 58H
Email-info@omsaiconsultantsandlaboratory.com, Gmail- omsaiconsultantspatna@gmail.com
Sr
Description Page No.
No
1. Introduction 1
2. Scope of work 1
4. Sampling 3
5. Laboratory tests 3
7. Soil stratification 4
8. Foundation analysis 4
Appendix-B,C,D
[Containing Figures and Tables]
Appendix Description
Certified that this report contains pages l to ------- and further all the test has been conducted
with high degree of reliability .and accuracy
INTRODUCTION
The Geotechnical Investigation work was entrusted and the ground sample collection and
laboratory tests and report preparation were completed work was conducted by
M/S Om Sai Consultants, Patna/Ranchi (Bihar/Jharkhand) .
The subsoil investigations reported herein were taken up to find out the nature of subsoil at the
site of the proposed construction and to recommend the capacity and type of its foundation. After
certain tests on the soil, as detailed below, the desired recommendations have been start on
page 4 of this Report.
1
RNOSC261223D
OM SAI CONSULTANTS
BANK OF INDIA COLONY, NEAR JAI SHREE GAS GODOWN,
SOUTH D/SS P.O. B.V. COLLEGE,RAJA BAZAR PATNA, BIHAR-800014
Report on Sub Soil Investigations for the
CONSULTANCY SERVICES FOR PREPARATION OF DETAILED PROJECT REPORT FOR CONSTRUCTION OF EXISTING ROAD/ GREEN
FIELD ALIGNMENT FOR 2 LANE 2 LANE WITH PAVED SHOULDER/ FOUR LANE CONFIGURATION ROAD FROM ASHIRVAD BANQUET
TO FIRING RANGE (BARIATU) INCLUDING REPLACEMENT OF CULVERTS AND BRIDGES, CONSTRUCTION OF NEW CULVERTS AND
BRIDGES, COMPLETE LAND ACQUISITION PLAN INCLUDING OWNERSHIP DETAILS ALL COMPLETE AS PER LATEST GUIDELINES,
RESETTLEMENT AND REHABILITATION PLAN AND FOREST DIVERSION PROPOSAL ETC AS REQUIRED, IN THE STATE OF
JHARKHAND. TENTATIVE LENGTH -2.52KM
4.1.1 Sampling
4.1.2 Undisturbed Soil Samples
Open drive samplers of 100-mm diameter and about 450-mm length were used for
obtaining undisturbed samples of cohesive soils. The collection, sealing, labeling and
transportation of the samples to the laboratory were done as per the IS guide-lines.
4.2.3 Disturbed Soil Samples
Disturbed soil samples were collected at suitable intervals of depth (not more than
2.5 m) and at all depths of change in the nature of the subsoil. These samples were
sealed in polythene bags with proper identification labels.
5. LABORATORY TESTS
Some or all of the following laboratory tests, as necessary, were done on the collected
soil samples. Representative soil samples were selected for this from the different soil
strata encountered during boring. The tests were performed as per the relevant Indian
Standard Codes of Practice.
3
RNOSC261223D
OM SAI CONSULTANTS
BANK OF INDIA COLONY, NEAR JAI SHREE GAS GODOWN,
SOUTH D/SS P.O. B.V. COLLEGE,RAJA BAZAR PATNA, BIHAR-800014
Report on Sub Soil Investigations for the
CONSULTANCY SERVICES FOR PREPARATION OF DETAILED PROJECT REPORT FOR CONSTRUCTION OF EXISTING ROAD/ GREEN
FIELD ALIGNMENT FOR 2 LANE 2 LANE WITH PAVED SHOULDER/ FOUR LANE CONFIGURATION ROAD FROM ASHIRVAD BANQUET
TO FIRING RANGE (BARIATU) INCLUDING REPLACEMENT OF CULVERTS AND BRIDGES, CONSTRUCTION OF NEW CULVERTS AND
BRIDGES, COMPLETE LAND ACQUISITION PLAN INCLUDING OWNERSHIP DETAILS ALL COMPLETE AS PER LATEST GUIDELINES,
RESETTLEMENT AND REHABILITATION PLAN AND FOREST DIVERSION PROPOSAL ETC AS REQUIRED, IN THE STATE OF
JHARKHAND. TENTATIVE LENGTH -2.52KM
7. SOIL STRATIFICATION
The Two bore holes sunk at the site and the results of field and laboratory tests
conducted on the collected soil samples indicate that the soil stratification at the site
is as describe below.
The sub soil is Greyish Clayey Silt Mix With sand , Greyish silty Fine Sand,(CL-
ML/SM) Soft Weathered Rock & Hard Rock up to the investigated depth of 15m, below
GL.
