Professional Documents
Culture Documents
G+6 mixed use abera lisanu building-Model2
G+6 mixed use abera lisanu building-Model2
G+6 mixed use abera lisanu building-Model2
3
REVISION
M
AR
CH ENGINEERING CONSULTANCY
ITE PLC.
1 2 3 4 AR SELAM ARCHITECTS AND
CH ENGINEERING CONSULTANCY
LA CT
S ITE
M
PLC.
SE CT
LA
LOCATION; S
&
SE
HAWASSA SIDAMA LOCATION;
1905
ETHIOPIA
Tel: & HAWASSA SIDAMA
ETHIOPIA
550 500 550 0462127346, Tel:
20 99 590 15 456 20 157 20 153 15 345 15 EN 1905
GIN EER ING +251-916067138 0462127346,
20
20
20
20
550 500 550
Balcony +19.50Balcony 724 460 720
EN
Balcony +251-961047689 GINEER ING +251-916067138
50
TOILET
15
15
20
126
126
100
(Ceramic Tile f/f)
108
(Ceramic Tile f/f) (Ceramic Tile f/f)
A= 2.50 sq.m. (Ceramic Tile f/f) A= 2.20 sq.m. A= 5 sq.m. E-Mail Selamconsultingplc@yahoo.co m
+251-961047689
+19.50 A= 2.10 sq.m. +19.50
A
+19.50 E-Mail Selamconsultingplc@yahoo.co
115
m
115
235
236
236
15
15
40
40
40
70 TOILET 160
A
20 99 15 575 15 456 20 86 70 20 82 70 15 15 100
Bed Room In Case of any confusion in the dimensions 20 669 15 500 15 670 15
135
50
15
(Ceramic Tile f/f)
405
A= 2.10 sq.m.
In Case of any confusion in the dimensions
152
155
155
(Ceramic Tile f/f) +19.50
53
Beam Size, Slab Thickness, Lintel size ETC, of structural elements such as Column size,
15
15
20 50 104 70 15 A= 20.70 sq.m. 450 15 160 28 28 28 28 28 156 20 157 20 153 15 230 15 30 70 15
+19.50 The Measurements Given In Structural Beam Size, Slab Thickness, Lintel size ETC,
273
70
+19.50
28 28 28 28 28 28
28 28 28 28 28
Drawings Has To Be Followed: The Measurements Given In Structural
155
185
TOILET
Drawings Has To Be Followed:
158
509
(Ceramic Tile f/f)
85
494
+19.50
460
500
500
A= 2.75 sq.m.
453
Bed Room Confidentiality Issues:
15
15
15
382
357
500
500
500
589
Living Area It's a Production Of Confidentiality Issues:
70
(Ceramic Tile f/f)
A=28 m²
+19.50 (Ceramic Tile f/f)
A= 11.25 sq.m. SELAM ARCHITECTURAL AND ENGINEERING It's a Production Of
188
20 154 15 420 15 80 20 157 147 152 20 329 15 345 15
CONSULTANCY PLC. This Company Owns The
170
210
210
TOILET A= 27.30 sq.m. SELAM ARCHITECTURAL AND ENGINEERING
(Ceramic Tile f/f)
Bed Room +19.50
copyright To this Drawing, Which is Strictly CONSULTANCY PLC. This Company Owns The
155
A= 2.75 sq.m.
(Ceramic Tile f/f) Prohibited To Be Copied, Reproduced or copyright To this Drawing, Which is Strictly
B
403
A= 18.70 sq.m. Disclosed to A Third Party Without The Written
40
40
40
20
24 40
20
Prohibited To Be Copied, Reproduced or
1200
15
15
20 99 70 480 70 430 70 80 210 15 80 95 70 100 15
Permission.
+19.50
B Disclosed to A Third Party Without The Written
77
83
15
155
Circulation corridor Permission.
135
135
+19.50
125
101
(Ceramic Tile f/f)
Project Type
178
178
Balcony A= 10.70 sq.m.
101
Project Type
(Ceramic Tile f/f)
15
15
15
15
15
A= 2.70 sq.m. +19.50
720 15 310 855
Balcony G+6 MIXED USE
80
15
15
15
15
91
Balcony
(Ceramic Tile f/f)
A= 3.70 sq.m.
227
101
213
(Ceramic Tile f/f)
BUILDING
A= 2.70 sq.m. +19.50
Bed Room Bed Room
543
580
380
580
172
172
1810
+19.50
133
Circulation corridor
1795
(Ceramic Tile f/f) (Ceramic Tile f/f) +19.50 (Ceramic Tile f/f)
Project Status
583
583
71
563
2030
2030
2030
A= 31.90 sq.m.
415
A= 19.20 sq.m. A= 15.25 sq.m.
Project Status
430
15
15
15
373
TOILET50 15 New Modification As-Built
324
2030
2030
20 50 104 15 518 15 473 20 523 15 88
Living Area
120
(Ceramic Tile f/f)
110
TOILET
A= 2.50 sq.m. New Modification As-Built
+19.50
195
(Ceramic Tile f/f)
187
185
188
(Ceramic Tile f/f)
A= 2.75 sq.m. A= 12.50 sq.m. +19.50
80
70
70
+19.50
No Revisions Date Signature
C
35
40
40
15
40
15
No Revisions Date Signature
15
15
15
C
20 99 70 480 70 205 15 80 130 70 480 70 100 15
15
155
+19.50
99
Bed Room 2
197
15
449 15 295
OWNER
273
288
(Ceramic Tile f/f)
70
293 15 70 170 15 360 15 439 15 80 396 15
+19.50 +19.50
A= 12.90 sq.m.
OWNER
+19.50
593
Living Room
580
540
580
578
570
570
585
+19.50
Living Room
80
583
(Ceramic Tile f/f)
581
581
426
A= 22.80 sq.m. Bed Room 2 Bed Room 1 +19.50
355
(Ceramic Tile f/f)
Drawing Type
371
(Ceramic Tile f/f) (Ceramic Tile f/f)
A= 27.60 sq.m.
A= 16.05 sq.m. Bed Room 1 Drawing Type
305
A= 13.40 sq.m.
777
657
(Ceramic Tile f/f)
ARCHITECTURAL DRAWING
210
A= 12.50 sq.m.
ARCHITECTURAL DRAWING
D
40
40
40
Date
15
15
15
D
2019 80 110 15 70 80 15 160 15 80 115 15 80 70 15 210 70 80 81 15 80 70 15 70 116 23 80 35 1719 15 135 15
78
+19.50
Date
100
62
+19.50
103
+19.50 +19.50
78
+19.50
20
20
20
20
Balcony
Balcony TOILET CITY-----Hawassa MAY. 2024
144
TOILET
15
15
(Ceramic Tile f/f)
TOILET
182
212
182
182
183
(Ceramic Tile f/f) (Ceramic Tile f/f) A= 6.50 sq.m.
+19.50 Balcony CITY-----Hawassa MAY. 2024
Balcony (Ceramic Tile f/f) A= 4 sq.m.
61
(Ceramic Tile f/f)
50
SUBCITY---Addiss Ketema
50
A= 2.75 sq.m.
137
137
137
209 15 A= 2.75150
sq.m. 15 160 15 195 15 150 15 441 15 150 15 186 15(Ceramic
108
105
A= 2.75 sq.m.
110
Tile f/f)
(Ceramic Tile f/f)
+19.50
197
54 5
A= 4.30 sq.m.
A= 3.80 sq.m.
KEBELE---- Filadelfiya A=37.30 m² SUBCITY---Addiss Ketema
63
59
15
15
15
15
15
40 20
20
409 370 416 385 324 KEBELE---- Filadelfiya
60
550 500 550
20
1905
CHECKE BY
105
Signature 20 209 180 335 30 331 30 265 180 309 15
20
1905
M
AR SELAM ARCHITECTS AND CT PLC.