Ground water table is struck 3.4m, & 7.7m, bgl in Dec 2023.
8. FOUNDATION ANALYSIS
The safe bearing capacity of foundation of any type and size may be determined on
the basis of the soil data given in this Report by using the standard methods of
foundation design and following the relevant Indian Standard Codes. In the present
case, shallow foundations may be provided.
9. RECOMMENDATIONS
The proposed structure may be provided with shallow foundation as per soil bearing
capacity. [Strip, square or raft].& Plane Pile Capacity
The net allowable bearing pressure of a footing of any size and depth may be
calculated by standard methods using the relevant BIS Code and soil properties
reported herein.
The values of net allowable bearing pressures of foundations of certain sizes have
been calculated [vide sample of Calculation in Appendix - F] and are tabulated below.
4
RNOSC261223D
OM SAI CONSULTANTS
BANK OF INDIA COLONY, NEAR JAI SHREE GAS GODOWN,
SOUTH D/SS P.O. B.V. COLLEGE,RAJA BAZAR PATNA, BIHAR-800014
Report on Sub Soil Investigations for the
CONSULTANCY SERVICES FOR PREPARATION OF DETAILED PROJECT REPORT FOR CONSTRUCTION OF EXISTING ROAD/ GREEN
FIELD ALIGNMENT FOR 2 LANE 2 LANE WITH PAVED SHOULDER/ FOUR LANE CONFIGURATION ROAD FROM ASHIRVAD BANQUET
TO FIRING RANGE (BARIATU) INCLUDING REPLACEMENT OF CULVERTS AND BRIDGES, CONSTRUCTION OF NEW CULVERTS AND
BRIDGES, COMPLETE LAND ACQUISITION PLAN INCLUDING OWNERSHIP DETAILS ALL COMPLETE AS PER LATEST GUIDELINES,
RESETTLEMENT AND REHABILITATION PLAN AND FOREST DIVERSION PROPOSAL ETC AS REQUIRED, IN THE STATE OF
JHARKHAND. TENTATIVE LENGTH -2.52KM
The values of the other factors in the above equation for usual conditions are as tabulated below :
0.5
sc = 1.3 1+0.2B/L 1 dc = 1+ 0.2 (Nf ) D/ B Dw at G.L. Fou'dn.Level
o
sq = 1.2 1+0.2B/L 1 dq =d 1 for f<10 w = 0.5 1
0.5 o
sg = 0.8//0.6 1-0.4B/L 1 dq =d 1+ 0.1(Nf ) D/ B f>10 Interpolation between
FOR sq.// O Rect. STRIP Ic ,Iq, I = 1 for vertical load these values is linear.
In the present case, the representative values of cohesion © and angle of internal friction (
may be obtained from the soil data given earlier. Full submergence of the soil has been assumed. The safe
bearing capacity, qns has been obtained by dividing qnf by a safety factor, 3.
One example of calculation of safe bearing capacity for a certain shape, depth and width of a footing
is given in Table A on the next page. The net safe bearing capacity for the footing is entered in the last
column of Table A. Calculations for other depths and widths of footings are done similarly.
The value of net safe bearing capacity (qns ) calculated for each set of values of B and D is used for
calculating the consolidation settlement s as explained in Sec. 2 below.
5
RNOSC261223D
OM SAI CONSULTANTS
BANK OF INDIA COLONY, NEAR JAI SHREE GAS GODOWN,
SOUTH D/SS P.O. B.V. COLLEGE,RAJA BAZAR PATNA, BIHAR-800014
Report on Sub Soil Investigations for the
CONSULTANCY SERVICES FOR PREPARATION OF DETAILED PROJECT REPORT FOR CONSTRUCTION OF EXISTING ROAD/ GREEN
FIELD ALIGNMENT FOR 2 LANE 2 LANE WITH PAVED SHOULDER/ FOUR LANE CONFIGURATION ROAD FROM ASHIRVAD BANQUET
TO FIRING RANGE (BARIATU) INCLUDING REPLACEMENT OF CULVERTS AND BRIDGES, CONSTRUCTION OF NEW CULVERTS AND
BRIDGES, COMPLETE LAND ACQUISITION PLAN INCLUDING OWNERSHIP DETAILS ALL COMPLETE AS PER LATEST GUIDELINES,
RESETTLEMENT AND REHABILITATION PLAN AND FOREST DIVERSION PROPOSAL ETC AS REQUIRED, IN THE STATE OF
JHARKHAND. TENTATIVE LENGTH -2.52KM
One example of calculation for a certain depth and width of a strip or square footing is given
in the Table A on the next page. Full submergence of the soil has been assumed. The safe bearing
capacity, qns has been obtained by dividing qnf by a safety factor, 3. The net safe bearing capacity for
a footing of the selected size and depth of footing is to be seen in its last column. Calculations of safe
bearing capacities for other depths and widths of footings are done similarly.