LA
WATER TANK
CH ENGINEERING CONSULTANCY LEVEL
S
ITE
SE
M
CT PLC. +24.70 +24.50 LOCATION;
&
LA
S +24.00 HAWASSA SIDAMA
SE
WATER TANK
LOCATION; +23.70 +23.70 +23.70 +23.70 ETHIOPIA
LEVEL Tel:
+24.70
Plastered and Painted
+24.85
+24.50
&HAWASSA SIDAMA ROOF CEILING
LEVEL
Plastered and Plastered and
Painted
Plastered and
Painted
Plastered and
Painted 0462127346,
Tel: ETHIOPIA EN
Painted
4 mm Clear Glass
With
+11.90
HCB Wall
4 mm Clear Glass
Plastered and
Painted
HCB Wall
+11.90
4 mm Clear Glass
BUILDING
With
HCB Wall Steel Framing
With Plastered and
BUILDING
Steel Framing Steel Framing With
Plastered and Plastered and Painted
Plastered and
Painted
+11.90
Painted
HCB+11.90
Wall
Painted
+11.90
HCB Wall
+12.25
4 mm Clear Glass
+10.90 HCB Wall +10.90 +10.90
Painted
HCB Wall
Steel Framing
+10.90 Project Status
HCB Wall With+11.75
THIRD
4 mm Clear Glass 4 mm Clear Glass 4 mm Clear Glass Steel Framing +10.35 +10.35 +10.35 +10.35
New Modification As-Built
With
Steel Framing
Plastered and Painted
With
Steel Framing
With
Steel Framing Plastered and
Painted Plastered and Painted
Plastered and
Painted
Project Status FLOOR LEVEL
+ 9.90 Plastered and Painted
+9.80 +9.80
Plastered and Painted Plastered and Painted
+9.80
Plastered and Painted
+9.80
+10.90 HCB Wall +10.90 +10.90 HCB Wall HCB Wall
+10.90 HCB Wall HCB Wall HCB Wall HCB Wall
HCB Wall
New Modification As-Built
THIRD +10.35 +10.35 +10.35 +10.35
+8.70 +8.70
FLOOR LEVEL 4 mm Clear Glass
With
4 mm Clear Glass 4 mm Clear Glass
With
4 mm Clear Glass 4 mm Clear Glass 4 mm Clear Glass
Plastered and Painted
+ 9.90 +9.80 +9.80 +9.80 +9.80
HCB Wall
Steel Framing
curtain wall
4 mm Clear Glass
With
With
Steel Framing
curtain wall
Steel Framing
curtain wall
With
4 mm Clear Glass Steel Framing
With curtain wall
With
Steel Framing
curtain wall
With
Steel Framing
curtain wall
No Revisions Date Signature
Steel Framing Steel Framing
+9.20 +9.20 +9.20 +9.20
+7.70 +7.70 +7.70 +7.70
4 mm Clear Glass
+8.70
With
4 mm Clear Glass
With With
4 mm Clear Glass
4 mm Clear Glass
With
4 mm Clear Glass
+8.70
With
4 mm Clear Glass
+8.70
With
4 mm Clear Glass
With
4 mm Clear Glass
With
4 mm Clear Glass
+8.70
With
No Revisions Date Signature
Steel Framing Steel Framing Steel Framing Steel Framing Steel Framing Steel Framing Steel Framing Steel Framing Steel Framing SECOND +7.15 +7.15 +7.15 +7.15
FLOOR LEVEL +6.90 +6.90
Plastered and Painted Plastered and Painted Plastered and Painted
+ 6.70 +6.60 +6.60 +6.60 +6.60
FLOOR LEVEL
HCB+3.95
Wall
Plastered and Painted
+3.95
+2.00
With
Steel Framing
curtain wall
4 mm Clear Glass
With
+2.00
4 mm Clear Glass
With
ARCHITECTURAL DRAWING
+ 3.50 HCB Wall +3.40 4 mm Clear Glass
With
4 mm Clear Glass
Steel Framing
curtain wall
Steel Framing
curtain wall
With 4 mm Clear Glass
4 mm Clear Glass
+2.00
With
4 mm Clear Glass
With
4 mm Clear Glass
With
4 mm Clear Glass
With +2.00
+2.50
4 mm Clear Glass
With
+2.50
4 mm Clear Glass
+2.00
With
4 mm Clear Glass
With
4 mm Clear Glass
With
+2.50
4 mm Clear Glass
+2.00
With
+1.00
Date
Steel Framing Steel Framing Steel Framing Steel Framing Steel Framing Steel Framing Steel Framing Steel Framing Steel Framing GROUND +0.40
CITY-----Hawassa MAY. 2024
Plastered and Painted
HCB Wall
Date FLOOR LEVEL
+ 0.00
Plastered and Painted
HCB Wall
Plastered and Painted
HCB Wall
SUBCITY---Addiss Ketema
Plastered and Painted
GROUND
Plastered and Painted
HCB Wall HCB Wall
CITY-----Hawassa MAY. 2024 -0.80
-0.45 -0.45
-0.80
KEBELE---- Filadelfiya
FLOOR LEVEL SUBCITY---Addiss Ketema
+ 0.00
-0.80 -0.80
KEBELE---- Filadelfiya
FRONT ELEVATION CHECKE BY Signature
BENIAM ALEMAYEHU PPAR/2931
CHECKE BY Signature SCALE.1:100
BENIAM ALEMAYEHU PPAR/2931
Des.Team
LEFT SIDE ELEVATION Des.Team ZEKARIAS TESFAYE.....
- Use plastic door stoppers fixed to the floor at proper location approved by the engineer. the Architect prior to fixing.