The net soil pressure, qs (t/m2) for a permissible settlement of 25 mm is give by Teng’s formula:
2
qs = 3.5 [N’’ – 3] [ (B + 0.3)/ 2 B] w’ Fd t/m2
Fd = [1 + D/B] < or = 2
q’s = S qs /25
The corrected SPT N” values used in the calculations based on the above formula for different
depths below G.L. may be found from the recorded data.
The N” value used in any case is to be for the influence zone below the footing, which depends
on its width. A sample of calculation of the allowable soil pressure for the chosen size and depth of
footing and for the permissible settlement is given in Table B in the next section
6
RNOSC261223D
OM SAI CONSULTANTS
BANK OF INDIA COLONY, NEAR JAI SHREE GAS GODOWN,
SOUTH D/SS P.O. B.V. COLLEGE,RAJA BAZAR PATNA, BIHAR-800014
Report on Sub Soil Investigations for the
CONSULTANCY SERVICES FOR PREPARATION OF DETAILED PROJECT REPORT FOR CONSTRUCTION OF EXISTING ROAD/ GREEN
FIELD ALIGNMENT FOR 2 LANE 2 LANE WITH PAVED SHOULDER/ FOUR LANE CONFIGURATION ROAD FROM ASHIRVAD BANQUET
TO FIRING RANGE (BARIATU) INCLUDING REPLACEMENT OF CULVERTS AND BRIDGES, CONSTRUCTION OF NEW CULVERTS AND
BRIDGES, COMPLETE LAND ACQUISITION PLAN INCLUDING OWNERSHIP DETAILS ALL COMPLETE AS PER LATEST GUIDELINES,
RESETTLEMENT AND REHABILITATION PLAN AND FOREST DIVERSION PROPOSAL ETC AS REQUIRED, IN THE STATE OF
JHARKHAND. TENTATIVE LENGTH -2.52KM
Table 1 : Allowable Net Bearing Pressures [ qna ] and Settlements Expected [s]
2.0 50
12.2 14.9 --
3.0 3.0 50
11.8 14.1 --
10.0 15.3 75
-- --
2.0 -- 50
14.5 17.7
4.0 3.0 50
13.7 16.5 --
10.0 75
-- -- 17.0
2.0 50
17.0 20.7 --
5.0 3.0 50
15.8 18.9 --
10.0 75
-- -- 18.6
Notes :
1. If a subsoil condition much different from those reported herein is met with during foundation
trenching or piling, suitable steps should be taken.
Authorize Signatory
(Er. K.N. Parihar)
7
RNOSC261223D
OM SAI CONSULTANTS
BANK OF INDIA COLONY, NEAR JAI SHREE GAS GODOWN,
SOUTH D/SS P.O. B.V. COLLEGE,RAJA BAZAR PATNA, BIHAR-800014
Report on Sub Soil Investigations for the
CONSULTANCY SERVICES FOR PREPARATION OF DETAILED PROJECT REPORT FOR CONSTRUCTION OF EXISTING ROAD/ GREEN
FIELD ALIGNMENT FOR 2 LANE 2 LANE WITH PAVED SHOULDER/ FOUR LANE CONFIGURATION ROAD FROM ASHIRVAD BANQUET
TO FIRING RANGE (BARIATU) INCLUDING REPLACEMENT OF CULVERTS AND BRIDGES, CONSTRUCTION OF NEW CULVERTS AND
BRIDGES, COMPLETE LAND ACQUISITION PLAN INCLUDING OWNERSHIP DETAILS ALL COMPLETE AS PER LATEST GUIDELINES,
RESETTLEMENT AND REHABILITATION PLAN AND FOREST DIVERSION PROPOSAL ETC AS REQUIRED, IN THE STATE OF
JHARKHAND. TENTATIVE LENGTH -2.52KM
* SAMPLE CALCULATION
The net safe bearing capacity for the footing is to be seen in the last column of the above Table
Aand B. This value is checked for settlement as shown below.
2 2
m m t/m mm t/m below it are for a footing of depth, D=
2
The value of allowable bearing pressure from the above Table for s = 50 mm is = 24.1 t/m
2
The value of safe bearing capacity from shear criterion as found from Table A = 14.9 t/m
2
Hence the allowable bearing pressure for settlement, s= or < 50 mm will be = 14.9 t/m
8
RNOSC261223D
OM SAI CONSULTANTS
BANK OF INDIA COLONY, NEAR JAI SHREE GAS GODOWN,
SOUTH D/SS P.O. B.V. COLLEGE,RAJA BAZAR PATNA, BIHAR-800014
Report on Sub Soil Investigations for the
CONSULTANCY SERVICES FOR PREPARATION OF DETAILED PROJECT REPORT FOR CONSTRUCTION OF EXISTING ROAD/ GREEN
FIELD ALIGNMENT FOR 2 LANE 2 LANE WITH PAVED SHOULDER/ FOUR LANE CONFIGURATION ROAD FROM ASHIRVAD BANQUET
TO FIRING RANGE (BARIATU) INCLUDING REPLACEMENT OF CULVERTS AND BRIDGES, CONSTRUCTION OF NEW CULVERTS AND
BRIDGES, COMPLETE LAND ACQUISITION PLAN INCLUDING OWNERSHIP DETAILS ALL COMPLETE AS PER LATEST GUIDELINES,
RESETTLEMENT AND REHABILITATION PLAN AND FOREST DIVERSION PROPOSAL ETC AS REQUIRED, IN THE STATE OF
JHARKHAND. TENTATIVE LENGTH -2.52KM
Notes:
.
1. If a subsoil condition much different from those reported herein is met with during foundation
trenching or piling, suitable steps should be taken.
2. DMC and tremie method of pile concreting should be adopted as the water table is near the
ground surface.
3. If u/r piles are provided, care should be taken to ensure proper formation of bulbs.
4. Shallow foundations or pile caps should be isolated from the surrounding expansive
soil of type CI by layers of compacted local sand.
5. As per the provisions of the IS Code, an appropriate number of piles must be subjected to routine
load tests to check the veracity of the above recommended values of the safe capacities of piles.
Authorize Signatory
(Er. K.N. Parihar)
9
RNOSC261223D
OM SAI CONSULTANTS
BANK OF INDIA COLONY, NEAR JAI SHREE GAS GODOWN,
SOUTH D/SS P.O. B.V. COLLEGE,RAJA BAZAR PATNA, BIHAR-800014
Report on Sub Soil Investigations for the
CONSULTANCY SERVICES FOR PREPARATION OF DETAILED PROJECT REPORT FOR CONSTRUCTION OF EXISTING ROAD/ GREEN
FIELD ALIGNMENT FOR 2 LANE 2 LANE WITH PAVED SHOULDER/ FOUR LANE CONFIGURATION ROAD FROM ASHIRVAD BANQUET
TO FIRING RANGE (BARIATU) INCLUDING REPLACEMENT OF CULVERTS AND BRIDGES, CONSTRUCTION OF NEW CULVERTS AND
BRIDGES, COMPLETE LAND ACQUISITION PLAN INCLUDING OWNERSHIP DETAILS ALL COMPLETE AS PER LATEST GUIDELINES,
RESETTLEMENT AND REHABILITATION PLAN AND FOREST DIVERSION PROPOSAL ETC AS REQUIRED, IN THE STATE OF
JHARKHAND. TENTATIVE LENGTH -2.52KM
I.S.CLASSIFICATION
GW: Well graded gravels, gravel-sand mixture or no fines.
ML: Inorganic silt and very fine sands rock flour; silty or clayey fine sands or
clayey silts with non-to low plasticity.
CL: Inorganic clays, gravely clays, sandy clays, silty clays, lean clays of low plasticity.
MI: Inorganic silts, silty or clayey fine sands or clayey silts of medium plasticity.
CI: Inorganic clays, gravely clays, sandy clays, silty clays, lean clays of medium
plasticity.
10
RNOSC261223D
OM SAI CONSULTANTS
BANK OF INDIA COLONY, NEAR JAI SHREE GAS GODOWN,
SOUTH D/SS P.O. B.V. COLLEGE,RAJA BAZAR PATNA, BIHAR-800014
Report on Sub Soil Investigations for the
CONSULTANCY SERVICES FOR PREPARATION OF DETAILED PROJECT REPORT FOR CONSTRUCTION OF EXISTING ROAD/ GREEN
FIELD ALIGNMENT FOR 2 LANE 2 LANE WITH PAVED SHOULDER/ FOUR LANE CONFIGURATION ROAD FROM ASHIRVAD BANQUET
TO FIRING RANGE (BARIATU) INCLUDING REPLACEMENT OF CULVERTS AND BRIDGES, CONSTRUCTION OF NEW CULVERTS AND
BRIDGES, COMPLETE LAND ACQUISITION PLAN INCLUDING OWNERSHIP DETAILS ALL COMPLETE AS PER LATEST GUIDELINES,
RESETTLEMENT AND REHABILITATION PLAN AND FOREST DIVERSION PROPOSAL ETC AS REQUIRED, IN THE STATE OF
JHARKHAND. TENTATIVE LENGTH -2.52KM
ABBREVIATIONS
EGL Existing Ground Level
SPT Standard Penetration Test
BH Bore Hole
m Meter
mm Milli Meter
m3 Cubic Meter
HR Hard Rock
PP Passive Resistance
C Cohesion
RL Reduced Level
PI Plasticity Index
LL Liquid Limit
PL Plastic Limit
D Depth
Kg Kilograms
11
RNOSC261223D
OM SAI CONSULTANTS
BANK OF INDIA COLONY, NEAR JAI SHREE GAS GODOWN,
SOUTH D/SS P.O. B.V. COLLEGE,RAJA BAZAR PATNA, BIHAR-800014
Report on Sub Soil Investigations for the
CONSULTANCY SERVICES FOR PREPARATION OF DETAILED PROJECT REPORT FOR CONSTRUCTION OF EXISTING ROAD/ GREEN
FIELD ALIGNMENT FOR 2 LANE 2 LANE WITH PAVED SHOULDER/ FOUR LANE CONFIGURATION ROAD FROM ASHIRVAD BANQUET
TO FIRING RANGE (BARIATU) INCLUDING REPLACEMENT OF CULVERTS AND BRIDGES, CONSTRUCTION OF NEW CULVERTS AND
BRIDGES, COMPLETE LAND ACQUISITION PLAN INCLUDING OWNERSHIP DETAILS ALL COMPLETE AS PER LATEST GUIDELINES,
RESETTLEMENT AND REHABILITATION PLAN AND FOREST DIVERSION PROPOSAL ETC AS REQUIRED, IN THE STATE OF
JHARKHAND. TENTATIVE LENGTH -2.52KM
12
RNOSC261223D
OM SAI CONSULTANTS
BANK OF INDIA COLONY, NEAR JAI SHREE GAS GODOWN,
SOUTH D/SS P.O. B.V. COLLEGE,RAJA BAZAR PATNA, BIHAR-800014
Report on Sub Soil Investigations for the
CONSULTANCY SERVICES FOR PREPARATION OF DETAILED PROJECT REPORT FOR CONSTRUCTION OF EXISTING ROAD/ GREEN
FIELD ALIGNMENT FOR 2 LANE 2 LANE WITH PAVED SHOULDER/ FOUR LANE CONFIGURATION ROAD FROM ASHIRVAD BANQUET
TO FIRING RANGE (BARIATU) INCLUDING REPLACEMENT OF CULVERTS AND BRIDGES, CONSTRUCTION OF NEW CULVERTS AND
BRIDGES, COMPLETE LAND ACQUISITION PLAN INCLUDING OWNERSHIP DETAILS ALL COMPLETE AS PER LATEST GUIDELINES,
RESETTLEMENT AND REHABILITATION PLAN AND FOREST DIVERSION PROPOSAL ETC AS REQUIRED, IN THE STATE OF
JHARKHAND. TENTATIVE LENGTH -2.52KM
13
RNOSC261223D
OM SAI CONSULTANTS
BANK OF INDIA COLONY, NEAR JAI SHREE GAS GODOWN,
SOUTH D/SS P.O. B.V. COLLEGE,RAJA BAZAR PATNA, BIHAR-800014
CALCULATION OF CAPACITY OF PLANE PILE for C/O BRIDGE AT 300 M
Based on IS:2911 (Part I, Sec. 2) 1979, Appendix B, Clause 5.3.1.1,
using both cohesion (c), in t/m2 and angle of internal friction ( fo ).
WHEN Pile diameter, D ( m)= 1.20 Area of pile base, Ap (m2) = 1.13 & circ'mf'r'nce ( in m) of pile base, j = 3.14 x D3.768
=
Surface area of pile's contact with soil, A (m2) = j x t where t = thickness of soil layer in contact with pile.
In CLAY: Skin friction in clay, Qs =acA, End bearing, Qb= Ap cp Nc, In SAND: Skin friction, Qs = KPmidA tan d, where K= 1
where Reduction factor, a,depends on N :-- where Nc=9 and d = f. End bearing, Qb = Ap(0.5 Dg Ng + PtipNq),
N= <4 4 to 8 8 to 15 >15 where P = overburden press.at mid-layer or pile tip , as the case be,
a= 0.7 0.5 0.4 0.3 and the values of Nq and Ng are to be taken from the IS Code.
*Max'm permissible P[t/m2] = 15 to 20 X pile diameter (D) X gsub
2
Total Ultimate capacity of pile, Qu = Qs + Qb. If factor of safety = 2.5 = 18 to 24 X gsub t/m .
Safe capacity of pile, Qsf = Qu / 2.5 16.38 to 21.84 t/m2.
Depth of Soil type p= Ptip Permissible A= Qs' (for Qs = Qb Qu (t) Qsf (t) Pile
o
soil layer gsub c a f t gxt =Sp Ptip Pmid jxt 1 layer) SQs' Uplift Uplift
Length
Compressi Compre
without without
on ssion
(m) t/m3 t/m2 [m] t/m2 t/m2 t/m2 t/m2 m 2
t t t pile pile m
0.0 - 0.5 Clayey Silt weight
Not considered due to cut-off and very soft layers. weight
0.00 1.0 0.5 0.00 0.00 0.0 0.0 0.5
0.5 - 2.0 Clayey Silt 0.89 1.3 1.0 16.2 1.5 1.34 1.34 1.3 0.7 5.65 8.44 8.44 2.0
2.0-4.0 Silty Fine Sand 0.91 1.7 1.0 16.9 2.0 1.82 3.16 3.2 2.2 7.54 17.95 26.39 4.0
4.0-6.0 Silty Fine Sand 0.86 0.0 1.0 28.1 2.0 1.71 4.87 4.9 4.0 7.54 16.13 42.52 91.68 42.52 134.20 17.0 53.7 6.0
6.0-8.0 Silty Fine Sand 0.86 0.0 1.0 28.6 2.0 1.72 6.59 6.6 5.7 7.54 23.51 66.03 127.71 66.03 193.74 26.4 77.5 8.0
Silty Fine Sand With
08.0-10.0 soft weathered rock
0.86 0.0 1.0 29.3 2.0 1.72 8.31 8.3 7.4 7.54 31.47 97.49 171.42 97.49 268.92 39.0 107.6 10.0
10.0-12.0 soft weathered rock 0.88 0.0 1.0 36.6 2.0 1.76 10.07 10.1 9.2 7.54 51.37 148.86 500.76 148.86 649.63 59.5 259.9 12.0
Qb for f Qb for c
Depth,d gsub fo * Ng * Nq # Qb c # Qb
6.0 0.86 28.1 16.96 14.88 91.68 0.0 0.00
8.0 0.86 28.6 18.24 15.73 127.71 0.0 0.00
10.0 0.86 29.3 20.21 17.00 171.42 0.0 0.00
12.0 0.88 36.6 62.03 40.76 500.76 0.0 0.00
OM SAI CONSULTANTS
BANK OF INDIA COLONY, NEAR JAI SHREE GAS GODOWN,
SOUTH D/SS P.O. B.V. COLLEGE, RAJA BAZAR PATNA, BIHAR-800014
RNOSC261223D Appendix F1
Field TesT ObservaTiOns
&
labOraTOry TesT resulTs
(aPPendiX b)
Table 1 : FIELD TEST RESULT & OBSERVATIONS Table 1 : RESULT OF LAB TEST
Start Date : 24/12/2023 CONSULTANCY SERVICES FOR PREPARATION OF DETAILED PROJECT REPORT FOR CONSTRUCTION OF EXISTING ROAD/ GREEN FIELD ALIGNMENT FOR 2
LANE 2 LANE WITH PAVED SHOULDER/ FOUR LANE CONFIGURATION ROAD FROM ASHIRVAD BANQUET TO FIRING RANGE (BARIATU) INCLUDING
Bore Hole No:-01 Latitude:23.42035793° REPLACEMENT OF CULVERTS AND BRIDGES, CONSTRUCTION OF NEW CULVERTS AND BRIDGES, COMPLETE LAND ACQUISITION PLAN INCLUDING
longitude85.34944633° OWNERSHIP DETAILS ALL COMPLETE AS PER LATEST GUIDELINES, RESETTLEMENT AND REHABILITATION PLAN AND FOREST DIVERSION PROPOSAL ETC AS
REQUIRED, IN THE STATE OF JHARKHAND. TENTATIVE LENGTH -2.52KM
Termination Depth:-15. m Depth of Water Table :-3.4m BGL
Method of Drilling: Rotary Drilling Dia of Bore Hole: 150mm Nominal
PLS INDEX
Density (gm/cm³)
Plastic Limit (%)
Liquid Limit (%)
N- Value
Specific Gravity
Plasticity Index
IS
N/mm2
Type of Test
Notation of
Ø in Degree
Gravel (%)
Depth (m) Description of Strata Classificat
C Kg/cm²
Sand (%)
Clay (%)
Silt (%)
RQD %
TCR %
Soil Strata
ion
0.5
1.0
CL-ML
OM SAI CONSULTANTS
RNOSC261223D BANK OF INDIA COLONY, NEAR JAI SHREE GAS GODOWN, SOUTH D/SS P.O. B.V. COLLEGE,RAJA BAZAR PATNA, BIHAR-800014 Appendix- B
FIELD N-Value Graph
Bore Hole No:-01
0.0
0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 60 64 68 72 76 80 84 88 92 96 100
-1.5
-3.0
FIELD N- Depth in m below
Value Ground Level
-4.5
19 -3.0
-6.0
23 -4.5
29 -6.0 -7.5
38 -7.5
45 -9.0 -9.0
100 -10.5
>100 -15.0
-12.0
-13.5
-15.0
-16.5
-18.0
-19.5
OM SAI CONSULTANTS
RNOSC261223D BANK OF INDIA COLONY, NEAR JAI SHREE GAS GODOWN, SOUTH D/SS P.O. B.V. COLLEGE,RAJA BAZAR PATNA, BIHAR-800014 Appendix- B
Table 1 : FIELD TEST RESULT & OBSERVATIONS Table 2 : RESULT OF LAB TEST
Start Date :- 27/12/2023 CONSULTANCY SERVICES FOR PREPARATION OF DETAILED PROJECT REPORT FOR CONSTRUCTION OF EXISTING ROAD/ GREEN FIELD
ALIGNMENT FOR 2 LANE 2 LANE WITH PAVED SHOULDER/ FOUR LANE CONFIGURATION ROAD FROM ASHIRVAD BANQUET TO FIRING RANGE
Bore Hole No:-02 Latitude:23.420430° (BARIATU) INCLUDING REPLACEMENT OF CULVERTS AND BRIDGES, CONSTRUCTION OF NEW CULVERTS AND BRIDGES, COMPLETE LAND
ACQUISITION PLAN INCLUDING OWNERSHIP DETAILS ALL COMPLETE AS PER LATEST GUIDELINES, RESETTLEMENT AND REHABILITATION
longitude85.349077°
PLAN AND FOREST DIVERSION PROPOSAL ETC AS REQUIRED, IN THE STATE OF JHARKHAND. TENTATIVE LENGTH -2.52KM
Termination Depth:-15m Depth of Water Table :-3.7m BGL
(N/mm2)P/(D1.5D*½
Notation of Soil Strata
Particle Size Analysis Atterberg Limits In-Situ Triaxial /DS Test Rock sample test
UCS qc = 23*Is50
IS Classification
PLS INDEX
) IN N/mm2
N- Value
N/mm2
Compression Index
Plastic Limit
Type of Test
Content (%)
Depth (m)
Liquid Limit
Description of Strata
Dry Density
Ø in Degree
Gravel (%)
(gm/cm³)
C Kg/cm²
Plasticity
Sand (%)
(Cc )
Moisture
Clay (%)
Silt (%)
(g/cm³)
Density
Specific
Gravity
RQD %
TCR %
Index
(%)
(%)
0.5
1.0 Graeyish Clayey Silt
CL-ML
1.5 Mix With Sand 19.0 0.0 11.64 58.9067 29.4533 23.7 19.1 4.6 1.91 19.5 1.60 2.68 UU 0.16 16.8
2.0
3.0 25.0 0.0 74.8 16.8 8.4 1.84 19.8 1.54 2.62 UU 0.18 17.2
4.0
4.5 31.0 1.85 20.5 1.54 2.62 DS 0.0 28.4
5.0
SM
12.0
13.0
68.0 37.0 50.6 2.2
13.5
Hard Rock
14.0
78.0 55.0 71.3 3.1
15.0 1.96 0.47 2.71
NP = Non Plastic, DS = Direct Shear Test, UU = Unconsolidated Undrained Test
CLAY SAND ROCK
OM SAI CONSULTANTS
RNOSC261223D BANK OF INDIA COLONY, NEAR JAI SHREE GAS GODOWN, SOUTH D/SS P.O. B.V. COLLEGE,RAJA BAZAR PATNA, BIHAR-800014 Appendix- B
FIELD N -Value Graph
Bore Hole No:-02
0.0
0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 60 64 68 72 76 80 84 88 92 96 100 104 108
-1.5
FIELD
Value
N- Depth in m below
Ground Level
-3.0
25 -3.0
-4.5
31 -4.5
39 -6.0
42 -7.5
-6.0
100 -9.0
>100 -15.0
-9.0
-10.5
-12.0
-13.5
-15.0
OM SAI CONSULTANTS
RNOSC261223D BANK OF INDIA COLONY, NEAR JAI SHREE GAS GODOWN, SOUTH D/SS P.O. B.V. COLLEGE,RAJA BAZAR PATNA, BIHAR-800014 Appendix- B
Graph of Grain size analysis
(appendix- C)
Report on Sub Soil Investigation for the proposed C/O
CONSULTANCY SERVICES FOR PREPARATION OF DETAILED PROJECT REPORT FOR CONSTRUCTION OF EXISTING ROAD/ GREEN FIELD
ALIGNMENT FOR 2 LANE 2 LANE WITH PAVED SHOULDER/ FOUR LANE CONFIGURATION ROAD FROM ASHIRVAD BANQUET TO FIRING RANGE
(BARIATU) INCLUDING REPLACEMENT OF CULVERTS AND BRIDGES, CONSTRUCTION OF NEW CULVERTS AND BRIDGES, COMPLETE LAND
ACQUISITION PLAN INCLUDING OWNERSHIP DETAILS ALL COMPLETE AS PER LATEST GUIDELINES, RESETTLEMENT AND REHABILITATION
PLAN AND FOREST DIVERSION PROPOSAL ETC AS REQUIRED, IN THE STATE OF JHARKHAND. TENTATIVE LENGTH -2.52KM
Table 2 [part B]: Grain Size Analysis Results [ for Bore hole No./ Depth in m shown thus: 1/1.5 ]
100
90
80
70
60
50
40
30
20
10
0
0.001 0.01 0.1 1 10
OM SAI CONSULTANTS
BANK OF INDIA COLONY, NEAR JAI SHREE GAS GODOWN,
SOUTH D/SS P.O. B.V. COLLEGE,RAJA BAZAR PATNA, BIHAR-800014
RNOSC261223D Appendix - C1
Report on Sub Soil Investigation for the proposed C/O
CONSULTANCY SERVICES FOR PREPARATION OF DETAILED PROJECT REPORT FOR CONSTRUCTION OF EXISTING ROAD/ GREEN FIELD
ALIGNMENT FOR 2 LANE 2 LANE WITH PAVED SHOULDER/ FOUR LANE CONFIGURATION ROAD FROM ASHIRVAD BANQUET TO FIRING RANGE
(BARIATU) INCLUDING REPLACEMENT OF CULVERTS AND BRIDGES, CONSTRUCTION OF NEW CULVERTS AND BRIDGES, COMPLETE LAND
ACQUISITION PLAN INCLUDING OWNERSHIP DETAILS ALL COMPLETE AS PER LATEST GUIDELINES, RESETTLEMENT AND REHABILITATION
PLAN AND FOREST DIVERSION PROPOSAL ETC AS REQUIRED, IN THE STATE OF JHARKHAND. TENTATIVE LENGTH -2.52KM
Table 2 [part B]: Grain Size Analysis Results [ for Bore hole No./ Depth in m shown thus: 1/1.5 ]
100
90
80
70
60
50
40
30
20
10
0
0.001 0.01 0.1 1 10
OM SAI CONSULTANTS
BANK OF INDIA COLONY, NEAR JAI SHREE GAS GODOWN,
SOUTH D/SS P.O. B.V. COLLEGE,RAJA BAZAR PATNA, BIHAR-800014
RNOSC261223D Appendix - C2
TRIAXIAL / DIRECT SHEAR TEST PLOTS
BORE HOLE NO:- 01
0.0 1.0 2.0 3.0 4.0 0.0 1.0 2.0 3.0 4.0 0.0 1.0 2.0 3.0 4.0
Normal stress kg/cm² Normal stress kg/cm² Normal stress kg/cm²
Depth - 10.5
m
Cohesion - 0.00Kg/cm²
Angle of Internal Friction - 36.6°
Depth - 7.5 m
3.0
Depth - 9.0 m 3.0
3.0 Cohesion - 0.00Kg/cm²
Cohesion - 0.00Kg/cm²
Angle of Internal Friction - 28.6° Angle of Internal Friction - 29.3°
2.0 2.0
2.0
1.0 1.0
1.0
0.0 1.0 2.0 3.0 4.0 0.0 1.0 2.0 3.0 4.0
0.0 1.0 2.0 3.0 4.0
Normal stress kg/cm²
Normal stress kg/cm² Normal stress kg/cm²
Depth - 3.0m
Depth - 1.5m
3.0
Cohesion - 0.18Kg/cm²
3.0
Cohesion - 0.16Kg/cm² Angle of Internal Friction - 17.2°
1.0
1.0
Depth - 9.0 m
Cohesion - 0.00Kg/cm²
Depth - 7.5 m Angle of Internal Friction - 37.1°
Depth - 4.5 m 3.0 3.0
3.0 Cohesion - 0.00Kg/cm²
Cohesion - 0.00Kg/cm²
Angle of Internal Friction - 29.2°
2.0 2.0
2.0
1.0 1.0
1.0
0.0 1.0 2.0 3.0 4.0 0.0 1.0 2.0 3.0 4.0
0.0 1.0 2.0 3.0 4.0 Normal stress kg/cm²
Normal stress kg/cm²
Normal stress kg/cm²